Intelligent Lightning Safety Monitoring Methods and Systems for Water Conservancy Projects
By constructing a lightning risk matrix for water conservancy projects and combining lightning probability and project vulnerability assessment, the problem of inaccurate lightning monitoring in existing technologies has been solved, realizing intelligent lightning safety monitoring of water conservancy projects, improving the accuracy of risk assessment and the scientific nature of management, and reducing operating costs and safety hazards.
Patent Information
- Application Number
- CN202611310785.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-27
- Publication Date
- 2026-11-17
AI Technical Summary
Existing lightning monitoring methods cannot accurately reflect the probability of lightning occurrence in local areas of water conservancy projects, nor can they comprehensively consider the structural characteristics and facility conditions of the projects. This leads to inaccurate risk assessments, a lack of scientific decision-making basis, and difficulty in meeting the high-precision and intelligent requirements of modern water conservancy projects for lightning safety monitoring.
By acquiring the probability of lightning strikes and vulnerability assessment indicators of water conservancy project areas, a 3×3 two-dimensional risk matrix is constructed. Combining the probability level of lightning occurrence and the vulnerability level of the project, risk assessment and management decisions are made, including a lightning monitoring module, a water conservancy project monitoring module, a risk assessment module, and an early warning decision module.
It enables accurate assessment and dynamic management of lightning risks in water conservancy projects, provides targeted risk management decisions, reduces facility damage caused by lightning strikes, lowers operating costs, and ensures the stable operation of projects and the normal life order of surrounding areas.
Smart Images

Figure CN123117792A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of lightning monitoring technology for water conservancy projects, and more specifically, to an intelligent lightning safety monitoring method and system for water conservancy projects. Background Technology
[0002] In modern water conservancy engineering, lightning strikes have become a significant factor affecting the safe and stable operation of these projects. With the continuous expansion of water conservancy projects and their increasing level of automation, these projects contain a large number of electrical equipment, complex pipeline systems, and critical dam structures. A lightning strike on these facilities can lead to serious safety accidents and economic losses. From the perspective of electrical equipment, various electrical devices in pumping stations, such as transformers and switchgear, are extremely sensitive to lightning overvoltages. Statistics show that in lightning-prone areas, lightning strikes account for 15%-20% of all pumping station electrical equipment failures annually. Lightning strikes can break down the insulation of electrical equipment, causing short circuits and affecting the normal operation of pumping stations, leading to water supply or drainage interruptions and causing significant inconvenience to residents and industrial production in surrounding areas. For pipeline systems, lightning strikes can trigger instantaneous high voltage and strong current, accelerating the corrosion process of pipeline materials and reducing their service life. This is especially true for long-distance water pipelines traversing areas with varying geological conditions, which already face complex corrosive environments; the impact of lightning exacerbates this problem. Related studies have shown that pipelines struck by lightning experience a 20%-30% higher corrosion rate compared to normal conditions. This means that pipelines require more frequent maintenance and replacement, increasing operating costs and potentially leading to leaks, water waste, and environmental pollution. Meanwhile, dams, as the core structure of water conservancy projects, bear enormous water pressure and other loads. Although dam structures are generally robust, the impact of lightning can cause stress concentration in localized areas, which, over time, can pose a potential threat to the structural stability of the dam. This is especially true for older dams that have been in operation for many years, where structural strength has already decreased, making the safety hazards even more pronounced under lightning strikes. If a dam experiences a safety issue, it will pose a serious threat to the lives and property of people downstream.
[0003] Currently, traditional lightning monitoring methods mainly rely on regional monitoring data from meteorological departments. This data has low spatial resolution and cannot accurately reflect the probability of lightning occurrence in the local area where waterworks projects are located. Furthermore, most existing monitoring methods fail to comprehensively consider the structural characteristics and facility conditions of the waterworks itself, making it difficult to accurately assess the risks to waterworks projects under lightning conditions. For example, some monitoring systems can only monitor the time and approximate location of lightning strikes, but cannot combine this with the specific conditions of facilities such as dams, pumping stations, and pipelines within the waterworks to determine the potential impact. In terms of risk management, the lack of scientific and effective decision-making basis often leads to only some general preventative measures, which are difficult to implement effectively and cannot meet the high-precision and intelligent lightning safety monitoring requirements of modern waterworks projects.
[0004] There are currently no effective solutions to the problems in the relevant technologies. Summary of the Invention
[0005] In response to the problems in related technologies, this invention proposes an intelligent lightning safety monitoring method and system for water conservancy projects to overcome the aforementioned technical problems existing in the existing related technologies.
[0006] The technical solution of this invention is implemented as follows: One aspect of the present invention: A smart lightning safety monitoring method for water conservancy projects includes the following steps: Pre-determine the probability of lightning strikes in the area where the waterworks project is located. And based on the probability of being struck by lightning Obtain the probability level of lightning occurrence; Vulnerability assessment indicators for water conservancy projects are obtained, and the vulnerability level of water conservancy projects is obtained based on the vulnerability assessment indicators. The vulnerability assessment indicators for water conservancy projects include at least: dam structural strength index value, pump station electrical equipment strength index value, and pipeline material corrosion intensity index value. A two-dimensional matrix consisting of 3×3 cells is constructed as a risk matrix. The risk level of each cell in the risk matrix is labeled. The risk levels of water conservancy projects under different combinations of lightning occurrence probability levels and water conservancy project vulnerability levels are filled into the corresponding cells to fill the risk matrix. The rows of the matrix represent the lightning occurrence probability level, and the columns of the matrix represent the water conservancy project vulnerability level. Based on the risk matrix, the current risk status of the water project is obtained, and risk management decisions are made based on the risk status.
[0007] Among them, the probability of lightning strikes in the area where the waterworks project is located is obtained. This includes the following steps: Calculate lightning density , represented as: ; in, This refers to the number of days with thunderstorms. Calculate the probability of lightning strikes in the area where the waterworks project is located. , represented as: ; in, For the equivalent interception area of water conservancy projects, This is the terrain correction factor.
[0008] Among them, the probability of being struck by lightning Obtain the probability level of lightning occurrence, including: A preset lightning threshold is set, and the calculated probability of being struck by lightning is used as the basis for this. To obtain the probability level of lightning occurrence by comparing it with a lightning threshold, the following steps are included: like ≤1 indicates a low probability; If 1 < ≤5 indicates a medium probability; like >5 indicates a high probability.
[0009] Obtaining the vulnerability level of water conservancy projects includes the following steps: The risk value F of a waterworks project is obtained as follows: ; in, For the structural strength index value of the dam, For the strength index values of the electrical equipment of the pumping station and This refers to the corrosion strength index value of the pipe material. These are the weights; The risk value F of the waterworks project is compared with a preset risk threshold, including the following steps: If F < 0.3, it indicates that the current vulnerability level of the water conservancy project is low. If 0.3 ≤ F < 0.7, it indicates that the current vulnerability level of the water conservancy project is medium vulnerability; If 0.7 ≤ F, it indicates that the current vulnerability level of the waterworks project is high vulnerability.
[0010] Among them, obtaining the quantitative value of the dam structural strength index , represented as: ; in, This refers to the standard value of the compressive strength of dam materials. K1 is the standard value of tensile strength of dam materials, K2 is the structural correction coefficient, K3 is the influence coefficient of service life, and K4 is the influence coefficient of environmental erosion.
[0011] Among them, obtaining the strength index values of the electrical equipment of the pumping station This includes the following steps: The degree of equipment aging, LH, is calculated and expressed as: ; Where S represents the years of use and ZS represents the design service life; Calculate the withstand voltage capability NY, expressed as ; Where V represents the rated withstand voltage value, and ZV represents the maximum lightning overvoltage value that may be encountered during actual operation; Calculate the strength index value of the electrical equipment of the pumping station , represented as: ; in, HJ This is the impact value of the operating environment. , and These are the weights.
[0012] Among them, the corrosion intensity index value of the pipeline material is obtained. This includes the following steps: The wall thickness variation ΔT is calculated and expressed as: ΔT = Tc - Td; Where Td is the current wall thickness and Tc is the initial wall thickness; Calculate the corrosion intensity index of pipeline material Represented as: ; in, The coefficient representing the influence of material properties. The corrosion rate is represented by the value of .
[0013] The risk management decision-making based on the risk situation includes the following steps: If the current risk matrix indicates a low risk level, it means that the current waterworks project is relatively safe under the current lightning conditions, and routine monitoring and maintenance strategies should be implemented. If the current risk matrix indicates a medium risk level, it means that the current water project has a lightning safety risk. Therefore, we will increase the frequency of monitoring the stress concentration areas of the dam and the important electrical equipment of the pumping station to keep track of the equipment's operating status in real time. We will also reinforce or repair weak links in the pipelines to improve their corrosion resistance and lightning protection capabilities. If the current risk matrix indicates a high risk level, it means that the water conservancy project is facing a serious threat of lightning, and emergency measures should be taken. These measures should include at least: emergency repair or reinforcement of stress concentration areas of the dam, emergency replacement of severely corroded pipelines, and emergency upgrading of aging pump station electrical equipment.
[0014] Another aspect of the present invention: A smart lightning safety monitoring system for water conservancy projects, comprising: The lightning monitoring module is used to calculate the probability of lightning strikes in the area where the water conservancy project is located, and to obtain the probability level of lightning occurrence based on the probability of lightning strikes. The water conservancy project monitoring module is used to obtain vulnerability assessment indicators of water conservancy projects and obtain the vulnerability level of water conservancy projects based on the vulnerability assessment indicators. The vulnerability assessment indicators of water conservancy projects include at least: dam structural strength index value, pump station electrical equipment strength index value, and pipeline material corrosion intensity index value. The risk assessment module is used to construct a two-dimensional matrix consisting of 3×3 cells as a risk matrix, to label the risk level of each cell in the risk matrix, and to fill the corresponding cells with the risk levels of water conservancy projects under different combinations of lightning occurrence probability levels and water conservancy project vulnerability levels, thereby filling the risk matrix. In this matrix, the rows represent the lightning occurrence probability level, and the columns represent the water conservancy project vulnerability level. The early warning decision module is used to obtain the current risk status of water projects based on the risk matrix and to make risk management decisions based on the risk status.
[0015] The beneficial effects of this invention are: 1. This invention comprehensively considers the probability of lightning strikes in the area where water conservancy projects are located and the project's own vulnerability assessment indicators, including the structural strength of the dam, the strength of the electrical equipment in the pumping station, and the corrosion resistance of the pipeline materials. It can accurately construct a risk matrix to determine the risk level of water conservancy projects facing lightning threats under different circumstances. Compared with traditional lightning monitoring methods, this method is no longer limited to a single factor or fuzzy judgment, greatly improving the accuracy and reliability of risk assessment. It enables managers to clearly understand the actual risk status of the project, allowing for the early detection and handling of potential safety hazards, and reducing damage to critical facilities such as dams, pumping station electrical equipment, and pipelines caused by lightning. This helps ensure the stable operation of water conservancy projects, ensures normal water supply and drainage functions, avoids problems such as water outages and drainage problems caused by lightning strikes, and maintains the normal living order of residents and the smooth operation of industrial production in surrounding areas, thus having significant social and economic implications.
[0016] 2. This invention enables dynamic tracking and management. Throughout the monitoring process, it continuously collects information such as meteorological data and equipment operation data, dynamically tracking the probability of lightning strikes and the vulnerability of water conservancy projects. This allows for the timely detection of changes in potential risks. For example, when meteorological conditions change abnormally or engineering facilities become aging or damaged, the risk assessment results can be quickly adjusted, and corresponding risk management decisions can be made accordingly. This achieves dynamic and intelligent management of lightning risks, effectively preventing safety accidents caused by the failure to detect changes in risks in a timely manner.
[0017] 3. Based on the risk levels presented by the risk matrix, this invention provides highly targeted risk management decision-making solutions. Under low-risk conditions, conventional monitoring and maintenance strategies are adopted, ensuring project safety while rationally allocating resources. Under medium-risk conditions, monitoring of key components is strengthened, preventive measures are formulated, and training is organized to effectively reduce risks. Under high-risk conditions, emergency repairs are carried out immediately, equipment is shut down, and emergency plans are activated to maximize the safety of personnel and equipment and reduce economic losses. This risk-level-based decision-making mechanism provides managers with scientific and clear action guidelines, improving the efficiency and effectiveness of responding to lightning disasters.
[0018] 4. The precise risk assessment and scientific management decisions of this invention avoid unnecessary over-maintenance and blind investment. When the risk is low, there is no need to invest excessive resources in additional protection; when the risk increases, targeted repairs and reinforcements are carried out, improving resource utilization efficiency. At the same time, it reduces equipment damage and engineering failures caused by lightning disasters, lowers maintenance costs and equipment replacement expenses, and in the long run, effectively reduces the overall operating cost of water conservancy projects. Attached Figure Description
[0019] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0020] Figure 1 This is a flowchart illustrating an intelligent lightning safety monitoring method for water conservancy projects according to an embodiment of the present invention. Figure 2 This is a schematic diagram of an intelligent lightning safety monitoring system for water conservancy projects according to an embodiment of the present invention.
[0021] In the picture: 1. Lightning monitoring module; 2. Water conservancy project monitoring module; 3. Risk assessment module; 4. Early warning decision-making module. Detailed Implementation
[0022] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention are within the scope of protection of the present invention.
[0023] According to an embodiment of the present invention, an intelligent lightning safety monitoring method for water conservancy projects is provided.
[0024] like Figure 1 As shown, the intelligent lightning safety monitoring method for water conservancy projects according to an embodiment of the present invention includes the following steps: Step S1: Pre-obtain the probability of lightning strikes in the area where the waterworks project is located. And based on the probability of being struck by lightning Obtain the probability level of lightning occurrence; Among them, the probability of lightning strikes in the area where the waterworks project is located is obtained. This includes the following steps: Obtain the average annual number of thunderstorm days for the region from the local meteorological department in advance; this is the number of days in a year when thunderstorms occur, expressed as the thunderstorm days. Calculate lightning density , represented as: ; When this technical solution is applied, the lightning density... Data can also be obtained through satellite monitoring or lightning location systems, in units of (times / square kilometer / year).
[0025] Calculate the probability of lightning strikes in the area where the waterworks project is located. , represented as: ; in, The equivalent interception area (square meters) for water conservancy projects. This is a terrain correction factor. Mountainous areas and bodies of water may increase the probability of lightning. For details, please refer to the IEC 62305 standard. The value is 1.5. 2. Plains The value is 1.
[0026] Among them, according to the probability of being struck by lightning To obtain the probability level of lightning occurrence, the following steps are involved: A preset lightning threshold is set, and the calculated probability of lightning strike is used. They are divided into different levels, as follows: like ≤1 indicates a low probability; If 1 < ≤5 indicates a medium probability; like >5 indicates a high probability.
[0027] Specifically, in application, for example, in a waterworks project, its , , (Near water) Next / year, i.e. ≤1 indicates a low probability. It should also be noted that the specific lightning threshold can be adjusted based on historical lightning activity data and actual engineering requirements in the local area.
[0028] Step S2: Obtain the vulnerability assessment indicators of the water conservancy project, and obtain the vulnerability level of the water conservancy project based on the vulnerability assessment indicators. The vulnerability assessment indicators of the water conservancy project include at least: the structural strength index value of the dam, the strength index value of the electrical equipment of the pumping station, and the corrosion intensity index value of the pipeline material. Obtaining the vulnerability level of water conservancy projects includes the following steps: The risk value F of a waterworks project is obtained as follows: ; in, For the structural strength index value of the dam, For the strength index values of the electrical equipment of the pumping station and This refers to the corrosion strength index value of the pipe material. These are the weights; The risk value F of the waterworks project is compared with a preset risk threshold, including the following steps: If F < 0.3, it indicates that the current vulnerability level of the water conservancy project is low. If 0.3 ≤ F < 0.7, it indicates that the current vulnerability level of the water conservancy project is medium vulnerability; If 0.7 ≤ F, it indicates that the current vulnerability level of the waterworks project is high vulnerability.
[0029] Specifically, in application, the weight of dam structural strength indicators... The weight of the strength index of the electrical equipment in the pumping station is set at 0.4. The value is 0.3, which is the weight of the corrosion intensity index of the pipeline material. The value is 0.3.
[0030] Among them, obtaining the structural strength index value of the dam , represented as: ; in, The standard value of the compressive strength (MPa) of the dam material can be obtained by taking core samples on site and conducting compressive tests, or by referring to design documents and historical test data. K1 is the standard value of the tensile strength (MPa) of the dam material, determined through splitting tensile test or direct tensile test. K2 is the structural correction factor; different dam structures, such as gravity dams, arch dams, and earth-rock dams, have different mechanical properties and stability. In practical applications, a value of 0.9-1.1 can be used for gravity dams, 1.1-1.3 for arch dams, and 0.8-1.0 for earth-rock dams. K3 is the service life influence factor; the structural performance of the dam gradually deteriorates with the increase of its service life. It can be determined based on the actual operating time T (years). The year is represented as: If T > 50 years, then it is expressed as: K3 is the environmental erosion impact coefficient. In practical applications, the erosion effect of environmental factors such as water quality and climate on the dam is considered. In areas with good water quality and mild climate, the value is taken as 0.95-1.0; if it is in an area with highly corrosive water quality or severe climate such as strong winds and heavy rainfall, the value is taken as 0.7-0.9.
[0031] Among them, obtaining the strength index values of the electrical equipment of the pumping station This includes the following steps: The degree of equipment aging, LH, is calculated and expressed as: ; Where S represents the years of use and ZS represents the design service life; In this technical solution, the higher the degree of equipment aging, the lower the relative strength of the equipment.
[0032] Calculate the withstand voltage capability NY, expressed as ; Where V represents the rated withstand voltage value, and ZV represents the maximum lightning overvoltage value that may be encountered during actual operation; Specifically, the withstand voltage capability NY reflects the electrical equipment's ability to withstand lightning overvoltage surges. The rated withstand voltage V of the equipment can be obtained from the product manual, while the maximum lightning overvoltage value ZV that may be encountered in actual operation can be obtained by referring to local historical lightning activity data and relevant lightning monitoring reports.
[0033] Calculate the strength index value of the electrical equipment of the pumping station , represented as: ; Where HJ is the environmental impact value, with a value of 0.8. , and These are the weights; Specifically, the setting is based on the impact of factors such as humidity, temperature, and corrosive gases in the current operating environment on the strength of electrical equipment. In practical applications, HJ is set to 0.8, with lower scores indicating a greater weakening effect of the environment on equipment strength. Furthermore, in practical applications... , and The values are 0.4, 0.4 and 0.2 respectively.
[0034] Among them, the corrosion intensity index value of the pipeline material is obtained. This includes the following steps: During pipeline use, the pipe wall thickness will decrease due to corrosion. By using an ultrasonic thickness gauge to measure the pipe wall thickness, the current wall thickness Td and the initial wall thickness Tc are obtained. The difference between the two is the wall thickness change value ΔT, expressed as: ΔT = Tc - Td; Calculate the corrosion intensity index of pipeline material Represented as: ; in, The coefficient representing the influence of material properties. For corrosion rate; This technical solution addresses the varying corrosion resistance of different pipe materials. Based on the material's chemical composition, microstructure, and relevant corrosion research data, a material property influence coefficient is determined. In application, for ordinary carbon steel pipes, the K-value is between 1.0 and 1.5; for stainless steel pipes, the K-value is between 0.5 and 1.0. Additionally, the corrosion rate... This reflects the rate of corrosion of the pipe material. In application, corrosion-resistant strips are installed on the pipe, and the corrosion rate is obtained by periodically measuring the weight loss of the strips or by referring to historical corrosion rate data of similar pipes under similar environments.
[0035] Step S3: Construct a two-dimensional matrix consisting of 3×3 cells as a risk matrix, label the risk level of each cell in the risk matrix, and fill in the corresponding cells according to the risk level of the water conservancy project under different combinations of lightning occurrence probability levels and water conservancy project vulnerability levels, and fill in the risk matrix. Here, the rows of the matrix represent the lightning occurrence probability level, and the columns of the matrix represent the water conservancy project vulnerability level. Specifically, each cell has a risk level, including: low risk, medium risk, and high risk.
[0036] Furthermore, the specific risk levels for water conservancy projects based on different combinations of lightning probability levels and water conservancy project vulnerability levels are as follows: Among them, the low probability-low vulnerability combination is marked as low risk level, and the low risk level is filled into the corresponding cell; Among them, low probability - medium vulnerability, medium probability - low vulnerability, medium probability - medium vulnerability, high probability - low vulnerability or low probability - high vulnerability, and combinations thereof are labeled as medium risk level; fill in the medium risk level in the corresponding cell; Among them, combinations of high probability-high vulnerability, high probability-medium vulnerability, or medium probability-high vulnerability are marked as high risk level, and the high risk level is filled into the corresponding cell.
[0037] Specifically, in application, when the probability of lightning strikes in a certain area is medium and the vulnerability level of water conservancy projects in that area is high, the corresponding cell in the risk matrix should be filled with the high risk level as medium probability - high vulnerability.
[0038] Step S4: Based on the risk matrix, obtain the current risk status of the water project and make risk management decisions based on the risk status.
[0039] This technical solution, regarding the acquisition of the current risk status of a waterworks project, can accurately locate the corresponding cell in the risk matrix based on the lightning probability level and the vulnerability level of the waterworks project, thereby determining the current risk level of the waterworks project and clarifying its risk status. Taking a certain waterworks project as an example, if the lightning probability level in the area where the project is located is high, and its vulnerability level is determined to be medium vulnerability by evaluating the strength index values of its dam structure, the strength index values of its pump station electrical equipment, and the corrosion intensity index values of its pipeline materials, then in the risk matrix, this project corresponds to the high probability-medium vulnerability cell, with a risk level of high risk. This indicates that under the current circumstances, when the waterworks project faces the threat of lightning, the possibility of a safety accident is relatively high. Once struck by lightning, it may have a serious impact on the normal operation of the project, posing a high safety hazard.
[0040] Furthermore, the specific details regarding risk management decisions based on the aforementioned risk profile are as follows: If the current risk matrix indicates a low risk level, it means that the current waterworks project is relatively safe under the current lightning conditions, and routine monitoring and maintenance strategies should be implemented.
[0041] Specifically, according to the established inspection plan, regular inspections are conducted on the electrical equipment and pipelines of dams and pumping stations to ensure their normal operation. Simultaneously, meteorological data and equipment operation data are continuously collected to dynamically track the probability of lightning strikes and the vulnerability of water conservancy projects, enabling timely detection of changes in potential risks. For example, a routine inspection of pumping station electrical equipment is conducted monthly, checking equipment operating status and cleaning equipment surfaces; a visual inspection and structural stability assessment of the dam is conducted quarterly; and pipe wall thickness measurements and corrosion checks are performed annually.
[0042] If the current risk matrix indicates a medium risk level, it means that the current waterworks project faces lightning safety risks. Therefore, we will increase the frequency of monitoring the stress concentration areas of the dam and the important electrical equipment of the pumping station to keep track of the equipment's operating status in real time. We will also reinforce or repair weak links in the pipelines to improve their corrosion resistance and lightning protection capabilities.
[0043] Specifically, in practice, relevant personnel can be organized to receive lightning safety training to improve their ability to respond to lightning disasters. For example, the frequency of stress monitoring at key parts of the dam can be increased from once a week to once a day; multiple additional lightning warning sensors can be installed around pumping stations to ensure the accuracy and timeliness of warning information; and water conservancy engineering staff can be regularly organized to receive lightning safety knowledge training and emergency drills to familiarize them with the response procedures and operating procedures when lightning occurs.
[0044] If the current risk matrix indicates a high risk level, it means that the water conservancy project is facing a serious threat of lightning, and emergency measures should be taken. These measures should include at least: emergency repair or reinforcement of stress concentration areas of the dam, emergency replacement of severely corroded pipelines, and emergency upgrading of aging pump station electrical equipment.
[0045] Specifically, in application, emergency plans can be set up, and professional personnel can be organized into emergency response teams to be ready to deal with possible lightning disasters at any time. For example, before the peak lightning season, all pipelines with serious safety hazards should be replaced; when the lightning warning system issues a high-risk warning, the operation of some non-critical equipment in the pumping station should be stopped immediately, and personnel should be organized to protect important equipment; the emergency response team should be on standby 24 hours a day, equipped with sufficient emergency supplies and equipment to ensure a rapid response and minimize losses in the event of an accident.
[0046] According to an embodiment of the present invention, an intelligent lightning safety monitoring system for water conservancy projects is provided.
[0047] like Figure 2 As shown, the intelligent lightning safety monitoring system for water conservancy projects according to an embodiment of the present invention includes: Lightning monitoring module 1 is used to calculate the probability of lightning strike in the area where the water conservancy project is located, and to obtain the probability level of lightning occurrence based on the probability of lightning strike; Waterworks project monitoring module 2 is used to obtain vulnerability assessment indicators for waterworks projects and obtain the vulnerability level of waterworks projects based on the vulnerability assessment indicators. The vulnerability assessment indicators for waterworks projects include at least: dam structural strength index value, pump station electrical equipment strength index value, and pipeline material corrosion intensity index value. Risk assessment module 3 is used to construct a two-dimensional matrix consisting of 3×3 cells as a risk matrix, to label the risk level of each cell in the risk matrix, and to fill the corresponding cells with the risk level of the water conservancy project under different combinations of lightning occurrence probability levels and water conservancy project vulnerability levels, so as to fill the risk matrix. Here, the rows of the matrix represent the lightning occurrence probability level, and the columns of the matrix represent the water conservancy project vulnerability level. Early warning decision module 4 is used to obtain the current risk status of water projects based on the risk matrix and to make risk management decisions based on the risk status.
[0048] In summary, by utilizing the above-described technical solution of the present invention, the following effects can be achieved: 1. This invention comprehensively considers the probability of lightning strikes in the area where water conservancy projects are located and the project's own vulnerability assessment indicators, including the structural strength of the dam, the strength of the electrical equipment in the pumping station, and the corrosion resistance of the pipeline materials. It can accurately construct a risk matrix to determine the risk level of water conservancy projects facing lightning threats under different circumstances. Compared with traditional lightning monitoring methods, this method is no longer limited to a single factor or fuzzy judgment, greatly improving the accuracy and reliability of risk assessment. It enables managers to clearly understand the actual risk status of the project, allowing for the early detection and handling of potential safety hazards, and reducing damage to critical facilities such as dams, pumping station electrical equipment, and pipelines caused by lightning. This helps ensure the stable operation of water conservancy projects, ensures normal water supply and drainage functions, avoids problems such as water outages and drainage problems caused by lightning strikes, and maintains the normal living order of residents and the smooth operation of industrial production in surrounding areas, thus having significant social and economic implications.
[0049] 2. This invention enables dynamic tracking and management. Throughout the monitoring process, it continuously collects information such as meteorological data and equipment operation data, dynamically tracking the probability of lightning strikes and the vulnerability of water conservancy projects. This allows for the timely detection of changes in potential risks. For example, when meteorological conditions change abnormally or engineering facilities become aging or damaged, the risk assessment results can be quickly adjusted, and corresponding risk management decisions can be made accordingly. This achieves dynamic and intelligent management of lightning risks, effectively preventing safety accidents caused by the failure to detect changes in risks in a timely manner.
[0050] 3. Based on the risk levels presented by the risk matrix, this invention provides highly targeted risk management decision-making solutions. Under low-risk conditions, conventional monitoring and maintenance strategies are adopted, ensuring project safety while rationally allocating resources. Under medium-risk conditions, monitoring of key components is strengthened, preventive measures are formulated, and training is organized to effectively reduce risks. Under high-risk conditions, emergency repairs are carried out immediately, equipment is shut down, and emergency plans are activated to maximize the safety of personnel and equipment and reduce economic losses. This risk-level-based decision-making mechanism provides managers with scientific and clear action guidelines, improving the efficiency and effectiveness of responding to lightning disasters.
[0051] 4. The precise risk assessment and scientific management decisions of this invention avoid unnecessary over-maintenance and blind investment. When the risk is low, there is no need to invest excessive resources in additional protection; when the risk increases, targeted repairs and reinforcements are carried out, improving resource utilization efficiency. At the same time, it reduces equipment damage and engineering failures caused by lightning disasters, lowers maintenance costs and equipment replacement expenses, and in the long run, effectively reduces the overall operating cost of water conservancy projects.
[0052] The above are merely preferred embodiments of the present invention and are not intended to limit the invention. Those skilled in the art, upon considering the disclosure in the specification and embodiments, will readily conceive of other embodiments of this disclosure. This application is intended to cover any variations, uses, or adaptations of this disclosure that follow the general principles of this disclosure and include common knowledge or customary techniques in the art not disclosed herein. The specification and embodiments are to be considered exemplary only, and the true scope and spirit of this disclosure are indicated by the claims.
[0053] It should be understood that this disclosure is not limited to the precise structures described above and shown in the accompanying drawings, and various modifications and changes can be made without departing from its scope. The scope of this disclosure is limited only by the appended claims.
Claims
1. An intelligent lightning safety monitoring method for water conservancy projects, characterized in that, Includes the following steps: Pre-determine the probability of lightning strikes in the area where the waterworks project is located. And based on the probability of being struck by lightning Obtain the probability level of lightning occurrence; Vulnerability assessment indicators for water conservancy projects are obtained, and the vulnerability level of water conservancy projects is obtained based on the vulnerability assessment indicators. The vulnerability assessment indicators for water conservancy projects include at least: dam structural strength index value, pump station electrical equipment strength index value, and pipeline material corrosion intensity index value. A two-dimensional matrix consisting of 3×3 cells is constructed as a risk matrix. The risk level of each cell in the risk matrix is labeled. The risk levels of water conservancy projects under different combinations of lightning occurrence probability levels and water conservancy project vulnerability levels are filled into the corresponding cells to fill the risk matrix. The rows of the matrix represent the lightning occurrence probability level, and the columns of the matrix represent the water conservancy project vulnerability level. Based on the risk matrix, the current risk status of the water project is obtained, and risk management decisions are made based on the risk status.
2. The intelligent lightning safety monitoring method for water conservancy projects according to claim 1, characterized in that, The probability of lightning strikes in the area where the waterworks project is located is obtained. This includes the following steps: Calculate lightning density , is represented as: ; in, This refers to the number of days with thunderstorms. Calculate the probability of lightning strikes in the area where the waterworks project is located. , is represented as: ; in, For the equivalent interception area of water conservancy projects, This is the terrain correction factor.
3. The intelligent lightning safety monitoring method for water conservancy projects according to claim 2, characterized in that, According to the probability of being struck by lightning Obtain the probability level of lightning occurrence, including: A preset lightning threshold is set, and the calculated probability of being struck by lightning is used as the basis for this. To obtain the probability level of lightning occurrence by comparing it with a lightning threshold, the following steps are included: like ≤1 indicates a low probability; If 1 < ≤5 indicates a medium probability; like >5 indicates a high probability.
4. The intelligent lightning safety monitoring method for water conservancy projects according to claim 1, characterized in that, Obtaining the vulnerability level of a waterworks project includes the following steps: The risk value F of a waterworks project is obtained as follows: ; in, For the structural strength index value of the dam, For the strength index values of the electrical equipment of the pumping station and This refers to the corrosion strength index value of the pipe material. These are the weights; The risk value F of the waterworks project is compared with a preset risk threshold, including the following steps: If F < 0.3, it indicates that the current vulnerability level of the water conservancy project is low. If 0.3 ≤ F < 0.7, it indicates that the current vulnerability level of the water conservancy project is medium vulnerability; If 0.7 ≤ F, it indicates that the current vulnerability level of the water conservancy project is high vulnerability.
5. The intelligent lightning safety monitoring method for water conservancy projects according to claim 4, characterized in that, Obtaining quantitative values of dam structural strength indicators , is represented as: ; in, This refers to the standard value of the compressive strength of dam materials. K1 is the standard value of tensile strength of dam materials, K2 is the structural correction coefficient, K3 is the influence coefficient of service life, and K4 is the influence coefficient of environmental erosion.
6. The intelligent lightning safety monitoring method for water conservancy projects according to claim 5, characterized in that, Obtain the strength index values of the electrical equipment of the pumping station This includes the following steps: The degree of equipment aging, LH, is calculated and expressed as: ; Where S represents the years of use and ZS represents the design service life; Calculate the withstand voltage capability NY, expressed as ; Where V represents the rated withstand voltage value, and ZV represents the maximum lightning overvoltage value that may be encountered during actual operation; Calculate the strength index value of the electrical equipment of the pumping station , is represented as: ; in, HJ This is the impact value of the operating environment. , and These are the weights.
7. The intelligent lightning safety monitoring method for water conservancy projects according to claim 1, characterized in that, Obtain the corrosion intensity index value of the pipeline material This includes the following steps: The wall thickness variation ΔT is calculated and expressed as: ΔT = Tc - Td; Where Td is the current wall thickness and Tc is the initial wall thickness; Calculate the corrosion intensity index of pipeline material Represented as: ; in, The coefficient representing the influence of material properties. The corrosion rate is represented by the value of .
8. The intelligent lightning safety monitoring method for water conservancy projects according to claim 1, characterized in that, The risk management decision-making based on the risk situation includes the following steps: If the current risk matrix indicates a low risk level, it means that the current waterworks project is relatively safe under the current lightning conditions, and routine monitoring and maintenance strategies should be implemented. If the current risk matrix indicates a medium risk level, it means that the current water project has a lightning safety risk. Therefore, we will increase the frequency of monitoring the stress concentration areas of the dam and the important electrical equipment of the pumping station to keep track of the equipment's operating status in real time. We will also reinforce or repair weak links in the pipelines to improve their corrosion resistance and lightning protection capabilities. If the current risk matrix indicates a high risk level, it means that the water conservancy project is facing a serious threat of lightning, and emergency measures should be taken. These measures should include at least: emergency repair or reinforcement of stress concentration areas of the dam, emergency replacement of severely corroded pipelines, and emergency upgrading of aging pump station electrical equipment.
9. A smart lightning safety monitoring system for water conservancy projects, used in the system of the smart lightning safety monitoring method for water conservancy projects as described in any one of claims 1-8, characterized in that, include: The lightning monitoring module (1) is used to calculate the probability of lightning strike in the area where the water conservancy project is located, and to obtain the probability level of lightning occurrence based on the probability of lightning strike. Waterworks engineering monitoring module (2) is used to obtain the vulnerability assessment index of waterworks engineering and obtain the vulnerability level of waterworks engineering based on the vulnerability assessment index. The vulnerability assessment index of waterworks engineering includes at least: dam structure strength index value, pump station electrical equipment strength index value and pipeline material corrosion intensity index value. The risk assessment module (3) is used to construct a two-dimensional matrix consisting of 3×3 cells as a risk matrix, to label the risk level of each cell in the risk matrix, and to fill the corresponding cells with the risk level of the water conservancy project under different combinations of lightning probability levels and water conservancy project vulnerability levels, so as to fill the risk matrix. The rows of the matrix represent the lightning probability level, and the columns of the matrix represent the water conservancy project vulnerability level. The early warning decision module (4) is used to obtain the current risk status of the water project based on the risk matrix and make risk management decisions based on the risk status.