An energy management method and system based on microgrid partitioning
By determining the permissible disconnection range of power flow based on boundary power flow and resource status during the microgrid partitioning process, and utilizing the coordinated regulation of fast-regulating resources and continuous-regulating resources, the problem of excessive occupation of fast-regulating resources is solved, and the continuous partitioning of multiple candidate microgrid boundaries is realized.
Patent Information
- Application Number
- CN202611505431.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-24
- Publication Date
- 2026-11-17
AI Technical Summary
In the process of dividing a continuous microgrid, the feasibility of continuous division is affected by the excessive use of rapid regulation resources due to improper pre-disruption power flow regulation strategies.
By acquiring the boundary power flow and the operating status of fast-regulating and continuous-regulating resources at the candidate microgrid boundaries, the allowable disconnection range of power flow is determined. Once the boundary power flow enters the allowable range, the boundary is disconnected. The fast-regulating resources are used to handle the active power regulation, and the continuous-regulating resources are controlled to perform power replacement, restoring the available capacity of the fast-regulating resources. This supports the continuous division of multiple candidate microgrid boundaries.
It reduces unnecessary occupation of rapid adjustment resources before boundary disconnection, ensures that resource adjustment capacity matches actual available capacity, and supports continuous division of multiple candidate microgrid boundaries.
Smart Images

Figure CN123121852A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of microgrid operation control and distributed energy management technology, specifically to an energy management method and system based on microgrid partitioning. Background Technology
[0002] With the integration of distributed photovoltaic, energy storage devices, and adjustable loads into the distribution network, the distribution area can form one or more independently operating microgrids by disconnecting the corresponding tie lines or controllable switches when the upper-level grid is abnormal, planned to disconnect from the grid, or local power supply demand changes.
[0003] During the transition of a microgrid from grid-connected to stand-alone operation, there is typically some active power exchange at the boundary to be disconnected before disconnection. When the candidate microgrid boundary is disconnected, the original boundary power flow disappears, causing a corresponding active power imbalance within the microgrid to be formed, and potentially leading to frequency changes. Therefore, existing microgrid off-grid control typically adjusts the active power of distributed generation, energy storage devices, or adjustable loads before boundary disconnection to reduce the boundary power flow to a preset range, thereby minimizing the power changes caused by boundary disconnection.
[0004] In scenarios where multiple candidate microgrid boundaries need to be continuously disconnected, there is an operational state correlation between each boundary disconnection. Before and after the disconnection of the previous candidate microgrid boundary, the operational state of the energy storage devices, adjustable distributed power sources, and controllable loads within the microgrid will change. At the same time, the power flow distribution in the distribution area will also be redistributed as the network topology changes. Therefore, the adjustment and disconnection of the previous candidate microgrid boundary will affect the executable conditions of the subsequent candidate microgrid boundaries.
[0005] Existing control methods based on fixed boundary power flow thresholds or those that only regulate power flow at the current single boundary are difficult to simultaneously reflect the active power regulation demand after the current candidate microgrid boundary is disconnected and the actual availability of subsequent regulation resources. This may affect the continued disconnection of subsequent candidate microgrid boundaries during the continuous microgrid partitioning process. Summary of the Invention
[0006] To address the technical problem in existing technologies where improper pre-disconnect power flow regulation strategies lead to excessive occupation of rapid regulation resources and affect the feasibility of continuous microgrid partitioning, this invention provides an energy management method and system based on microgrid partitioning.
[0007] To achieve the above objectives, in one aspect, the present invention provides an energy management method based on microgrid partitioning, comprising:
[0008] Obtain the boundary power flow of the candidate microgrid boundary in the power distribution area to be allocated, as well as the operating status of the fast regulation resources and continuous regulation resources in the microgrid to be formed.
[0009] Adjust the boundary power flow of the current candidate microgrid boundary according to the allowable disconnection power flow range, and disconnect the current candidate microgrid boundary after the boundary power flow enters the allowable disconnection power flow range, wherein the allowable disconnection power flow range is determined based on the available fast active power regulation capacity of the fast regulation resource and the available continuous active power regulation capacity of the continuous regulation resource.
[0010] The active power regulation amount undertaken by the fast-regulating resource is used to control the continuous regulating resource to perform power takeover, wherein the active power regulation amount undertaken by the fast-regulating resource is determined based on the instantaneous active power imbalance caused by the disconnection of the current candidate microgrid boundary.
[0011] The next candidate microgrid boundary is disconnected based on the available fast active power regulation capacity after the fast regulation resources are restored, wherein the available fast active power regulation capacity after the fast regulation resources are restored is determined based on the succession result of the active power regulation amount of the continuous regulation resources.
[0012] Furthermore, the fast-adjustable resource includes at least a grid-type energy storage device, and the continuously adjustable resource includes at least one of adjustable distributed power sources and controllable loads, wherein the power response speed of the fast-adjustable resource is higher than that of the continuously adjustable resource.
[0013] Furthermore, the available fast active power regulation capacity is determined based on the active power output state and power regulation boundary of the fast regulation resource, wherein the power regulation boundary is determined based on the maximum charging and discharging power, state of charge, and current reactive power occupancy state of the fast regulation resource.
[0014] Furthermore, the available continuous active power regulation capacity is determined based on the adjustable active power change of the continuously regulating resource within a preset recovery period, wherein the adjustable active power change is determined based on the current active power of the continuously regulating resource, the allowable active power range, and the active power regulation rate.
[0015] Furthermore, the allowable disconnection power flow range is determined based on the available fast active power regulation capacity of the fast regulation resource and the available continuous active power regulation capacity of the continuous regulation resource. The allowable disconnection power flow range ensures that the instantaneous active power imbalance caused by the disconnection of the current candidate microgrid boundary does not exceed the available fast active power regulation capacity, and the active power regulation amount corresponding to the instantaneous active power imbalance can be taken over by the continuous regulation resource within a preset recovery period.
[0016] Furthermore, the active power adjustment direction of the fast-adjustment resource is determined based on the boundary power flow direction of the current candidate microgrid boundary, wherein, in response to the boundary power flow flowing out of the current microgrid to be formed, the active power adjustment direction is a downward active power adjustment direction; in response to the boundary power flow flowing into the current microgrid to be formed, the active power adjustment direction is an upward active power adjustment direction.
[0017] Further, the power flow regulation termination state of the current candidate microgrid boundary is determined according to the allowed disconnection power flow range, wherein, in response to the boundary power flow entering the allowed disconnection power flow range, the use of the fast adjustment resources to reduce the absolute value of the boundary power flow is stopped, and the disconnection of the current candidate microgrid boundary is executed.
[0018] Furthermore, the active power output of the continuous adjustment resource is adjusted according to the active power adjustment amount undertaken by the rapid adjustment resource, and the active power output state of the rapid adjustment resource is restored according to the change in the active power output of the continuous adjustment resource, wherein the direction of change in the active power output of the continuous adjustment resource is the same as the direction of change in the active power output when the rapid adjustment resource undertakes the active power adjustment amount.
[0019] Furthermore, the active power regulation demand corresponding to the disconnection of the next candidate microgrid boundary is determined based on the boundary power flow of the next candidate microgrid boundary, and the disconnection of the next candidate microgrid boundary is executed when the available fast active power regulation capacity after the fast regulation resource is restored meets the active power regulation demand. The boundary power flow of the next candidate microgrid boundary is determined based on the operating status of the distribution area after the current candidate microgrid boundary is disconnected.
[0020] On the other hand, the present invention also provides an energy management system based on microgrid partitioning, including: a status acquisition module, which is used to acquire the boundary power flow of the candidate microgrid boundary in the power distribution area to be partitioned, and the operating status of the fast regulation resources and the continuous regulation resources in the microgrid to be formed.
[0021] A boundary division module is used to adjust the boundary power flow of the current candidate microgrid boundary according to the allowable disconnection power flow range, and disconnect the current candidate microgrid boundary after the boundary power flow enters the allowable disconnection power flow range, wherein the allowable disconnection power flow range is determined based on the available fast active power regulation capacity of the fast regulation resource and the available continuous active power regulation capacity of the continuous regulation resource.
[0022] A power replacement module is used to control the continuous adjustment resource to perform power replacement based on the active power adjustment amount undertaken by the fast adjustment resource, wherein the active power adjustment amount undertaken by the fast adjustment resource is determined based on the instantaneous active power imbalance caused by the disconnection of the current candidate microgrid boundary.
[0023] A continuous partitioning module is used to disconnect the next candidate microgrid boundary based on the available fast active power regulation capacity after the fast regulation resource is restored, wherein the available fast active power regulation capacity after the fast regulation resource is restored is determined based on the succession result of the continuous regulation resource on the active power regulation amount.
[0024] Compared with the prior art, the present invention has the following beneficial effects: The present invention determines the allowable disconnection power flow range based on the available fast active power regulation capacity of fast regulation resources and the available continuous active power regulation capacity of continuous regulation resources, so that the disconnection conditions of candidate microgrid boundaries are adapted to the actual available capacity of current regulation resources, reducing unnecessary occupation of fast regulation resource regulation capacity before boundary disconnection; after boundary disconnection, the active power regulation amount undertaken by fast regulation resources is replaced by continuous regulation resources, so that fast regulation resources restore available fast active power regulation capacity, and the execution conditions of the next candidate microgrid boundary are determined accordingly, thereby supporting the continuous division of multiple candidate microgrid boundaries. Attached Figure Description
[0025] Figure 1 This is a flowchart of an energy management method based on microgrid partitioning, as described in an embodiment of the present invention.
[0026] Figure 2 This is a detailed flowchart illustrating the process of determining the permissible power flow disconnection range in an embodiment of the present invention;
[0027] Figure 3 This is a detailed flowchart of power handover and capability restoration in an embodiment of the present invention;
[0028] Figure 4 This is a schematic diagram of the modules of the energy management system in an embodiment of the present invention. Detailed Implementation
[0029] To make the technical solution of the present invention clearer, the present invention will be further described below with reference to the accompanying drawings and specific embodiments.
[0030] This embodiment is applied to a power distribution area that requires the sequential disconnection of multiple electrical boundaries to form a microgrid. The power distribution area includes feeders connected to the upper-level power grid, distributed power sources, energy storage devices, loads, and controllable switches located between different electrical areas. The energy management controller is communicatively connected to the distributed power source controller, energy storage controller, load controller, and controllable switches to acquire the operating status of each device and issue active power adjustment commands and boundary disconnection commands to the corresponding devices.
[0031] In this embodiment, before the current candidate microgrid boundary is disconnected, the corresponding available active power regulation capacity is determined based on the operating status of the fast regulation resources and continuous regulation resources within the microgrid to be formed, and the allowable disconnection power flow range of the current candidate microgrid boundary is determined accordingly. After the current candidate microgrid boundary is disconnected, the continuous regulation resources are controlled to take over power based on the active power regulation amount undertaken by the fast regulation resources, and it is determined whether to disconnect the next candidate microgrid boundary based on the available fast active power regulation capacity after the fast regulation resources are restored.
[0032] In this embodiment, the candidate microgrid boundary refers to the network boundary that can electrically isolate the current microgrid from the other distribution networks by disconnecting the corresponding tie line or controllable switch; the boundary power flow refers to the active power exchanged through the candidate microgrid boundary before it is disconnected, including the magnitude and direction of the active power flow.
[0033] Rapidly regulating resources refer to regulating resources that can change active power before continuous regulating resources after the candidate microgrid boundary is disconnected, in order to respond to instantaneous active power imbalance; continuous regulating resources refer to regulating resources that can adjust active power output or load demand after the candidate microgrid boundary is disconnected, and continuously bear the corresponding active power changes.
[0034] In one embodiment, the fast-regulating resource includes at least a grid-type energy storage device, and the continuously regulating resource includes at least one of adjustable distributed power sources and controllable loads, and the power response speed of the fast-regulating resource is higher than that of the continuously regulating resource.
[0035] The permissible disconnection power flow range refers to the boundary power flow range determined based on the available fast active power regulation capacity of fast regulation resources and the available continuous active power regulation capacity of continuous regulation resources in the microgrid to be formed. It is used to determine whether the current candidate microgrid boundary meets the disconnection condition.
[0036] Power succession refers to the process by which, after the boundary of the current candidate microgrid is disconnected, the continuous regulation resource adjusts its active power according to the active power regulation amount undertaken by the fast regulation resource, so that the active power output state of the fast regulation resource is gradually restored.
[0037] In this embodiment, the distribution area to be designated includes one or more feeders connected to the upper-level power grid, distributed power sources, energy storage devices, power loads, and interconnecting lines and controllable switches between different distribution areas. The candidate microgrid boundary can be formed by interconnecting lines and their corresponding controllable switches.
[0038] The energy management controller acquires the active power measurement value and power flow direction corresponding to the candidate microgrid boundary, and obtains the operating status from the local controllers corresponding to the fast-adjustment resource and the continuous-adjustment resource, respectively.
[0039] When the rapidly adjustable resource is a grid-type energy storage device, the operating status may include the current active power, current reactive power, maximum allowable charge / discharge power, state of charge, and converter capacity status; when the continuously adjustable resource is an adjustable distributed power source, the operating status may include the current active power output, allowable output range, and active power adjustment rate; when the continuously adjustable resource is a controllable load, the operating status may include the current power consumption and the allowable range of load power increases or decreases.
[0040] Reference Figure 1 The diagram shown is a flowchart of an energy management method based on microgrid partitioning according to an embodiment of the present invention. The method in this embodiment includes:
[0041] Step S1: Obtain the boundary power flow of the candidate microgrid boundary in the power distribution area to be allocated, as well as the operating status of the fast-regulating resources and the continuous-regulating resources in the microgrid to be formed.
[0042] Specifically, the energy management controller obtains the active power and active power flow direction of the boundary from the power measurement device corresponding to the candidate microgrid boundary, and determines whether the boundary power flow is flowing into or out of the current microgrid to be formed based on the active power flow direction.
[0043] The energy management controller obtains the current active power output status and operating parameters used to determine the power regulation boundary from the controller corresponding to the fast-adjustment resource, and obtains the current active power output, allowable output range and active power regulation rate from the controller corresponding to the continuous-adjustment resource.
[0044] The boundary power flow is used to determine the direction of active power imbalance caused by the current candidate microgrid boundary disconnection, and the operating status of the fast regulation resource and the continuous regulation resource is used to determine the available fast active power regulation capacity and the available continuous active power regulation capacity, respectively.
[0045] Step S2: Determine the available fast active power regulation capacity based on the active power output state and power regulation boundary of the fast regulation resource.
[0046] Specifically, the power regulation boundary is determined based on the maximum charging and discharging power of the fast regulation resource, the state of charge, and the current reactive power occupancy status of the converter.
[0047] When the boundary power flow of the current candidate microgrid boundary flows into the current microgrid to be formed, the boundary is disconnected and an active power deficit is formed. The corresponding active power adjustment direction is the upward active power adjustment direction. At this time, the available upward fast active power adjustment capacity is determined based on the difference between the current active power output of the fast adjustment resource and the upward power adjustment boundary.
[0048] When the boundary power flow flows out from the microgrid to be formed, the boundary is disconnected and an active power surplus is formed. The corresponding active power adjustment direction is the downward active power adjustment direction. At this time, the available downward fast active power adjustment capacity is determined based on the difference between the current active power output of the fast adjustment resource and the downward power adjustment boundary.
[0049] Taking a grid-type energy storage device with rapidly adjustable resources as an example, when the state of charge is close to the lower limit of allowable discharge, the upward power adjustment boundary is limited by the maximum allowable discharge power and the state of charge; when the state of charge is close to the upper limit of allowable charging, the downward power adjustment boundary is limited by the maximum allowable charging power and the state of charge.
[0050] When the energy storage converter simultaneously outputs reactive power, its active power adjustment boundary is adjusted according to the converter's allowable active-reactive operating boundary. For example, if the rated apparent power of the energy storage converter is 1000kVA, the current active output is 800kW, and the reactive output is 500kVar, then the apparent power corresponding to the current operating point is approximately 943kVA. At this point, the amount of active power that can be further increased cannot be directly determined based on the difference between the rated power and the current active output, but should be determined by combining the rated apparent power and the current reactive output.
[0051] The available continuous active power regulation capacity is determined based on the change in adjustable active power of the continuously regulating resource during a preset recovery period.
[0052] Specifically, for adjustable distributed power sources, the amount of active power output change that can be achieved within a preset recovery period is determined based on its current active power output, allowable output range, and active power adjustment rate. The available continuous active power adjustment capacity does not exceed the adjustable power between the current active power output of the continuously adjustable resource and the allowable output boundary in the corresponding direction, and also does not exceed the amount of active power change that can be achieved within the preset recovery period according to the active power adjustment rate.
[0053] For example, a diesel generator currently has an active power output of 300kW and a maximum allowable active power output of 600kW. Its upward active power adjustment rate is 10kW / s, and the preset recovery period is 10s. The diesel generator has an upward output space of 300kW from its current output to its maximum allowable output. According to the active power adjustment rate of 10kW / s, it can increase its active power output by 100kW within the preset recovery period of 10s. Therefore, 100kW is defined as the upward adjustable active power change of the diesel generator within the current preset recovery period.
[0054] For the downward active power regulation direction, the corresponding available continuous active power regulation capacity is determined in the same way based on the adjustable power between the current active power output and the minimum allowable active power output of the continuously regulating resource, and its downward active power regulation rate.
[0055] Step S3: Determine the allowable disconnection power flow range of the current candidate microgrid boundary based on the available fast active power regulation capacity and the available continuous active power regulation capacity.
[0056] Specifically, the allowable disconnection power flow range satisfies the following: when the current candidate microgrid boundary is disconnected within the allowable disconnection power flow range, the resulting instantaneous active power imbalance does not exceed the available fast active power regulation capacity corresponding to the current regulation direction, and the active power regulation amount corresponding to the instantaneous active power imbalance can be replaced by continuous regulation resources within a preset recovery period.
[0057] In one implementation, when both the available fast active power regulation capacity and the available continuous active power regulation capacity are expressed as active power values in the current regulation direction, the smaller of the two values is determined as the upper limit of the allowable disconnection power flow corresponding to the current regulation direction.
[0058] If the boundary power flow into the microgrid to be formed is positive, then for the inflow power flow, the allowable disconnection range can be expressed as the range from zero to the upper limit of the allowable inflow power flow; for the outflow power flow, the allowable disconnection range can be expressed as the range from the lower limit of the allowable outflow power flow to zero.
[0059] Since the available capacity of fast-adjusting resources and continuous-adjusting resources can differ in the upward and downward active power adjustment directions, the upper limit of the allowable disconnection flow corresponding to the inflow flow and the lower limit of the allowable outflow flow corresponding to the outflow flow can be determined separately.
[0060] For example, when a grid-type energy storage device is currently in a discharging state, the upward active power regulation capacity corresponding to its continued increase in discharge power may be different from the downward active power regulation capacity corresponding to its decrease in discharge power or transition to a charging state. Therefore, the allowable disconnection range of power flow can be determined separately for the inlet power flow and the outlet power flow.
[0061] Step S4: Adjust the boundary power flow of the current candidate microgrid boundary according to the allowed disconnection power flow range, and disconnect the current candidate microgrid boundary after the boundary power flow enters the allowed disconnection power flow range.
[0062] Specifically, when the boundary power flow of the current candidate microgrid boundary does not enter the allowable disconnection power flow range, the energy management controller adjusts the active power of the adjustable resources in the current microgrid to be formed, so that the boundary power flow changes towards the allowable disconnection power flow range.
[0063] In one implementation, the continuously regulating resources are preferentially controlled to regulate active power before a power outage. For example, when the boundary power flow from the current candidate microgrid boundary flows into the current microgrid to be formed, the inflow boundary power flow can be reduced by increasing the active power output of adjustable distributed generation sources or reducing the power of controllable loads; when the boundary power flow flows out of the current microgrid to be formed, the absolute value of the outflow boundary power flow can be reduced by reducing the active power output of adjustable distributed generation sources or increasing the power of controllable loads.
[0064] In response to the boundary power flow entering the allowed disconnection power flow range, it is determined that the current candidate microgrid boundary has reached the power flow regulation termination state, the use of the fast regulation resources to reduce the absolute value of the boundary power flow is stopped, and the disconnection of the current candidate microgrid boundary is executed.
[0065] For example, when the inlet power of the current candidate microgrid boundary decreases from 500kW to 180kW, and the corresponding allowable disconnection inlet power flow upper limit is 200kW, it is determined that the boundary power flow has entered the allowable disconnection power flow range. At this time, even if the fast adjustment resources still have adjustment space to continue increasing active power output to further reduce the inlet boundary power flow, the fast adjustment resources will no longer be called for the purpose of reducing the boundary power flow, and the disconnection of the current candidate microgrid boundary will be executed.
[0066] It should be noted that fast-adjustment resources do not completely refrain from active power regulation before the current candidate microgrid boundary is disconnected. When the boundary power flow has not yet entered the allowable disconnection power flow range, fast-adjustment resources can be invoked to participate in boundary power flow regulation according to the resource scheduling status; however, once the boundary power flow has entered the allowable disconnection power flow range, the invocation of fast-adjustment resources before disconnection will no longer be increased for the purpose of reducing the absolute value of the boundary power flow.
[0067] Step S5: In response to the disconnection of the current candidate microgrid boundary, determine the active power adjustment amount undertaken by the fast adjustment resource based on the instantaneous active power imbalance caused by the disconnection of the current candidate microgrid boundary.
[0068] Specifically, when there is a boundary power flow flowing into the current microgrid to be formed before the current candidate microgrid boundary is disconnected, an active power deficit is formed after the candidate microgrid boundary is disconnected, and the fast adjustment resources are controlled to change the active power output along the upward active power adjustment direction; when there is a boundary power flow flowing out of the current microgrid to be formed before the current candidate microgrid boundary is disconnected, an active power surplus is formed after the candidate microgrid boundary is disconnected, and the fast adjustment resources are controlled to change the active power output along the downward active power adjustment direction.
[0069] In one implementation, the active power regulation amount undertaken by the fast-adjustment resource can be determined based on the boundary power flow before the current candidate microgrid boundary is disconnected, and corrected based on the actual active power change after the boundary is disconnected.
[0070] During the boundary disconnection period, when the load power or distributed renewable energy output changes, the actual instantaneous active power imbalance may differ from the boundary power flow before the disconnection. Therefore, the boundary power flow before the disconnection can be used as the initial active power adjustment, and the active power adjustment can be updated based on the actual power status collected after the boundary disconnection.
[0071] For example, when 180kW of active power is input into the current microgrid to be formed before the boundary of the candidate microgrid is disconnected, the current microgrid to be formed will have a corresponding active power deficit after the boundary is disconnected. The grid-type energy storage device increases the active power output along the upward active power adjustment direction to bear the instantaneous active power imbalance.
[0072] When the rapid adjustment resource is a grid-type energy storage device, the active power adjustment can be implemented by the local energy storage controller responding to changes in active power or frequency after the boundary is disconnected, or the energy management controller can issue a corresponding active power adjustment command to the energy storage controller.
[0073] Step S6: Control the continuous adjustment resource to perform power takeover based on the active power adjustment amount undertaken by the rapid adjustment resource.
[0074] Specifically, based on the active power adjustment direction and amount undertaken by the rapid adjustment resource, the continuous adjustment resource is controlled to gradually adjust its active power output along the same active power adjustment direction, and the active power output of the rapid adjustment resource is adjusted accordingly based on the change in the active power output of the continuous adjustment resource.
[0075] When the fast-regulating resource undertakes active power regulation in the upward active power regulation direction, the continuous regulating resource gradually increases the corresponding net active power contribution and gradually reverses the active power output state of the fast-regulating resource after the boundary disconnection; when the fast-regulating resource undertakes active power regulation in the downward active power regulation direction, the continuous regulating resource gradually reduces the corresponding net active power contribution and gradually restores the active power regulation space in the corresponding direction.
[0076] For example, if a grid-based energy storage device increases its active power output by 180kW after the current candidate microgrid boundary is disconnected, the control diesel generator gradually increases its active power output according to its allowed active power regulation rate. When the diesel generator cumulatively increases its active power output by 40kW, the grid-based energy storage device's active power output is reduced by 40kW relative to the disconnected output; when the diesel generator cumulatively increases its active power output by 100kW, the grid-based energy storage device is correspondingly reduced by 100kW. As the continuously regulating resources gradually replace the active power regulation amount, the active power output state of the rapidly regulating resources is gradually restored, and the available rapid active power regulation capacity in the corresponding direction is re-established.
[0077] Step S7: Based on the succession result of the active power regulation amount by the continuous regulation resource, determine the available fast active power regulation capacity after the fast regulation resource is restored, and perform the disconnection of the next candidate microgrid boundary based on the restored available fast active power regulation capacity.
[0078] Specifically, during the power handover process of continuously regulating resources, the energy management controller redetermines the available fast active power regulation capacity in the current regulation direction based on the current active power output status of the fast regulating resources and the corresponding power regulation boundary. As continuously regulating resources gradually take over the active power regulation undertaken by fast regulating resources, the active power output of fast regulating resources gradually decreases, and the available fast active power regulation capacity in the corresponding direction increases accordingly.
[0079] Before disconnecting the next candidate microgrid boundary, the operating status of the distribution area after the current candidate microgrid boundary is disconnected is obtained, and the boundary power flow of the next candidate microgrid boundary is redefined accordingly. The active power regulation demand corresponding to the disconnection of the next candidate microgrid boundary is determined based on the boundary power flow of the next candidate microgrid boundary.
[0080] If the available fast active power regulation capacity after the fast regulation resource is restored meets the active power regulation requirement corresponding to the disconnection of the next candidate microgrid boundary, the disconnection of the next candidate microgrid boundary is executed; if not, the disconnection of the next candidate microgrid boundary is temporarily suspended, and the power replacement of the continuous regulation resource continues.
[0081] Specifically, this invention determines the permissible disconnection power flow range based on the available fast active power regulation capacity of fast regulation resources and the available continuous active power regulation capacity of continuous regulation resources. This ensures that the disconnection conditions of candidate microgrid boundaries are adapted to the actual available capacity of current regulation resources, reducing unnecessary occupation of fast regulation resource regulation capacity before boundary disconnection. After boundary disconnection, continuous regulation resources take over the active power regulation amount undertaken by fast regulation resources, restoring the available fast active power regulation capacity of fast regulation resources. Based on this, the execution conditions of the next candidate microgrid boundary are determined, thereby supporting the continuous division of multiple candidate microgrid boundaries.
[0082] In this embodiment, the corresponding active power adjustment direction is determined based on the boundary power flow direction of the current candidate microgrid boundary.
[0083] When the boundary power flows out of the current microgrid to be formed, the boundary of the current candidate microgrid is disconnected, and the original external output power is no longer output. The current microgrid to be formed then has an active power surplus. Therefore, the active power adjustment direction of the fast-adjustment resource is determined to be the downward active power adjustment direction. The downward active power adjustment can be achieved by reducing the generation power, reducing the energy storage discharge power, increasing the energy storage charging power, or increasing the controllable load power.
[0084] When the boundary power flow flows into the current microgrid to be formed, the boundary of the current candidate microgrid is disconnected, the original external input power disappears, and the current microgrid to be formed has an active power deficit. Therefore, the active power adjustment direction of the fast-adjustment resource is determined to be the upward active power adjustment direction. The upward active power adjustment can be achieved by increasing the generation power, increasing the energy storage discharge power, reducing the energy storage charging power, or reducing the controllable load power.
[0085] To further illustrate the implementation process of the present invention, the following description takes the continuous division of two candidate microgrid boundaries as an example.
[0086] Assume the distribution area to be allocated includes candidate microgrid boundaries L1 and L2. Currently, L1 inputs 500kW of active power to the microgrid to be formed, and L2 inputs 250kW of active power to the microgrid to be formed. A grid-connected energy storage device (BESS) is installed in the microgrid to be formed as a fast-regulation resource, and a diesel generator (DG) is installed as a continuous-regulation resource.
[0087] The current active power output of BESS is 200kW. Based on its current active power output status, power regulation boundary, state of charge, and converter operating status, its available fast active power regulation capacity is determined to be 300kW.
[0088] The current active power output of the DG is 400kW, the maximum allowable active power output is 1000kW, the upward active power regulation rate is 20kW / s, and the preset recovery period is 10s.
[0089] First, the boundary L1 of the candidate microgrid is defined.
[0090] Based on the current active power output and maximum allowable active power output of the DG, it has an upward steady-state output capacity of 600kW; according to the upward active power regulation rate of 20kW / s, it can increase the active power output by 200kW within the preset recovery period of 10s. Therefore, 200kW is determined as the current available continuous active power regulation capacity of the DG.
[0091] The current available fast active power regulation capacity of BESS is 300kW. Therefore, in this embodiment, the smaller of the two, 200kW, is determined as the upper limit of the allowable disconnection of the inlet power flow corresponding to L1.
[0092] The current inlet boundary power flow of L1 is 500kW, which is greater than the upper limit of 200kW that can be disconnected from the inlet power flow. Therefore, the active power output of the DG is increased to gradually reduce the inlet boundary power flow of L1.
[0093] When the active power output of DG increases by 320kW, the inlet boundary power flow of L1 decreases from 500kW to 180kW. Since 180kW has entered the permissible disconnection power flow range of 0 to 200kW, it is determined that L1 has reached the power flow regulation termination state.
[0094] At this point, BESS still has upward active power regulation space, but it no longer uses BESS to reduce the absolute value of the boundary power flow of L1, and performs disconnection of the candidate microgrid boundary corresponding to L1.
[0095] After L1 is disconnected, the 180kW active power input from L1 disappears, resulting in an instantaneous active power deficit of approximately 180kW in the microgrid to be formed. Based on this instantaneous active power imbalance, the active power regulation amount undertaken by the BESS is determined, and the BESS is controlled to increase the active power output by approximately 180kW in the upward active power regulation direction.
[0096] Subsequently, the DG continues to increase its active power output to take over the 180kW active power regulation load borne by the BESS. As the active power output of the DG gradually increases, the BESS is controlled to correspondingly reduce the active power output increased after its disconnection.
[0097] Once the DG's replacement of the 180kW active power regulation reaches the corresponding value, its available fast active power regulation capacity is re-determined based on the current active power output status and power regulation boundary of the BESS.
[0098] Next, we will prepare to delineate the candidate microgrid boundary L2.
[0099] After L1 is disconnected, the network topology of the distribution area changes. Therefore, the boundary power flow of L2 under the current operating state of the distribution area needs to be reacquired. Assuming that the reacquired boundary power flow of L2 is 230kW, the upward active power regulation demand corresponding to the L2 disconnection is determined based on the 230kW boundary power flow.
[0100] If the available fast active power regulation capacity after BESS recovery is 250kW, then the 250kW available fast active power regulation capacity meets the 230kW active power regulation requirement corresponding to L2 disconnection, and enters the next round of candidate microgrid boundary division process corresponding to L2.
[0101] If the available fast active power regulation capacity after BESS recovery is less than 230kW, then the disconnection of L2 will be temporarily suspended, and the power replacement of the previous round of active power regulation by DG will continue until the active power regulation requirement corresponding to the next candidate microgrid boundary is met.
[0102] In one embodiment, the rapidly adjustable resources include at least a grid-type energy storage device, and the continuously adjustable resources include at least one of adjustable distributed power sources and controllable loads.
[0103] When the fast-regulating resource is a grid-type energy storage device, the grid-type energy storage device changes its active power output according to the instantaneous active power imbalance caused by the disconnection of the candidate microgrid boundary; when the continuous-regulating resource is a diesel generator, gas turbine, or other adjustable distributed power source, the active power regulation amount undertaken by the fast-regulating resource is replaced by adjusting the corresponding active power output; when the continuous-regulating resource is a controllable load, the active power regulation amount in the corresponding direction is formed by increasing or decreasing the load power.
[0104] In one implementation, the microgrid to be formed includes multiple fast-regulating resources. The available fast active power regulation capacity of each fast-regulating resource in the current active power regulation direction is determined, and the available fast active power regulation capacity corresponding to the microgrid to be formed is determined based on the available fast active power regulation capacity of each fast-regulating resource that can affect the active power balance of the microgrid to be formed.
[0105] In another implementation, the microgrid to be formed includes multiple continuously adjustable resources. The adjustable active power change of each continuously adjustable resource within a preset recovery period is determined, and the available continuously adjustable active power capacity corresponding to the microgrid to be formed is determined based on the adjustable active power change of each continuously adjustable resource in the current active power adjustment direction.
[0106] The above method is applicable to both situations where there is an active power deficit after the candidate microgrid boundary is disconnected and situations where there is an active power surplus. For active power deficit, the fast adjustment resources perform upward active power adjustment, and the continuous adjustment resources perform power replacement by increasing the net active power contribution; for active power surplus, the fast adjustment resources perform downward active power adjustment, and the continuous adjustment resources perform power replacement by reducing the net active power contribution.
[0107] In one implementation, when the available continuous active power regulation capacity is insufficient to replace the active power regulation corresponding to the current candidate microgrid boundary disconnection within a preset recovery period, the allowable disconnection power flow range is reduced, and the boundary power flow of the current candidate microgrid boundary continues to be adjusted until the boundary power flow enters the redefined allowable disconnection power flow range.
[0108] If the available fast active power regulation capacity is insufficient to handle the instantaneous active power imbalance caused by the disconnection of the current candidate microgrid boundary, the disconnection of the current candidate microgrid boundary will not be executed.
[0109] When the available fast active power regulation capacity after the continuous regulation resource has performed power replacement is still insufficient to meet the active power regulation requirements corresponding to the disconnection of the next candidate microgrid boundary after the fast regulation resource has recovered, the disconnection of the next candidate microgrid boundary is temporarily suspended, and the power replacement of the continuous regulation resource continues.
[0110] In contrast, under the same initial conditions as the aforementioned numerical embodiment, a control method can be adopted that further adjusts the L1 boundary power flow to zero before disconnecting.
[0111] Under this comparative control method, assuming that the control DG increases active power output by 300kW and the control BESS increases active power output by 200kW, the inlet boundary power flow of L1 is reduced from 500kW to 0. Since the BESS has already increased active power output by 200kW before L1 is disconnected, its original 300kW available fast active power regulation capacity is reduced to 100kW accordingly.
[0112] After L1 is disconnected, since the boundary power flow of L1 was adjusted to 0 before the disconnection, the disconnection of L1 itself no longer generates a corresponding instantaneous active power deficit of 180kW; however, at this time, BESS is still in the operating state with an increase of 200kW active power output relative to the initial state, and its available fast active power regulation capacity is still 100kW.
[0113] If the L2 inlet boundary power flow reacquired after L1 is disconnected is 230kW, then the current 100kW available fast active power regulation capacity of BESS cannot meet the 230kW active power regulation requirement corresponding to the L2 disconnection. It is necessary to first adjust the active power through other continuous regulation resources, so that the active power output state of BESS can be rolled back and the corresponding available fast active power regulation capacity can be restored before it is determined whether to disconnect L2.
[0114] In contrast, in the aforementioned embodiment, when the L1 boundary power flow decreases to 180kW and enters the allowable disconnection power flow range of 0 to 200kW, the BESS is no longer invoked to further reduce the L1 boundary power flow; instead, L1 disconnection is executed. After L1 disconnection, the BESS increases active power output based on the resulting instantaneous active power deficit of approximately 180kW. Subsequently, the DG takes over the regulation of this 180kW active power, gradually restoring the BESS's upward available fast active power regulation capacity, and thereby re-determining whether the L2 disconnection condition is met.
[0115] In one embodiment, the present invention also provides an energy management system based on microgrid partitioning, including a status acquisition module, a boundary partitioning module, a power succession module, and a continuous partitioning module.
[0116] The status acquisition module is used to acquire the boundary power flow of the candidate microgrid boundary in the power distribution area to be divided, as well as the operating status of the fast-regulating resources and the continuously regulating resources in the microgrid to be formed. Specifically, the status acquisition module can be communicatively connected to the power measurement device, the fast-regulating resource controller, and the continuously regulating resource controller corresponding to the candidate microgrid boundary to acquire the boundary active power, power flow direction, and the operating parameters corresponding to each regulating resource.
[0117] The boundary division module is used to adjust the boundary power flow of the current candidate microgrid boundary according to the allowable disconnection power flow range, and disconnect the current candidate microgrid boundary after the boundary power flow enters the allowable disconnection power flow range, wherein the allowable disconnection power flow range is determined based on the available fast active power regulation capacity of the fast regulation resource and the available continuous active power regulation capacity of the continuous regulation resource.
[0118] In one implementation, the boundary division module determines the available fast active power regulation capacity based on the active power output state and power regulation boundary of the fast regulation resource, and determines the available continuous active power regulation capacity based on the adjustable active power change of the continuous regulation resource within a preset recovery period.
[0119] The power takeover module is used to control the continuous adjustment resource to perform power takeover based on the active power adjustment amount undertaken by the fast adjustment resource, wherein the active power adjustment amount undertaken by the fast adjustment resource is determined based on the instantaneous active power imbalance caused by the disconnection of the current candidate microgrid boundary.
[0120] Specifically, the power replacement module controls the continuous adjustment resource to gradually adjust its active power output according to the direction and amount of active power adjustment undertaken by the rapid adjustment resource, and adjusts the active power output state of the rapid adjustment resource according to the change in the active power output of the continuous adjustment resource.
[0121] The continuous partitioning module is used to disconnect the next candidate microgrid boundary based on the available fast active power regulation capacity after the fast regulation resource is restored, wherein the available fast active power regulation capacity after the fast regulation resource is restored is determined based on the succession result of the continuous regulation resource on the active power regulation amount.
[0122] In one implementation, the continuous partitioning module obtains the operating status of the distribution area after the current candidate microgrid boundary is disconnected, redetermines the boundary power flow of the next candidate microgrid boundary based on the operating status of the distribution area, and determines the corresponding active power regulation demand based on the boundary power flow of the next candidate microgrid boundary; when the available fast active power regulation capacity after the fast regulation resource is restored meets the active power regulation demand, the disconnection of the next candidate microgrid boundary is controlled.
[0123] The above description is merely a preferred embodiment of the present invention and is not intended to limit the invention. Various modifications and variations can be made to the present invention by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.
Claims
1. An energy management method based on microgrid partitioning, characterized in that, include: Obtain the boundary power flow of the candidate microgrid boundary in the power distribution area to be allocated, as well as the operating status of the fast regulation resources and continuous regulation resources in the microgrid to be formed. Adjust the boundary power flow of the current candidate microgrid boundary according to the allowable disconnection power flow range, and disconnect the current candidate microgrid boundary after the boundary power flow enters the allowable disconnection power flow range, wherein the allowable disconnection power flow range is determined based on the available fast active power regulation capacity of the fast regulation resource and the available continuous active power regulation capacity of the continuous regulation resource. The active power regulation amount undertaken by the fast-regulating resource is used to control the continuous regulating resource to perform power takeover, wherein the active power regulation amount undertaken by the fast-regulating resource is determined based on the instantaneous active power imbalance caused by the disconnection of the current candidate microgrid boundary. The next candidate microgrid boundary is disconnected based on the available fast active power regulation capacity after the fast regulation resources are restored, wherein the available fast active power regulation capacity after the fast regulation resources are restored is determined based on the succession result of the active power regulation amount of the continuous regulation resources.
2. The energy management method based on microgrid partitioning according to claim 1, characterized in that, The fast-adjustable resources include at least grid-type energy storage devices, and the continuously adjustable resources include at least one of adjustable distributed power sources and controllable loads, wherein the power response speed of the fast-adjustable resources is higher than that of the continuously adjustable resources.
3. The energy management method based on microgrid partitioning according to claim 2, characterized in that, The available fast active power regulation capacity is determined based on the active power output state and power regulation boundary of the fast regulation resource, wherein the power regulation boundary is determined based on the maximum charge and discharge power, state of charge, and current reactive power occupancy state of the converter.
4. The energy management method based on microgrid partitioning according to claim 2, characterized in that, The available continuous active power regulation capacity is determined based on the change in adjustable active power of the continuously regulating resource within a preset recovery period, wherein the change in adjustable active power is determined based on the current active power of the continuously regulating resource, the allowable active power range, and the active power regulation rate.
5. The energy management method based on microgrid partitioning according to claim 3 or 4, characterized in that, The allowable disconnection power flow range is determined based on the available fast active power regulation capacity of the fast regulation resource and the available continuous active power regulation capacity of the continuous regulation resource. The allowable disconnection power flow range ensures that the instantaneous active power imbalance caused by the disconnection of the current candidate microgrid boundary does not exceed the available fast active power regulation capacity, and the active power regulation amount corresponding to the instantaneous active power imbalance can be taken over by the continuous regulation resource within a preset recovery period.
6. The energy management method based on microgrid partitioning according to claim 5, characterized in that, The active power adjustment direction of the fast-adjustment resource is determined based on the boundary power flow direction of the current candidate microgrid boundary, wherein, in response to the boundary power flow flowing out of the current microgrid to be formed, the active power adjustment direction is a downward active power adjustment direction; in response to the boundary power flow flowing into the current microgrid to be formed, the active power adjustment direction is an upward active power adjustment direction.
7. The energy management method based on microgrid partitioning according to claim 5, characterized in that, The power flow regulation termination state of the current candidate microgrid boundary is determined according to the allowed disconnection power flow range, wherein, in response to the boundary power flow entering the allowed disconnection power flow range, the use of the fast regulation resource to reduce the absolute value of the boundary power flow is stopped, and the disconnection of the current candidate microgrid boundary is performed.
8. The energy management method based on microgrid partitioning according to claim 4, characterized in that, The active power output of the continuous adjustment resource is adjusted according to the active power adjustment amount undertaken by the rapid adjustment resource, and the active power output state of the rapid adjustment resource is restored according to the change in the active power output of the continuous adjustment resource, wherein the direction of change in the active power output of the continuous adjustment resource is the same as the direction of change in the active power output when the rapid adjustment resource undertakes the active power adjustment amount.
9. The energy management method based on microgrid partitioning according to claim 8, characterized in that, The active power regulation demand corresponding to the disconnection of the next candidate microgrid boundary is determined based on the boundary power flow of the next candidate microgrid boundary, and the disconnection of the next candidate microgrid boundary is executed when the available fast active power regulation capacity after the fast regulation resource is restored meets the active power regulation demand. The boundary power flow of the next candidate microgrid boundary is determined based on the operating status of the distribution area after the disconnection of the current candidate microgrid boundary.
10. An energy management system based on microgrid partitioning, wherein the method described in any one of claims 1-9 is characterized in that, include: The status acquisition module is used to acquire the boundary power flow of the candidate microgrid boundary in the power distribution area to be allocated, as well as the operating status of the fast regulation resources and continuous regulation resources in the microgrid to be formed. A boundary division module is used to adjust the boundary power flow of the current candidate microgrid boundary according to the allowable disconnection power flow range, and disconnect the current candidate microgrid boundary after the boundary power flow enters the allowable disconnection power flow range, wherein the allowable disconnection power flow range is determined based on the available fast active power regulation capacity of the fast regulation resource and the available continuous active power regulation capacity of the continuous regulation resource. A power replacement module is used to control the continuous adjustment resource to perform power replacement based on the active power adjustment amount undertaken by the fast adjustment resource, wherein the active power adjustment amount undertaken by the fast adjustment resource is determined based on the instantaneous active power imbalance caused by the disconnection of the current candidate microgrid boundary. A continuous partitioning module is used to disconnect the next candidate microgrid boundary based on the available fast active power regulation capacity after the fast regulation resource is restored, wherein the available fast active power regulation capacity after the fast regulation resource is restored is determined based on the succession result of the continuous regulation resource on the active power regulation amount.