Overcurrent protection device selection method, overcurrent protection devices, equipment and storage media

By obtaining the peak current and maximum current difference at the end of the charge and discharge of the battery cluster, the grid current is determined, which solves the problem of unexpected fuse blowing in grid-type energy storage systems and improves the accuracy and reliability of overcurrent protection components.

CN123121882APending Publication Date: 2026-11-17EVE ENERGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611289425.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-24
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing technologies, grid-type energy storage systems may generate high-amplitude instantaneous inrush currents during grid-building operations, causing unexpected fuse blowouts and affecting the normal use of the energy storage system.

Method used

By obtaining the peak current at the end of the charge and discharge cycle of the battery cluster, the grid current is determined. Combined with the maximum current difference between different battery clusters, the maximum current of the battery cluster is determined. Based on the maximum current, the parameters of the overcurrent protection device are determined, and the selection is closer to the actual operating characteristics.

Benefits of technology

It improves the overcurrent protection component's resistance to current surges, avoids unexpected melting, and ensures reliable protection of the system during critical short circuits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123121882A_ABST
    Figure CN123121882A_ABST
Patent Text Reader

Abstract

This application provides a method for determining an overcurrent protection device, an overcurrent protection device, an apparatus, and a storage medium. The method for determining the overcurrent protection device is applied to an energy storage system comprising multiple battery clusters connected in parallel. The method includes: determining the grid current of the battery cluster based on the peak current at the end of the charge / discharge cycle; determining the maximum current of the battery cluster based on the maximum current difference between different battery clusters and the grid current; and determining the parameters of the overcurrent protection device used for the battery cluster based on the maximum current. The method for determining the overcurrent protection device in this application makes the determined overcurrent protection device more consistent with the actual operating characteristics of a grid-type energy storage system, thereby improving the overcurrent protection device's resistance to current surges and preventing unexpected melting of the overcurrent protection device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of overcurrent protection technology, specifically to a method for determining overcurrent protection components, overcurrent protection components, devices, and storage media. Background Technology

[0002] As an important component of the new power system, grid-based energy storage systems can provide active support during grid voltage and frequency fluctuations, and are widely used in scenarios such as new energy grid integration, microgrids, and islanded power supply. A grid-based energy storage system typically consists of multiple battery clusters, each composed of several battery packs, and equipped with corresponding protection devices. Among these, the fuse is the core component for overcurrent protection of the battery cluster, used to disconnect the faulty circuit in the event of a short circuit or severe overload, ensuring system safety.

[0003] In related technologies, the selection and design of battery cluster fuses are usually determined based on the rated operating current of the energy storage system with a certain margin.

[0004] However, the selection and design methods in related technologies are mainly based on the steady-state current under normal charging and discharging conditions. When the grid-type energy storage system is being constructed, a high-amplitude instantaneous inrush current may be generated in the system, which may cause the fuse to blow unexpectedly due to the current impact, affecting the normal use of the energy storage system. Summary of the Invention

[0005] The embodiments of this application provide a method for determining an overcurrent protection device, an overcurrent protection device, a device, and a storage medium to at least partially solve the above-mentioned technical problems.

[0006] In a first aspect, embodiments of this application provide a method for determining an overcurrent protection component, applied to an energy storage system. The energy storage system includes multiple battery clusters connected in parallel. The method for determining the overcurrent protection component includes: Obtain the peak current at the end of the charge and discharge cycle of the battery cluster, and determine the grid current of the battery cluster based on the peak current at the end of the charge and discharge cycle of the battery cluster. Obtain the maximum current difference between different battery clusters, and determine the maximum current of the battery cluster based on the maximum current difference between different battery clusters and the grid current; Based on the maximum current, determine the parameters of the overcurrent protection device used for the battery cluster.

[0007] In one embodiment, before the step of determining the maximum current of a battery cluster based on the maximum current difference between different battery clusters and the grid current, the method further includes: The maximum ratio difference is determined based on the proportion of the current of different battery clusters to the total current of the energy storage system; The maximum current difference is determined based on the maximum proportional difference and the rated current of the battery cluster.

[0008] By adopting the above technical solution, the maximum proportional difference is first determined based on the proportion of the current of different battery clusters to the total current of the energy storage system. Then, the maximum current difference is determined based on the maximum proportional difference and the rated current of the battery clusters. This can more accurately reflect the current deviation between battery clusters, thus providing a more reliable basis for subsequently determining the maximum current of the battery clusters and the parameters of the overcurrent protection components.

[0009] In one embodiment, before the step of determining the maximum ratio difference based on the proportion of the current of different battery clusters to the total current of the energy storage system, the method further includes: Based on the equivalent internal resistance of each battery cluster, the proportion of the current of different battery clusters to the total current of the energy storage system is determined.

[0010] By adopting the above technical solution, the proportion of the current of different battery clusters to the total current of the energy storage system can be determined based on the equivalent internal resistance of each battery cluster. This can more accurately reflect the current distribution in the parallel system, thus providing a more reliable basis for subsequently determining the maximum proportional difference and the maximum current difference.

[0011] In one embodiment, before the step of determining the proportion of the current of different battery clusters to the total current of the energy storage system based on the equivalent internal resistance of each battery cluster, the method further includes: The maximum internal resistance deviation value is determined based on the number of cells in the battery cluster and the internal resistance deviation value of the cells. The maximum internal resistance of the battery cluster is determined based on the deviation between the basic internal resistance and the maximum internal resistance of the battery cluster. The equivalent internal resistance of each battery cluster is determined based on the maximum internal resistance of the battery cluster and the number of battery clusters.

[0012] By adopting the above technical solution, the maximum internal resistance deviation value is first determined based on the number of cells in the battery cluster and the internal resistance deviation value of the cells. Then, the maximum internal resistance of the battery cluster is determined in combination with the basic internal resistance. Based on the maximum internal resistance of the battery cluster and the number of battery clusters, the equivalent internal resistance of each battery cluster is determined. This can more accurately reflect the internal resistance difference between parallel battery clusters, thus providing a more reliable basis for subsequent current ratio analysis and overcurrent protection component parameter determination.

[0013] In one embodiment, before determining the maximum internal resistance of the battery cluster based on the deviation between the basic internal resistance and the maximum internal resistance of the battery cluster, the method further includes: The internal resistance of the battery pack is determined based on the internal resistance of the aluminum busbar, the internal resistance of the connecting copper busbar, the internal resistance of the contact, the internal resistance of the electrical components, and the internal resistance of the battery cell. The basic internal resistance of the battery cluster is determined based on the internal resistance of the battery pack and the number of battery packs.

[0014] By adopting the above technical solution, the internal resistance of the battery pack is first determined based on the internal resistance of the aluminum busbar, the internal resistance of the connecting copper busbar, the internal resistance of the contact, the internal resistance of the electrical components, and the internal resistance of the cells. Then, the basic internal resistance of the battery cluster is determined based on the internal resistance of the battery pack and the number of battery packs. This can more accurately reflect the basic electrical characteristics of the battery cluster, thereby providing a reliable basis for subsequently determining the maximum internal resistance of the battery cluster and the parameters of the overcurrent protection components.

[0015] In one embodiment, the maximum current is equal to the sum of the difference between the grid current and the maximum current.

[0016] By adopting the above technical solution, the maximum current is made equal to the sum of the difference between the grid current and the maximum current. This allows the basic current requirement under grid conditions to be combined with the bias current effect in the parallel system, thereby obtaining a maximum current value that is more consistent with the actual operating conditions. This provides a more reliable basis for determining the parameters of the overcurrent protection components.

[0017] In one embodiment, before the step of determining the grid current of the battery cluster based on the peak current at the end of the charge and discharge cycle of the battery cluster, the method further includes: The peak current at the charging and discharging ends of the battery cluster is determined based on the peak current at the discharge end of the battery cluster.

[0018] By adopting the above technical solution, the peak current at the end of the charge and discharge of the battery cluster is first determined based on the peak current at the end of the battery cluster discharge, and then the grid current is determined based on the peak current at the end of the charge and discharge. This makes the calculation basis of the grid current closer to the actual output capacity of the battery cluster under adverse operating conditions, thereby improving the accuracy of the determination of overcurrent protection components and the resistance to current surges.

[0019] In one embodiment, before determining the peak current at the charge / discharge end of the battery cluster based on the peak current at the discharge end of the battery cluster, the method further includes: The peak current at the discharge end of the battery cluster is determined based on the discharge cutoff voltage of the battery cells, the rated voltage of the cells, and the rated current of the battery cluster.

[0020] By adopting the above technical solution, the peak current at the discharge end of the battery cluster can be determined based on the discharge cutoff voltage of the battery cell, the rated voltage of the battery cell, and the rated current of the battery cluster. This allows the calculation basis of the peak current at the end of subsequent charging and discharging and the grid current to be closer to the actual output capacity of the battery cluster at the discharge end, thereby improving the accuracy and reliability of the determination of overcurrent protection components.

[0021] Secondly, embodiments of this application provide an overcurrent protection device, which is determined according to the overcurrent protection device determination method described above.

[0022] Thirdly, embodiments of this application provide an electrical device including the overcurrent protection device described above.

[0023] An electronic device according to a fourth aspect of this application includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, it implements the overcurrent protection device determination method described above.

[0024] According to a fifth aspect embodiment of the present application, a non-transitory computer-readable storage medium includes a computer program that, when executed by a processor, implements the overcurrent protection determination method described above.

[0025] According to a sixth aspect of this application, the computer program product includes a computer program that, when executed by a processor, implements the overcurrent protection element determination method described above.

[0026] The beneficial effects of the embodiments of this application are as follows: In the embodiments of this application, after determining the parameters of the overcurrent protection device for the battery cluster based on the maximum current, the parameters of the selected overcurrent protection device no longer correspond solely to the conventional operating current, but rather to the higher current requirement jointly determined by the difference between the grid current and the maximum current. In this way, the overcurrent protection device can both meet the strong overload requirements during grid construction and provide reliable protection for the system at critical short-circuit moments, preventing unexpected fuse failure due to excessive current surges.

[0027] In other words, this embodiment determines the grid current based on the peak current at the end of the charge and discharge of the battery cluster, then determines the maximum current of the battery cluster by combining the maximum current difference between different battery clusters, and determines the parameters of the overcurrent protection device based on the maximum current. This enables the determined overcurrent protection device to better match the actual operating characteristics of the grid-type energy storage system, thereby improving the overcurrent protection device's resistance to current surges and preventing unexpected melting of the overcurrent protection device.

[0028] Other features and advantages of this application will be described in detail in the following detailed description section. Attached Figure Description

[0029] To more clearly illustrate the technical solutions in the embodiments of this application, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0030] Figure 1 This is a flowchart of the overcurrent protection device determination method provided in the embodiments of this application; Figure 2 This is a schematic diagram of the aluminum busbar inside the battery pack provided in an embodiment of this application; Figure 3This is a schematic diagram of the connection bar inside the battery pack provided in an embodiment of this application; Figure 4 This is a schematic diagram of the conductor connection within the battery pack provided in an embodiment of this application; Figure 5 This is a schematic diagram of the structure of an electronic device provided in an embodiment of this application.

[0031] Explanation of reference numerals in the attached figures: 310. Processor; 320. Communication interface; 330. Memory; 340. Communication bus. Detailed Implementation

[0032] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of this application, and not all of them. All other embodiments obtained by those skilled in the art based on the embodiments of this application without creative effort are within the protection scope of this application.

[0033] The following is combined Figures 1 to 5 This application describes the method for determining overcurrent protection devices, overcurrent protection devices, devices, and storage media.

[0034] According to the embodiments of the first aspect of this application, see [link / reference]. Figure 1 This application provides a method for determining an overcurrent protection component, applied to an energy storage system, the energy storage system including multiple battery clusters connected in parallel; the method for determining the overcurrent protection component includes: S100. Obtain the peak current at the end of the charge and discharge cycle of the battery cluster, and determine the grid current of the battery cluster based on the peak current at the end of the charge and discharge cycle of the battery cluster. S200: Obtain the maximum current difference between different battery clusters, and determine the maximum current of the battery cluster based on the maximum current difference between different battery clusters and the grid current; S300. Based on the maximum current, determine the parameters of the overcurrent protection device used for the battery cluster.

[0035] Understandably, grid-based energy storage systems, as an important component of new power systems, can provide active support during grid voltage and frequency fluctuations and are widely used in scenarios such as new energy grid integration, microgrids, and islanded power supply. Grid-based energy storage systems typically consist of multiple parallel-connected battery clusters, each composed of several battery packs and equipped with corresponding protection devices. Among these, overcurrent protection devices, such as fuses, are the core components for overcurrent protection of battery clusters, used to disconnect faulty circuits and ensure system safety in the event of short circuits or severe overloads.

[0036] However, the selection of overcurrent protection devices in related technologies is usually determined based on the rated operating current of the energy storage system with a certain margin, and is mainly designed based on the steady-state current under normal charging and discharging conditions. When a grid-type energy storage system is being constructed, a high-amplitude instantaneous inrush current may be generated in the system. If the conventional steady-state current selection method is still used, the selected current of the overcurrent protection device may be too small, which may lead to unexpected fuse failure due to large current surges during the grid construction process or after multiple grid constructions, affecting the normal use of the energy storage system.

[0037] To address the aforementioned issues, this embodiment first determines the grid-connection current of the battery cluster based on the peak current at the end of its charge and discharge cycle. In other words, instead of directly using the traditional rated current as the design basis for overcurrent protection components, it determines the current requirements under grid-connection conditions based on the peak current at the end of the charge and discharge cycle of the battery cluster during actual operation. This design ensures that the selection basis for overcurrent protection components is closer to the actual inrush current during grid connection, thereby improving the overcurrent protection components' ability to withstand current surges.

[0038] After determining the grid current, the maximum current of each battery cluster is determined based on the maximum current difference between different battery clusters and the grid current. It is understandable that when multiple battery clusters are connected in parallel, the actual current distribution is often uneven due to differences in parameters such as internal resistance, voltage, temperature, and SOC among the clusters, resulting in current differences between them. Ignoring this current imbalance can easily lead to some battery clusters experiencing currents higher than the grid current itself. Therefore, this embodiment further adds the maximum current difference between different battery clusters to the grid current to obtain the maximum current of the battery cluster. With this setting, the overcurrent protection device can cover the most unfavorable current conditions in the parallel system, avoiding malfunctions caused by the superposition of current imbalances.

[0039] Understandably, after determining the parameters of the overcurrent protection components used for the battery cluster based on the maximum current, the parameters of the selected overcurrent protection components no longer correspond solely to the conventional operating current, but rather to the higher current requirements determined by the difference between the grid current and the maximum current. In this way, the overcurrent protection components can not only meet the strong overload requirements during grid construction, but also provide reliable protection for the system at critical short-circuit moments, avoiding unexpected fuse blowouts due to excessive current surges.

[0040] In other words, this embodiment determines the grid current based on the peak current at the end of the charge and discharge of the battery cluster, then determines the maximum current of the battery cluster by combining the maximum current difference between different battery clusters, and determines the parameters of the overcurrent protection device based on the maximum current. This enables the determined overcurrent protection device to better match the actual operating characteristics of the grid-type energy storage system, thereby improving the overcurrent protection device's resistance to current surges and preventing unexpected melting of the overcurrent protection device.

[0041] In some examples, overcurrent protection devices are, for example, fuses or DC circuit breakers with overcurrent tripping capabilities.

[0042] It should be noted that the peak current at the end of charging and discharging can refer to either the peak current at the end of discharging or the peak current at the end of charging.

[0043] It should be noted that when determining overcurrent protection components, the parameters of the overcurrent protection components determined by the overcurrent protection component determination method can be used to redesign the overcurrent protection components, or a suitable overcurrent protection component can be selected from the existing overcurrent protection components.

[0044] In some embodiments, before the step of determining the maximum current of a battery cluster based on the maximum current difference between different battery clusters and the grid current, the method further includes: The maximum ratio difference is determined based on the proportion of the current of different battery clusters to the total current of the energy storage system; The maximum current difference is determined based on the maximum proportional difference and the rated current of the battery cluster.

[0045] It is understandable that when multiple battery clusters are connected in parallel to an energy storage system, the current distribution ratio of each cluster will not be the same during actual operation due to inconsistencies in parameters such as internal resistance, voltage, temperature, and state of charge (SOC). To more accurately reflect the current imbalance between battery clusters, this embodiment first determines the maximum proportional difference based on the proportion of the current of different battery clusters to the total current of the energy storage system. This setting allows for a proportional reflection of the degree of current imbalance in each battery cluster within the parallel system.

[0046] After determining the maximum proportional difference, the maximum current difference is then determined based on the maximum proportional difference and the rated current of the battery cluster. In other words, the maximum proportional difference can be combined with the rated current of the battery cluster to calculate the maximum possible current difference between the battery clusters. This method transforms the proportional characteristics of the bias current into specific current difference parameters, facilitating subsequent superposition with the grid current to obtain the maximum current of the battery cluster.

[0047] Understandably, this embodiment first determines the maximum proportional difference based on the ratio of the current of each battery cluster to the total current, and then further converts it into the maximum current difference. This approach more closely reflects the actual current distribution of parallel battery clusters. Consequently, the obtained maximum current difference better matches the current bias characteristics of the energy storage system during parallel operation, which helps in accurately determining the parameters of the overcurrent protection components.

[0048] In other words, this embodiment first determines the maximum proportional difference based on the proportion of the current of different battery clusters to the total current of the energy storage system, and then determines the maximum current difference based on the maximum proportional difference and the rated current of the battery clusters. This can more accurately reflect the current deviation between battery clusters, thus providing a more reliable basis for subsequently determining the maximum current of the battery clusters and the parameters of the overcurrent protection components.

[0049] In some examples, the maximum scale difference can be utilized. The maximum current difference is obtained by taking the rated current of the battery cluster. Alternatively, the maximum current difference can be defined as a value greater than the product of the maximum proportional difference and the rated current of the battery cluster.

[0050] In some embodiments, before the step of determining the maximum ratio difference based on the proportion of the current of different battery clusters to the total current of the energy storage system, the method further includes: Based on the equivalent internal resistance of each battery cluster, the proportion of the current of different battery clusters to the total current of the energy storage system is determined.

[0051] Understandably, the equivalent internal resistance of a battery cluster can comprehensively consider factors such as cell internal resistance, connecting wire resistance, contact resistance, and electrical component resistance to reflect the overall impedance characteristics of a single battery cluster. By calculating the equivalent internal resistance of each battery cluster and then determining the proportion of current from different battery clusters to the total current of the energy storage system based on the relative relationships between their equivalent internal resistances, the bias current phenomenon in parallel systems can be reflected more accurately. In this way, when determining the maximum proportional difference, the actual internal resistance state of each battery cluster can be used as a basis, rather than relying solely on empirical estimations.

[0052] Understandably, determining the current proportion of different battery clusters based on the equivalent internal resistance of each cluster allows for a more accurate calculation of the maximum current difference, closely reflecting actual operating conditions. Since the difference in internal resistance among battery clusters directly affects current distribution when the energy storage system operates in parallel, using the equivalent internal resistance to inversely deduce the current proportion provides a more reasonable reflection of the load differences of each battery cluster in the total current, thus providing a basis for subsequently determining the maximum current difference and overcurrent protection parameters.

[0053] In other words, this embodiment first determines the proportion of the current of different battery clusters to the total current of the energy storage system based on the equivalent internal resistance of each battery cluster. This can more accurately reflect the current distribution in the parallel system, thus providing a more reliable basis for subsequently determining the maximum proportional difference and the maximum current difference.

[0054] In some embodiments, before the step of determining the proportion of the current of different battery clusters to the total current of the energy storage system based on the equivalent internal resistance of each battery cluster, the method further includes: The maximum internal resistance deviation value is determined based on the number of cells in the battery cluster and the internal resistance deviation value of the cells. The maximum internal resistance of the battery cluster is determined based on the deviation between the basic internal resistance and the maximum internal resistance of the battery cluster. The equivalent internal resistance of each battery cluster is determined based on the maximum internal resistance of the battery cluster and the number of battery clusters.

[0055] It is understandable that when multiple battery clusters are connected in parallel, their internal resistances are often not completely consistent due to factors such as the number of cells within each cluster, batch differences, and manufacturing inconsistencies. To more accurately assess the current distribution in a parallel system, this embodiment first determines the maximum internal resistance deviation value based on the number of cells in the battery cluster and the cell internal resistance deviation value. This setting allows the cumulative effect of the internal resistance deviation of a single cell in the series-parallel structure to be taken into account, making the internal resistance calculation closer to reality.

[0056] After obtaining the maximum internal resistance deviation value, the maximum internal resistance of the battery cluster is determined based on the basic internal resistance and the maximum internal resistance deviation value. It can be understood that the basic internal resistance reflects the basic impedance level of the battery cluster under standard conditions, while the maximum internal resistance deviation value reflects the additional impedance change that may result from the cumulative deviations of different cells. Combining these two values ​​yields the maximum internal resistance of the battery cluster under the most unfavorable conditions, thus more accurately describing the electrical characteristics of the battery cluster.

[0057] Based on the maximum internal resistance of the battery clusters and the number of battery clusters, the equivalent internal resistance of each battery cluster is determined. In other words, when multiple battery clusters are connected in parallel in a system, an equivalent conversion can be performed using the maximum internal resistance of each battery cluster and the number of battery clusters to obtain the equivalent internal resistance of each battery cluster in the parallel system. This setting provides a basis for subsequent calculations of the current distribution ratio of different battery clusters, thus making the calculation of the maximum ratio difference and the maximum current difference more reasonable.

[0058] It is understandable that by first calculating the maximum internal resistance deviation value, then determining the maximum internal resistance of the battery cluster, and further obtaining the equivalent internal resistance of each battery cluster, this embodiment can gradually reflect the impact of cell deviation on the internal resistance of the battery cluster, making the subsequent current ratio calculation and overcurrent protection device determination more consistent with the actual operation of the energy storage system.

[0059] In other words, this embodiment first determines the maximum internal resistance deviation value based on the number of cells in the battery cluster and the internal resistance deviation value of the cells, then determines the maximum internal resistance of the battery cluster based on the basic internal resistance, and determines the equivalent internal resistance of each battery cluster based on the maximum internal resistance of the battery cluster and the number of battery clusters. This can more accurately reflect the internal resistance difference between parallel battery clusters, thus providing a more reliable basis for subsequent current ratio analysis and overcurrent protection component parameter determination.

[0060] In some examples, the internal resistance deviation of the battery cell can be obtained through testing or by obtaining data such as the battery cell's datasheet.

[0061] In some examples, the maximum internal resistance of the battery cluster is equal to the sum of the base internal resistance and the maximum internal resistance deviation.

[0062] In some examples, when determining the equivalent internal resistance of each battery cluster, the maximum internal resistance can be used as the equivalent internal resistance of the first battery cluster. The maximum internal resistance is divided by the number of battery clusters to obtain a decreasing value; the equivalent internal resistance of the second battery cluster is equal to the maximum internal resistance minus one decreasing value, the equivalent internal resistance of the third is equal to the maximum internal resistance minus two decreasing values, and so on.

[0063] In some embodiments, before the step of determining the maximum internal resistance of the battery cluster based on the fundamental internal resistance and the maximum internal resistance deviation value of the battery cluster, the method further includes: The internal resistance of the battery pack is determined based on the internal resistance of the aluminum busbar, the internal resistance of the connecting busbar, the internal resistance of the contact, the internal resistance of the electrical components, and the internal resistance of the battery cell. The basic internal resistance of the battery cluster is determined based on the internal resistance of the battery pack and the number of battery packs.

[0064] It is understandable that a battery cluster typically consists of multiple battery packs, and each battery pack itself comprises aluminum busbars, connectors, contacts, electrical components, and battery cells. Therefore, the internal resistance of a battery cluster is not a single value, but rather the sum of the internal resistances of each component. To address this, this embodiment first determines the internal resistance of the battery pack within the battery cluster based on the internal resistances of the aluminum busbars, connectors, contacts, electrical components, and battery cells. This setup allows the impedance factors of each component within the battery pack to be incorporated into the calculation, making the determination of the battery pack's internal resistance more accurate.

[0065] After determining the internal resistance of the battery pack, the basic internal resistance of the battery cluster is determined based on the internal resistance of the battery pack and the number of battery packs. In other words, a battery cluster is composed of multiple battery packs. Given the internal resistance of each battery pack, the equivalent internal resistance of the battery cluster in its basic state can be obtained by combining the number of battery packs. Therefore, the basic internal resistance of the battery cluster is no longer a simple empirical value, but is determined by the actual internal resistance and number of each battery pack, thus better reflecting the actual electrical characteristics of the battery cluster.

[0066] Understandably, calculating the battery pack's internal resistance first, and then determining the basic internal resistance of the battery cluster based on the number of battery packs, provides a more reliable basis for subsequently superimposing the maximum internal resistance deviation and determining the maximum internal resistance of the battery cluster. Since the maximum internal resistance of the battery cluster directly affects the subsequent calculation of the equivalent internal resistance and current distribution ratio, the accuracy of the basic internal resistance will directly affect the determination of the overcurrent protection component parameters.

[0067] In other words, this embodiment first determines the battery pack internal resistance based on the internal resistance of the aluminum busbar, the internal resistance of the connecting busbar, the internal resistance of the contact, the internal resistance of the electrical components, and the internal resistance of the cells. Then, it determines the basic internal resistance of the battery cluster based on the internal resistance of the battery pack and the number of battery packs. This can more accurately reflect the basic electrical characteristics of the battery cluster, thereby providing a reliable basis for subsequently determining the maximum internal resistance of the battery cluster and the parameters of the overcurrent protection components.

[0068] In some embodiments, the maximum current is equal to the sum of the difference between the grid current and the maximum current.

[0069] Understandably, the grid-connecting current is used to characterize the basic operating current requirement of the energy storage system under grid-connected conditions, while the maximum current difference is used to characterize the maximum bias current generated between different battery clusters due to differences in parameters such as internal resistance, state of charge (SOC), and temperature. Setting the maximum current as the sum of the grid-connecting current and the maximum current difference means that when determining the maximum current of a battery cluster, not only is the current requirement of the system itself during grid connection considered, but the maximum bias current effect that may occur between battery clusters is also added, thus making the obtained maximum current closer to the most unfavorable operating condition of the parallel system in actual operation.

[0070] Understandably, compared to selecting overcurrent protection devices solely based on the grid current, adding the maximum current difference to the grid current to obtain the maximum current improves the adaptability of overcurrent protection device parameter determination, making the overcurrent protection devices less prone to unexpected operation due to current surges during grid construction. In this way, the overcurrent protection devices can maintain stable operation under normal grid conditions and maintain protection reliability when current deviations occur in the system.

[0071] In other words, by making the maximum current equal to the sum of the difference between the grid current and the maximum current, this embodiment can combine the basic current demand under grid conditions with the bias current effect in the parallel system, thereby obtaining a maximum current value that is more in line with the actual operating conditions, and providing a more reliable basis for determining the parameters of the overcurrent protection device.

[0072] In some other embodiments, the maximum current may also be greater than the sum of the difference between the grid current and the maximum current.

[0073] In some embodiments, before determining the grid current of the battery cluster based on the peak current at the end of the charge / discharge cycle of the battery cluster, the method further includes: The peak current at the charging and discharging ends of the battery cluster is determined based on the peak current at the discharge end of the battery cluster.

[0074] It is understandable that the output capability of a battery cluster varies under different SOC states. The voltage state corresponding to the discharge end is lower, and the operating conditions it can withstand are more severe. Therefore, the peak current at the charge / discharge end under this state can more directly reflect the current carrying capacity of the battery cluster under more unfavorable conditions. To this end, this embodiment first determines the peak current at the charge / discharge end of the battery cluster based on the peak current at the discharge end. In other words, the peak current at the charge / discharge end corresponding to the discharge end of the battery cluster is used as the basis for calculating the grid current, so that the subsequent determination of the grid current is closer to the actual operating boundary of the battery cluster under grid-type operating conditions.

[0075] Understandably, due to the potential for high-amplitude instantaneous current surges during grid-based energy storage system construction, determining the grid-based current solely based on the conventional rated current or average operating current can easily lead to underestimating the calculated value. By first determining the peak current at the end of the charge / discharge cycle of the battery cluster using the peak current at the discharge end, and then determining the grid-based current based on this peak current, the starting point of the grid-based current can be made more consistent with the actual output characteristics of the battery cluster under low SOC and low voltage conditions, thereby improving the rationality of subsequent overcurrent protection component parameter determination.

[0076] Understandably, the peak current at the end of discharge typically corresponds to the instantaneous output capability of the battery cluster when it is close to its minimum usable state. This moment better reflects the current carrying capacity of the battery cluster under the most unfavorable voltage conditions. By using this peak current at the end of charge and discharge as the basis for grid current, the problem of insufficient grid current estimation due to ignoring the state at the end of discharge can be avoided, making overcurrent protection components less susceptible to unexpected fuse failure due to current surges during actual grid construction.

[0077] In other words, this embodiment first determines the peak current at the end of the charge and discharge of the battery cluster based on the peak current at the end of the discharge, and then determines the grid current based on the peak current at the end of the charge and discharge. This makes the calculation basis of the grid current closer to the actual output capability of the battery cluster under adverse operating conditions, thereby improving the accuracy of the overcurrent protection device determination and the resistance to current surge.

[0078] In some embodiments, before determining the peak current at the charge / discharge end of the battery cluster based on the peak current at the discharge end of the battery cluster, the method further includes: The peak current at the discharge end of the battery cluster is determined based on the discharge cutoff voltage of the battery cells, the rated voltage of the cells, and the rated current of the battery cluster.

[0079] It is understandable that when a battery cluster is at the end of its discharge cycle, its cell voltage is close to the discharge cutoff voltage. This state typically corresponds to a condition where the battery cluster's output capability is lower but it is more sensitive to current surges. Therefore, this embodiment first determines the peak current at the end of the battery cluster's discharge cycle based on the cell's discharge cutoff voltage, the cell's rated voltage, and the battery cluster's rated current. In other words, by using the correspondence between voltage boundaries and rated current, the peak current at the end of the charge / discharge cycle that the battery cluster can provide at the end of its discharge cycle is calculated.

[0080] The rated voltage of a battery cell can serve as a reference voltage for the battery cluster under normal operating conditions, while the discharge cutoff voltage reflects the lowest usable voltage boundary of the battery cluster at the discharge end. By combining the rated current of the battery cluster with the aforementioned voltage parameters, the peak charge / discharge current of the battery cluster at the discharge end can be obtained. With this setting, the determined peak charge / discharge current at the discharge end is closer to the actual output characteristics of the battery cluster under low voltage and low SOC conditions, providing a more reasonable basis for subsequently determining the peak charge / discharge current of the battery cluster.

[0081] Understandably, compared to directly using the rated current as the basis for the peak current at the end of charging and discharging, this embodiment introduces the discharge cutoff voltage and rated voltage for conversion, so that the determination of the peak current at the end of charging and discharging takes into account the voltage change of the battery cluster at the end of discharge. In this way, the obtained peak current at the end of charging and discharging is more consistent with the actual operating boundary of the grid-type energy storage system under adverse conditions, thus making the subsequent determination of the grid current based on this peak current at the end of charging and discharging more targeted.

[0082] In other words, this embodiment determines the peak current at the discharge end of the battery cluster based on the discharge cutoff voltage of the battery cell, the rated voltage of the battery cell, and the rated current of the battery cluster. This enables the calculation basis of the peak current at the end of subsequent charging and discharging and the grid current to be closer to the actual output capacity of the battery cluster at the discharge end, thereby improving the accuracy and reliability of the determination of the overcurrent protection device.

[0083] In some examples, when the BMS calculates the cell SOC (State of Charge), the cell SOC at the end of discharge is 5% and the cell voltage V is 2.8V, the BMS does not allow grid formation; the cell SOC at the end of charging is 95% and the cell voltage is 3.45V, the BMS also does not allow grid formation.

[0084] The following is an example illustrating the method for determining the overcurrent protection element in this application: The current imbalance between multiple battery clusters in an energy storage system refers to the phenomenon of uneven current distribution caused by inconsistent electrical parameters among the clusters when multiple battery clusters are connected in parallel. Essentially, it is due to Ohm's law, which causes current to automatically flow to the path with lower impedance.

[0085] To understand the root cause of current imbalance, it is necessary to first clarify the composition of the equivalent internal resistance. The equivalent internal resistance of each battery cluster is the sum of the following four types of resistance: 1. Cell internal resistance: The inherent resistance of a single cell, which is greatly affected by materials, processes and batches, and is the focus of calculation; 2. Connecting wire resistance: The resistance of the copper cable from the cluster to the busbar is related to the length and cross-sectional area, mainly the internal resistance of the aluminum busbar and the internal resistance of the connecting busbar. 3. Contact resistance: The additional resistance generated at connection points (such as bolts, contacts) due to oxidation, poor pressure, or poor surface condition; 4. Electrical component resistance: The contact resistance of the switch contacts, which is affected by the contact material and pressure.

[0086] Battery pack composition analysis shows that the internal resistance of the battery pack includes: 1) aluminum busbar internal resistance; 2) connector busbar internal resistance; 3) contact internal resistance; 4) electrical component internal resistance; and 5) cell internal resistance.

[0087] 1) Calculation method for internal resistance of aluminum busbar: Internal resistance calculation formula: R=ρ L / S, where ρ is resistivity, L is the current-carrying length of the copper busbar, and S is the cross-sectional area of ​​the copper busbar. For example, see [reference needed]. Figure 2 Taking the 1P104S energy storage system as an example, there are 8 aluminum busbars for module output, 96 aluminum busbars between cells, and 4 aluminum busbars between modules. The total internal resistance of the aluminum busbars is 1.038mΩ.

[0088] 2) Calculation method for the internal resistance of the connection array: Calculation formula: R=ρ L / S, where ρ is resistivity, L is the current flow length of the copper busbar, and S is the cross-sectional area of ​​the copper busbar.

[0089] Composition of the copper busbar: See Figure 3 Connector 1 is the main positive copper busbar, connected to the main positive connector. Connector 2 is the connecting busbar for modules 1 and 2. Connector 3 is the connecting busbar for modules 2 and 3. Connector 4 is the connecting busbar for modules 3 and 4. Connector 5 is the output copper busbar for module 4, connected to the fuse. Connector 6 is the output copper busbar for the fuse, connected to the main negative connector. For example, the total internal resistance of the connecting busbars is 0.32mΩ.

[0090] 3) Method for calculating contact resistance: Contact resistance refers to the resistance generated at the contact point between two conductors. This resistance arises from various factors, including unevenness of the conductor surfaces, oxide layers, the materials and surface conditions of the contact surfaces, contact pressure, and environmental conditions. For example, see [link to relevant documentation]. Figure 4 The total measured internal resistance of the battery pack contacts is 0.445 mΩ.

[0091] 4) Method for calculating the internal resistance of electrical components: The electrical components inside the battery pack include: one positive high-voltage connector, one negative high-voltage connector, one maintenance switch MSD, and one fuse.

[0092] The initial total internal resistance was 0.42 mΩ, and the internal resistance after aging was 0.48 mΩ.

[0093] 5) Calculation method for cell internal resistance: According to the cell specifications, the initial internal resistance of the cell is 0.1 mΩ. There are 104 cells in total for 1P104S, and the sum of the initial internal resistances of the cells is 10.4 mΩ.

[0094] If different clusters use cells from different batches, the equivalent internal resistance at the cluster level may vary significantly. The cell internal resistance is 0.1mΩ according to the specifications. Each cluster consists of 1P416S cells, meaning 1 parallel 416 series cells. The maximum deviation in internal resistance caused by the cell size is 416. 0.1 = 41.68 mΩ.

[0095] For example, the initial total internal resistance of the battery pack is 12.623 mΩ, and the battery cluster has 4 battery packs with a total internal resistance of 12.623 mΩ. 4 = 50.492 mΩ, maximum internal resistance 50.492 + 41.6 = 92.072 mΩ, a system has 8 clusters, 41.6 / 8 = 5.2 mΩ, the equivalent internal resistance of each cluster are 55.672 mΩ, 60.872 mΩ, 66.072 mΩ, 71.272 mΩ, 76.472 mΩ, 81.672 mΩ, 86.872 mΩ, and 92.072 mΩ respectively.

[0096] The proportion of the current of each battery cluster connected in parallel to the total current of the energy storage system is: Battery cluster 1 percentage = (1 / R1) / (1 / R1 + 1 / R2 + ... + 1 / R8) × 100% = 16.15%; Battery cluster 2 percentage = (1 / R2) / (1 / R1 + 1 / R2 + ... + 1 / R8) × 100% = 14.77%; Battery cluster 3 percentage = (1 / R3) / (1 / R1 + 1 / R2 + ... + 1 / R8) × 100% = 13.60%; Battery cluster 4 percentage = (1 / R4) / (1 / R1 + 1 / R2 + ... + 1 / R8) × 100% = 12.61%; Battery cluster 5 percentage = (1 / R5) / (1 / R1 + 1 / R2 + ... + 1 / R8) × 100% = 11.75%; Battery cluster 6 percentage = (1 / R6) / (1 / R1 + 1 / R2 + ... + 1 / R8) × 100% = 11.01%; Battery cluster 7 percentage = (1 / R7) / (1 / R1 + 1 / R2 + ... + 1 / R8) × 100% = 10.35%; Battery cluster 8 percentage = (1 / R8) / (1 / R1 + 1 / R2 + ... + 1 / R8) × 100% = 9.76%; Current deviation = 16.15% - 9.76% = 6.39%.

[0097] For example, with a cell capacity of 314Ah 1P, a rated current of 314A for the battery cluster, a rated cell voltage of 3.2V, a cell SOC of 5% at the discharge end, and a cell voltage V of 2.8V, the calculated discharge end current is 314A. (3.2 / 2.8) = 359A, meaning the starting current is calculated based on 359A.

[0098] The grid current is calculated as 1.5 times the design standard: 359 1.5 = 539A.

[0099] The energy storage system has eight battery clusters connected in parallel. The bias current (i.e., the maximum current difference between different battery clusters) after parallel connection is 6.39% of the rated current of the battery clusters. 314 = 20.06A.

[0100] The maximum current of the battery cluster = 539 + 20.06 = 559.06A.

[0101] Based on the maximum current of the battery cluster, the fusing current of the fuse used for the battery cluster is determined to be greater than 559.06A.

[0102] According to an embodiment of the second aspect of this application, this application also provides an overcurrent protection device determined based on the above-described overcurrent protection device determination method.

[0103] Understandably, overcurrent protection devices determined based on the overcurrent protection device determination method can not only handle conventional operating currents but also higher current requirements determined by the grid current and the maximum current difference. In this way, the overcurrent protection devices can meet the strong overload requirements during grid construction and provide reliable protection for the system at critical short-circuit moments, avoiding unexpected fuse blowouts due to excessive current surges.

[0104] According to an embodiment of the third aspect of this application, this application also provides an electrical appliance. The electrical appliance includes an overcurrent protection device, and the electrical appliance has all the beneficial effects of the overcurrent protection device, which will not be repeated here.

[0105] It should be noted that electrical equipment can include vehicles, energy storage power supplies, consumer electronics, medical equipment, smart cities, etc. It is important to note that the above are merely illustrative examples of electrical equipment and do not impose any specific limitations on the types of equipment used.

[0106] According to the embodiments of the fourth aspect of this application, see Figure 5 This application also provides an electronic device. The electronic device may include: a processor 310, a communications interface 320, a memory 330, and a communication bus 340, wherein the processor 310, the communications interface 320, and the memory 330 communicate with each other via the communication bus 340. The processor 310 can call logical instructions in the memory 330 to execute an overcurrent protection device determination method, the method including: The grid current of the battery cluster is determined based on the peak current at the end of the charge and discharge cycle. The maximum current of a battery cluster is determined based on the maximum current difference between different battery clusters and the grid current. Based on the maximum current, determine the parameters of the overcurrent protection device used for the battery cluster.

[0107] Furthermore, the logical instructions in the aforementioned memory 330 can be implemented as software functional units and, when sold or used as independent products, can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of this application, in essence, or the part that contributes to the prior art, or a part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods of the various embodiments of this invention. The aforementioned storage medium includes various media capable of storing program code, such as USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), magnetic disks, or optical disks.

[0108] On the other hand, this application also provides a computer program product, which includes a computer program stored on a non-transitory computer-readable storage medium. The computer program includes program instructions, and when the program instructions are executed by a computer, the computer is able to perform the automatic detection method provided by the above methods, the method including: The grid current of the battery cluster is determined based on the peak current at the end of the charge and discharge cycle. The maximum current of a battery cluster is determined based on the maximum current difference between different battery clusters and the grid current. Based on the maximum current, determine the parameters of the overcurrent protection device used for the battery cluster.

[0109] According to an embodiment of the fifth aspect of this application, the application further includes a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, is implemented to perform the automatic detection methods provided above, the method comprising: The grid current of the battery cluster is determined based on the peak current at the end of the charge and discharge cycle. The maximum current of a battery cluster is determined based on the maximum current difference between different battery clusters and the grid current. Based on the maximum current, determine the parameters of the overcurrent protection device used for the battery cluster.

[0110] Through the above description of the embodiments, those skilled in the art can clearly understand that each embodiment can be implemented by means of software plus necessary general-purpose hardware platforms, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solutions, in essence or the part that contributes to the prior art, can be embodied in the form of a software product. This computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, magnetic disk, optical disk, etc., including several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute the methods of various embodiments or some parts of embodiments.

[0111] In the description of this application, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more features. In the description of this application, "multiple" means two or more, unless otherwise explicitly specified.

[0112] In the above embodiments, the descriptions of each embodiment have different focuses. For parts not described in detail in a certain embodiment, please refer to the relevant descriptions in other embodiments.

[0113] The embodiments, implementation methods, and related technical features of this application can be combined and substituted for each other without conflict.

[0114] The above are merely preferred embodiments of this application and are not intended to limit this application in any way. Any simple modifications, equivalent changes, and alterations made to the above embodiments based on the technical essence of this application without departing from the scope of the technical solution of this application shall still fall within the scope of the technical solution of this application.

Claims

1. A method for determining an overcurrent protection component, applied to an energy storage system, the energy storage system comprising multiple battery clusters connected in parallel, characterized in that, The method for determining the overcurrent protection component includes: Obtain the peak current at the end of the charge and discharge cycle of the battery cluster, and determine the grid current of the battery cluster based on the peak current at the end of the charge and discharge cycle of the battery cluster; Obtain the maximum current difference between different battery clusters, and determine the maximum current of the battery cluster based on the maximum current difference between different battery clusters and the grid current; Based on the maximum current, the parameters for the overcurrent protection device used for the battery cluster are determined.

2. The method for determining overcurrent protection components according to claim 1, characterized in that, Before the step of determining the maximum current of a battery cluster based on the maximum current difference between different battery clusters and the grid current, the method further includes: The maximum ratio difference is determined based on the proportion of the current of different battery clusters to the total current of the energy storage system; The maximum current difference is determined based on the maximum ratio difference and the rated current of the battery cluster.

3. The method for determining overcurrent protection components according to claim 2, characterized in that, Before the step of determining the maximum ratio difference based on the proportion of current in different battery clusters to the total current of the energy storage system, the method further includes: Based on the equivalent internal resistance of each battery cluster, the proportion of the current of different battery clusters to the total current of the energy storage system is determined.

4. The method for determining overcurrent protection components according to claim 3, characterized in that, Before the step of determining the proportion of the current of different battery clusters to the total current of the energy storage system based on the equivalent internal resistance of each battery cluster, the method further includes: The maximum internal resistance deviation value is determined based on the number of cells in the battery cluster and the internal resistance deviation value of the cells. The maximum internal resistance of the battery cluster is determined based on the deviation between the basic internal resistance and the maximum internal resistance of the battery cluster. The equivalent internal resistance of each battery cluster is determined based on the maximum internal resistance of the battery cluster and the number of battery clusters.

5. The method for determining overcurrent protection components according to claim 4, characterized in that, Before the step of determining the maximum internal resistance of the battery cluster based on the deviation between the basic internal resistance and the maximum internal resistance of the battery cluster, the method further includes: The internal resistance of the battery pack is determined based on the internal resistance of the aluminum busbar, the internal resistance of the connecting copper busbar, the internal resistance of the contact, the internal resistance of the electrical components, and the internal resistance of the battery cell. The basic internal resistance of the battery cluster is determined based on the internal resistance of the battery pack and the number of battery packs.

6. The method for determining the overcurrent protection element according to any one of claims 1 to 5, characterized in that, The maximum current is equal to the sum of the difference between the network current and the maximum current.

7. The method for determining the overcurrent protection element according to any one of claims 1 to 5, characterized in that, Before the step of determining the grid current of the battery cluster based on the peak current at the end of the charge and discharge cycle of the battery cluster, the method further includes: The peak current at the charge / discharge end of the battery cluster is determined based on the peak current at the discharge end of the battery cluster.

8. The method for determining overcurrent protection components according to claim 7, characterized in that, Before the step of determining the peak current at the charge / discharge end of the battery cluster based on the peak current at the discharge end of the battery cluster, the method further includes: The peak current at the discharge end of the battery cluster is determined based on the discharge cutoff voltage of the battery cell, the rated voltage of the battery cell, and the rated current of the battery cluster.

9. An overcurrent protection component, characterized in that, The overcurrent protection device is determined by the overcurrent protection device determination method according to any one of claims 1 to 8.

10. An electrical appliance, characterized in that, Includes the overcurrent protection element as described in claim 9.

11. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the computer program, it implements the overcurrent protection device determination method according to any one of claims 1 to 8.

12. A non-transitory computer-readable storage medium, the non-transitory computer-readable storage medium comprising a computer program, characterized in that, When the computer program is executed by the processor, it implements the overcurrent protection device determination method according to any one of claims 1 to 8.