A method, device, equipment and storage medium for real-time coordinated control of high-voltage power grids.

By determining consensus intervals and equilibrium control strategies in high-power transmission grids and combining the coupling relationship of transmission sections, the problem of lagging information exchange between provincial and local dispatching under rapid fluctuations in new energy output was solved, realizing coordinated real-time control of high-power transmission grids and improving control efficiency and security.

CN123121644APending Publication Date: 2026-11-17YUNNAN POWER GRID CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611617089.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-19
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

When the output of renewable energy fluctuates rapidly, the information exchange between provincial and local dispatching levels is lagging and the efficiency of control decision-making is low, which increases the risk to the safe operation of the power grid.

Method used

By determining the consensus interval based on multidimensional stability margin and regional power grid parameters at the prefecture level, decision identification is performed to generate variable consensus intervals and equilibrium control strategies. In addition, distributed negotiation is carried out in combination with the coupling relationship and capacity of shared transmission sections to constrain the equilibrium control strategy and achieve coordinated real-time control of the high-output power grid.

Benefits of technology

It has improved the coordination capabilities and control response efficiency between provincial and local dispatching, reduced the operational risks caused by the lack of coordination between regional dispatching, and realized the coordinated real-time control of the high-power transmission grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123121644A_ABST
    Figure CN123121644A_ABST
Patent Text Reader

Abstract

This application discloses a method, apparatus, equipment, and storage medium for coordinated real-time control of a high-voltage power grid, relating to the field of smart grid dispatching technology. The disclosed method includes: determining a consensus interval for a prefecture-level dispatching area based on the multidimensional stability margin of the high-voltage power grid and the grid parameters of the prefecture-level dispatching area; performing decision identification based on the consensus interval to obtain a variable consensus interval and a balance control strategy; conducting distributed negotiation on the variable consensus interval based on the coupling relationship and capacity of shared transmission sections in the prefecture-level dispatching area to obtain a negotiated consensus interval; constraining the balance control strategy based on the negotiated consensus interval to obtain a target control strategy; and performing coordinated real-time control of the high-voltage power grid based on the target control strategy. Applying the technical means of this solution improves the stability, coordination, and real-time performance of power grid dispatching control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of smart grid dispatching technology, and in particular to a method, device, equipment and storage medium for coordinated real-time control of high-output power grids. Background Technology

[0002] With the continuous expansion of new energy installed capacity and the increasing demand for inter-regional power transmission, high-voltage power grids have gradually become an important form of power transmission from concentrated new energy development areas to load centers. Such power grids are characterized by rapid fluctuations in new energy output, long transmission distances, and high operational pressure on key sections. They also involve multiple prefecture-level dispatching areas and various operational constraints such as voltage, frequency, power angle, and line power flow, making power grid dispatching exhibit obvious multi-regional, multi-constraint, and highly time-varying characteristics.

[0003] In traditional technologies, local operational data is typically collected by each prefecture-level dispatching region and reported to the provincial dispatching center. The provincial dispatching center then aggregates the data, performs network-wide analysis and optimization calculations, and finally issues dispatching instructions to each prefecture-level region for execution. Because this method involves data collection, transmission, centralized calculation, and instruction issuance, and given the rapid changes in renewable energy output, as well as potential mutual influences between different prefecture-level regions due to shared transmission lines, traditional technologies struggle to promptly coordinate the overall provincial dispatching needs with the real-time operational status of each prefecture-level region. This can easily lead to delayed control decisions and increase the risk to grid safety. Summary of the Invention

[0004] The main purpose of this application is to provide a method, device, equipment and storage medium for real-time coordinated control of high-power transmission power grids, which aims to solve the technical problems of lagging information exchange between provincial and local dispatching levels and low efficiency of control decision-making in high-power transmission power grids under the condition of rapid fluctuation in new energy output.

[0005] To achieve the above objectives, this application proposes a real-time collaborative control method for high-voltage power grids, the method comprising: The consensus interval of the prefecture-level dispatching area is determined based on the multidimensional stability margin of the high-output power grid and the power grid parameters of the prefecture-level dispatching area. Decision identification is performed based on the consensus interval to obtain the variable consensus interval and the equilibrium control strategy; Based on the coupling relationship and capacity of the shared transmission sections in the prefecture-level dispatch area, the variable consensus interval is negotiated in a distributed manner to obtain the negotiation consensus interval; The equilibrium control strategy is constrained according to the consensus interval to obtain the target control strategy, and the high-power transmission grid is controlled in a coordinated real-time manner according to the target control strategy.

[0006] In one embodiment, the step of performing decision identification based on the consensus interval to obtain the variable consensus interval and the equilibrium control strategy includes: Obtain provincial-level dispatch targets; Based on the consensus interval, the provincial scheduling target is decomposed into target stacking to obtain the prefecture-level scheduling target and the provincial constraint framework; Based on the prefecture-level scheduling objectives, the provincial-level constraint framework, and the real-time operating status of the prefecture-level scheduling area, the variable consensus interval and local control decisions are determined. Based on the variable consensus interval and the local control decision, a game equilibrium solution is performed on the provincial scheduling target and the prefecture-level scheduling target to obtain the equilibrium control strategy.

[0007] In one embodiment, the step of solving the game equilibrium for the provincial-level scheduling target and the prefecture-level scheduling target based on the variable consensus interval and the local control decision to obtain the equilibrium control strategy includes: The optimization objectives of the provincial dispatching side are determined based on the provincial dispatching objectives, and the response strategies of the prefecture-level dispatching areas are determined based on the prefecture-level dispatching objectives, the local control decisions, and the variable consensus intervals. Based on the optimization objective and the response strategy, a game equilibrium solution is obtained to achieve the equilibrium control result. Based on the balanced control results, determine the prefecture-level control strategy for the prefecture-level scheduling area and the target decomposition results for the provincial-level scheduling objectives; An equilibrium control strategy is generated based on the prefecture-level control strategy and the target decomposition results.

[0008] In one embodiment, after the step of solving the game equilibrium for the provincial-level scheduling target and the prefecture-level scheduling target based on the variable consensus interval and the local control decision to obtain the equilibrium control strategy, the method further includes: The coordination deviation between provincial-level scheduling targets and prefecture-level scheduling targets is determined based on the aforementioned balanced control strategy; Determine whether the coordination deviation is greater than a preset deviation threshold; If the coordination deviation is greater than the preset deviation threshold, the weight coefficient corresponding to the prefecture-level scheduling area and the boundary parameters of the variable consensus interval are adjusted to obtain the adjusted weight coefficient and the adjusted boundary parameters. The game equilibrium is solved based on the adjusted weight coefficients and the adjusted boundary parameters to update the equilibrium control strategy.

[0009] In one embodiment, the step of determining the consensus interval of the prefecture-level dispatching area based on the multidimensional stability margin of the high-output power grid and the power grid parameters of the prefecture-level dispatching area includes: Based on the multidimensional stability margin of the high-output power grid and the power grid parameters of the prefecture-level dispatch area, the sensitivity vector of the prefecture-level dispatch area corresponding to the multidimensional stability margin is determined, wherein the multidimensional stability margin includes voltage stability margin, frequency stability margin, power angle stability margin and line power flow stability margin. The baseline consensus interval of the prefecture-level scheduling region is determined based on the sensitivity vector and the multidimensional stability margin. The benchmark consensus interval is adjusted according to the local operational constraints of the prefecture-level scheduling region to obtain the consensus interval of the prefecture-level scheduling region.

[0010] In one embodiment, the step of performing distributed negotiation on the variable consensus interval based on the shared transmission section coupling relationship and shared transmission section capacity of the prefecture-level dispatch area to obtain the negotiation consensus interval includes: Based on the power grid topology and dispatch boundaries of the prefecture-level dispatch areas, establish a coupling relationship matrix between the prefecture-level dispatch areas; The capacity of the shared transmission section is determined based on the coupling relationship of the shared transmission section in the prefecture-level dispatch area; The reservation ratio of the negotiation interval is determined based on the shared transmission section capacity and the variable consensus interval, and the negotiation interval is determined within the variable consensus interval based on the reservation ratio of the negotiation interval; The adjacent prefecture-level scheduling areas are determined based on the coupling relationship matrix, and the interval boundary information is determined based on the adjacent prefecture-level scheduling areas; The negotiation interval is iteratively updated based on the interval boundary information to obtain the negotiation consensus interval.

[0011] In one embodiment, after the step of iteratively updating the negotiation interval based on the interval boundary information to obtain the negotiation consensus interval, the method further includes: Based on the consensus intervals corresponding to adjacent prefecture-level dispatching areas, determine whether there is interval overlap or shared transmission section capacity exceeding limits between the adjacent prefecture-level dispatching areas; If it is determined that there is an overlap between adjacent prefecture-level dispatching areas or that the shared transmission section capacity exceeds the limit, it is determined that there is a section capacity conflict in the prefecture-level dispatching areas. Send a capacity adjustment request to the prefecture-level scheduling area where there is a capacity conflict at the cross section, and obtain the capacity adjustment information fed back by the prefecture-level scheduling area according to the capacity adjustment request; The available capacity of the shared transmission section is reallocated based on the capacity adjustment information to obtain the reallocated capacity of the shared transmission section. The negotiated consensus interval is updated based on the redistributed shared transmission section capacity.

[0012] In addition, to achieve the above objectives, this application also proposes a high-voltage power grid collaborative real-time control device, which includes: an interval determination module, used to determine the consensus interval of the prefecture-level dispatching area based on the multidimensional stability margin of the high-voltage power grid and the power grid parameters of the prefecture-level dispatching area; The decision identification module is used to identify decisions based on the consensus interval to obtain the variable consensus interval and the equilibrium control strategy. The distributed negotiation module is used to perform distributed negotiation on the variable consensus interval based on the coupling relationship and capacity of the shared transmission section in the prefecture-level dispatch area, so as to obtain the negotiation consensus interval. The collaborative control module is used to constrain the equilibrium control strategy according to the negotiated consensus interval to obtain the target control strategy, and to perform collaborative real-time control of the high-power transmission grid according to the target control strategy.

[0013] In addition, to achieve the above objectives, this application also proposes a high-power grid collaborative real-time control device, the device comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, the computer program being configured to implement the steps of the high-power grid collaborative real-time control method described above.

[0014] In addition, to achieve the above objectives, this application also proposes a storage medium, which is a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, it implements the steps of the high-voltage power grid collaborative real-time control method described above.

[0015] In addition, to achieve the above objectives, this application also provides a computer program product, which includes a computer program that, when executed by a processor, implements the steps of the high-voltage power grid collaborative real-time control method described above.

[0016] One or more technical solutions proposed in this application have at least the following technical effects: By employing techniques that determine consensus intervals based on multidimensional stability margins and regional grid parameters at the prefecture-level dispatching level, generate variable consensus intervals and equilibrium control strategies based on these consensus intervals, and combine the coupling relationship and capacity of shared transmission sections to conduct distributed negotiation of variable consensus intervals and use the negotiated consensus intervals to constrain the equilibrium control strategies, this approach achieves a coordinated expression of operational constraints and regional dispatching needs for high-power transmission grids. This enables regional control decisions to adapt to real-time operational status changes while meeting overall stability constraints, solving the problems of lagging information exchange and low control decision efficiency between provincial and prefecture-level dispatching in high-power transmission grids under conditions of rapid fluctuations in renewable energy output. Compared with existing technologies that rely on centralized provincial calculations before issuing instructions, this scheme improves the coordination capabilities and control response efficiency between provincial and prefecture-level dispatching, reduces operational risks caused by inter-regional dispatching incoordination, and achieves coordinated real-time control of high-power transmission grids. Attached Figure Description

[0017] The accompanying drawings, which are incorporated in and form part of this specification, illustrate embodiments consistent with this application and, together with the description, serve to explain the principles of this application.

[0018] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, for those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0019] Figure 1 This is a flowchart illustrating an embodiment of the high-voltage power grid collaborative real-time control method of this application. Figure 2 This is a schematic diagram of the dynamic game equilibrium process at the provincial and local levels provided in Embodiment 1 of the high-power grid collaborative real-time control method of this application; Figure 3 This is a schematic diagram of adjacent area meshing negotiation provided in Embodiment 1 of the high-voltage power grid collaborative real-time control method of this application; Figure 4 This is a flowchart illustrating Embodiment 2 of the high-voltage power grid collaborative real-time control method of this application; Figure 5 A simplified flowchart illustrating the high-voltage power grid collaborative real-time control method provided in Embodiment 2 of this application; Figure 6 This is a schematic diagram of the module structure of the high-voltage power grid collaborative real-time control device according to an embodiment of this application; Figure 7 This is a schematic diagram of the equipment structure of the hardware operating environment involved in the high-voltage power grid collaborative real-time control method in the embodiments of this application.

[0020] The purpose, features, and advantages of this application will be further explained in conjunction with the embodiments and with reference to the accompanying drawings. Detailed Implementation

[0021] It should be understood that the specific embodiments described herein are merely illustrative of the technical solutions of this application and are not intended to limit this application.

[0022] To better understand the technical solution of this application, a detailed description will be provided below in conjunction with the accompanying drawings and specific implementation methods.

[0023] The main solution of this application embodiment is as follows: Based on the multidimensional stability margin of the high-voltage power grid and the power grid parameters of the prefecture-level dispatch area, a consensus interval for the prefecture-level dispatch area is determined; decision identification is performed based on the consensus interval to obtain a variable consensus interval and a balance control strategy; based on the shared transmission section coupling relationship and shared transmission section capacity of the prefecture-level dispatch area, distributed negotiation is performed on the variable consensus interval to obtain a negotiated consensus interval; the balance control strategy is constrained based on the negotiated consensus interval to obtain a target control strategy, and the high-voltage power grid is subjected to coordinated real-time control based on the target control strategy.

[0024] In this embodiment, for ease of description, the following description will focus on identifying the real-time control equipment for high-voltage power grid coordination.

[0025] Due to the lag in information exchange and low efficiency in control decision-making between provincial and local dispatching levels in high-voltage power grids under conditions of rapid fluctuations in renewable energy output, this application provides a solution. This solution employs a method that uses multi-dimensional stability margin and regional power grid parameters to determine a consensus interval, generates a variable consensus interval and a balanced control strategy based on this interval, and combines the coupling relationship and capacity of shared transmission sections to conduct distributed negotiation of the variable consensus interval, using the negotiated consensus interval to constrain the balanced control strategy. This achieves a coordinated expression of the operational constraints of the high-voltage power grid and regional dispatching needs, enabling regional control decisions to adapt to real-time operational status changes while meeting overall stability constraints. This solves the problem of lag in information exchange and low efficiency in control decision-making between provincial and local dispatching levels in high-voltage power grids under conditions of rapid fluctuations in renewable energy output. Compared with existing technologies that rely on centralized provincial calculations before issuing instructions, this solution improves the coordination capability and control response efficiency between provincial and local dispatching levels, reduces operational risks caused by inter-regional dispatching incoordination, and achieves coordinated real-time control of the high-voltage power grid.

[0026] It should be noted that the executing entity in this embodiment can be a computing service device with data processing, network communication, and program execution functions, such as a tablet computer, personal computer, or mobile phone, or an electronic device capable of performing the above functions, such as a high-voltage power grid collaborative real-time control device. The following description uses a high-voltage power grid collaborative real-time control device as an example to illustrate this embodiment and the subsequent embodiments.

[0027] Based on this, the embodiments of this application provide a method for coordinated real-time control of high-voltage power grids, referring to... Figure 1 , Figure 1 This is a flowchart illustrating the first embodiment of the high-voltage power grid collaborative real-time control method of this application.

[0028] In this embodiment, the high-voltage power grid collaborative real-time control method includes steps S10~S40: Step S10: Determine the consensus interval of the prefecture-level dispatching area based on the multidimensional stability margin of the high-output power grid and the power grid parameters of the prefecture-level dispatching area.

[0029] It should be noted that multidimensional stability margin is a data indicator used to characterize the adjustable space of a high-voltage power grid from the stability boundary under different operational constraints, reflecting the safety margin of the current power grid operation. In this embodiment, multidimensional stability margin includes voltage stability margin, frequency stability margin, power angle stability margin, and line power flow stability margin, which together describe the stable operation capability of the high-voltage power grid under the influence of new energy output fluctuations, load changes, and transmission operation pressures.

[0030] In addition, the power grid parameters of the prefecture-level dispatch area are data used to describe the local power grid operation characteristics of the prefecture-level dispatch area. These include the power grid topology parameters, equipment parameters, load data, and renewable energy output forecasts for the corresponding prefecture-level dispatch area. The power grid parameters of the prefecture-level dispatch area can reflect the power grid structure characteristics and operating conditions of different regions, providing a data foundation for subsequently determining the dispatch range corresponding to different regions.

[0031] Furthermore, the consensus interval is used to define the operational range within which a prefecture-level dispatching region can make dispatching decisions. It transforms the overall stability constraints of the high-power transmission grid into identifiable interval boundaries for the prefecture-level dispatching region, enabling it to autonomously adjust while meeting overall operational safety requirements. In this embodiment, the consensus interval includes a lower bound characterizing the conservative dispatching boundary and an upper bound characterizing the range of dispatching capacity utilization.

[0032] It is understandable that when determining the consensus interval of the prefecture-level dispatch area, the overall stability state of the current power grid is first obtained based on the multidimensional stability margin of the high-output power grid, and the degree of influence of various stability constraints on different prefecture-level dispatch areas is analyzed in combination with the power grid parameters of the prefecture-level dispatch area.

[0033] Based on the correspondence between multidimensional stability margin and power grid parameters in prefecture-level dispatch areas, the influence range of multidimensional stability constraints on the dispatch space of prefecture-level dispatch areas is determined. Furthermore, the overall stability constraints of the high-power transmission grid are mapped to prefecture-level dispatch areas to form corresponding consensus intervals, so that each prefecture-level dispatch area has a dispatch boundary that matches the current operating state.

[0034] Step S20: Decision identification is performed based on the consensus interval to obtain the variable consensus interval and the equilibrium control strategy.

[0035] It should be noted that the variable consensus interval is a scheduling decision space that is dynamically adjusted based on the real-time operational status of the prefecture-level scheduling area within the defined consensus interval. The variable consensus interval can change its adjustment range according to regional operational needs while meeting the overall constraints of the provincial level, giving the prefecture-level scheduling area decision-making flexibility to adapt to the current operational status.

[0036] Furthermore, the balanced control strategy is a control scheme determined based on the coordination relationship between provincial scheduling objectives and the operational needs of prefecture-level scheduling areas. It aims to satisfy overall scheduling objectives while also considering the operational constraints of different prefecture-level scheduling areas. In this embodiment, the balanced control strategy is jointly determined by the variable consensus interval and regional control decisions, serving as the foundational control scheme for subsequent coordinated control.

[0037] Furthermore, decision identification involves analyzing the current scheduling requirements based on the consensus interval to determine the adjustment range and corresponding control scheme that can be adopted in the prefecture-level scheduling area. The decision identification process transforms fixed operational constraints into a dynamic decision space that adapts to real-time state changes.

[0038] Understandably, during decision identification, the constraints of decomposable and executable provincial-level scheduling objectives are determined based on the consensus interval, and the current operational needs of the prefecture-level scheduling region are analyzed in conjunction with the real-time operational status of the prefecture-level scheduling region. While satisfying the consensus interval constraints, the adjustable range of the prefecture-level scheduling region is dynamically adjusted to obtain a variable consensus interval. Simultaneously, based on the coordination relationship between provincial-level scheduling objectives and prefecture-level scheduling region control needs, a balance analysis is performed on different scheduling objectives to determine a balance control strategy that can simultaneously meet overall scheduling needs and regional operational requirements.

[0039] In one feasible implementation, step S20 may include steps S21 to S24: Step S21: Obtain the provincial scheduling target.

[0040] It should be noted that the provincial dispatch target is a dispatch optimization direction determined based on the overall operational needs of the high-power transmission grid, used to characterize the control requirements of the provincial dispatching side on the overall operation status of the power grid. In this embodiment, the provincial dispatch target may include comprehensive dispatching needs such as renewable energy consumption, power generation cost control, stable grid operation, and transmission section safety constraints, used to guide coordinated regulation in different prefecture-level dispatching areas.

[0041] Understandably, when obtaining provincial dispatch targets, the global optimization direction that the provincial dispatching side needs to achieve is determined based on the current operational needs of the high-voltage power grid and the overall dispatching requirements. This global optimization direction serves as the basis for subsequent target decomposition and provincial-regional collaborative decision-making. Provincial dispatch targets are used to coordinate the operational behavior of multiple prefecture-level dispatching regions at the overall level, ensuring that dispatching decisions in different regions meet the overall operational needs of the high-voltage power grid.

[0042] Step S22: Decompose the provincial scheduling target into a target stack based on the consensus interval to obtain the prefecture-level scheduling target and the provincial constraint framework.

[0043] It should be noted that target stacking decomposition is a process of breaking down provincial-level scheduling targets layer by layer according to the operating conditions of different prefecture-level scheduling regions, so that the overall scheduling requirements are transformed into local scheduling targets that can be executed by multiple prefecture-level scheduling regions. In this embodiment, target stacking decomposition allocates and transforms provincial-level scheduling targets based on the scheduling range constraints provided by the consensus interval, so that the decomposed scheduling targets meet the adjustability of each prefecture-level scheduling region.

[0044] In addition, prefecture-level dispatch targets are local dispatch requirements derived from provincial-level dispatch targets and oriented towards individual prefecture-level dispatch areas. Prefecture-level dispatch targets describe the regulation tasks that the corresponding prefecture-level dispatch area needs to complete, enabling the prefecture-level dispatch area to make control decisions based on its own operational situation while meeting overall dispatch requirements.

[0045] Furthermore, the provincial constraint framework is determined by the provincial dispatching authority based on overall operational requirements, and serves to limit the dispatching scope and adjustment boundaries of each prefecture-level dispatching area. In this embodiment, the provincial constraint framework constrains the adjustable range of prefecture-level dispatching areas through consensus intervals, ensuring that the autonomous decisions of prefecture-level dispatching areas always remain within the range that meets overall stability requirements.

[0046] Understandably, when performing target stacking decomposition, the consensus interval is first used to determine the operational scope that each prefecture-level dispatching region can participate in regulation. Then, based on the overall optimization requirements in the provincial dispatching target, the overall target is decomposed according to the operational conditions of different regions. By analyzing the regulation space and target-bearing capacity corresponding to each prefecture-level dispatching region, the provincial dispatching target is converted into multiple prefecture-level dispatching targets. Simultaneously, a provincial constraint framework is generated to constrain the behavior of prefecture-level dispatching regions, enabling the overall provincial target to be executed by the prefecture-level dispatching regions.

[0047] Step S23: Determine the variable consensus interval and local control decision based on the prefecture-level scheduling target, the provincial constraint framework, and the real-time operating status of the prefecture-level scheduling area.

[0048] It should be noted that the real-time operational status of a prefecture-level dispatching area reflects the current operational status of that area, including changes in its current operational status, equipment operating status, and real-time dispatching needs within the area. The real-time operational status of a prefecture-level dispatching area is used to determine whether the area needs to adjust its dispatching scope to adapt to changes in power grid operation.

[0049] Furthermore, local control decisions are the local control choices determined by the prefecture-level dispatching region based on its own operational needs and constraints. These decisions represent the control methods adopted by the prefecture-level dispatching region within its permissible adjustment range. In this embodiment, local control decisions are determined by combining prefecture-level dispatching objectives and real-time operational status, enabling the prefecture-level dispatching region to achieve autonomous adjustment while meeting provincial constraints.

[0050] Furthermore, the variable consensus interval is a regional scheduling range dynamically adjusted based on the consensus interval, according to the prefecture-level scheduling objectives, the provincial constraint framework, and the real-time operational status. The variable consensus interval can adjust its boundaries as the operational status changes, giving the prefecture-level scheduling area an adjustment space that matches the current operational conditions.

[0051] Understandably, when determining the variable consensus interval and local control decisions, the overall adjustable range of the prefecture-level dispatching area is first limited based on the provincial constraint framework. Then, the dispatching tasks that the current area needs to complete are analyzed in conjunction with the prefecture-level dispatching objectives, while the actual operating conditions of the current area are judged based on the real-time operating status. Based on the above information, the original dispatching range is adjusted within the provincial constraint range to form a variable consensus interval that adapts to the current operating status. And within the allowable range of the variable consensus interval, the local control decisions corresponding to the prefecture-level dispatching area are determined.

[0052] In one feasible implementation, prefecture-level dispatching regions can make autonomous decisions based on their own operational needs within the constraints of the provincial-level framework. Specifically, prefecture-level dispatching regions determine local optimization objectives based on prefecture-level dispatching goals. These local optimization objectives represent the local regulation needs that the prefecture-level dispatching region needs to achieve based on its own operational characteristics. Local optimization objectives may include reducing local power generation costs, meeting local load demand, and improving local renewable energy absorption capacity.

[0053] Furthermore, the prefecture-level dispatching region dynamically adjusts the variable consensus interval based on real-time operational status. While adhering to the provincial constraint framework, the prefecture-level dispatching region determines the corresponding adjustable range based on changes in the current operational status, ensuring that the variable consensus interval can adapt to the region's real-time operational needs. Specifically, the variable consensus interval lies within the limits of the provincial constraint framework; that is, the autonomous adjustment range of the prefecture-level dispatching region will not exceed the overall provincial dispatching constraints.

[0054] Furthermore, the prefecture-level dispatching region determines its local control decisions based on local optimization objectives, real-time operating status, and variable consensus intervals. These local control decisions represent the control methods selected by the prefecture-level dispatching region under current operating conditions, enabling it to autonomously adjust according to its own operational needs while meeting provincial constraints.

[0055] Understandably, the prefecture-level dispatching region determines whether the current variable consensus interval needs adjustment based on real-time operational status. When a change in operational status is detected, or when the current local optimization objective does not match the operational status, the variable consensus interval is redefined, and local control decisions are updated based on the adjusted variable consensus interval, enabling the prefecture-level dispatching region's control behavior to adapt to changes in operational status. Based on dynamic criteria, within the constraint framework set by the provincial level, the variable consensus interval for this region is dynamically defined. This range is subject to provincial constraints. subset of:

[0056] In the formula, It is the lower bound of the variable consensus interval corresponding to the i-th prefecture-level scheduling region, used to represent the lower limit of the adjustable range of the prefecture-level scheduling region under the current operating state; It represents the upper bound of the variable consensus interval corresponding to the i-th prefecture-level scheduling region, used to indicate the upper limit of the adjustable range of the prefecture-level scheduling region under the current operating state. This is the lower bound of the provincial constraint framework corresponding to the i-th prefecture-level dispatch area, used to represent the lowest boundary set by the provincial dispatch side for the adjustment range of the prefecture-level dispatch area; This represents the upper bound of the provincial constraint framework corresponding to the i-th prefecture-level dispatch area, used to indicate the highest boundary set by the provincial dispatch side for the adjustment range of the prefecture-level dispatch area.

[0057] Step S24: Based on the variable consensus interval and the local control decision, perform game equilibrium solution on the provincial scheduling target and the prefecture-level scheduling target to obtain the equilibrium control strategy.

[0058] It should be noted that game equilibrium solution is a process of determining the balanced control outcome by analyzing the goal constraints and decision-making behaviors of both parties, addressing the coordination relationship between provincial and prefecture-level scheduling objectives. In this embodiment, game equilibrium solution is used to coordinate the overall optimization needs of the provincial level with the autonomous adjustment needs of prefecture-level regions, so that the final control outcome can simultaneously meet both global objectives and local operational requirements.

[0059] Furthermore, the equilibrium control strategy is a control scheme obtained through game theory equilibrium solutions. It represents the control outcome after provincial and prefecture-level dispatching objectives reach a coordinated state. The equilibrium control strategy can serve as the basis for subsequent high-power transmission grid control execution, ensuring coordinated operation between different dispatching levels.

[0060] Understandably, when solving the game equilibrium problem, the provincial-level scheduling objective is considered as the overall optimization requirement, and the prefecture-level scheduling objective is considered as the regional operational requirement. A variable consensus interval is used to limit the adjustable range for both parties, while local control decision analysis is incorporated to determine the control behaviors that the prefecture-level scheduling region can adopt under current operational conditions. Through coordinated analysis of the constraints, optimization requirements, and control responses between the provincial and prefecture-level objectives, the equilibrium control outcome that satisfies the constraints of both parties is determined, and an equilibrium control strategy is generated based on this outcome.

[0061] In one feasible implementation, step S24 may include steps S241 to S244: Step S241: Determine the optimization target of the provincial scheduling side based on the provincial scheduling target, and determine the response strategy of the prefecture-level scheduling area based on the prefecture-level scheduling target, the local control decision, and the variable consensus interval.

[0062] It should be noted that the optimization objectives of the provincial dispatching side are further determined based on the provincial dispatching objectives and are used to describe the optimization direction for the overall operational effect that the provincial dispatching side expects to achieve. In this embodiment, the optimization objectives of the provincial dispatching side are used to reflect the overall dispatching needs of the high-power transmission grid, such as comprehensive objectives like improving the capacity for renewable energy absorption, reducing operating costs, and ensuring stable grid operation, providing a target basis for subsequent coordination decisions between the provincial dispatching side and the prefecture-level dispatching areas.

[0063] Additionally, the response strategy is the adjustment plan determined by the prefecture-level dispatching region in response to provincial constraints and its own operational needs. It characterizes the prefecture-level dispatching region's response to provincial dispatching objectives under current operating conditions. The response strategy is determined by combining prefecture-level dispatching objectives, local control decisions, and variable consensus intervals, enabling the prefecture-level dispatching region to select an adjustment plan suitable for its own operational status while meeting constraints.

[0064] In one feasible implementation, the provincial and regional two-level dispatching process can be modeled as a game between a leader and followers. The provincial dispatching authority acts as the leader, determining optimization objectives and constraints based on the overall operational needs of the high-power transmission grid; multiple regional dispatching areas act as followers, determining local control decisions based on the constraints provided by the provincial dispatching authority and their own operational status.

[0065] The strategy space of the provincial dispatching side includes the consensus interval constraint framework, the interval boundary corresponding to the prefecture-level dispatching area, and the weight coefficient, which are used to describe the constraint relationship of the provincial dispatching side on the overall dispatching process; the strategy space of the prefecture-level dispatching area includes local control decisions and variable consensus intervals, which are used to describe the autonomous adjustment range of the prefecture-level dispatching area under the condition of satisfying the provincial constraints.

[0066] Understandably, when determining the optimization objectives for the provincial dispatching side, the optimization direction to be achieved by the provincial dispatching side is analyzed and determined based on the overall operational needs included in the provincial dispatching objectives, enabling the provincial dispatching side to adjust with the overall power grid operation effect as the target. Simultaneously, based on the prefecture-level dispatching objectives, the local adjustment tasks to be completed by the prefecture-level dispatching area are determined, and combined with local control decision analysis, the control behaviors that the prefecture-level dispatching area can currently execute are determined. The adjustable range of the prefecture-level dispatching area is limited by a variable consensus interval, further determining the response strategy of the prefecture-level dispatching area to the provincial dispatching objectives under current constraints.

[0067] In one feasible implementation, a game equilibrium solution between provincial and prefecture-level dispatching objectives can be achieved based on an objective stacking mechanism. Specifically, the provincial dispatching side, as the main body for formulating the overall optimization objective, determines the global optimization objective based on the operational needs of the high-power transmission grid. The global optimization objective may include multiple optimization objectives such as maximizing renewable energy consumption, minimizing power generation costs, ensuring system frequency stability, and avoiding transmission line overload. By comprehensively considering multiple optimization objectives, a comprehensive optimization objective for the provincial dispatching side is formed. The expression for the comprehensive optimization objective is as follows:

[0068] in, The weight coefficients for each sub-objective reflect the optimization focus in different time periods and scenarios; For the overall goal; To maximize the absorption of new energy sources; To minimize power generation costs; To ensure system frequency stability; To avoid overloading the connection line.

[0069] Among them, the comprehensive optimization objectives on the provincial dispatch side are used to describe the overall operational needs of the high-power transmission grid, with different optimization objectives corresponding to different optimization directions. The renewable energy consumption objective is used to improve the utilization capacity of renewable energy output and reduce renewable energy curtailment; the power generation cost objective is used to reduce the economic cost of power generation during grid operation; the frequency stability objective is used to ensure the frequency stability during grid operation; and the line overload constraint objective is used to prevent transmission lines from operating beyond the allowable range.

[0070] Furthermore, based on the comprehensive optimization goals of the provincial dispatching side, the overall dispatching goals are decomposed into target stacking, transforming the overall provincial dispatching needs into local optimization goals corresponding to multiple prefecture-level dispatching regions. During the target stacking decomposition process, the adjustable range of each prefecture-level dispatching region is limited according to the consensus interval, and the target allocation relationship between different prefecture-level dispatching regions is determined, enabling each prefecture-level dispatching region to exercise autonomous control while meeting the overall provincial optimization needs.

[0071]

[0072]

[0073] in, Let represent the local optimization objective function of the i-th prefecture-level agent. This represents the local control decision of the i-th prefecture-level intelligent agent. This represents the total scheduling target quantity to be stacked and decomposed at the provincial level. This represents the stacking priority of the i-th prefecture-level agent. Let represent the lower and upper bounds of the consensus interval for the i-th local intelligent agent.

[0074] Specifically, each prefecture-level dispatching region determines its response strategy based on its corresponding prefecture-level dispatching objectives, local control decisions, and variable consensus intervals. The response strategy represents the control scheme that a prefecture-level dispatching region can adopt under the current operating state and constraints. By coordinating the response strategies of different prefecture-level dispatching regions, the control behaviors of different regions are made to meet the overall provincial optimization objectives.

[0075] When solving the game equilibrium, the optimization objective of the provincial-level dispatching side is taken as the overall optimization direction, and the response strategies of each prefecture-level dispatching region are taken as local control behaviors. By analyzing the coordination relationship between the provincial-level objective and the prefecture-level objective, the equilibrium control result that satisfies the constraints of both sides is determined. Based on the equilibrium control result, the prefecture-level control strategy corresponding to each prefecture-level dispatching region and the objective decomposition result corresponding to the provincial-level dispatching objective are determined, and the equilibrium control strategy is generated based on the prefecture-level control strategy and the objective decomposition result.

[0076] Step S242: Solve the game equilibrium according to the optimization objective and the response strategy to obtain the equilibrium control result.

[0077] It should be noted that game equilibrium solution is a process of coordinating and analyzing the target relationships and control behaviors between different scheduling entities based on the optimization objectives of the provincial-level scheduling side and the response strategies of the prefecture-level scheduling regions, in order to determine the corresponding control results when both parties reach a coordinated state. In this embodiment, game equilibrium solution is used to handle the coordination relationship between the overall provincial-level scheduling needs and the autonomous control needs of the prefecture-level scheduling regions, so that the final control result can take into account the scheduling requirements of different levels.

[0078] Furthermore, the equilibrium control result is obtained through game theory equilibrium solutions, representing the control outcome achieved after coordination between the provincial-level dispatching body and the prefecture-level dispatching region. The equilibrium control result reflects the acceptable control state among the various dispatching entities under the current optimization objectives, response strategies, and constraints, providing a basis for subsequently generating equilibrium control strategies.

[0079] Understandably, when solving the game equilibrium, the optimization objective of the provincial-level dispatching side is taken as the overall dispatching direction, and the response strategy of the prefecture-level dispatching region is taken as the regional control response information. A coordination analysis is then conducted on the objective relationship between the provincial-level dispatching side and the prefecture-level dispatching region. By analyzing the matching relationship between the optimization needs of the provincial-level dispatching side and the response behavior of the prefecture-level dispatching region, and under the constraint of the variable consensus interval, the optimization effect of the local control decision and the degree of deviation from the provincial constraints are comprehensively evaluated based on the payoff function corresponding to the prefecture-level dispatching region. Based on the evaluation results, control schemes corresponding to different dispatching objectives are coordinated to determine the equilibrium control result that can simultaneously satisfy the provincial-level optimization requirements and the prefecture-level operational needs. The payoff function expression is as follows:

[0080] In the formula, Let be the local optimization objective function for the i-th prefecture-level agent; It is the lower bound of the variable consensus interval corresponding to the i-th prefecture-level scheduling region, used to represent the lower limit of the adjustable range of the prefecture-level scheduling region under the current operating state; It represents the upper bound of the variable consensus interval corresponding to the i-th prefecture-level scheduling region, used to indicate the upper limit of the adjustable range of the prefecture-level scheduling region under the current operating state; The penalty coefficient is... Used to measure the degree to which prefecture-level decisions deviate from provincial-level constraints; Let be the lower and upper bounds of the consensus interval for the i-th prefecture-level intelligent agent.

[0081] In one feasible implementation, an adaptive dynamic programming approach can be used to solve the game process between the provincial dispatching side and the prefecture-level dispatching area. Specifically, the multidimensional stability margin, the real-time operating status of the prefecture-level dispatching area, the consensus interval boundary, and the shared transmission section occupancy status are used as the current state information. The adjustment of the provincial constraint boundary, the adjustment of the weight coefficient, and the local control decision of the prefecture-level dispatching area are used as strategy variables. A benefit evaluation relationship is constructed based on the provincial dispatching objectives, the prefecture-level dispatching objectives, and the constraints.

[0082] When solving for the game equilibrium, the first step is to determine the payoff evaluation result based on the current state information and the current strategy. The evaluation process analyzes whether the current provincial-level dispatching optimization objective and the prefecture-level dispatching area local control objective are met, and determines whether the current strategy has reached a coordinated state based on the evaluation result. If the payoff evaluation result corresponding to the current strategy does not meet the optimization requirements, adjustments are made to the provincial-level dispatching strategy and the prefecture-level dispatching area response strategy.

[0083] Furthermore, when updating the strategy, the provincial-level dispatching strategy is first fixed, and the optimal response strategy for each prefecture-level dispatching area is determined based on the current constraints. Then, the provincial-level dispatching strategy is adjusted based on the response results of the prefecture-level dispatching areas, forming a cyclical optimization process between the provincial and prefecture-level dispatching strategies. By continuously updating the provincial-level dispatching strategy and the prefecture-level dispatching area response strategy, the provincial-level dispatching objectives and prefecture-level dispatching objectives gradually reach a coordinated state, resulting in balanced control.

[0084] Understandably, during the game equilibrium solution process, when the evaluation error, strategy change, and provincial-local coordination deviation are all less than the corresponding preset thresholds, it is considered that the current provincial-level dispatching strategy and the prefecture-level dispatching regional response strategy have reached a convergence state, and the current strategy combination is determined as the game equilibrium result.

[0085] Step S243: Determine the prefecture-level control strategy for the prefecture-level scheduling area and the target decomposition result of the provincial-level scheduling target based on the balanced control result.

[0086] It should be noted that the prefecture-level control strategy is a specific control scheme determined based on the balanced control results and executed by the prefecture-level dispatching area. It guides the prefecture-level dispatching area to adjust its own operational status according to the current coordination results. The prefecture-level control strategy reflects the autonomous control results of the prefecture-level dispatching area while meeting the provincial-level dispatching requirements.

[0087] Furthermore, the target decomposition results of provincial-level dispatch objectives are the breakdown of the overall provincial dispatch objectives into corresponding tasks for each prefecture-level dispatch area after coordination and analysis. These target decomposition results describe the specific implementation content of the provincial dispatch objectives in different prefecture-level dispatch areas, enabling the overall dispatch objectives to be transformed into regionally executable control requirements.

[0088] Understandably, when determining the prefecture-level control strategy and target decomposition results, the control state after coordination between the provincial dispatching side and the prefecture-level dispatching area is analyzed based on the balanced control results. From this analysis, the control content that the prefecture-level dispatching area needs to execute is extracted to form the prefecture-level control strategy. Simultaneously, based on the relationship between the provincial dispatching targets and the response of each prefecture-level dispatching area in the balanced control results, the provincial dispatching targets are allocated accordingly, resulting in target decomposition results applicable to different prefecture-level dispatching areas.

[0089] Step S244: Generate an equilibrium control strategy based on the prefecture-level control strategy and the target decomposition result.

[0090] It is understandable that when generating a balanced control strategy, the prefecture-level control strategy is taken as the actual control content executed on the regional side. Combined with the target decomposition results of the provincial scheduling objectives, the overall provincial scheduling requirements and prefecture-level control behaviors are uniformly organized to form a balanced control strategy that simultaneously meets the provincial scheduling objectives and the regional operation needs of the prefecture-level scheduling area.

[0091] In one possible implementation, steps S25 to S28 may be included after step S24: Step S25: Determine the coordination deviation between the provincial-level scheduling target and the prefecture-level scheduling target according to the balanced control strategy.

[0092] It should be noted that coordination deviation is an indicator used to measure the degree of coordination between provincial-level and prefecture-level scheduling objectives. It reflects the deviation between the overall optimization needs of the province and the execution results of the prefecture-level scheduling areas. In this embodiment, coordination deviation is used to determine whether the equilibrium control strategy obtained through game equilibrium solution can effectively coordinate the relationship between provincial-level and prefecture-level scheduling objectives, providing a basis for subsequent dynamic adjustments.

[0093] Understandably, when determining the coordination deviation between provincial and prefecture-level dispatching targets, the matching status of the provincial and prefecture-level dispatching targets under the current control scheme is analyzed based on the control results corresponding to the equilibrium control strategy, thus determining the degree of deviation between the provincial and prefecture-level dispatching targets. By comparing the overall provincial dispatching demand with the actual response in the prefecture-level dispatching area, the coordination deviation, which characterizes the coordination status of the two levels of dispatching targets, is obtained. The deviation monitoring expression is as follows:

[0094] In the formula, For the coordination deviation index; The actual overall benefit achieved; This represents the theoretically optimal global benefit.

[0095] Step S26: Determine whether the coordination deviation is greater than a preset deviation threshold.

[0096] It should be noted that the preset deviation threshold is a preset condition used to determine whether the coordination deviation is within the allowable range. It is used to distinguish between the normal deviation state between the current provincial scheduling target and the prefecture-level scheduling target and the abnormal deviation state that needs to be adjusted.

[0097] Understandably, when determining whether the coordination deviation exceeds a preset deviation threshold, the coordination deviation is compared to the preset deviation threshold. If the coordination deviation does not exceed the preset deviation threshold, it indicates that the current equilibrium control strategy can meet the coordination requirements between provincial and prefecture-level scheduling objectives, and the current equilibrium control strategy is maintained. If the coordination deviation exceeds the preset deviation threshold, it indicates a significant deviation between the provincial and prefecture-level objectives corresponding to the current equilibrium control strategy, requiring further adjustment of the parameters affecting the game equilibrium outcome.

[0098] In this embodiment, when ( You can set it yourself, such as When the deviation is less than or equal to 0.1, the coordination mechanism is triggered. The coordination priority is dynamically adjusted based on the degree of deviation; the greater the deviation, the higher the coordination priority.

[0099] Step S27: If the coordination deviation is greater than the preset deviation threshold, adjust the weight coefficient corresponding to the prefecture-level scheduling area and the boundary parameters of the variable consensus interval to obtain the adjusted weight coefficient and the adjusted boundary parameters.

[0100] It should be noted that the weighting coefficient is a parameter used to adjust the influence relationship between different prefecture-level dispatching regions in the coordination process between provincial and prefecture-level dispatching objectives. In this embodiment, the weighting coefficient is used to participate in the coordination and adjustment of the game equilibrium process, enabling different prefecture-level dispatching regions to adjust their own roles in the equilibrium process according to the current deviation between provincial and prefecture-level objectives.

[0101] Additionally, the boundary parameters of the variable consensus interval are parameters used to describe the boundary of the variable consensus interval's adjustment range, and are used to adjust the range within which the prefecture-level scheduling region can make autonomous decisions. In this embodiment, by adjusting the boundary parameters of the variable consensus interval, the adjustment space of the prefecture-level scheduling region within the provincial-level constraints can be changed, allowing the variable consensus interval to adapt to current coordination needs.

[0102] Understandably, when the coordination deviation exceeds the preset deviation threshold, the weight coefficients corresponding to the prefecture-level scheduling area are adjusted based on the deviation between the current provincial-level scheduling target and the prefecture-level scheduling target. At the same time, the boundary parameters of the variable consensus interval are adjusted, so that the target trade-off relationship and adjustable range in the game equilibrium process change, and the adjusted weight coefficients and adjusted boundary parameters are obtained, providing updated coordination conditions for subsequent re-solving of the game equilibrium.

[0103] For example, during coordination, a dynamic rebalancing of interests can be achieved by adjusting the weight coefficients *wi* of each prefecture-level region and the boundary parameters of the variable consensus interval. The adjustment strategy can employ gradient descent or constraint relaxation methods to find a compromise solution that satisfies all parties while satisfying their basic constraints.

[0104] Step S28: Solve the game equilibrium based on the adjusted weight coefficients and the adjusted boundary parameters to update the equilibrium control strategy.

[0105] It should be noted that updating the equilibrium control strategy is a process of redetermining the balance control result between provincial and prefecture-level scheduling objectives based on adjusted coordination parameters. In this embodiment, the updated equilibrium control strategy replaces the previous equilibrium control strategy, enabling the control scheme to adapt to changes in the current coordination relationship between provincial and prefecture-level objectives.

[0106] Understandably, when solving the game equilibrium based on the adjusted weight coefficients and boundary parameters, the adjusted weight coefficients serve as the basis for adjusting the coordination relationship between provincial and prefecture-level scheduling objectives, and the adjusted boundary parameters serve as new constraints for the variable consensus interval. This allows for a re-analysis of the optimization relationship and control response relationship between the provincial and prefecture-level scheduling objectives. The game equilibrium is then solved based on the redefined objective relationship and constraints to obtain the updated equilibrium control result, and the equilibrium control strategy is updated accordingly.

[0107] Reference Figure 2 , Figure 2 This is a schematic diagram of the dynamic game equilibrium process at the provincial and local levels in the first embodiment of the high-voltage power grid collaborative real-time control method of this application.

[0108] like Figure 2 The diagram illustrates the process of optimizing the equilibrium control strategy based on a provincial-level and prefecture-level dispatch coordination and dynamic coordination mechanism. First, the provincial-level intelligent agent distributes target stacking and constraint frameworks according to overall dispatch requirements. This provincial agent determines the dispatch direction based on the overall operational goals of the high-power transmission grid and transmits the corresponding constraints and coordination requirements to multiple prefecture-level dispatch areas. These prefecture-level dispatch areas correspond to prefecture-level intelligent agents A, B, and C, respectively. Each prefecture-level intelligent agent performs autonomous control based on the dispatch constraints distributed by the provincial agent and its own operational status, determining its corresponding variable interval. The variable interval represents the operational range that each prefecture-level dispatch area can autonomously adjust under the condition of satisfying the provincial constraints. The control results from multiple prefecture-level intelligent agents are further balanced. By comprehensively analyzing the relationship between the provincial dispatch objectives and the response strategies of each prefecture-level dispatch area, the control schemes of different areas are coordinated and optimized to obtain the equilibrium control result. After obtaining the equilibrium control result, the coordination deviation between the provincial and prefecture-level dispatch objectives is monitored. This process is represented by a coordination deviation monitoring module in the diagram. The coordination deviation monitoring module calculates the coordination deviation based on the coordination deviation index... With preset threshold A comparison is made to determine whether the current provincial and municipal level scheduling objectives have achieved a coordinated state. When the coordination deviation index... Less than or equal to the preset threshold When the current equilibrium control result meets the coordination requirements, it enters the equilibrium convergence state; when the coordination deviation index... Greater than the preset threshold This indicates that there is still a significant deviation between the current provincial-level dispatching targets and the prefecture-level dispatching targets, necessitating the triggering of a coordination mechanism. This involves adjusting the weighting coefficients and variable consensus interval boundary parameters to re-optimize the system, and then feeding the adjustment results back to the provincial and prefecture-level agents for a second equilibrium solution. Through this process, dynamic coordination between the overall provincial-level dispatching needs and the autonomous control needs of prefecture-level regions is achieved, improving the collaborative control capabilities of the high-voltage power grid under multi-regional and multi-constraint operating conditions.

[0109] Step S30: Based on the coupling relationship and capacity of the shared transmission section in the prefecture-level dispatch area, the variable consensus interval is negotiated in a distributed manner to obtain the negotiation consensus interval.

[0110] It should be noted that the shared transmission section coupling relationship is used to describe the mutual influence between different prefecture-level dispatching areas due to the shared use of transmission sections. The shared transmission section coupling relationship can reflect the degree of correlation between different areas in the process of using transmission capacity, and provide a basis for subsequent inter-regional coordinated dispatching.

[0111] Additionally, shared transmission capacity is an operating parameter used to characterize the allowable power transmission range of a shared transmission section, and is used to limit the capacity constraints when multiple prefecture-level dispatch areas share the transmission section. Shared transmission capacity can prevent the increased operational pressure on the transmission section caused by multiple areas simultaneously expanding their dispatch range.

[0112] Furthermore, distributed negotiation is a process in which multiple prefecture-level scheduling regions adjust their adjustable space through information exchange based on their own scheduling range and the coupling relationships between them. Distributed negotiation does not rely on a single region to uniformly determine the entire scheduling range, but rather forms a collaborative result that satisfies shared constraints through inter-regional coordination.

[0113] Furthermore, the negotiated consensus interval is the final adjustment range formed through inter-regional coordination, based on the variable consensus interval and combined with the shared transmission section constraints between adjacent prefecture-level dispatching areas. The negotiated consensus interval can reflect the coordination results when multiple regions share transmission resources.

[0114] Understandably, during distributed negotiation, the first step is to determine the interdependent relationships between regions based on the coupling relationship of shared transmission sections between prefecture-level dispatching areas, and then analyze the capacity constraints between different regions in conjunction with the shared transmission section capacity. Based on the shared transmission section capacity, the variable consensus intervals of each prefecture-level dispatching area are coordinated and adjusted to ensure that each region maintains its own regulation needs while avoiding conflicts in the use of shared transmission section capacity due to mutual influence within the dispatching scope, thus obtaining a negotiation consensus interval that meets the requirements of regional coordination.

[0115] In one feasible implementation, step S30 may include steps S31 to S35: Step S31: Based on the power grid topology and dispatch boundaries of the prefecture-level dispatch areas, establish a coupling relationship matrix between the prefecture-level dispatch areas.

[0116] It should be noted that the power grid topology is structural information used to describe the electrical connections between different prefecture-level dispatching areas in a high-voltage power grid, reflecting the transmission line connections between different areas. In this embodiment, the power grid topology can be used to analyze whether there are direct electrical connections between different prefecture-level dispatching areas, providing a basis for determining the coupling relationships between areas.

[0117] Additionally, dispatch boundaries are boundary information used to delineate the dispatch range of different prefecture-level dispatch areas, clarifying the control scope corresponding to each prefecture-level dispatch area. In this embodiment, dispatch boundaries are combined with the power grid topology to determine whether dispatch correlations arise between different prefecture-level dispatch areas due to transmission line connections.

[0118] Furthermore, the coupling relationship matrix is ​​a data matrix used to represent whether there is a shared transmission section coupling relationship between different prefecture-level dispatching areas. In this embodiment, the matrix elements in the coupling relationship matrix are used to represent the association status between two corresponding prefecture-level dispatching areas, providing a basis for subsequent determination of adjacent prefecture-level dispatching areas and inter-regional negotiation.

[0119] Understandably, when establishing the coupling relationship matrix between prefecture-level dispatching areas, the electrical connections between different prefecture-level dispatching areas are analyzed based on the power grid topology, and the dispatching range corresponding to each area is determined in conjunction with the dispatching boundaries. Based on whether there are shared transmission section connections between areas, the correlation between different prefecture-level dispatching areas is recorded, forming a coupling relationship matrix to describe the coupling relationships between areas. The expression for the coupling relationship matrix is ​​as follows:

[0120] In the formula, C is the coupling relationship matrix; Cij is the matrix element in the i-th row and j-th column of the coupling relationship matrix; Let N be the set of real numbers; N is the number of prefecture-level dispatch areas; i and j are the numbers of the prefecture-level dispatch areas, respectively; Cij=1 indicates that there is a shared transmission section coupling between the i-th prefecture-level dispatch area and the j-th prefecture-level dispatch area; Cij=0 indicates that there is no shared transmission section coupling. The coupling relationship matrix is ​​a symmetric matrix, satisfying Cij=Cij.

[0121] Step S32: Determine the capacity of the shared transmission section based on the coupling relationship of the shared transmission section in the prefecture-level dispatch area.

[0122] It should be noted that the shared transmission section coupling relationship is used to describe the relationship between multiple prefecture-level dispatching areas that are jointly associated with the same transmission section, reflecting the mutual influence between different areas due to shared transmission resources. In this embodiment, the shared transmission section coupling relationship can identify the prefecture-level dispatching areas participating in the dispatching of the same transmission section, providing a basis for analyzing capacity constraints between areas.

[0123] Additionally, the shared transmission section capacity is an operating parameter used to characterize the allowable transmission power range of a shared transmission section, and is used to limit the maximum transmission capacity when multiple prefecture-level dispatch areas share the transmission section. In this embodiment, the shared transmission section capacity is used as a constraint condition to adjust the adjustable range of each prefecture-level dispatch area during the negotiation process.

[0124] It is understandable that when determining the capacity of shared transmission sections, the transmission sections commonly associated with multiple prefecture-level dispatching areas are identified based on the coupling relationship between shared transmission sections between prefecture-level dispatching areas, and the capacity information of the corresponding shared transmission sections is obtained, thereby determining the transmission capacity limitations faced by different areas when carrying out coordinated dispatching.

[0125] Step S33: Determine the negotiation interval reservation ratio based on the shared transmission section capacity and the variable consensus interval, and determine the negotiation interval within the variable consensus interval based on the negotiation interval reservation ratio.

[0126] It should be noted that the negotiation interval reservation ratio is information used to determine the proportion of the variable consensus interval allocated for inter-regional coordination and adjustment. In this embodiment, the negotiation interval reservation ratio is determined based on the shared transmission section capacity constraints and regional dispatching needs, and is used to provide adjustment space for interval coordination between adjacent prefecture-level dispatching areas.

[0127] Additionally, the negotiation interval is a range delineated from the variable consensus interval, used for coordination and adjustment between prefecture-level dispatching areas. In this embodiment, the negotiation interval retains the original adjustment capabilities of the prefecture-level dispatching area while providing space for negotiation between different areas based on shared transmission section constraints.

[0128] Understandably, when determining the negotiation interval, the degree of sharing of current transmission resources is analyzed based on the shared transmission section capacity, and the required negotiation space is determined in conjunction with the adjustment range corresponding to the variable consensus interval. Based on the determined reservation ratio of the negotiation interval, an adjustment range for regional negotiation is divided within the variable consensus interval, forming a negotiation interval, which enables subsequent adjacent areas to coordinate and adjust based on this interval.

[0129] In one feasible implementation, when determining the negotiation interval, a certain proportion of adjustment space can be reserved within the variable consensus interval corresponding to the prefecture-level scheduling region as a buffer range for coordinated adjustments between adjacent prefecture-level scheduling regions. Specifically, the negotiation interval of the prefecture-level scheduling region can be represented as:

[0130] In the formula, It is the lower bound of the negotiation interval corresponding to the i-th prefecture-level dispatch area, used to represent the lowest boundary of the allowable adjustment range when the prefecture-level dispatch area participates in inter-regional negotiation; This represents the upper bound of the negotiation interval corresponding to the i-th prefecture-level dispatch area, indicating the highest boundary of the allowable adjustment range when this prefecture-level dispatch area participates in inter-regional negotiations. The negotiation interval must satisfy:

[0131] In the formula, It is the lower bound of the consensus interval corresponding to the i-th prefecture-level scheduling region, used to represent the lowest boundary of the overall adjustable range of the prefecture-level scheduling region; It represents the upper bound of the consensus interval corresponding to the i-th prefecture-level scheduling region, and is used to indicate the highest boundary of the overall adjustable range of the prefecture-level scheduling region.

[0132] Understandably, the negotiation interval is located within the consensus interval. By limiting the upper and lower boundaries of the negotiation interval to not exceed the range of the consensus interval, the prefecture-level dispatching area can retain its own regulation capacity while providing adjustment space for coordination between adjacent areas based on shared transmission section constraints. The size of the negotiation interval can be determined according to the reserved proportion.

[0133] In the formula, The width of the negotiation interval corresponding to the i-th prefecture-level dispatch area is used to represent the adjustment range covered by the negotiation interval; The width of the consensus interval corresponding to the i-th prefecture-level scheduling region is used to represent the overall adjustable range; The reserved ratio for the negotiation interval is in the range of (0,1) and can be dynamically adjusted according to the tension of the shared section.

[0134] When the shared transmission section capacity margin is large, the reserved ratio of negotiation intervals can be increased, allowing for greater coordination space between prefecture-level dispatching areas; conversely, when the shared transmission section capacity margin is small, the reserved ratio of negotiation intervals can be decreased, making the negotiation process more focused on transmission resource constraints. For example, when the shared section margin is sufficient... A larger value (such as 0.5) can be chosen to provide greater flexibility in negotiation; when the shared cross-section margin is tight, A smaller value (such as 0.2) should be chosen to conservatively reserve space.

[0135] It is understandable that when determining the negotiation interval, the coordination needs between adjacent prefecture-level dispatching areas are analyzed based on the shared transmission section capacity, and the negotiation scope is divided from the variable consensus interval according to the reserved ratio of the negotiation interval, so that different prefecture-level dispatching areas can reserve adjustment space for the coordination of shared transmission section capacity while meeting their own operational constraints.

[0136] Step S34: Determine adjacent prefecture-level scheduling areas based on the coupling relationship matrix, and determine the interval boundary information based on the adjacent prefecture-level scheduling areas.

[0137] It should be noted that adjacent prefecture-level dispatching areas are determined based on the coupling relationship between prefecture-level dispatching areas and are areas associated with shared transmission sections. In this embodiment, adjacent prefecture-level dispatching areas share transmission resources, which will affect each other's dispatching range, requiring coordination and control through inter-regional negotiation.

[0138] Additionally, the interval boundary information describes the state of the negotiation interval boundaries, including the boundary information corresponding to the current negotiation range of the prefecture-level scheduling area. In this embodiment, the interval boundary information reflects the currently adjustable space of different prefecture-level scheduling areas, providing a data foundation for subsequent iterative updates to the negotiation interval.

[0139] It is understandable that when determining adjacent prefecture-level dispatch areas, the prefecture-level dispatch areas with shared transmission section coupling are screened according to the regional correlation in the coupling relationship matrix, and the negotiation interval boundary information corresponding to adjacent prefecture-level dispatch areas is further obtained, so that different areas can carry out negotiation and adjustment based on each other's interval boundary status.

[0140] Step S35: Iteratively update the negotiation interval based on the interval boundary information to obtain the negotiation consensus interval.

[0141] Understandably, upon obtaining the consensus interval, the matching relationship between the negotiation intervals of different regions is analyzed based on the interval boundary information of adjacent prefecture-level dispatching areas, and the negotiation interval is adjusted multiple times according to the shared transmission section constraints between regions. By continuously updating the negotiation interval boundaries of each prefecture-level dispatching area, the dispatching range between different regions gradually meets the shared transmission resource constraints, thus obtaining the consensus interval.

[0142] In this embodiment, for a coupled pair of smart agents (i,j), the shared transmission section k is identified, and the rated capacity of that section is obtained. The initial share of shared cross-sections occupied by each prefecture-level intelligent agent is... ,satisfy ,in This is the set of associated intelligent agents sharing the same cross-section k. The feasible space of adjacent regions is abstracted as meshing gears, with their share ratios (transmission ratios, feasible modes) not exceeding the rated capacity of the cross-section, as shown in the following formula:

[0143]

[0144]

[0145] In the formula, Let be the capacity occupancy of the i-th prefecture-level dispatch area on the k-th shared transmission section, used to represent the usage of the shared transmission section capacity in this area; Let be the capacity occupancy of the j-th prefecture-level dispatch area on the k-th shared transmission section, used to represent the usage of the capacity of the same shared transmission section by adjacent areas; The rated capacity of the cross-section; It is the upper bound of the negotiation interval corresponding to the i-th prefecture-level dispatch area, used to represent the maximum adjustment amount that the i-th prefecture-level dispatch area is allowed to reach within the current negotiation range; It is the upper bound of the negotiation interval corresponding to the j-th prefecture-level dispatch area, used to represent the maximum adjustment amount that the j-th prefecture-level dispatch area is allowed to reach within the current negotiation range; This is the gear ratio. In one feasible implementation, when iteratively updating the negotiation interval based on the interval boundary information, different prefecture-level scheduling regions can exchange interval boundary information through point-to-point communication and adjust their own negotiation intervals based on the boundary information of adjacent prefecture-level scheduling regions. Specifically, the prefecture-level scheduling region updates the negotiation interval boundary through a distributed consensus iterative method based on the interval boundary information fed back by adjacent regions, so that the negotiation intervals between adjacent prefecture-level scheduling regions gradually become consistent. Let the lower bound of the consensus interval of agent i at the t-th iteration be... The upper boundary is The update rule for the (t+1)th iteration is:

[0146]

[0147] In the formula, It represents the lower bound of the negotiation interval for the i-th prefecture-level scheduling region at the t-th iteration, used to indicate the lower limit of the negotiation range of the prefecture-level scheduling region during the current iteration; This is the lower bound of the negotiation interval for the i-th prefecture-level scheduling region after the (t+1)-th iteration, used to represent the lower limit of the negotiation range after adjustment based on the boundary information of adjacent regions; Let i be the set of neighbors of agent i (neighboring agents with coupling relationships). The convergence step size (usually a small positive number, such as 0.1). The communication weight reflects the degree of influence of agent j on agent i. It represents the upper bound of the negotiation interval for the i-th prefecture-level scheduling region at the t-th iteration, and is used to indicate the upper limit of the negotiation range of the prefecture-level scheduling region during the current iteration. It represents the upper bound of the negotiation interval for the i-th prefecture-level scheduling region after the (t+1)-th iteration, and is used to indicate the upper limit of the updated negotiation range.

[0148] Furthermore, when iteratively updating the negotiation interval based on the interval boundary information, it is necessary to set an iteration termination condition to determine whether the current negotiation interval has reached a stable state. Specifically, the iteration process ends when any of the following conditions are met: When the change in the interval boundaries of all prefecture-level dispatch areas is less than the preset threshold When the time is reached, it indicates that after multiple rounds of boundary adjustments, the negotiation intervals of each prefecture-level dispatch area have changed little, the current negotiation results have become stable, and the iteration can be stopped and the current negotiation consensus interval can be output.

[0149] When the number of iterations reaches the preset upper limit Tmax, it indicates that the current distributed negotiation process has reached the maximum allowed number of iterations. In order to avoid the continuous iteration affecting the control efficiency, the iteration is stopped and the negotiation consensus range is determined based on the current iteration results.

[0150] When a conflict that cannot be eliminated through negotiation is detected, it indicates that there may be a capacity conflict between adjacent prefecture-level dispatching areas that cannot meet the shared transmission section constraints. The current iteration process needs to be stopped and the conflict resolution mechanism needs to be triggered to further adjust the capacity allocation relationship between areas.

[0151] Understandably, during the consensus interval update process, the current distributed negotiation process is judged to meet the convergence requirements by continuously comparing the changes in the boundaries of each prefecture-level scheduling region, the number of iterations, and the conflict status between regions. When any termination condition is met, the boundary update process stops, and the range of the interval that has reached a coordinated state is determined as the consensus interval.

[0152] Reference Figure 3 , Figure 3 This is a schematic diagram of adjacent area meshing negotiation in the first embodiment of the high-voltage power grid collaborative real-time control method of this application.

[0153] like Figure 3 As shown in the figure, there are three prefecture-level agents: A, B, and C, representing different prefecture-level scheduling regions participating in coordinated control. Each prefecture-level agent corresponds to a negotiation interval, where the negotiation interval for prefecture-level agent A is [missing information]. The negotiation interval corresponding to the prefecture-level intelligent agent B is The negotiation interval corresponding to the prefecture-level intelligent agent C is The negotiation interval represents the operational scope within which each prefecture-level dispatching region can participate in coordination and adjustment during regional collaboration. Prefecture-level agents A and B exchange negotiation information via asynchronous point-to-point communication. The communication content includes their respective negotiation interval boundary information, power dispatching requirements, and shared transmission section constraint information, used to achieve distributed coordination between adjacent prefecture-level dispatching regions. Specifically, prefecture-level agent A corresponds to the power dispatching requirements. The power scheduling requirements of the prefecture-level intelligent agent B The power scheduling requirements of the prefecture-level intelligent agent C Power dispatch demand is used to represent the power adjustment needs determined by each prefecture-level dispatch area based on its own operating status and dispatch objectives. Prefecture-level intelligent agent A and prefecture-level intelligent agent B share a transmission section, and their corresponding shared transmission section capacity... Shared transmission capacity The maximum transmission capacity allowed for a shared power transmission channel between adjacent prefecture-level dispatching areas is a crucial constraint limiting the scope of inter-regional coordinated regulation. Each prefecture-level agent coordinates its intervals through a meshing negotiation protocol. This protocol comprises two processes: consensus protocol iteration and conflict resolution. The consensus protocol iteration involves three steps: information exchange, interval updating, and non-overlap verification. First, each prefecture-level agent exchanges negotiation interval boundary information via communication. Then, based on the interval information of adjacent prefecture-level dispatching areas, it adjusts its own negotiation intervals and determines whether the adjusted inter-regional negotiation ranges meet the non-overlap condition, gradually bringing the negotiation intervals of multiple prefecture-level dispatching areas to a coordinated state. When conflicts such as interval overlap or shared transmission section capacity exceeding limits are detected during the consensus protocol iteration process, the conflict resolution mechanism is activated. This mechanism includes a distributed auction mechanism and a weight adjustment mechanism. By re-coordinating the shared transmission section capacity allocation relationship and adjusting the coordination weights of different prefecture-level dispatching areas, the conflicting areas regain compliance with capacity constraints and negotiation requirements. After consistency protocol iteration and conflict resolution mechanism processing, the final result is that the feasible space of adjacent areas does not overlap and does not encroach on each other. This enables different prefecture-level dispatching areas to maintain independent adjustment range while meeting the shared transmission section capacity constraints, and realizes coordinated operation among multiple areas.

[0154] In one feasible implementation, after step S35, steps S351 to S355 may also be included: Step S351: Based on the consensus intervals corresponding to adjacent prefecture-level dispatching areas, determine whether there is interval overlap or shared transmission section capacity exceeding limits between adjacent prefecture-level dispatching areas.

[0155] It should be noted that interval overlap refers to a situation where the adjustment ranges of the negotiation consensus intervals corresponding to adjacent prefecture-level dispatching areas partially intersect. In this embodiment, interval overlap indicates that different prefecture-level dispatching areas may simultaneously occupy the same adjustment space when making dispatching decisions, leading to the risk of dispatching range conflicts between areas.

[0156] Additionally, "shared transmission section capacity exceeding limit" refers to a situation where multiple prefecture-level dispatching regions, based on their respective negotiated consensus intervals, have power usage demands on shared transmission sections exceeding the permitted transmission capacity of those sections. In this embodiment, "shared transmission section capacity exceeding limit" is used to determine whether the shared use of transmission resources by multiple regions exceeds the safe operating range.

[0157] Understandably, when determining whether there is overlap in transmission intervals or overcapacity of shared transmission sections between adjacent prefecture-level dispatching areas, the adjustment range relationship between different areas is analyzed based on the consensus intervals corresponding to the adjacent prefecture-level dispatching areas. Simultaneously, the transmission resource occupancy situation corresponding to regional dispatching needs is assessed in conjunction with the shared transmission section capacity. When the consensus intervals of adjacent areas overlap, or when the demand for shared transmission sections from multiple areas exceeds the corresponding capacity limit, a potential conflict is identified in the current regional coordinated dispatching process.

[0158] In this embodiment, after each negotiation iteration, it is verified whether the consensus intervals of each local agent satisfy the non-overlapping condition. The expression for the non-overlapping interval constraint is as follows:

[0159] In the formula, i and j represent two adjacent prefecture-level dispatching regions that have a coupling relationship; Let be the negotiation consensus interval corresponding to the i-th prefecture-level dispatch area; Let j be the negotiation consensus interval corresponding to the j-th prefecture-level dispatch area; This is a set of agent pairs that are coupled. If overlap exists, return to the negotiation iteration process to continue adjusting.

[0160] Understandably, when determining whether there is interval overlap between adjacent prefecture-level dispatching areas, the consensus intervals corresponding to adjacent prefecture-level dispatching areas with shared transmission section coupling relationships are obtained, and the intersection of the two consensus intervals is judged. When the two consensus intervals do not intersect, it indicates that the adjustment ranges corresponding to the two prefecture-level dispatching areas do not overlap; when the two consensus intervals intersect, it indicates that there is interval overlap between adjacent prefecture-level dispatching areas. Simultaneously, the dispatching decisions of each prefecture-level agent must strictly satisfy the shared section capacity constraint, the expression for which is as follows:

[0161] In the formula, K represents the set of all shared cross sections. If a constraint is violated, a conflict resolution mechanism is triggered to reallocate capacity. k Identification for shared transmission sections; In order to be with the first k A set of prefecture-level dispatching areas associated with a shared transmission section; For the i-th prefecture-level dispatch area in the thk The capacity occupancy on a shared transmission section is used to indicate the usage of the transmission capacity of the shared transmission section by the corresponding prefecture-level dispatch area; For the first k The rated capacity of a shared transmission section is used to indicate the upper limit of the capacity that the shared transmission section is allowed to carry.

[0162] Step S352: If it is determined that there is an overlap between adjacent prefecture-level dispatching areas or that the shared transmission section capacity exceeds the limit, then it is determined that there is a section capacity conflict in the prefecture-level dispatching areas.

[0163] It should be noted that cross-sectional capacity conflict refers to a situation where resource allocation is uncoordinated when adjacent prefecture-level dispatching areas share a common transmission section for dispatching, due to overlapping adjustment ranges or transmission resource demand exceeding capacity limits. In this embodiment, cross-sectional capacity conflict indicates that the dispatching demands of multiple prefecture-level dispatching areas cannot simultaneously meet the operational constraints of the shared transmission section, requiring further capacity coordination.

[0164] Understandably, when determining cross-sectional capacity conflicts, a comprehensive judgment is made based on the overlap between adjacent prefecture-level dispatching areas and the over-limit of shared transmission cross-sectional capacity. When there is overlap between the negotiated consensus intervals, or when the actual demand for shared transmission cross-sections exceeds the allowable capacity, it indicates that there is a conflict in the allocation of shared transmission resources among multiple prefecture-level dispatching areas, and a cross-sectional capacity conflict is determined for the corresponding prefecture-level dispatching area.

[0165] In one feasible implementation, during the iterative update of the negotiation interval based on the interval boundary information, when a conflict that cannot be eliminated by boundary adjustment is detected between adjacent prefecture-level dispatch areas, a conflict resolution mechanism can be further triggered to re-coordinate the capacity allocation relationship of the shared transmission section.

[0166] It should be noted that conflict refers to an uncoordinated state arising during negotiations between adjacent prefecture-level dispatching areas due to overlapping consensus intervals or insufficient shared transmission capacity to meet regional dispatching needs. In this embodiment, when the consensus intervals corresponding to adjacent prefecture-level dispatching areas satisfy: And i≠j In the formula, Let be the negotiation consensus interval corresponding to the i-th prefecture-level dispatch area, used to represent the adjustable range determined by negotiation for the i-th prefecture-level dispatch area; Let be the negotiation consensus interval corresponding to the j-th prefecture-level scheduling region, used to represent the adjustable range corresponding to the adjacent region that has a coupling relationship with the i-th prefecture-level scheduling region; ∩ represents the interval intersection operation, used to determine whether two negotiation consensus intervals have a common range.

[0167] It is understandable that when the negotiation consensus intervals corresponding to the i-th prefecture-level scheduling region and the j-th prefecture-level scheduling region intersect, it indicates that the adjustment ranges currently determined by the two regions overlap, which may lead to multiple regions occupying the same scheduling space at the same time. Therefore, it is determined that there is an interval conflict between adjacent prefecture-level scheduling regions.

[0168] Furthermore, the over-limit of shared transmission section capacity can be determined using the following relationship:

[0169] In the formula, Let be the set of associated prefecture-level dispatch areas for the i-th shared transmission section, used to represent the shared use of the i-th th transmission section. k A prefecture-level dispatching area sharing a power transmission section; For the i-th prefecture-level dispatch area in the th k The capacity occupancy of a shared transmission section is used to represent the transmission capacity of the currently occupied shared transmission section in the prefecture-level dispatch area; For the first k The rated capacity of a shared transmission section is used to indicate the maximum capacity that the shared transmission section is allowed to transmit.

[0170] Understandably, when determining whether the capacity of a shared transmission section is exceeded, the capacity occupancy of all associated prefecture-level dispatching areas on the same shared transmission section is summed and compared with the rated capacity of that shared transmission section. When the total capacity occupancy of multiple prefecture-level dispatching areas exceeds the rated capacity of the shared transmission section, it indicates that the current regional coordinated dispatching demand exceeds the transmission resource carrying capacity, thus confirming a capacity conflict of the shared transmission section.

[0171] When overlapping of transmission sections or the capacity of shared transmission sections is detected, a capacity adjustment request is sent to the conflicting prefecture-level dispatching areas. Based on the feedback capacity adjustment information, the available capacity of the shared transmission sections is reallocated, and the consensus interval is further updated so that the dispatching range of different prefecture-level dispatching areas can once again meet the inter-regional coordination constraints.

[0172] Step S353: Send a capacity adjustment request to the prefecture-level scheduling area where the cross-sectional capacity conflict exists, and obtain the capacity adjustment information fed back by the prefecture-level scheduling area according to the capacity adjustment request.

[0173] It should be noted that a capacity adjustment request is used to request prefecture-level dispatching regions with conflicting capacity to coordinate and adjust the usage of shared transmission sections. In this embodiment, the capacity adjustment request is used to trigger information exchange between conflicting regions, enabling the relevant prefecture-level dispatching regions to participate in the re-coordination of shared transmission resources.

[0174] Additionally, capacity adjustment information is feedback from the prefecture-level dispatching area based on capacity adjustment requests, indicating the usage status of adjustable shared transmission sections on the regional side. In this embodiment, capacity adjustment information is used to reflect the capacity adjustment results that the prefecture-level dispatching area can provide when there are capacity conflicts, providing a basis for subsequent reallocation of available capacity of shared transmission sections.

[0175] Understandably, when acquiring capacity adjustment information, capacity adjustment requests are first sent to the prefecture-level dispatching areas where there are capacity conflicts. This allows the relevant prefecture-level dispatching areas to analyze the adjustable range of shared transmission section capacity based on their own dispatching needs and operational constraints, and then provide corresponding capacity adjustment information. The capacity adjustment information from different prefecture-level dispatching areas provides a data foundation for subsequent reallocation of shared transmission section capacity.

[0176] Step S354: The available capacity of the shared transmission section is reallocated according to the capacity adjustment information to obtain the reallocated capacity of the shared transmission section.

[0177] It should be noted that available capacity refers to the remaining transmission capacity of a shared transmission section that can be further utilized by the prefecture-level dispatching area under the current operating conditions. In this embodiment, available capacity is used to represent the capacity range of a shared transmission section that, in addition to the currently allocated and used portion, can still support regional dispatching adjustments.

[0178] In addition, the redistributed shared transmission capacity is the result of the redistribution of shared transmission capacity based on capacity adjustment information. It is used to replace the original capacity allocation relationship so that the use of shared transmission resources between different prefecture-level dispatching areas can be re-coordinated.

[0179] Understandably, when reallocating the available capacity of shared transmission sections, the capacity adjustment information fed back by the prefecture-level dispatching areas with capacity conflicts is used to analyze the adjustment needs of different areas for the shared transmission section capacity, and the remaining available capacity of the shared transmission sections is reallocated so that the capacity usage range corresponding to each prefecture-level dispatching area meets the overall capacity constraint of the shared transmission section, thus obtaining the reallocated shared transmission section capacity.

[0180] Step S355: Update the negotiated consensus interval according to the redistributed shared transmission section capacity.

[0181] It should be noted that updating the negotiation consensus interval is a process of adjusting the original regional negotiation scope based on the redefined shared transmission section capacity. In this embodiment, the updated negotiation consensus interval can reflect the regional adjustable range after the redistribution of shared transmission resources, ensuring that the regional scheduling range remains consistent with the latest capacity constraints.

[0182] Understandably, when updating the consensus interval, the capacity constraints of each prefecture-level dispatching area are re-analyzed based on the redistributed shared transmission capacity, and the boundaries of the consensus interval affected by the shared transmission capacity are adjusted to ensure that the consensus intervals of different prefecture-level dispatching areas meet the new capacity allocation results. The updated consensus interval allows subsequent dispatching control processes to be based on the adjusted regional constraint range.

[0183] Step S40: Constrain the equilibrium control strategy according to the negotiated consensus interval to obtain the target control strategy, and perform coordinated real-time control of the high-output power grid according to the target control strategy.

[0184] It should be noted that the target control strategy is the final control scheme obtained by adjusting the equilibrium control strategy based on the consensus interval, and is used to guide the high-power transmission grid to perform real-time dispatch control. The target control strategy also considers the shared transmission constraints between regions and the coordination results of provincial and local dispatching, so that the control scheme meets the overall operational requirements.

[0185] Understandably, when generating the target control strategy, the negotiated consensus interval is used as a constraint condition in the execution process of the equilibrium control strategy. This corrects the control range corresponding to the equilibrium control strategy, ensuring that the adjustment content in the equilibrium control strategy meets the coordination requirements between multiple prefecture-level dispatching areas. Based on the constrained control results, the target control strategy is formed, and it is used to adjust the operating status of the high-power transmission grid in real time, achieving coordinated control between multiple prefecture-level dispatching areas.

[0186] This embodiment provides a collaborative real-time control method for high-voltage power grids. It determines a consensus interval based on the multidimensional stability margin of the high-voltage power grid and the grid parameters of the prefecture-level dispatch area. Based on this consensus interval, it performs decision identification to obtain a variable consensus interval and a balanced control strategy. Furthermore, it conducts distributed negotiation on the variable consensus interval by combining the coupling relationship and capacity of shared transmission sections. The target control strategy is obtained by constraining the balanced control strategy using the negotiated consensus interval. This method achieves a collaborative expression of the overall stability constraints of the high-voltage power grid, regional dispatch requirements, and inter-regional transmission resource constraints. It solves the problems of delayed information exchange and low control decision efficiency between provincial and prefecture-level dispatching under conditions of rapid fluctuations in new energy output, and improves the coordination and real-time response capabilities in the collaborative real-time control process of high-voltage power grids.

[0187] Based on the first embodiment of this application, in the second embodiment of this application, the content that is the same as or similar to that in the first embodiment described above can be referred to the above description, and will not be repeated hereafter. Based on this, please refer to... Figure 4 Step S10 of the high-voltage power grid collaborative real-time control method includes steps S11 to S13: Step S11: Based on the multidimensional stability margin of the high-voltage power grid and the power grid parameters of the prefecture-level dispatch area, determine the sensitivity vector of the prefecture-level dispatch area corresponding to the multidimensional stability margin, wherein the multidimensional stability margin includes voltage stability margin, frequency stability margin, power angle stability margin and line power flow stability margin.

[0188] It should be noted that multidimensional stability margin is a data indicator used to characterize the operating space of a high-power transmission grid from the corresponding stability boundary under multiple stability constraint dimensions.

[0189] In this embodiment, the multidimensional stability margin includes voltage stability margin, frequency stability margin, power angle stability margin, and line power flow stability margin, which together describe the stability capability of the high-voltage power grid under different operating conditions through multiple dimensions.

[0190] Voltage stability margin reflects the margin between the grid voltage state and the voltage instability boundary; frequency stability margin reflects the stability space corresponding to the grid's active power balance capability; power angle stability margin reflects the grid's ability to maintain synchronous operation when subjected to disturbances; and line power flow stability margin reflects the margin between the current transmission power of the transmission line and its allowable transmission capacity.

[0191] In addition, the power grid parameters of a prefecture-level dispatch area are data used to describe the operational characteristics of the power grid in that area. These include power grid topology parameters, equipment parameters, load data, and renewable energy output forecasts. The power grid parameters of a prefecture-level dispatch area reflect the differences in power grid structure, equipment capacity, and operational status among different regions, providing a basis for analyzing the impact of different stability margins on the dispatch space of the prefecture-level dispatch area.

[0192] Furthermore, the sensitivity vector is a data vector used to represent the degree of impact of multidimensional stability margin changes on the scheduling space of the prefecture-level dispatching area. In this embodiment, different dimensions in the sensitivity vector correspond to different types of stability margins, used to describe the impact weights on the dispatchable range of the prefecture-level dispatching area when voltage stability margin, frequency stability margin, power angle stability margin, and line power flow stability margin change.

[0193] Understandably, when determining the sensitivity vector of a prefecture-level dispatching region corresponding to a multidimensional stability margin, the overall stability state of the current power grid is obtained based on the multidimensional stability margin of the high-output power grid. The impact of different stability dimensions on the dispatching space of the prefecture-level dispatching region is then analyzed in conjunction with the power grid parameters of that region. By analyzing the correlation between changes in each dimension of stability margin and the operational capacity of the prefecture-level dispatching region, the degree of influence corresponding to different stability margin dimensions is determined, thus forming the sensitivity vector of the prefecture-level dispatching region corresponding to the multidimensional stability margin.

[0194] In this embodiment, voltage stability is fundamental to the safe operation of the power system. In high-output power grids, voltage stability is particularly critical due to fluctuations in renewable energy output and insufficient voltage support for long-distance transmission. The voltage stability margin is defined as:

[0195] In the formula, For voltage stability margin; This is the critical value for voltage instability; The current voltage level is given. Voltage stability margins for each node and region are obtained through power flow calculations and voltage stability analysis.

[0196] Frequency stability reflects the system's ability to balance active power. In high-output power grids, rapid fluctuations in renewable energy output can lead to frequent system frequency fluctuations. The frequency stability margin is defined as:

[0197] In the formula, For frequency stability margin; This is the lower limit of the frequency. This represents the current lowest frequency point. Frequency stability margin is assessed through response characteristic analysis of primary and secondary frequency modulation.

[0198] Power angle stability relates to the dynamic stability of the system. In interconnected sending-end power grids, power angle instability may occur under large disturbances. The power angle stability margin is defined as:

[0199] In the formula, For the stability margin of the work angle; This is the critical value for the stability of the work angle; This represents the current maximum power angle difference. The power angle stability margin is obtained through time-domain simulation or direct method analysis.

[0200] Power flow stability of transmission lines means that the transmission power of each line does not exceed its thermal stability limit or safe operating limit. The power flow stability margin of the i-th line is defined as:

[0201] In the formula, To ensure a stable trend margin; The maximum allowable power of line i. This represents the current actual power.

[0202] By combining the stability margins of the above four dimensions, a multidimensional stability margin space is constructed. Where K=4 is the total number of dimensions. In this space, each point represents a state of operation, and its distance to the stability boundary of each dimension is the corresponding margin value.

[0203] Furthermore, the provincial power grid is divided into N prefecture-level dispatch regions according to the dispatch boundaries, with one local intelligent agent node deployed in each prefecture-level region. A multi-dimensional stability margin space is established at the provincial level. Mapping function to consensus interval parameters of each level agent :

[0204] In the formula, For mapping functions; This provides a multi-dimensional stability margin for provincial-level projects.

[0205] The mapping function will transform the provincial multidimensional stability margin vector Mapped to the lower bound vector of the consensus interval of each level agent. and consensus interval upper bound vector .

[0206] The mapping function must satisfy the monotonicity constraint, the consistency constraint, and the interpretability constraint.

[0207] Among them, the monotonicity constraint indicates that when the provincial stability margin deteriorates, that is, when the margin values ​​of each dimension decrease, the consensus intervals of each prefecture-level city should narrow accordingly. and ,in, The lower bound of the consensus interval is sensitive to changes in the k-th dimension stability margin, and is used to represent the degree of impact of changes in the k-th dimension stability margin on the lower bound of the consensus interval of the i-th prefecture-level scheduling region. The upper bound of the consensus interval is sensitive to changes in the k-th dimension stability margin, representing the impact of changes in the k-th dimension stability margin on the upper bound of the consensus interval for the i-th prefecture-level scheduling region. This holds true for all i=1,...,N and k=1,...,K. This guarantees a positive correlation between the consensus interval and actual operational risk.

[0208] The consistency constraint means that the intersection of consensus intervals at all prefecture levels should cover the operating area permitted by the province, that is... ,in This refers to the scheduling scope permitted at the provincial level.

[0209] Interpretability constraints mean that the mapping results should have clear physical meaning, making them easy for schedulers to understand and monitor.

[0210] Furthermore, by obtaining the provincial multidimensional stability margin vector and the power grid parameters of the prefecture-level dispatch area, and combining the topology, equipment parameters, load data, and new energy output forecasts of the prefecture-level dispatch area, the influence of different stability margin dimensions on the regional dispatch space can be analyzed. The sensitivity vector corresponding to each stability margin can be determined, and the benchmark consensus interval of the prefecture-level dispatch area can be calculated based on the mapping relationship between the sensitivity vector and the multidimensional stability margin. This realizes the transformation of the overall stability constraints of the provincial power grid into a dispatch range that can be identified by the prefecture-level dispatch area, providing a basis for subsequent adjustment of the consensus interval in combination with the local operation constraints of the region.

[0211] Specifically, obtain the provincial multidimensional stability margin vector M and the local power grid parameters, including the topology Gi and equipment parameters. Load data New energy output forecast .

[0212] Calculate the sensitivity vector of this region to stability margins in each dimension. ,in This represents the weight of the impact on the local scheduling space when the k-th dimension stability margin changes. Sensitivity can be obtained through power flow analysis, sensitivity calculation, or data-driven methods.

[0213] Calculate the baseline consensus interval for this region based on the sensitivity vector and provincial multidimensional margin:

[0214]

[0215] In the formula, and These represent the lower and upper bounds of the benchmark consensus interval, respectively. and is the threshold parameter for the k-th dimension of the margin, used to control the interval width at different margin levels; This represents the weight of the impact of changes in the k-th dimension of the stability margin on the scheduling space of the region. The sensitivity can be obtained through power flow analysis, sensitivity calculation, or data-driven methods. Let be the k-th dimension of the stability margin, used to represent the k-th stability constraint dimension in the multidimensional stability margin.

[0216] Step S12: Determine the benchmark consensus interval of the prefecture-level scheduling region based on the sensitivity vector and the multidimensional stability margin.

[0217] It should be noted that the baseline consensus interval is the initial scheduling range determined based on the multidimensional stability margin and sensitivity vector before incorporating local operational constraints of the prefecture-level scheduling region. In this embodiment, the baseline consensus interval is used to represent the basic range that the prefecture-level scheduling region can adjust based on the current multidimensional stability state under the overall stability constraints of the high-power transmission grid.

[0218] Understandably, when determining the baseline consensus interval for a prefecture-level dispatching region, the impact of different stability margins on the dispatching space of the prefecture-level dispatching region is analyzed based on sensitivity vector analysis, and the constraint range corresponding to each stability dimension is determined in conjunction with the current multidimensional stability margin. By comprehensively considering the impact of different stability margin dimensions on the regional dispatching space, the multidimensional stability constraints are mapped to the adjustment range of the prefecture-level dispatching region, thus obtaining the baseline consensus interval corresponding to the prefecture-level dispatching region.

[0219] In this embodiment, the baseline consensus interval is used as the basis for subsequent adjustments based on local operating conditions. The baseline consensus interval reflects the limitations imposed by the overall stability requirements of the high-power transmission grid on the regulation capabilities of the prefecture-level dispatching area, enabling the prefecture-level dispatching area to determine its initial dispatching space while satisfying global stability constraints.

[0220] In one feasible implementation, an event-driven consensus interval dynamic update mechanism can be established, enabling the consensus interval to be adjusted in real time according to changes in the operating status of the high-power grid. When the change in stability margin in any dimension exceeds a preset threshold, a consensus interval update is triggered. The change in stability margin can be determined based on the difference between the current stability margin value and the stability margin value at the time of the last update, and the preset threshold can be dynamically set based on the benchmark values ​​of stability margins in different dimensions. The expression for triggering the interval update is as follows:

[0221] in, This represents the current stability margin value. This is the margin value from the last update. It can be dynamically set according to the stability margin benchmark values ​​of each dimension.

[0222] After the consensus interval update is triggered, each prefecture-level dispatch area re-executes the consensus interval generation process based on the updated stability margin information and recalculates the interval boundary of the corresponding prefecture-level dispatch area. The updated consensus interval is obtained. Subsequently, the updated consensus interval information is sent to adjacent prefecture-level scheduling areas and the provincial-level scheduling side through a communication mechanism. After receiving the update information, the adjacent prefecture-level scheduling areas verify their own current consensus interval. When they detect that their own consensus interval needs to be adjusted, they further trigger the corresponding update process.

[0223] Due to time differences in information exchange between different prefecture-level scheduling regions, consensus interval updates may be completed at different times. To ensure consistency of consensus information across different regions, a logical clock mechanism is introduced, maintaining an independent local time and version number for each prefecture-level scheduling region. When updating a consensus interval, the current update information, along with the corresponding version number, is sent to other regions. The receiving regions compare the version numbers to determine whether the received information is the latest update, thus avoiding the processing of expired consensus interval data.

[0224] Step S13: Adjust the benchmark consensus interval according to the local operation constraints of the prefecture-level scheduling area to obtain the consensus interval of the prefecture-level scheduling area.

[0225] It should be noted that local operational constraints are data constraints used to limit the operational capabilities and dispatching scope of a prefecture-level dispatching area. In this embodiment, local operational constraints are used to describe the limitations imposed on the prefecture-level dispatching area by its own power grid operating conditions, ensuring that the final consensus interval meets the actual operational requirements of the area.

[0226] Furthermore, the consensus interval is the final dispatch range determined by combining the overall stability constraints of the high-voltage power grid and the local operating conditions of the prefecture-level dispatch area. In this embodiment, the consensus interval is used as a range constraint when the prefecture-level dispatch area participates in subsequent collaborative decision-making and control adjustments, ensuring that the control behavior of the prefecture-level dispatch area is within an adjustable space that meets the overall stability requirements and local operating conditions.

[0227] Understandably, when obtaining the consensus interval for the prefecture-level dispatch area, the baseline consensus interval is further corrected based on the local operational constraints of the prefecture-level dispatch area. By analyzing the limitations of local operational constraints on the regional adjustment capability, the adjustment boundary in the baseline consensus interval is adjusted so that the adjusted interval satisfies both the overall safety requirements corresponding to the multidimensional stability margin and the operating conditions of the prefecture-level dispatch area itself, thus obtaining the consensus interval for the prefecture-level dispatch area.

[0228] This embodiment provides a real-time collaborative control method for high-voltage power grids. It determines a sensitivity vector corresponding to the multidimensional stability margin based on the multidimensional stability margin of the high-voltage power grid and the grid parameters of the prefecture-level dispatch area. A benchmark consensus interval is then determined based on the sensitivity vector and the multidimensional stability margin. This benchmark consensus interval is adjusted by incorporating the local operational constraints of the prefecture-level dispatch area to obtain the final consensus interval. This method maps the multidimensional stability constraints in the high-voltage power grid to the dispatch range of the prefecture-level dispatch area, ensuring that the consensus interval simultaneously meets both the overall stability requirements of the power grid and the region's own operational conditions. This provides accurate dispatch constraint boundaries for subsequent provincial-regional collaborative decision-making and inter-regional distributed negotiation.

[0229] For example, to help understand the implementation process of the high-voltage power grid collaborative real-time control method obtained by combining this embodiment with the above embodiment one, please refer to... Figure 5 , Figure 5 A simplified flowchart of a real-time collaborative control method for high-power transmission grids is provided, specifically: First, a multi-dimensional stability margin space is constructed, comprising four dimensions: voltage margin, frequency margin, power angle margin, and power flow margin. These dimensions reflect the stability capabilities of the high-voltage power grid in terms of voltage stability, frequency stability, power angle stability, and line power flow operation, respectively. Based on the information from these multiple stability margin dimensions, a comprehensive analysis is performed on each dimension to generate a consensus interval. This consensus interval characterizes the adjustable operating range of a prefecture-level dispatching area under the condition of satisfying grid stability constraints. The generated consensus interval is further input into the provincial-level intelligent agent. The provincial-level intelligent agent decomposes the overall dispatching objective according to the target stacking and constraint framework, and issues corresponding dispatching constraints and coordination requirements to different prefecture-level dispatching areas. Multiple prefecture-level intelligent agents, including Prefecture-level Intelligent Agent A, Prefecture-level Intelligent Agent B, and Prefecture-level Intelligent Agent C, correspond to different prefecture-level dispatching areas. Each prefecture-level intelligent agent performs autonomous control within its corresponding consensus interval based on its own operating status and the received provincial-level dispatching constraints, forming its own variable interval. The intelligent agents at the prefecture level interact and coordinate based on a meshing negotiation mechanism. By exchanging interval boundary information, they collaboratively adjust the regulation range of each prefecture-level dispatching area, ensuring that the dispatching ranges of different areas match each other and avoiding inter-regional regulation conflicts caused by shared transmission section capacity constraints. During the meshing negotiation process, when problems that cannot be directly coordinated, such as interval overlap or shared transmission section capacity exceeding limits, are detected, a conflict resolution mechanism is further initiated. This mechanism readjusts the capacity allocation relationship between areas and updates the negotiation range, ensuring that each prefecture-level dispatching area once again meets the coordination constraint requirements. The right side of the figure represents the overall control process through three stages: generation, coordination, and negotiation. First, a consensus interval is generated based on a multi-dimensional stability margin space. Then, a regional control strategy is formed through a coordination mechanism between provincial and prefecture-level dispatching. Finally, distributed negotiation between prefecture-level dispatching areas optimizes the regulation range, thereby achieving real-time coordinated control of the high-power transmission grid under multiple regions and multiple constraints.

[0230] It should be noted that the above examples are only for understanding this application and do not constitute a limitation on the high-voltage power grid collaborative real-time control method of this application. Any simple modifications based on this technical concept are within the protection scope of this application.

[0231] This application also provides a real-time collaborative control device for high-voltage power grids; please refer to [reference needed]. Figure 6 The high-voltage power grid collaborative real-time control device includes: The interval determination module 10 is used to determine the consensus interval of the prefecture-level dispatching area based on the multidimensional stability margin of the high-output power grid and the power grid parameters of the prefecture-level dispatching area. Decision identification module 20 is used to identify decisions based on the consensus interval to obtain a variable consensus interval and a balanced control strategy; The distributed negotiation module 30 is used to perform distributed negotiation on the variable consensus interval based on the coupling relationship and capacity of the shared transmission section in the prefecture-level dispatch area to obtain the negotiation consensus interval. The collaborative control module 40 is used to constrain the equilibrium control strategy according to the negotiated consensus interval to obtain the target control strategy, and to perform collaborative real-time control of the high-power transmission grid according to the target control strategy.

[0232] The high-voltage power grid collaborative real-time control device provided in this application, employing the high-voltage power grid collaborative real-time control method described in the above embodiments, can solve the technical problems of lagging information exchange and low control decision efficiency between provincial and local dispatching levels under the condition of rapid fluctuations in renewable energy output. Compared with the prior art, the beneficial effects of the high-voltage power grid collaborative real-time control device provided in this application are the same as those of the high-voltage power grid collaborative real-time control method described in the above embodiments, and other technical features in the high-voltage power grid collaborative real-time control device are the same as those disclosed in the methods of the above embodiments, and will not be repeated here.

[0233] In one embodiment, the decision identification module 20 is further configured to obtain provincial-level scheduling targets; Based on the consensus interval, the provincial scheduling target is decomposed into target stacking to obtain the prefecture-level scheduling target and the provincial constraint framework; Based on the prefecture-level scheduling objectives, the provincial-level constraint framework, and the real-time operating status of the prefecture-level scheduling area, the variable consensus interval and local control decisions are determined. Based on the variable consensus interval and the local control decision, a game equilibrium solution is performed on the provincial scheduling target and the prefecture-level scheduling target to obtain the equilibrium control strategy.

[0234] In one embodiment, the decision identification module 20 is further configured to determine the optimization target of the provincial scheduling side based on the provincial scheduling target, and to determine the response strategy of the prefecture-level scheduling area based on the prefecture-level scheduling target, the local control decision, and the variable consensus interval; Based on the optimization objective and the response strategy, a game equilibrium solution is obtained to achieve the equilibrium control result. Based on the balanced control results, determine the prefecture-level control strategy for the prefecture-level scheduling area and the target decomposition results for the provincial-level scheduling objectives; An equilibrium control strategy is generated based on the prefecture-level control strategy and the target decomposition results.

[0235] In one embodiment, the decision identification module 20 is further configured to determine the coordination deviation between the provincial-level scheduling target and the prefecture-level scheduling target based on the equilibrium control strategy; Determine whether the coordination deviation is greater than a preset deviation threshold; If the coordination deviation is greater than the preset deviation threshold, the weight coefficient corresponding to the prefecture-level scheduling area and the boundary parameters of the variable consensus interval are adjusted to obtain the adjusted weight coefficient and the adjusted boundary parameters. The game equilibrium is solved based on the adjusted weight coefficients and the adjusted boundary parameters to update the equilibrium control strategy.

[0236] In one embodiment, the interval determination module 10 is further configured to determine the sensitivity vector of the prefecture-level dispatching area corresponding to the multidimensional stability margin based on the multidimensional stability margin of the high-voltage power grid and the power grid parameters of the prefecture-level dispatching area, wherein the multidimensional stability margin includes voltage stability margin, frequency stability margin, power angle stability margin and line power flow stability margin. The baseline consensus interval of the prefecture-level scheduling region is determined based on the sensitivity vector and the multidimensional stability margin. The benchmark consensus interval is adjusted according to the local operational constraints of the prefecture-level scheduling region to obtain the consensus interval of the prefecture-level scheduling region.

[0237] In one embodiment, the distributed negotiation module 30 is further configured to establish a coupling relationship matrix between the prefecture-level dispatching areas based on the power grid topology and dispatching boundaries of the prefecture-level dispatching areas; The capacity of the shared transmission section is determined based on the coupling relationship of the shared transmission section in the prefecture-level dispatch area; The reservation ratio of the negotiation interval is determined based on the shared transmission section capacity and the variable consensus interval, and the negotiation interval is determined within the variable consensus interval based on the reservation ratio of the negotiation interval; The adjacent prefecture-level scheduling areas are determined based on the coupling relationship matrix, and the interval boundary information is determined based on the adjacent prefecture-level scheduling areas; The negotiation interval is iteratively updated based on the interval boundary information to obtain the negotiation consensus interval.

[0238] In one embodiment, the distributed negotiation module 30 is further configured to determine whether there is interval overlap or shared transmission section capacity exceeding limit between adjacent prefecture-level dispatching areas based on the negotiation consensus intervals corresponding to adjacent prefecture-level dispatching areas. If it is determined that there is an overlap between adjacent prefecture-level dispatching areas or that the shared transmission section capacity exceeds the limit, it is determined that there is a section capacity conflict in the prefecture-level dispatching areas. Send a capacity adjustment request to the prefecture-level scheduling area where there is a capacity conflict at the cross section, and obtain the capacity adjustment information fed back by the prefecture-level scheduling area according to the capacity adjustment request; The available capacity of the shared transmission section is reallocated based on the capacity adjustment information to obtain the reallocated capacity of the shared transmission section. The negotiated consensus interval is updated based on the redistributed shared transmission section capacity.

[0239] This application provides a high-power grid collaborative real-time control device, which includes: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to execute the high-power grid collaborative real-time control method in Embodiment 1 above.

[0240] The following is for reference. Figure 7 This document illustrates a structural schematic diagram of a high-output power grid collaborative real-time control device suitable for implementing embodiments of this application. The high-output power grid collaborative real-time control device in the embodiments of this application may include, but is not limited to, mobile terminals such as mobile phones, laptops, digital broadcast receivers, PDAs (Personal Digital Assistants), tablets, PMPs (Portable Media Players), and vehicle terminals (e.g., vehicle navigation terminals), as well as fixed terminals such as digital TVs and desktop computers. Figure 7 The high-power grid collaborative real-time control device shown is merely an example and should not impose any limitations on the functionality and scope of use of the embodiments of this application.

[0241] like Figure 7As shown, the high-voltage power grid collaborative real-time control device may include a processing unit 1001 (e.g., a central processing unit, a graphics processor, etc.), which can perform various appropriate actions and processes according to programs stored in ROM (Read Only Memory) 1002 or programs loaded from storage device 1003 into RAM (Random Access Memory) 1004. RAM 1004 also stores various programs and data required for the operation of the high-voltage power grid collaborative real-time control device. The processing unit 1001, ROM 1002, and RAM 1004 are interconnected via bus 1005. Input / output (I / O) interface 1006 is also connected to the bus. Typically, the following systems can be connected to I / O interface 1006: input devices 1007 including, for example, touchscreens, touchpads, keyboards, mice, image sensors, microphones, accelerometers, gyroscopes, etc.; output devices 1008 including, for example, liquid crystal displays (LCDs), speakers, vibrators, etc.; storage devices 1003 including, for example, magnetic tapes, hard disks, etc.; and communication devices 1009. Communication device 1009 allows the high-output power grid collaborative real-time control equipment to exchange data wirelessly or via wired communication with other devices. Although a high-output power grid collaborative real-time control equipment with various systems is shown in the figure, it should be understood that it is not required to implement or possess all the systems shown. More or fewer systems may be implemented alternatively.

[0242] Specifically, according to the embodiments disclosed in this application, the processes described above with reference to the flowcharts can be implemented as computer software programs. For example, embodiments disclosed in this application include a computer program product comprising a computer program carried on a computer-readable medium, the computer program containing program code for performing the methods shown in the flowcharts. In such embodiments, the computer program can be downloaded and installed from a network via a communication device, or installed from storage device 1003, or installed from ROM 1002. When the computer program is executed by processing device 1001, it performs the functions defined in the methods of the embodiments disclosed in this application.

[0243] The high-voltage power grid collaborative real-time control equipment provided in this application, employing the high-voltage power grid collaborative real-time control method described in the above embodiments, can solve the technical problems of lagging information exchange and low control decision-making efficiency between provincial and local dispatching levels under the condition of rapid fluctuations in renewable energy output. Compared with the prior art, the beneficial effects of the high-voltage power grid collaborative real-time control equipment provided in this application are the same as those of the high-voltage power grid collaborative real-time control method described in the above embodiments, and other technical features of the high-voltage power grid collaborative real-time control equipment are the same as those disclosed in the previous embodiment method, and will not be repeated here.

[0244] It should be understood that the various parts disclosed in this application can be implemented using hardware, software, firmware, or a combination thereof. In the description of the above embodiments, specific features, structures, materials, or characteristics can be combined in any suitable manner in one or more embodiments or examples.

[0245] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.

[0246] This application provides a computer-readable storage medium having computer-readable program instructions (i.e., a computer program) stored thereon, which are used to execute the high-power grid collaborative real-time control method described in the above embodiments.

[0247] The computer-readable storage medium provided in this application may be, for example, a USB flash drive, but is not limited to, electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices, or any combination thereof. More specific examples of computer-readable storage media may include, but are not limited to: electrical connections having one or more wires, portable computer disks, hard disks, RAM (Random Access Memory), ROM (Read Only Memory), Erasable Programmable Read Only Memory (EPROM), optical fiber, CD-ROM (CD-Read Only Memory), optical storage devices, magnetic storage devices, or any suitable combination thereof. In this embodiment, the computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in conjunction with an instruction execution system, system, or device. The program code contained on the computer-readable storage medium may be transmitted using any suitable medium, including but not limited to: wires, optical cables, RF (Radio Frequency), etc., or any suitable combination thereof.

[0248] The aforementioned computer-readable storage medium may be included in the high-voltage power grid collaborative real-time control equipment; or it may exist independently and not be assembled into the high-voltage power grid collaborative real-time control equipment.

[0249] The aforementioned computer-readable storage medium carries one or more programs. When these programs are executed by the high-voltage power grid collaborative real-time control device, the high-voltage power grid collaborative real-time control device: determines the consensus interval of the prefecture-level dispatching area based on the multidimensional stability margin of the high-voltage power grid and the power grid parameters of the prefecture-level dispatching area; performs decision identification based on the consensus interval to obtain a variable consensus interval and a balance control strategy; performs distributed negotiation on the variable consensus interval based on the shared transmission section coupling relationship and shared transmission section capacity of the prefecture-level dispatching area to obtain a negotiated consensus interval; constrains the balance control strategy based on the negotiated consensus interval to obtain a target control strategy, and performs collaborative real-time control of the high-voltage power grid based on the target control strategy.

[0250] Computer program code for performing the operations of this application can be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages ​​such as Java, Smalltalk, and C++, as well as conventional procedural programming languages ​​such as the "C" language or similar programming languages. The program code can be executed entirely on the user's computer, partially on the user's computer, as a standalone software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In cases involving remote computers, the remote computer can be connected to the user's computer via any type of network—including LAN (Local Area Network) or WAN (Wide Area Network)—or can be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0251] The flowcharts and block diagrams in the accompanying drawings illustrate the architecture, functionality, and operation of possible implementations of systems, methods, and computer program products according to various embodiments of this application. In this regard, each block in a flowchart or block diagram may represent a module, segment, or portion of code containing one or more executable instructions for implementing a specified logical function. It should also be noted that in some alternative implementations, the functions indicated in the blocks may occur in a different order than those indicated in the drawings. For example, two consecutively indicated blocks may actually be executed substantially in parallel, and they may sometimes be executed in reverse order, depending on the functions involved. It should also be noted that each block in the block diagrams and / or flowcharts, and combinations of blocks in the block diagrams and / or flowcharts, can be implemented using a dedicated hardware-based system that performs the specified function or operation, or using a combination of dedicated hardware and computer instructions.

[0252] The modules described in the embodiments of this application can be implemented in software or hardware. The names of the modules do not necessarily limit the functionality of the unit itself.

[0253] The readable storage medium provided in this application is a computer-readable storage medium, which stores computer-readable program instructions (i.e., computer programs) for executing the above-described high-power grid collaborative real-time control method. This solves the technical problems of delayed information exchange and low control decision-making efficiency at the provincial and local dispatch levels in high-power grids under conditions of rapid fluctuations in renewable energy output. Compared with the prior art, the beneficial effects of the computer-readable storage medium provided in this application are the same as those of the high-power grid collaborative real-time control method provided in the above embodiments, and will not be repeated here.

[0254] This application also provides a computer program product, including a computer program that, when executed by a processor, implements the steps of the above-described high-power grid collaborative real-time control method.

[0255] The computer program product provided in this application can solve the technical problems of lagging information exchange and low control decision efficiency in provincial and local dispatching under the condition of rapid fluctuation in new energy output in high-power transmission power grids. Compared with the prior art, the beneficial effects of the computer program product provided in this application are the same as those of the high-power transmission power grid collaborative real-time control method provided in the above embodiments, and will not be repeated here.

[0256] The above description is only a part of the embodiments of this application and does not limit the patent scope of this application. All equivalent structural transformations made under the technical concept of this application and using the contents of the specification and drawings of this application, or direct / indirect applications in other related technical fields, are included in the patent protection scope of this application.

Claims

1. A method for coordinated real-time control of a high-voltage power grid, characterized in that, The method includes: The consensus interval of the prefecture-level dispatching area is determined based on the multidimensional stability margin of the high-output power grid and the power grid parameters of the prefecture-level dispatching area. Decision identification is performed based on the consensus interval to obtain the variable consensus interval and the equilibrium control strategy; Based on the coupling relationship and capacity of the shared transmission sections in the prefecture-level dispatch area, the variable consensus interval is negotiated in a distributed manner to obtain the negotiation consensus interval; The equilibrium control strategy is constrained according to the consensus interval to obtain the target control strategy, and the high-power transmission grid is controlled in a coordinated real-time manner according to the target control strategy.

2. The method as described in claim 1, characterized in that, The step of identifying the variable consensus interval and the equilibrium control strategy based on the consensus interval includes: Obtain provincial-level dispatch targets; Based on the consensus interval, the provincial scheduling target is decomposed into target stacking to obtain the prefecture-level scheduling target and the provincial constraint framework; Based on the prefecture-level scheduling objectives, the provincial-level constraint framework, and the real-time operating status of the prefecture-level scheduling area, the variable consensus interval and local control decisions are determined. Based on the variable consensus interval and the local control decision, a game equilibrium solution is performed on the provincial scheduling target and the prefecture-level scheduling target to obtain the equilibrium control strategy.

3. The method as described in claim 2, characterized in that, The step of solving the game equilibrium for the provincial-level scheduling target and the prefecture-level scheduling target based on the variable consensus interval and the local control decision to obtain the equilibrium control strategy includes: The optimization objectives of the provincial dispatching side are determined based on the provincial dispatching objectives, and the response strategies of the prefecture-level dispatching areas are determined based on the prefecture-level dispatching objectives, the local control decisions, and the variable consensus intervals. Based on the optimization objective and the response strategy, a game equilibrium solution is obtained to achieve the equilibrium control result. Based on the balanced control results, determine the prefecture-level control strategy for the prefecture-level scheduling area and the target decomposition results for the provincial-level scheduling objectives; An equilibrium control strategy is generated based on the prefecture-level control strategy and the target decomposition results.

4. The method as described in claim 2, characterized in that, After the step of solving the game equilibrium for the provincial-level scheduling target and the prefecture-level scheduling target based on the variable consensus interval and the local control decision to obtain the equilibrium control strategy, the method further includes: The coordination deviation between provincial-level scheduling targets and prefecture-level scheduling targets is determined based on the aforementioned balanced control strategy; Determine whether the coordination deviation is greater than a preset deviation threshold; If the coordination deviation is greater than the preset deviation threshold, the weight coefficient corresponding to the prefecture-level scheduling area and the boundary parameters of the variable consensus interval are adjusted to obtain the adjusted weight coefficient and the adjusted boundary parameters. The game equilibrium is solved based on the adjusted weight coefficients and the adjusted boundary parameters to update the equilibrium control strategy.

5. The method as described in claim 1, characterized in that, The step of determining the consensus interval of the prefecture-level dispatching area based on the multidimensional stability margin of the high-output power grid and the power grid parameters of the prefecture-level dispatching area includes: Based on the multidimensional stability margin of the high-output power grid and the power grid parameters of the prefecture-level dispatch area, the sensitivity vector of the prefecture-level dispatch area corresponding to the multidimensional stability margin is determined, wherein the multidimensional stability margin includes voltage stability margin, frequency stability margin, power angle stability margin and line power flow stability margin. The baseline consensus interval of the prefecture-level scheduling region is determined based on the sensitivity vector and the multidimensional stability margin. The benchmark consensus interval is adjusted according to the local operational constraints of the prefecture-level scheduling region to obtain the consensus interval of the prefecture-level scheduling region.

6. The method as described in claim 1, characterized in that, The step of performing distributed negotiation on the variable consensus interval based on the coupling relationship and capacity of the shared transmission sections in the prefecture-level dispatch area to obtain the negotiation consensus interval includes: Based on the power grid topology and dispatch boundaries of the prefecture-level dispatch areas, establish a coupling relationship matrix between the prefecture-level dispatch areas; The capacity of the shared transmission section is determined based on the coupling relationship of the shared transmission section in the prefecture-level dispatch area; The reservation ratio of the negotiation interval is determined based on the shared transmission section capacity and the variable consensus interval, and the negotiation interval is determined within the variable consensus interval based on the reservation ratio of the negotiation interval; The adjacent prefecture-level scheduling areas are determined based on the coupling relationship matrix, and the interval boundary information is determined based on the adjacent prefecture-level scheduling areas; The negotiation interval is iteratively updated based on the interval boundary information to obtain the negotiation consensus interval.

7. The method as described in claim 6, characterized in that, After the step of iteratively updating the negotiation interval based on the interval boundary information to obtain the negotiation consensus interval, the method further includes: Based on the consensus intervals corresponding to adjacent prefecture-level dispatching areas, determine whether there is interval overlap or shared transmission section capacity exceeding limits between the adjacent prefecture-level dispatching areas; If it is determined that there is an overlap between adjacent prefecture-level dispatching areas or that the shared transmission section capacity exceeds the limit, it is determined that there is a section capacity conflict in the prefecture-level dispatching areas. Send a capacity adjustment request to the prefecture-level scheduling area where there is a capacity conflict at the cross section, and obtain the capacity adjustment information fed back by the prefecture-level scheduling area according to the capacity adjustment request; The available capacity of the shared transmission section is reallocated based on the capacity adjustment information to obtain the reallocated capacity of the shared transmission section. The negotiated consensus interval is updated based on the redistributed shared transmission section capacity.

8. A real-time control device for high-voltage power grid coordination, characterized in that, The device includes: The interval determination module is used to determine the consensus interval of the prefecture-level dispatching area based on the multidimensional stability margin of the high-output power grid and the power grid parameters of the prefecture-level dispatching area. The decision identification module is used to identify decisions based on the consensus interval to obtain the variable consensus interval and the equilibrium control strategy. The distributed negotiation module is used to perform distributed negotiation on the variable consensus interval based on the coupling relationship and capacity of the shared transmission section in the prefecture-level dispatch area, so as to obtain the negotiation consensus interval. The collaborative control module is used to constrain the equilibrium control strategy according to the negotiated consensus interval to obtain the target control strategy, and to perform collaborative real-time control of the high-power transmission grid according to the target control strategy.

9. A real-time control device for high-voltage power grid coordination, characterized in that, The device includes: a memory, a processor, and a computer program stored in the memory and executable on the processor, the computer program being configured to implement the steps of the high-power grid collaborative real-time control method as described in any one of claims 1 to 7.

10. A storage medium, characterized in that, The storage medium is a computer-readable storage medium, and a computer program is stored on the storage medium. When the computer program is executed by a processor, it implements the steps of the high-power grid collaborative real-time control method as described in any one of claims 1 to 7.