An operation mode for an energy-saving distribution network system consisting of 110kV and below lines.

By calculating reactive power demand capacity step by step and optimizing the switching scheme of reactive power compensation devices, the problem of unreasonable reactive power compensation in the existing distribution network system is solved, achieving energy saving and equipment protection effects.

CN123121869APending Publication Date: 2026-11-17HUANGSHAN POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202511342179.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-09-19
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

When the existing distribution network system consisting of 110kV and below lines is in operation, reactive power compensation can only be insufficient and cannot be excessive, which leads to the selection of an unreasonable compensation scheme, which may not be the optimal scheme.

Method used

By progressively restoring the actual reactive power demand capacity of each voltage level, calculating the total reactive power compensation capacity, and prioritizing the switching of high-voltage level or the fewest reactive power compensation devices, the compensation scheme that best matches the actual reactive power demand is selected and switched on within a set time interval to avoid over- or under-compensation.

Benefits of technology

It achieves a reasonable reactive power compensation method, saves losses, increases equipment lifespan and reduces failure rate, and ensures the rationality and optimization of the compensation scheme.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

This invention relates to an energy-saving operation mode of a distribution network system composed of 110kV and below lines, comprising the following steps: Step (1) Based on the topology, according to the order of 0.4kV, 10kV, 35kV, and 110kV, restore the actual reactive power demand capacity of each power supply node of each transmission line at each voltage level before compensation; Step (2) Calculate the total reactive power compensation capacity provided by the reactive power compensation devices of the 110kV line distribution network system; which is the sum of the reactive power compensation capacity of all reactive power compensation devices on the 110kV transmission line and the 35kV, 10kV, and 0.4kV transmission lines that are topologically connected to the 110kV transmission line; Step (3) Obtain the final switching scheme based on steps (1) and (2). This invention can effectively solve the problem that existing compensation methods are not reasonable enough, and the compensation scheme used during compensation may not be the optimal scheme.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a distribution network system operation mode, and more particularly to an energy-saving distribution network system composed of 110kV and below lines. Background Technology

[0002] When the existing distribution network system consisting of 110kV and below lines is in operation, reactive power compensation can only be reduced and cannot be over-compensated. The principle of compensation for over-compensation has not been considered. Therefore, the selected compensation scheme may not be the closest to the actual needs or the optimal compensation scheme. Summary of the Invention

[0003] The purpose of this invention is to provide an energy-saving operation mode for a distribution network system consisting of 110kV and below lines, solving the problem that existing compensation methods are not reasonable enough, and the compensation scheme used during compensation may not be the optimal solution.

[0004] The technical solution adopted by this invention to solve its technical problem is: an operation mode of a distribution network system composed of 110kV and below lines that is energy-saving, comprising the following steps: Step (1): Based on the topology, and following the order of 0.4kV, 10kV, 35kV, and 110kV, restore the actual reactive power demand capacity of each power supply node of each transmission line at each voltage level before compensation. The specific method is as follows: Actual reactive power demand capacity of each 0.4kV transmission line power source node: Reactive power demand capacity collected on the 0.4kV transmission line + reactive power compensation capacity already switched on = Actual reactive power demand capacity of the 0.4kV transmission line power source node; The actual reactive power demand capacity of each 10kV transmission line power supply node is: the sum of the actual reactive power demand capacity of each subordinate 0.4kV transmission line power supply node + the reactive power compensation capacity already switched on the 10kV transmission line = the actual reactive power demand capacity of the 10kV transmission line power supply node. The actual reactive power demand capacity of each 35kV transmission line power supply node is: the sum of the actual reactive power demand capacity of each subordinate 10kV transmission line power supply node + the reactive power compensation capacity already switched on the 35kV transmission line = the actual reactive power demand capacity of the 35kV transmission line power supply node. Actual reactive power demand capacity of a 110kV transmission line power supply node: The sum of the actual reactive power demand capacity of each subordinate 35kV transmission line power supply node + the reactive power compensation capacity already switched on the 110kV transmission line = the actual reactive power demand capacity of the 110kV transmission line power supply node. Step (2): Calculate the total reactive power compensation capacity provided by the reactive power compensation devices of the 110kV line distribution network system; it is the sum of the reactive power compensation capacity of all reactive power compensation devices on the 110kV transmission line and the 35kV, 10kV and 0.4kV transmission lines that are topologically connected to the 110kV transmission line. Step (3): Based on the actual reactive power demand capacity of the 110kV transmission line obtained in step (1) and the total reactive power compensation capacity provided by the reactive power compensation device of the 110kV line distribution network system obtained in step (2), the final switching scheme is obtained. When the total reactive power compensation capacity is less than or equal to the actual reactive power demand capacity, the final switching scheme is to switch on all reactive power compensation devices at each level of the 110kV line distribution network system. When the total reactive power compensation capacity is greater than the actual reactive power demand capacity, a first switching scheme is obtained according to the first switching method, in which the total reactive power compensation capacity provided by the simultaneously switched reactive power compensation devices is less than or equal to the actual reactive power demand capacity; and a second switching scheme is obtained according to the second switching method, in which the total reactive power compensation capacity provided by the simultaneously switched reactive power compensation devices is greater than the actual reactive power demand capacity. The first switching method is to prioritize switching reactive power compensation devices on high-voltage transmission lines, and then switch them in order of voltage level from high to low on the transmission lines where the reactive power compensation devices are located. The total reactive power compensation capacity provided by the reactive power compensation devices that are switched at the same time is less than or equal to the actual reactive power demand capacity. This is the first switching rule to select a suitable primary switching scheme. If there is only one switching scheme, then that switching scheme is defined as the first switching scheme; If there is more than one switching scheme, the switching scheme selected by the first switching rule is used as the basis. The second switching rule is used to select a suitable secondary switching scheme based on the minimum total number of reactive power compensation devices that are switched at the same time, and the total reactive power compensation capacity provided by the reactive power compensation devices that are switched at the same time is less than or equal to the actual reactive power demand capacity. If there is only one secondary switching scheme, then the secondary switching scheme is defined as the first switching scheme; If there is more than one secondary switching scheme, the secondary switching scheme selected by the second switching rule shall be used as the basis. The third switching rule shall be used to select a suitable tertiary switching scheme if the total reactive power compensation capacity provided by the reactive power compensation devices that are switched at the same time is less than or equal to the actual reactive power demand capacity and is closest to the actual reactive power demand capacity. If there is only one three-way switching scheme, then that three-way switching scheme will be defined as the first switching scheme; If there is more than one three-stage throwing and cutting scheme, then one of them is manually selected and defined as the first throwing and cutting scheme. The second switching method is to prioritize switching the reactive power compensation devices on high-voltage transmission lines, and then switch them in order of voltage level from high to low on the transmission lines where the reactive power compensation devices are located. The total reactive power compensation capacity provided by the reactive power compensation devices that are switched at the same time is greater than the actual reactive power demand capacity. This is used as the first switching rule to select a suitable primary switching scheme. If there is only one switching scheme, then that switching scheme is defined as the first switching scheme; If there is more than one switching scheme, the switching scheme selected by the first switching rule is used as the basis. The second switching rule is used to select a suitable secondary switching scheme based on the minimum total number of reactive power compensation devices that are switched at the same time, and the total reactive power compensation capacity provided by the reactive power compensation devices that are switched at the same time is greater than the actual reactive power demand capacity. If there is only one secondary switching scheme, then the secondary switching scheme is defined as the first switching scheme; If there is more than one secondary switching scheme, the secondary switching scheme selected by the second switching rule shall be used as the basis. The third switching rule shall be used to select a suitable tertiary switching scheme if the total reactive power compensation capacity provided by the reactive power compensation devices that are switched at the same time is greater than the actual reactive power demand capacity and is closest to the actual reactive power demand capacity. If there is only one three-way switching scheme, then that three-way switching scheme will be defined as the first switching scheme; If there is more than one three-stage throwing and cutting scheme, then one of them is manually selected and defined as the first throwing and cutting scheme. According to the first switching scheme, the absolute value of the difference between the total reactive power compensation capacity provided by the simultaneously switched reactive power compensation devices and the actual reactive power demand capacity is calculated and defined as the first absolute value; according to the second switching scheme, the absolute value of the difference between the total reactive power compensation capacity provided by the simultaneously switched reactive power compensation devices and the actual reactive power demand capacity is calculated and defined as the second absolute value. Compare the first absolute value and the second absolute value, and select the switching scheme with the smallest absolute value as the final switching scheme when the total reactive power compensation capacity is greater than the actual reactive power demand capacity. Step (4): Using the time of the previous compensation as the time node, collect the data of the 110kV line distribution network system every set time interval. Calculate the actual reactive power demand capacity of the 110kV transmission line according to step (1) and compare it with the actual reactive power demand capacity at the previous switching time. If the difference is within the set threshold, no switching is performed; if it exceeds the threshold, actual switching is performed according to the final switching scheme obtained in step (3), and the time interval between two adjacent switchings needs to be greater than the set switching interval time value.

[0005] According to step (1), the data is collected and calculated once at each set interval. Then, based on the calculated value, the daily curve of the actual reactive power demand of each transmission line at each voltage level can be obtained.

[0006] According to step (3), the final switching scheme is obtained by collecting and calculating once at each set interval, which can obtain the daily curve of the total reactive power compensation capacity provided by the reactive power compensation devices of the distribution network system composed of 110kV and below lines that are switched on and off at the same time.

[0007] The beneficial effects of this invention are: by combining overcompensation and undercompensation, a compensation scheme that is closest to the actual reactive power demand can be selected, thereby achieving the goal of saving losses and making the compensation method more reasonable; it can effectively solve the problem that existing compensation methods are not reasonable enough, and the compensation scheme used during compensation may not be the optimal solution.

[0008] The time interval between two consecutive switching operations needs to be greater than the set switching interval value to protect the equipment, increase its service life, and reduce the failure rate. Detailed Implementation

[0009] An example of an energy-saving operation mode for a distribution network system consisting of 110kV and below lines includes the following steps: Step (1): Based on the topology, and following the order of 0.4kV, 10kV, 35kV, and 110kV, restore the actual reactive power demand capacity of each power supply node of each transmission line at each voltage level before compensation. The specific method is as follows: Actual reactive power demand capacity of each 0.4kV transmission line power source node: Reactive power demand capacity collected on the 0.4kV transmission line + reactive power compensation capacity already switched on = Actual reactive power demand capacity of the 0.4kV transmission line power source node; The actual reactive power demand capacity of each 10kV transmission line power supply node is: the sum of the actual reactive power demand capacity of each subordinate 0.4kV transmission line power supply node + the reactive power compensation capacity already switched on the 10kV transmission line = the actual reactive power demand capacity of the 10kV transmission line power supply node. The actual reactive power demand capacity of each 35kV transmission line power supply node is: the sum of the actual reactive power demand capacity of each subordinate 10kV transmission line power supply node + the reactive power compensation capacity already switched on the 35kV transmission line = the actual reactive power demand capacity of the 35kV transmission line power supply node. Actual reactive power demand capacity of a 110kV transmission line power supply node: The sum of the actual reactive power demand capacity of each subordinate 35kV transmission line power supply node + the reactive power compensation capacity already switched on the 110kV transmission line = the actual reactive power demand capacity of the 110kV transmission line power supply node. Step (2): Calculate the total reactive power compensation capacity provided by the reactive power compensation devices of the 110kV line distribution network system; it is the sum of the reactive power compensation capacity of all reactive power compensation devices on the 110kV transmission line and the 35kV, 10kV and 0.4kV transmission lines that are topologically connected to the 110kV transmission line. Step (3): Based on the actual reactive power demand capacity of the 110kV transmission line obtained in step (1) and the total reactive power compensation capacity provided by the reactive power compensation device of the 110kV line distribution network system obtained in step (2), the final switching scheme is obtained. When the total reactive power compensation capacity is less than or equal to the actual reactive power demand capacity, the final switching scheme is to switch on all reactive power compensation devices at each level of the 110kV line distribution network system. When the total reactive power compensation capacity is greater than the actual reactive power demand capacity, a first switching scheme is obtained according to the first switching method, in which the total reactive power compensation capacity provided by the simultaneously switched reactive power compensation devices is less than or equal to the actual reactive power demand capacity; and a second switching scheme is obtained according to the second switching method, in which the total reactive power compensation capacity provided by the simultaneously switched reactive power compensation devices is greater than the actual reactive power demand capacity. The first switching method is to prioritize switching reactive power compensation devices on high-voltage transmission lines, and then switch them in order of voltage level from high to low on the transmission lines where the reactive power compensation devices are located. The total reactive power compensation capacity provided by the reactive power compensation devices that are switched at the same time is less than or equal to the actual reactive power demand capacity. This is the first switching rule to select a suitable primary switching scheme. If there is only one switching scheme, then that switching scheme is defined as the first switching scheme; If there is more than one switching scheme, the switching scheme selected by the first switching rule is used as the basis. The second switching rule is used to select a suitable secondary switching scheme based on the minimum total number of reactive power compensation devices that are switched at the same time, and the total reactive power compensation capacity provided by the reactive power compensation devices that are switched at the same time is less than or equal to the actual reactive power demand capacity. If there is only one secondary switching scheme, then the secondary switching scheme is defined as the first switching scheme; If there is more than one secondary switching scheme, the secondary switching scheme selected by the second switching rule shall be used as the basis. The third switching rule shall be used to select a suitable tertiary switching scheme if the total reactive power compensation capacity provided by the reactive power compensation devices that are switched at the same time is less than or equal to the actual reactive power demand capacity and is closest to the actual reactive power demand capacity. If there is only one three-way switching scheme, then that three-way switching scheme will be defined as the first switching scheme; If there is more than one three-stage throwing and cutting scheme, then one of them is manually selected and defined as the first throwing and cutting scheme. The second switching method is to prioritize switching the reactive power compensation devices on high-voltage transmission lines, and then switch them in order of voltage level from high to low on the transmission lines where the reactive power compensation devices are located. The total reactive power compensation capacity provided by the reactive power compensation devices that are switched at the same time is greater than the actual reactive power demand capacity. This is used as the first switching rule to select a suitable primary switching scheme. If there is only one switching scheme, then that switching scheme is defined as the first switching scheme; If there is more than one switching scheme, the switching scheme selected by the first switching rule is used as the basis. The second switching rule is used to select a suitable secondary switching scheme based on the minimum total number of reactive power compensation devices that are switched at the same time, and the total reactive power compensation capacity provided by the reactive power compensation devices that are switched at the same time is greater than the actual reactive power demand capacity. If there is only one secondary switching scheme, then the secondary switching scheme is defined as the first switching scheme; If there is more than one secondary switching scheme, the secondary switching scheme selected by the second switching rule shall be used as the basis. The third switching rule shall be used to select a suitable tertiary switching scheme if the total reactive power compensation capacity provided by the reactive power compensation devices that are switched at the same time is greater than the actual reactive power demand capacity and is closest to the actual reactive power demand capacity. If there is only one three-way switching scheme, then that three-way switching scheme will be defined as the first switching scheme; If there is more than one three-stage throwing and cutting scheme, then one of them is manually selected and defined as the first throwing and cutting scheme. According to the first switching scheme, the absolute value of the difference between the total reactive power compensation capacity provided by the simultaneously switched reactive power compensation devices and the actual reactive power demand capacity is calculated and defined as the first absolute value; according to the second switching scheme, the absolute value of the difference between the total reactive power compensation capacity provided by the simultaneously switched reactive power compensation devices and the actual reactive power demand capacity is calculated and defined as the second absolute value. Compare the first absolute value and the second absolute value, and select the switching scheme with the smallest absolute value as the final switching scheme when the total reactive power compensation capacity is greater than the actual reactive power demand capacity. Step (4): Using the time of the previous compensation as the time node, collect the data of the 110kV line distribution network system every set time interval. Calculate the actual reactive power demand capacity of the 110kV transmission line according to step (1) and compare it with the actual reactive power demand capacity at the previous switching time. If the difference is within the set threshold, no switching is performed; if it exceeds the threshold, actual switching is performed according to the final switching scheme obtained in step (3), and the time interval between two adjacent switchings needs to be greater than the set switching interval time value.

[0010] According to step (1), the data is collected and calculated once at each set interval. Then, based on the calculated value, the daily curve of the actual reactive power demand of each transmission line at each voltage level can be obtained.

[0011] According to step (3), the final switching scheme is obtained by collecting and calculating once at each set interval, which can obtain the daily curve of the total reactive power compensation capacity provided by the reactive power compensation devices of the distribution network system composed of 110kV and below lines that are switched on and off at the same time.

[0012] In the description of this invention, it should be understood that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to limit the exemplary embodiments. Unless the context clearly indicates otherwise, the singular forms “a” and “an” as used herein are also intended to include the plural. It should also be understood that the terms “comprising” and / or “including” as used herein specify the presence of the stated features, integers, steps, operations, units, and / or components, without excluding the presence or addition of one or more other features, integers, steps, operations, units, components, and / or combinations thereof.

[0013] The above embodiments are not intended to limit the scope of the invention, but rather to illustrate it. The scope of the invention is determined by the scope of the claims, not by the description itself, and should be interpreted as including all differences within the equivalent scope. Any non-substantial improvements made using the inventive concept and technical solutions, or the direct application of the above-described concepts and technical solutions of the invention to other situations without modification, are all within the protection scope of the invention.

Claims

1. An energy-saving operation mode of a distribution network system composed of 110 kV and below lines, characterized in that: Includes the following steps: Step (1): Based on the topology, and following the order of 0.4kV, 10kV, 35kV, and 110kV, restore the actual reactive power demand capacity of each power supply node of each transmission line at each voltage level before compensation. The specific method is as follows: Actual reactive power demand capacity of each 0.4kV transmission line power source node: Reactive power demand capacity collected on the 0.4kV transmission line + reactive power compensation capacity already switched on = Actual reactive power demand capacity of the 0.4kV transmission line power source node; The actual reactive power demand capacity of each 10kV transmission line power supply node is: the sum of the actual reactive power demand capacity of each subordinate 0.4kV transmission line power supply node + the reactive power compensation capacity already switched on the 10kV transmission line = the actual reactive power demand capacity of the 10kV transmission line power supply node. The actual reactive power demand capacity of each 35kV transmission line power supply node is: the sum of the actual reactive power demand capacity of each subordinate 10kV transmission line power supply node + the reactive power compensation capacity already switched on the 35kV transmission line = the actual reactive power demand capacity of the 35kV transmission line power supply node. Actual reactive power demand capacity of a 110kV transmission line power supply node: The sum of the actual reactive power demand capacity of each subordinate 35kV transmission line power supply node + the reactive power compensation capacity already switched on the 110kV transmission line = the actual reactive power demand capacity of the 110kV transmission line power supply node. Step (2): Calculate the total reactive power compensation capacity provided by the reactive power compensation devices of the 110kV line distribution network system; it is the sum of the reactive power compensation capacity of all reactive power compensation devices on the 110kV transmission line and the 35kV, 10kV and 0.4kV transmission lines that are topologically connected to the 110kV transmission line. Step (3): Based on the actual reactive power demand capacity of the 110kV transmission line obtained in step (1) and the total reactive power compensation capacity provided by the reactive power compensation device of the 110kV line distribution network system obtained in step (2), the final switching scheme is obtained. When the total reactive power compensation capacity is less than or equal to the actual reactive power demand capacity, the final switching scheme is to switch on all reactive power compensation devices at each level of the 110kV line distribution network system. When the total reactive power compensation capacity is greater than the actual reactive power demand capacity, a first switching scheme is obtained according to the first switching method, in which the total reactive power compensation capacity provided by the simultaneously switched reactive power compensation devices is less than or equal to the actual reactive power demand capacity; and a second switching scheme is obtained according to the second switching method, in which the total reactive power compensation capacity provided by the simultaneously switched reactive power compensation devices is greater than the actual reactive power demand capacity. The first switching method is to prioritize switching reactive power compensation devices on high-voltage transmission lines, and then switch them in order of voltage level from high to low on the transmission lines where the reactive power compensation devices are located. The total reactive power compensation capacity provided by the reactive power compensation devices that are switched at the same time is less than or equal to the actual reactive power demand capacity. This is the first switching rule to select a suitable primary switching scheme. If there is only one switching scheme, then that switching scheme is defined as the first switching scheme; If there is more than one switching scheme, the switching scheme selected by the first switching rule is used as the basis. The second switching rule is used to select a suitable secondary switching scheme based on the minimum total number of reactive power compensation devices that are switched at the same time, and the total reactive power compensation capacity provided by the reactive power compensation devices that are switched at the same time is less than or equal to the actual reactive power demand capacity. If there is only one secondary switching scheme, then the secondary switching scheme is defined as the first switching scheme; If there is more than one secondary switching scheme, the secondary switching scheme selected by the second switching rule shall be used as the basis. The third switching rule shall be used to select a suitable tertiary switching scheme if the total reactive power compensation capacity provided by the reactive power compensation devices that are switched at the same time is less than or equal to the actual reactive power demand capacity and is closest to the actual reactive power demand capacity. If there is only one possible three-stage throwing and cutting scheme, then that three-stage throwing and cutting scheme will be defined as the first throwing and cutting scheme; If there is more than one three-stage throwing and cutting scheme, then one of them is manually selected and defined as the first throwing and cutting scheme. The second switching method is to prioritize switching the reactive power compensation devices on high-voltage transmission lines, and then switch them in order of voltage level from high to low on the transmission lines where the reactive power compensation devices are located. The total reactive power compensation capacity provided by the reactive power compensation devices that are switched at the same time is greater than the actual reactive power demand capacity. This is used as the first switching rule to select a suitable primary switching scheme. If there is only one switching scheme, then that switching scheme is defined as the first switching scheme; If there is more than one switching scheme, the switching scheme selected by the first switching rule is used as the basis. The second switching rule is used to select a suitable secondary switching scheme based on the minimum total number of reactive power compensation devices that are switched at the same time, and the total reactive power compensation capacity provided by the reactive power compensation devices that are switched at the same time is greater than the actual reactive power demand capacity. If there is only one secondary switching scheme, then the secondary switching scheme is defined as the first switching scheme; If there is more than one secondary switching scheme, the secondary switching scheme selected by the second switching rule shall be used as the basis. The third switching rule shall be used to select a suitable tertiary switching scheme if the total reactive power compensation capacity provided by the reactive power compensation devices that are switched at the same time is greater than the actual reactive power demand capacity and is closest to the actual reactive power demand capacity. If there is only one three-way switching scheme, then that three-way switching scheme will be defined as the first switching scheme; If there is more than one three-stage throwing and cutting scheme, then one of them is manually selected and defined as the first throwing and cutting scheme. According to the first switching scheme, the absolute value of the difference between the total reactive power compensation capacity provided by the simultaneously switched reactive power compensation devices and the actual reactive power demand capacity is calculated and defined as the first absolute value; according to the second switching scheme, the absolute value of the difference between the total reactive power compensation capacity provided by the simultaneously switched reactive power compensation devices and the actual reactive power demand capacity is calculated and defined as the second absolute value. Compare the first absolute value and the second absolute value, and select the switching scheme with the smallest absolute value as the final switching scheme when the total reactive power compensation capacity is greater than the actual reactive power demand capacity. Step (4): Using the time of the previous compensation as the time node, collect the data of the 110kV line distribution network system every set time interval. Calculate the actual reactive power demand capacity of the 110kV transmission line according to step (1) and compare it with the actual reactive power demand capacity at the previous switching time. If the difference is within the set threshold, no switching is performed; if it exceeds the threshold, actual switching is performed according to the final switching scheme obtained in step (3), and the time interval between two adjacent switchings must be greater than the set switching interval time value.

2. The energy-saving operation mode of the distribution network system consisting of 110 kV and below lines according to claim 1, characterized in that: According to step (1), the data is collected and calculated once at each set interval. Then, based on the calculated value, the daily curve of the actual reactive power demand of each transmission line at each voltage level can be obtained.

3. The operation mode of the distribution network system composed of energy-saving 110kV and below lines according to claim 1, characterized in that: According to step (3), the final switching scheme is obtained by collecting and calculating once at each set interval, which can obtain the daily curve of the total reactive power compensation capacity provided by the reactive power compensation devices of the distribution network system composed of 110kV and below lines that are switched on and off at the same time.