A Multi-Indicator Coupled Identification Method for Drought Risk in Downstream River Channels During the Dry Season

By using the Sigmoid function and a multi-index coupling method, based on actual operational data of the downstream river channel, the risk of drought during the dry season in the downstream area of ​​the reservoir is identified. This addresses the shortcomings of existing risk assessment technologies and enables the quantification and operational application of risk levels.

CN123117818APending Publication Date: 2026-11-17BUREAU OF HYDROLOGY CHANGJIANG WATER RESOURCES COMMISSION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611380090.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-07
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing technologies are insufficient to accurately identify the risk of drought during the dry season downstream of reservoirs. They lack the means to directly compare the measured situation after reservoir operation with the natural background. Furthermore, existing standardized methods are sensitive to extreme values ​​and lack objective methods for determining turning points.

Method used

The Sigmoid function is used for dimensionless standardization. Based on the average natural state before reservoir formation, the standardized index is calculated by taking into account the drop in water level during the dry season, the annual minimum water level variation, and the duration of low water. The comprehensive risk index is calculated by combining the index weights and using the multi-year average as the turning point to achieve quantitative identification of risk level.

Benefits of technology

It enables accurate identification of drought risks in downstream river channels during the dry season, avoids the oversensitivity of linear methods to extreme values ​​and subjective threshold settings, and provides an objective and robust risk assessment tool to support reservoir ecological scheduling and drought early warning management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123117818A_ABST
    Figure CN123117818A_ABST
Patent Text Reader

Abstract

This invention provides a multi-indicator coupled identification method for drought risk in downstream river channels during the dry season, comprising the following steps: Step 1. Collecting hydrological observation data and drought warning water level standards for the upstream and downstream of the reservoir under natural conditions and after reservoir construction; Step 2. Calculating the rate of decrease in water level during the dry season with the same flow rate; Step 3. Calculating the annual minimum water level variation; Step 4. Calculating the duration of low water below the drought warning water level; Step 5. Performing dimensionless standardization on each indicator; Step 6. Determining the indicator weights and coupling multiple indicators to calculate the comprehensive risk index; Step 7. Determining the risk level and outputting the risk identification result. This invention solves the problems of single-indicator assessment being one-sided, not considering the impact of reservoir operation, and lacking quantitative identification methods in existing technologies. It has the advantages of clear physical meaning of indicators, simple calculation methods, strong comparability of results, and ease of operational application, and is suitable for reservoir ecological scheduling effect assessment and downstream drought early warning management.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of hydrology and water resources technology, specifically involving reservoir ecological scheduling, river hydrological situation analysis and drought risk assessment, and particularly involving a multi-indicator coupled identification method for drought risk in downstream rivers of reservoirs during the dry season using the Sigmoid function method for dimensionless standardization. Background Technology

[0002] While reservoir construction provides comprehensive benefits such as flood control, power generation, and water supply, it inevitably alters the natural hydrological conditions of downstream rivers. Especially during the dry season, the downstream discharge is often significantly reduced compared to the natural state due to reservoir storage for power generation or to meet other water demands. This leads to lower river levels, prolonged periods of low water, and consequently, a series of problems including river channel shrinkage, wetland degradation, damage to aquatic ecosystems, and difficulties in water access for urban and rural areas. Accurately identifying drought risks downstream of reservoirs during the dry season is crucial for optimizing reservoir management and ensuring downstream ecological and water security.

[0003] In existing technologies, drought risk assessment downstream of reservoirs mainly relies on single indicators, such as the dry season flow guarantee rate and the lowest water level extreme, which are insufficient to comprehensively depict the complex causes of drought risk during the dry season. More importantly, existing methods lack the means to directly compare the measured conditions after reservoir operation with the natural background before reservoir construction, making it impossible to quantitatively assess the extent to which reservoir construction changes the downstream dry season.

[0004] In multi-indicator comprehensive evaluation, dimensionless standardization is a key step in eliminating dimensional differences and achieving indicator coupling. Existing methods mostly employ range standardization or linear interpolation, which, while computationally simple, have significant drawbacks: linear transformations are sensitive to extreme values, and abnormal years significantly affect the standardization results; proportional compression fails to reflect the nonlinear characteristics of risk perception. The Sigmoid function exhibits S-shaped curve characteristics, being sensitive in the middle region and saturated at both ends, consistent with the nonlinear laws of risk perception. However, current technology has not been systematically applied to the field of drought risk identification downstream of reservoirs, particularly lacking methods for determining core parameters such as inflection points.

[0005] The inflection point, as the risk-neutral point of the Sigmoid function, directly determines the baseline position of the standardized value. Existing methods such as the "baseline value method" (taking 0) or the "management allowance method" have significant shortcomings: the baseline value method assumes an ideal state of "no reservoir impact," but in reality, reservoirs are already built and operational, rendering this baseline unrealistic; the management allowance method relies on subjectively set thresholds and lacks objective basis. Therefore, there is an urgent need for a method to determine the inflection point based on actual operational data and objectively reflecting the general level after reservoir construction.

[0006] In summary, existing technologies have significant shortcomings in terms of benchmark determination, standardization methods, and objectivity of inflection points. There is an urgent need for a method that can establish a stable natural benchmark, use the Sigmoid function for scientific standardization, and use the multi-year average level after reservoir construction as the inflection point to identify the risk of drought in the downstream river channel during the dry season. Summary of the Invention

[0007] The purpose of this application is to provide a multi-indicator coupled identification method for drought risk in downstream river channels during the dry season. It has the advantages of clear physical meaning of indicators, simple calculation method, strong comparability of results, and easy application in business. It is suitable for reservoir ecological scheduling effect assessment and downstream drought early warning management.

[0008] To achieve the above objectives, the technical solution of the present invention is as follows:

[0009] A multi-indicator coupled identification method for drought risk in downstream river channels during the dry season of a reservoir includes the following steps:

[0010] Step 1. Collect hydrological observation data and drought warning water level standards for the upstream and downstream areas of the reservoir under natural conditions and after reservoir formation;

[0011] Step 2. Calculate the water level drop during the low-water season with the same flow rate;

[0012] Step 3. Calculate the annual minimum water level variation;

[0013] Step 4. Calculate the duration of low water levels below the drought warning level;

[0014] Step 5. Perform dimensionless standardization on each indicator;

[0015] Step 6. Determine the indicator weights and couple multiple indicators to calculate the comprehensive risk index;

[0016] Step 7. Determine the risk level and output the risk identification results.

[0017] The implementation method of step 1 is as follows:

[0018] Step 11: Collect daily water level and flow rate observation data before the reservoir is formed, and calculate multi-year average statistical parameters;

[0019] Step 12: Collect measured water level and flow rate data after the reservoir is completed;

[0020] Step 13: Collect drought warning water level standard data for downstream control sections.

[0021] The implementation method of step 2 is as follows:

[0022] Step 21: Determine the representative flow rate during the dry season. Take the daily flow sequence for that year and calculate the 75% frequency flow. and 95% frequency traffic ,Pick ;

[0023] Step 22: Obtain the measured water level at the same flow rate after reservoir completion. ;

[0024] Step 23: Calculate the average natural state water level with the same flow rate over the previous many years before the reservoir was formed. ;

[0025] Step 24, calculate the drop in water level during the low water period with the same flow rate: .

[0026] The implementation method of step 3 is as follows:

[0027] Step 31: Calculate the average annual minimum water level over the years prior to reservoir formation. ;

[0028] Step 32: Obtain the measured annual minimum water level after reservoir formation. ;

[0029] Step 33, calculate the annual minimum water level variation: .

[0030] The implementation method of step 4 is as follows:

[0031] Step 41: Determine the drought warning water level at the downstream control section. ;

[0032] Step 42: Identify the actual water level during the dry season after reservoir construction that is lower than the target level. Cumulative duration of the period: ,in This refers to the number of days a single low-water event lasts.

[0033] The implementation method of step 5 is as follows:

[0034] Step 51, calculate the standardized index of the low water level drop for the same flow rate: Mode

[0035] The inflection point of the low water level drop in the formula is the same as the flow rate. After taking the warehouse Multi-year average, scale parameter After being collected and stored for years The standard deviation of the standard deviation is adjusted by a coefficient k1 of 2.0.

[0036] Step 52, calculate the standardized index of the annual minimum water level variation: Mode

[0037] The inflection point of the annual minimum water level variation in the formula Data on the annual minimum water level variation after reservoir formation Multi-year average, scale parameter After being collected and stored for years The standard deviation of the standard deviation is adjusted by a coefficient k2 of 2.0.

[0038] Step 53, calculate the standardized index of the duration of low water levels below the drought warning level:

[0039] Equation (7)

[0040] The inflection point of the duration of low water below the drought warning level in the formula After taking the warehouse Multi-year average, scale parameter After being collected and stored for years The standard deviation is adjusted by a factor k3 of 2.0.

[0041] The implementation method of step 6 is as follows:

[0042] Step 61: Determine the weight of each indicator. ;

[0043] Step 62, calculate the comprehensive risk index:

[0044] Equation (8)

[0045] The implementation method of step 7 is as follows:

[0046] Step 71: Determine the risk level based on the R value: R < 0.30 is Level I, 0.30 ≤ R < 0.60 is Level II, 0.60 ≤ R < 0.85 is Level III, and R ≥ 0.85 is Level IV;

[0047] Step 72: Output the risk identification results.

[0048] Compared with the prior art, the beneficial effects of the present invention are:

[0049] This method uses the multi-year average natural conditions before reservoir formation as a benchmark for calculation. and This method isolates the interference of natural inflow fluctuations by utilizing the natural water level-discharge relationship curve, purely quantifying the cumulative impact of reservoir operation and resolving the issue of confusion between natural background and human influence in existing technologies. It employs the Sigmoid function method for dimensionless standardization, using the multi-year average value since reservoir construction as the inflection point. The intermediate region is sensitive, while both ends are saturated, conforming to the nonlinear law of risk perception and avoiding the oversensitivity of linear methods to extreme values ​​and the arbitrariness of subjective threshold setting. The three-indicator comprehensive evaluation system characterizes risk from three dimensions: typical flow conditions, annual extreme low water levels, and exceeding management thresholds, achieving indexed quantitative identification and four-level classification, directly supporting precise decision-making and emergency response. The calculation process is simple, requiring only routine hydrological observation data and scheduling records, facilitating integration with existing hydrological monitoring and reporting systems and reservoir scheduling platforms for automated operation. It provides an objective, robust, and operationally feasible new tool for identifying drought risks downstream of reservoirs, evaluating the effectiveness of ecological scheduling, and managing drought emergencies. The calculation method has a clear mechanism, a straightforward implementation process, and feasible technical means. Attached Figure Description

[0051] Figure 1 This is a flowchart illustrating the calculation process of the multi-indicator coupled identification method for drought risk in downstream river channels during the dry season, according to an embodiment of the present invention.

[0052] Figure 2 This is a schematic diagram of the water level and flow rate at a certain station on the main stream of a certain river in 2025.

[0053] Figure 3 This is a schematic diagram showing the fitting of the water level-discharge relationship at a certain station on the main stream of a certain river in 2025.

[0054] Figure 4 This is a schematic diagram showing the changes in water level at a certain station on the main stream of a certain river over the years, with the same flow rate, since 2025.

[0055] Figure 5 This is a schematic diagram showing the annual minimum water level changes at a certain station on the main stream of a certain river over many years. Detailed Implementation

[0057] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0058] A multi-indicator coupled identification method for drought risk in downstream river channels during the dry season of a reservoir, comprising the following steps:

[0059] Step 1. Collect hydrological observation data and drought warning water level standards for the upstream and downstream areas of the reservoir under natural conditions and after reservoir formation;

[0060] Step 11: Collect daily water level and flow rate observation data before the reservoir is formed, and calculate multi-year average statistical parameters;

[0061] Step 12: Collect measured water level and flow rate data after the reservoir is completed;

[0062] Step 13: Collect drought warning water level standard data for downstream control sections.

[0063] Step 2. Calculate the water level drop during the low-water season with the same flow rate;

[0064] Step 21: Determine the representative flow rate during the dry season. Take the daily flow sequence for that year and calculate the 75% frequency flow. and 95% frequency traffic ,Pick ;

[0065] Step 22: Obtain the measured water level at the same flow rate after reservoir completion. ;

[0066] Step 23: Calculate the average natural state water level with the same flow rate over the previous many years before the reservoir was formed. ;

[0067] Step 24, calculate the drop in water level during the low water period with the same flow rate: .

[0068] Step 3. Calculate the annual minimum water level variation;

[0069] Step 31: Calculate the average annual minimum water level over the years prior to reservoir formation. ;

[0070] Step 32: Obtain the measured annual minimum water level after reservoir formation. ;

[0071] Step 33, calculate the annual minimum water level variation: .

[0072] Step 4. Calculate the duration of low water levels below the drought warning level;

[0073] Step 41: Determine the drought warning water level at the downstream control section. ;

[0074] Step 42: Identify the actual water level during the dry season after reservoir construction that is lower than the target level. Cumulative duration of the period: ,in This refers to the number of days a single low-water event lasts.

[0075] Step 5. Perform dimensionless standardization on each indicator;

[0076] Step 51, calculate the standardized index of the low water level drop for the same flow rate:

[0077] Equation (9)

[0078] The inflection point of the low water level drop in the formula is the same as the flow rate. After taking the warehouse Multi-year average, scale parameter After being collected and stored for years The standard deviation of the standard deviation is adjusted by a coefficient k1 of 2.0.

[0079] Step 52, calculate the standardized index of the annual minimum water level variation:

[0080] Equation (10)

[0081] The inflection point of the annual minimum water level variation in the formula Data on the annual minimum water level variation after reservoir formation Multi-year average, scale parameter After being collected and stored for years The standard deviation of the standard deviation is adjusted by a coefficient k2 of 2.0.

[0082] Step 53, calculate the standardized index of the duration of low water levels below the drought warning level:

[0083] Equation (11)

[0084] The inflection point of the duration of low water below the drought warning level in the formula After taking the warehouse Multi-year average, scale parameter After being collected and stored for years The standard deviation is adjusted by a factor k3 of 2.0.

[0085] Step 6. Determine the indicator weights and couple multiple indicators to calculate the comprehensive risk index;

[0086] Step 61: Determine the weight of each indicator. ;

[0087] Step 62, calculate the comprehensive risk index:

[0088] Equation (12)

[0089] Step 7. Determine the risk level and output the risk identification results.

[0090] Step 71: Determine the risk level based on the R value: R < 0.30 is Level I, 0.30 ≤ R < 0.60 is Level II, 0.60 ≤ R < 0.85 is Level III, and R ≥ 0.85 is Level IV;

[0091] Step 72: Output the risk identification results.

[0092] The specific steps of the embodiment are as follows:

[0093] Step 1: Collect daily water level and flow data for a certain station on the main stream of a certain river from January 1, 1988 to December 31, 2025 (e.g., Figure 2 (Taking 2025 as an example) and drought warning water level (7.8m).

[0094] Step 2: Obtain the daily flow sequence for 2025 and calculate the 75% frequency flow Q. 75 =11600m 3 / s and 95% frequency flow Q 95 =9890m 3 / s, take =10745m 3 / s; Regression analysis of water level and flow rate data for each year yields water level and flow rate relationship curves (e.g. Figure 3 (Taking 2025 as an example), the water level corresponding to the same flow rate in that year is obtained from the water level-flow relationship curve of each year. like Figure 4 Calculate the average natural water level of the same flow rate over the years before the reservoir was formed. =10.14m; Calculate the annual low water level drop for the same flow rate: .

[0095] Step 3: Calculate the average annual minimum water level over the years prior to reservoir formation. =8.53m, obtain the measured minimum annual water level for each year after the reservoir was formed. Finally, calculate the annual minimum water level variation for each year: ,like Figure 5 As shown.

[0096] Step 4: Determine the drought warning water level at a certain station =7.8m, identify the cumulative duration of periods when the measured water level is below 7.8m during the dry season after reservoir formation in each year (taking 2025 as an example, i.e. Figure 1 The number of days the water level is below the drought warning level.

[0097] Step 4: After calculating the database The mean and standard deviation were 1.12 and 0.32, respectively; after calculation, the database was formed. The mean and standard deviation were 0.28 and 0.41, respectively; after calculation and warehousing... The mean and standard deviation were 3.63 and 11.06, respectively; 2025 , and The values ​​are 1.64, 0.57, and 0, respectively.

[0098] Step 5: Determine the adjustment coefficients k1=k2=k3=1 / 3, and then calculate the standardized index X1 for the decrease in water level during the same flow, the standardized index X2 for the annual minimum water level variation, and the standardized index X3 for the duration of low water below the drought warning level, which are 0.96, 0.81, and 0.70, respectively.

[0099] Step 6: Determine the weight of each indicator Calculate the comprehensive drought risk index of a certain station in 2025. =0.70. A similar method can be used to calculate the comprehensive drought risk index of a certain station on the main stream of a certain river over the past 6 years, as shown in the table below.

[0100]

[0101] Step 7: Determine the risk level based on the R value: R<0.30 is Level I, 0.30≤R<0.60 is Level II, 0.60≤R<0.85 is Level III, and R≥0.85 is Level IV. The drought risk levels for 2020-2025 are Level II, Level II, Level IV, Level IV, Level III, and Level III, respectively.

[0102] The above embodiments are merely illustrative examples of the technical solution of the present invention. The application of the multi-indicator coupled identification method for drought risk in downstream river channels during the dry season involved in this invention is not limited to the content described in the above embodiments, but is subject to the scope defined by the claims. Any modifications, additions, or equivalent substitutions made by those skilled in the art based on these embodiments are within the scope of protection claimed by this invention.

Claims

1. A multi-index coupling identification method for dry season risk of a reservoir downstream river channel in dry season, characterized in that, Includes the following steps: Step 1. Collect hydrological observation data and drought warning water level standards for the upstream and downstream areas of the reservoir under natural conditions and after reservoir formation; Step 2. Calculate the water level drop during the low-water season with the same flow rate; Step 3. Calculate the annual minimum water level variation; Step 4. Calculate the duration of low water levels below the drought warning level; Step 5. Perform dimensionless standardization on each indicator; Step 6. Determine the indicator weights and couple multiple indicators to calculate the comprehensive risk index; Step 7. Determine the risk level and output the risk identification results.

2. The method according to claim 1, characterized in that, The implementation method of step 1 is as follows: Step 11: Collect daily water level and flow rate observation data before the reservoir is formed, and calculate multi-year average statistical parameters; Step 12: Collect measured water level and flow rate data after the reservoir is completed; Step 13: Collect drought warning water level standard data for downstream control sections.

3. The method according to claim 2, characterized in that, The implementation method of step 2 is as follows: Step 21, determine the representative flow for dry season , take the daily flow series for the year, calculate the 75% frequency flow and the 95% frequency flow , take ; Step 22, obtain the same flow water level measured after the library ; Step 23, calculate the average multi-year natural state water level of the same flow before the library ; Step 24, calculate the same flow dry water level drop range: .

4. The method according to claim 3, characterized in that, The implementation method of step 3 is as follows: Step 31, calculate the average annual minimum water level before the library for many years ; Step 32, obtain the measured annual minimum water level after the library is obtained ; Step 33, calculate annual minimum water level range: .

5. The method according to claim 4, characterized in that, The implementation method of step 4 is as follows: Step 41, determining downstream control section flood warning water level ; Step 42: Identify the actual water level during the dry season after reservoir construction that is lower than the target level. Cumulative duration of the period: ,in This refers to the number of days a single low-water event lasts.

6. The method according to claim 5, wherein, The implementation method of step 5 is as follows: Step 51, calculate the standardized index of the low water level drop for the same flow rate: Formula (1) Wherein the same flow dry level drop amplitude turning point After the reservoir The average value of years, scale parameter After the reservoir The standard deviation of years, adjustment coefficient k1 is 2.0; Step 52, calculate the standardized index of the annual minimum water level variation: Equation (2) The inflection point of the annual minimum water level variation in the formula Data on the annual minimum water level variation after reservoir formation Multi-year average, scale parameter After being collected and stored for years The standard deviation of the standard deviation is adjusted by a coefficient k2 of 2.

0. Step 53, calculate the standardized index of the duration of low water levels below the drought warning level: Equation (3) The inflection point of the duration of low water below the drought warning level in the formula After taking the warehouse Multi-year average, scale parameter After being collected and stored for years The standard deviation is adjusted by a factor of 2.0, k3.

7. The method according to claim 6, characterized in that, The implementation method of step 6 is as follows: Step 61, determine the weight of each index ; Step 62, calculate the comprehensive risk index: Formula (4).

8. The method according to claim 7, characterized in that, The implementation method of step 7 is as follows: Step 71: Determine the risk level based on the R value: R < 0.30 is Level I, 0.30 ≤ R < 0.60 is Level II, 0.60 ≤ R < 0.85 is Level III, and R ≥ 0.85 is Level IV; Step 72: Output the risk identification results.