Semiconductor handling system control methods, apparatus and computer equipment

By automating the acquisition of scheduling task information, determining the boarding order and route, and performing safety checks before the elevator and overhead crane dock, the system solves the problems of low overhead crane loading and unloading efficiency and poor safety in semiconductor handling systems, and realizes continuous automatic loading and unloading of multiple overhead cranes and improves system operating efficiency.

CN123124728APending Publication Date: 2026-11-17MEETFUTURE TECH (SHANGHAI) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611337672.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-31
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing technologies, the operation of overhead cranes in semiconductor handling systems relies on manual control, resulting in low efficiency and poor safety, and making it impossible to support the coordinated automatic scheduling of multiple overhead cranes.

Method used

By acquiring the online and offline scheduling task information, the boarding order and route of the overhead crane are determined, and a safety check is performed before the elevator docks with the overhead crane. A waiting area isolated from the main track is set up to realize the automated boarding and offline process of the overhead crane.

Benefits of technology

This system enables continuous automatic loading and unloading of multiple overhead cranes, significantly improving efficiency and safety, avoiding interference with normal transport tasks on the main track, and ensuring the overall operational efficiency of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123124728A_ABST
    Figure CN123124728A_ABST
Patent Text Reader

Abstract

This application relates to a control method, apparatus, and computer device for a semiconductor handling system. The method includes: acquiring online and offline scheduling task information for multiple overhead cranes to be scheduled; determining the boarding order and boarding path of each overhead crane to be scheduled to the elevator based on the online and offline scheduling task information and the elevator's boarding constraints; controlling each overhead crane to be scheduled to move along the boarding path to the boarding waiting area corresponding to the elevator according to the boarding order; performing a safety check on the relative position state between the elevator and the overhead cranes to be scheduled; if the safety check passes, controlling the elevator to carry the overhead cranes to be scheduled to move to the destination corresponding to the online and offline scheduling task information; responding to the elevator reaching the destination, controlling the overhead cranes to be scheduled to leave the elevator, and updating the response status of the overhead cranes to be scheduled. The embodiments of this application can improve the safety and efficiency of overhead crane control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of semiconductor handling system technology, and in particular to a semiconductor handling system control method, apparatus, and computer equipment. Background Technology

[0002] With the rapid development of semiconductor manufacturing technology, automated material handling systems (AMHS) in wafer fabrication plants have become an indispensable infrastructure on large-scale semiconductor production lines. Among them, overhead hoist transport (OHT) systems are known for their ability to efficiently and stably transport wafer carriers (FOUP / FOSB) on elevated tracks in cleanrooms.

[0003] An OHT system typically includes multiple overhead transport trolleys running along a skyrail, a central dispatch system responsible for trolley path planning and task scheduling, and lifts located between the skyrail and target areas such as the ground. The trolleys can travel between the skyrail and the target area via the lifts, thus enabling communication between the elevated transport level and the maintenance level.

[0004] In related technologies, the operation of OHT (Overhead Crane) cranes, both online and offline, primarily relies on manual control. Taking crane offline as an example, the operator first locates the target crane in the station area near the elevator using the dispatch system's interface. Then, using a teach pendant to switch to manual mode, the operator slowly moves the crane from the overhead rail into the elevator using manual inching. After confirming the crane is in place, the operator manually operates the elevator control panel to lower the elevator from the overhead rail height to the target area height. The crane online process is similar: the operator manually pushes the crane into the elevator, raises the elevator to the overhead rail height, then manually moves the crane out of the overhead rail. Subsequently, the operator manually initializes the crane using the teach pendant and scans the travel barcode to confirm its position. Finally, the operator re-adds the crane to the work sequence through the dispatch system.

[0005] The aforementioned manual online / offline control methods suffer from both low efficiency and low security. Summary of the Invention

[0006] Therefore, it is necessary to provide a semiconductor handling system control method, apparatus, and computer equipment that can improve the safety and efficiency of overhead crane loading and unloading control, addressing the aforementioned technical problems.

[0007] In a first aspect, this application provides a control method for a semiconductor handling system, the method being applied to a semiconductor handling system; the semiconductor handling system includes an elevator and multiple overhead cranes; the method includes:

[0008] Obtain online / offline scheduling information for multiple overhead cranes awaiting scheduling;

[0009] Based on the online and offline scheduling task information and the elevator's riding constraints, determine the riding order and riding path of each crane to be scheduled to the elevator.

[0010] According to the boarding sequence, each of the overhead cranes to be dispatched is controlled to move along the boarding path to the boarding waiting area corresponding to the elevator; the boarding waiting area is isolated from the main track of the semiconductor handling system;

[0011] In response to the arrival of the overhead crane to be dispatched in the waiting area, the elevator's movable track is controlled to move to dock with the fixed track where the waiting area is located, and a safety check is performed on the relative position status between the elevator and the overhead crane to be dispatched.

[0012] If the safety check passes, control the active track to carry the crane to be scheduled to the destination corresponding to the online and offline scheduling task information;

[0013] In response to the elevator reaching the destination, the overhead crane to be dispatched is controlled to leave the elevator, and the response status of the overhead crane to be dispatched is updated.

[0014] Secondly, this application also provides a semiconductor handling system control device, which is applied to a semiconductor handling system; the semiconductor handling system includes an elevator and multiple overhead cranes, and the device includes:

[0015] The acquisition module is used to acquire online and offline scheduling task information for multiple overhead cranes to be scheduled;

[0016] The determination module is used to determine the boarding order and boarding path of each crane to be dispatched to the elevator based on the online and offline scheduling task information and the elevator's boarding constraints.

[0017] The control module is used to sequentially control each of the overhead cranes to be dispatched to move along the boarding path to the boarding waiting area corresponding to the elevator according to the boarding order; the boarding waiting area is isolated from the main track of the semiconductor handling system;

[0018] The verification module is used to control the movement of the active track to dock with the fixed track where the waiting area is located in response to the arrival of the crane to be dispatched in the waiting area, and to perform a safety verification of the relative position status between the elevator and the crane to be dispatched.

[0019] The scheduling module is used to control the active track to move the crane to be scheduled to the destination corresponding to the online and offline scheduling task information, provided that the safety verification is passed.

[0020] An update module is used to control the overhead crane to be dispatched to leave the elevator in response to the elevator reaching the destination, and to update the response status of the overhead crane to be dispatched.

[0021] Thirdly, this application also provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and the processor executes the computer program to implement the steps included in any of the foregoing method embodiments.

[0022] Fourthly, this application also provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps included in any of the foregoing method embodiments.

[0023] Fifthly, this application also provides a computer program product, including a computer program that, when executed by a processor, implements the steps included in any of the foregoing method embodiments.

[0024] The aforementioned semiconductor handling system control method, apparatus, computer equipment, computer-readable storage medium, and computer program product achieve orderly automatic scheduling of multiple overhead cranes going online and offline by acquiring online and offline scheduling task information and determining the boarding order and boarding path according to boarding constraints; by setting up a boarding waiting area isolated from the main track, the online and offline operations do not affect the normal handling tasks of the main track; by performing safety verification before the elevator and the overhead crane dock, the safety of the docking process is ensured; by locking the crane's movement capability and disabling boarding permissions before the elevator moves, safety protection during the lifting process is ensured; and by updating the response status after the crane leaves the elevator, accurate management of the crane's status is ensured. This application embodiment realizes a complete automated process from acquiring scheduling tasks, multi-crane queuing scheduling, automatic crane movement to the boarding waiting area, safety verification, automatic elevator loading and transportation, to automatic crane departure and status update. The entire online and offline process requires no manual intervention, significantly improving the efficiency and safety of overhead crane online and offline operations. For scenarios where multiple overhead cranes need to be loaded and unloaded simultaneously, this method achieves continuous automatic loading and unloading of multiple cranes through reasonable arrangement of the loading sequence and queuing buffer in the loading waiting area. This significantly shortens the overall operation time and effectively solves the problem of low efficiency caused by multiple cranes having to be processed serially in related technologies. Furthermore, by isolating the loading waiting area from the main track, this method ensures that loading and unloading operations do not interfere with the normal handling tasks of the semiconductor handling system, thus guaranteeing the overall operating efficiency of the system. Attached Figure Description

[0025] To more clearly illustrate the technical solutions in the embodiments of this application or related technologies, the drawings used in the description of the embodiments of this application or related technologies will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.

[0026] Figure 1 This is an application environment diagram of a semiconductor handling system control method in one embodiment;

[0027] Figure 2 This is a flowchart illustrating a semiconductor handling system control method in one embodiment;

[0028] Figure 3 This is a schematic diagram of signal interaction during the crane loading process in one embodiment of this application;

[0029] Figure 4 This is a schematic diagram of signal interaction during the crane unloading process in one embodiment of this application;

[0030] Figure 5 This is a schematic diagram of the automatic online process of the overhead crane in one embodiment of this application;

[0031] Figure 6 This is a schematic diagram of the automatic unloading process of the overhead crane in one embodiment of this application;

[0032] Figure 7 This is a structural block diagram of a semiconductor handling system control device in one embodiment;

[0033] Figure 8 This is an internal structural diagram of a computer device in one embodiment. Detailed Implementation

[0034] To make the objectives, technical solutions, and advantages of this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the scope of this application.

[0035] Before describing the embodiments of this application, the relevant technologies and their existing problems will be further explained:

[0036] In the actual operation of the OHT system, there are two scenarios in which the overhead crane needs to move from the overhead rail to the ground or other target areas (offline) or return from the target area to the overhead rail (online): The first is the regular maintenance scenario, where the overhead crane needs to be moved down to the target area for routine mechanical inspection, cleaning and component replacement after a certain mileage or time of use; the second is the irregular fault handling scenario, where the overhead crane malfunctions during operation but is still mobile and needs to be removed from the overhead rail to the target area for repair as soon as possible to avoid occupying the overhead rail resources for a long time and affecting the overall plant handling efficiency.

[0037] The manual online / offline control method has at least the following problems:

[0038] First, the operation process is cumbersome and inefficient. For an overhead crane to complete a single online or offline operation, operators need to perform multiple steps, including crane positioning, mode switching, manual operation, hoist operation, position confirmation, and status recovery. Each step requires manual confirmation and intervention, resulting in a long time consumption for each crane. When multiple cranes need to be offline for maintenance or emergency evacuation simultaneously, operators can only handle them one by one, making continuous automatic online / offline operation impossible. This severely impacts equipment maintenance efficiency and the continuity of material handling.

[0039] Secondly, manual operation poses safety hazards. The transfer process between the overhead crane and the elevator involves precise alignment and speed control. When operators remotely drive the crane manually via a teach pendant, they cannot perceive the relative positional deviation between the crane and the elevator entrance frame in real time. Manual operation is prone to errors such as misalignment of the crane with the elevator entrance, excessive speed causing vibration, and exceeding travel limits. These errors can range from minor damage to the joints between the crane's wheels and the track, to serious accidents such as derailment or elevator collisions, threatening personnel safety, equipment safety, and the integrity of the wafer products.

[0040] Third, it cannot support the coordinated automatic scheduling of multiple overhead cranes. In related technologies, the docking channel between the elevator and the overhead rail only allows a single crane to pass through, and there is a lack of a queuing and scheduling management mechanism for multiple cranes using the same elevator. When multiple cranes need to go online or offline sequentially, the operator of the next crane needs to be manually notified after the current crane completes its operation. When cranes are waiting in the passenger waiting area, they may occupy the main rail passage space, affecting other normal transport tasks. The entire process lacks a unified automatic scheduling logic, making it difficult to achieve orderly, safe, and continuous automatic online / offline operation of multiple cranes.

[0041] It should be noted that the terms "first," "second," etc., used in this application can be used to describe various elements, but these elements are not limited by these terms. These terms are only used to distinguish the first element from the second element. The terms "comprising" and "having," and any variations thereof, used in this application, are intended to cover non-exclusive inclusion. The term "multiple" used in this application refers to two or more. The term "and / or" used in this application refers to one of the embodiments, or any combination of multiple embodiments.

[0042] The semiconductor handling system control method provided in this application embodiment can be applied to, for example... Figure 1 In the application environment shown, terminal 102 communicates with server 104 via a network. A data storage system can store the data that server 104 needs to process. The data storage system can be integrated onto server 104 or located on the cloud or other network servers. Terminal 102 can be, but is not limited to, various personal computers, laptops, smartphones, tablets, drones, low-altitude aircraft, IoT devices, and portable wearable devices. IoT devices can include smart speakers, smart TVs, smart air conditioners, smart in-vehicle devices, projection devices, etc. Portable wearable devices can include smartwatches, smart bracelets, head-mounted devices, etc. Head-mounted devices can be virtual reality (VR) devices, augmented reality (AR) devices, smart glasses, etc. Server 104 can be a standalone physical server, a server cluster or distributed system composed of multiple physical servers, or a cloud server providing cloud computing services.

[0043] In one exemplary embodiment, such as Figure 2 As shown, a control method for a semiconductor handling system is provided, the method being applied to a semiconductor handling system; the semiconductor handling system includes an elevator and multiple sets of overhead cranes; the method is applied to... Figure 1 Taking terminal 102 or server 104 as an example, the following steps are included:

[0044] Step 202: Obtain the online / offline scheduling task information for multiple overhead cranes to be scheduled.

[0045] The "top-down / top-up" scheduling information refers to the task instructions that direct the overhead crane to transfer materials between the overhead rail and the target area in the semiconductor material handling system. In semiconductor wafer manufacturing plants, the Overhead Hoist Transport (OHT) system automates the transport of materials between workstations via elevated tracks. When the overhead crane requires regular maintenance, malfunctions requiring repair, or needs to be restarted or put into operation for the first time, it needs to be transferred between the overhead rail and the target area via a lift. This transfer process is referred to as "top-down" (descending from the overhead rail to the target area) and "top-up" (rising from the target area to the overhead rail).

[0046] Online / offline scheduling tasks can be triggered in various ways. For example, maintenance personnel can manually initiate an offline command through the scheduling system's human-machine interface. For instance, when a crane needs scheduled maintenance, the maintenance personnel select the target crane on the scheduling system's interface and click the "Offline" button, thus generating the corresponding offline scheduling task. Optionally, online / offline scheduling tasks can be automatically initiated by maintenance tasks. For example, when the mileage or operating time of a crane is detected to have reached a preset maintenance threshold, an offline scheduling task is automatically generated. Optionally, online / offline scheduling tasks can be automatically triggered by a fault detection mechanism. For example, when a fault report signal from a crane is received, and the crane still has mobility, an emergency offline scheduling task is automatically generated so that the faulty crane can automatically travel to the target area for repair.

[0047] The online / offline scheduling task information may include fields such as task type (e.g., indicating online or offline), target crane identifier, task priority, and specified elevator identifier. After obtaining this task information, it is added to the task queue to await scheduling execution.

[0048] This application embodiment, by acquiring online / offline scheduling task information, can identify which overhead cranes need to perform online / offline operations, as well as the type and priority of these operations, thereby providing a data foundation for subsequent scheduling decisions. Unlike related technologies that require manual identification and operation of each overhead crane for online / offline operations, this application embodiment can achieve automatic perception and task-based processing of online / offline requirements, enabling the entire online / offline process to proceed automatically in a task-driven manner.

[0049] Step 204: Based on the online and offline scheduling task information and the elevator's riding constraints, determine the riding order and riding path of each crane to be scheduled for the elevator.

[0050] Here, "cages awaiting dispatch" refers to the cranes that need to perform online or offline operations as indicated by the online / offline dispatch task information. "Boarding order" refers to the sequence in which multiple cranes awaiting dispatch use the elevator. Since an elevator can typically only carry one crane at a time, when multiple cranes need to go online or offline, their order must be determined to avoid resource contention and dispatching conflicts. "Boarding path" refers to the overhead rail route that the cranes awaiting dispatch take from their current position to the elevator's waiting area.

[0051] Riding constraints refer to the set of pre-set restrictive rules established for elevators to ensure operational safety and system efficiency when they are used to transport overhead cranes for vertical transport operations. Riding constraints define the physical load-bearing limits, spatial capacity limits, and safe operating boundaries of the elevator and its associated facilities. Specifically, riding constraints may include constraints on the following dimensions:

[0052] First, there are constraints on the physical load-bearing capacity of the elevator: The elevator's movable rails can only support one crane at a time. This is determined by the elevator's mechanical structure and safety regulations. The width of the movable rails is only compatible with the wheel spacing of a single crane, and the rated load of its lifting mechanism is designed only to support a single crane and its potential material carriers (such as FOUPs). If multiple cranes enter the elevator simultaneously, it will exceed the elevator's structural load-bearing limit, potentially leading to overload of the lifting mechanism, deformation or even breakage of the movable rails, causing serious safety accidents. Therefore, the riding constraints limit the maximum number of cranes that can ride on the elevator simultaneously to one.

[0053] Second, constraints on the queuing capacity of the waiting area: The waiting area is a dedicated section on the overhead rail for overhead cranes to queue and enter the elevator, and its physical length is limited. The number of cranes that can stop sequentially within the same waiting area is limited by the length of this section. If the number of queuing cranes exceeds the capacity of the waiting area, subsequent cranes will not be able to stop completely and will be forced to remain on the main rail, thus blocking the main rail and affecting the normal operation of the entire semiconductor handling system. Therefore, the passenger constraint limits the maximum number of cranes that can queue in the waiting area, a number determined by both the physical length of the waiting area and the length of the crane body.

[0054] Third, spatial constraints on crane parking positions: When a crane is waiting in the passenger waiting area, its body must be completely within the boundary of the waiting area and must not occupy the passage space of the main track. This is to ensure that the waiting crane does not obstruct other cranes operating normally on the main track. Since the main track is the main artery for high-frequency crane traffic in the semiconductor handling system, if a parked crane protrudes into the main track, it will seriously hinder the normal operation of other cranes and may even cause a rear-end collision. Therefore, the passenger constraints stipulate that the crane parking position must not exceed the boundary of the passenger waiting area.

[0055] Fourth, restrictions on the timing of the overhead crane entering the elevator: The overhead crane can only enter the elevator when the elevator's moving rail has been accurately raised to the docking height of the overhead rail and there are no other obstacles at the elevator entrance. This restriction is to ensure that during the transition of the overhead crane from the waiting area to the elevator interior, the crane's wheels can smoothly transition from the overhead rail to the elevator's moving rail, avoiding derailment or jamming due to differences in rail height or horizontal misalignment.

[0056] Furthermore, the riding constraints can be expanded based on specific factory deployment and safety management requirements. For example, in scenarios with high cleanliness requirements in certain wafer fabs, the riding constraints can also include wind speed detection requirements before the overhead crane enters the elevator to prevent dust from contaminating the wafers during elevator operation. For scenarios with multiple elevators deployed, the riding constraints can also include interlock rules that allow only one elevator to be in motion at a time, to avoid power overload or signal interference caused by multiple elevators operating simultaneously.

[0057] Specifically, riding constraints may include the maximum number of cranes that can ride simultaneously on the elevator (usually one), the maximum number of cranes that can queue in the waiting area, and positional constraints such as cranes not occupying the main track passage space when parked in the waiting area. These constraints are determined by the physical structure of the elevator and the safety specifications of the semiconductor handling system. For example, if three cranes need to be taken offline, their respective task information is parsed to obtain the current position, task priority, and designated elevator for each crane. The riding order is determined according to the priority of each crane, with the crane with the highest priority using the elevator first. At the same time, based on the current position of each crane and the position of the designated elevator, combined with the real-time position of other operating cranes on the main track, a collision-free riding path is planned for each crane, ensuring that the crane does not conflict with other cranes on its way to the elevator.

[0058] This embodiment determines the boarding order and boarding route by comprehensively considering scheduling task information and boarding constraints. On the one hand, it ensures that the scarce resource of the elevator is used in an orderly manner in multi-vehicle scenarios, avoiding congestion and conflicts caused by multiple cranes arriving at the elevator at the same time. On the other hand, it ensures the safety of the cranes on their way to the elevator, avoiding collisions with other cranes operating normally on the main track.

[0059] Step 206: Control each of the overhead cranes to be dispatched to move along the boarding path to the boarding waiting area corresponding to the elevator in the order of boarding; the boarding waiting area is isolated from the main track of the semiconductor handling system.

[0060] The waiting area refers to a dedicated area near the elevator location for overhead cranes to queue and wait to enter the elevator. This area is isolated from the main track of the semiconductor handling system, meaning that the waiting area is an independent section on the overhead track. When a crane stops in this area, it will not occupy the passage space of the main track, thus not affecting the normal operation of other cranes on the main track.

[0061] For example, a waiting area can be located on the overhead rail in front of the elevator entrance, specifically a separate track section. This section is connected to the main rail via switches or a physical isolation structure. When an elevator moves from the main rail into the waiting area, the passage space on the main rail is released, allowing other elevators to continue operating normally on the main rail. The waiting area can accommodate one or more elevators queuing, with the specific capacity determined by the physical layout of the elevator and the factory's safety regulations.

[0062] According to the aforementioned boarding order, each crane awaiting dispatch is sequentially dispatched along its planned boarding path to the waiting area. Specifically, a dispatch command is first sent to the first crane awaiting dispatch, which then travels along its boarding path to the waiting area and completes its positioning. After the first crane enters the elevator, a dispatch command is sent to the second crane awaiting dispatch, instructing it to move to the waiting area and queue. This process continues until all cranes awaiting dispatch have been dispatched to the waiting area or have entered the elevator.

[0063] This embodiment establishes a waiting area isolated from the main track, ensuring that cranes waiting to board or disembark do not obstruct the main track's passageway, thus minimizing interference with normal transport operations on the main track. Furthermore, by scheduling cranes according to boarding order, it avoids the chaos and safety risks caused by multiple cranes simultaneously entering the waiting area.

[0064] Step 208: In response to the arrival of the overhead crane to be dispatched in the waiting area, control the movable track of the elevator to move to dock with the fixed track where the waiting area is located, and perform a safety verification on the relative position status between the elevator and the overhead crane to be dispatched.

[0065] Once the overhead crane has traveled along its designated path to the waiting area and completed its positioning, the dispatch center is notified of its arrival. At this point, the elevator may be at the height of the overhead rail (on-line standby), the height of the target area (off-line standby), or a position where it is already in operation. To receive the crane, the crane dispatch center controls the movable track section of the elevator to move to the height where it aligns with the fixed track section of the waiting area. This means the movable track section inside the elevator is flush with the plane of the overhead rail, allowing the crane to smoothly enter the movable track section from the waiting area via the fixed and transition track sections.

[0066] After the movable track segment and the fixed track segment are docked, the crane dispatch center performs a safety check on the relative position status between the elevator and the crane to be dispatched. The relative position status refers to a set of parameters characterizing the spatial relationship between the movable track segment of the elevator and the crane to be dispatched during the docking and connection operation. The relative position status is used to determine whether the conditions for safe docking and connection are met. Specifically, the relative position status includes positional relationship information in the following multiple dimensions:

[0067] First, the parking position of the overhead crane relative to the elevator entrance: After the dispatched overhead crane arrives at the waiting area, it needs to park precisely within a predetermined range in front of the elevator entrance. This predetermined range is called the safe parking range. The safe parking range is a specific section on the overhead rail in front of the elevator entrance. When the overhead crane is within this section, the centerline of the crane body is aligned with the centerline of the elevator's moving rail, allowing the crane to safely enter the elevator in a straight line without deviating. If the crane's parking position deviates from the safe parking range (e.g., parking too far forward, too far back, or too far to the left or right), the crane may scrape or collide with the frame structure of the elevator entrance during its entry into the elevator. Therefore, the parking position of the overhead crane relative to the elevator entrance is an important dimension of its relative position.

[0068] Secondly, the alignment height between the elevator's movable rail and the overhead rail: The elevator's movable rail needs to rise or fall precisely to the same height as the overhead rail (i.e., the alignment height) for the gantry crane to smoothly enter the elevator's movable rail. If the movable rail is higher than the overhead rail, the crane's wheels may spin freely or the crane body may jolt when entering; if the movable rail is lower than the overhead rail, the crane will experience a fall, potentially causing impact and vehicle swaying; if there is a horizontal misalignment between the movable rail and the overhead rail, it is even more dangerous, as the crane may derail and fall. Therefore, the alignment height between the elevator's movable rail and the overhead rail is another dimension of their relative position.

[0069] Third, the target parking position of the overhead crane inside the elevator: After the overhead crane enters the elevator, it needs to stop precisely at the target parking position on the moving rail inside the elevator. The target parking position refers to a preset position on the moving rail of the elevator, usually located in the exact center of the moving rail. When the overhead crane stops at this position, the center of gravity of the overhead crane coincides with the lifting center of the elevator, and the elevator is evenly stressed during the lifting process, preventing uneven loading and tilting. At the same time, all four wheels of the overhead crane are within the effective support range of the moving rail, ensuring the stability of the overhead crane during the lifting process. If the overhead crane stops too far forward or too far back, it may cause the center of gravity of the elevator to shift during the lifting process, generating a tilting moment, affecting the smooth operation of the elevator and the safety of the overhead crane.

[0070] Fourth, the absolute position of the elevator's moving rails: Throughout the entire process of the elevator carrying the overhead crane, the real-time position of the moving rails (including their absolute height from the ground or overhead rail, movement speed, acceleration, and other parameters) is a crucial component of the relative position. By monitoring the absolute position of the moving rails, it is possible to determine whether the elevator has accurately reached its destination (overhead rail height or ground height), and whether there are any abnormal positional deviations or speed fluctuations during the lifting process.

[0071] Specifically, the acquisition and verification of relative position status relies on various sensing devices and communication protocols. For example, a radar baffle placed at the elevator entrance can detect whether the crane is within the safe stopping range; a QR code set on the elevator's moving rail can be scanned by the crane to determine whether it is at the target stopping position; real-time data comparison between the pull rope encoder and the lifting shaft encoder can determine whether the deviation between the actual position and the theoretical position of the moving rail is within the allowable range; and a short-range communication protocol can be used to exchange position confirmation signals between the crane and the elevator in real time.

[0072] Safety verification refers to a series of safety checks conducted on the relative position of the elevator and the overhead crane before and during docking to ensure they are in a safe docking state. Specific aspects of safety verification may include: whether the overhead crane is accurately stopped at the predetermined position within the waiting area (i.e., within the safe stopping range); whether the elevator's moving rail has accurately moved to the docking height; whether there are any obstacles at the elevator entrance; and whether the signal communication between the overhead crane and the elevator is normal.

[0073] For example, when the overhead crane arrives at the waiting area, it sends an entry request to the elevator via a short-range communication protocol. The elevator responds to this request by using detection devices (such as radar baffles or photoelectric sensors) at its entrance to check if the overhead crane is within the safe stopping range. Simultaneously, the elevator raises its movable rail to the height required to align with the overhead rail. Once it is confirmed that the overhead crane is within the safe stopping range and the movable rail is in position, the safety check is successful.

[0074] This embodiment performs a safety check before the elevator and the overhead crane are connected, which can promptly detect safety hazards such as deviations in the crane's stopping position and abnormal elevator positioning. This prevents the crane from blindly entering the elevator when it is not aligned or the elevator is not in position, thereby preventing safety accidents such as crane derailment and collision with the elevator.

[0075] Step 210: If the safety verification is passed, control the active track to move the crane to be scheduled to the destination corresponding to the online and offline scheduling task information.

[0076] Passing the safety check means that the relative positions of the elevator and the overhead crane meet the safety docking conditions, allowing the overhead crane to safely enter the elevator. At this point, the elevator is opened for passenger access, allowing the overhead crane to enter. The overhead crane enters the elevator at low speed and stops at the target parking position inside the elevator.

[0077] After the overhead crane enters the elevator and completes its positioning, it can perform a series of locking operations to ensure safety during the lifting process: the overhead crane locks all its own motion functions, preventing it from moving independently during the elevator's ascent and descent; the elevator closes passenger access permissions, such as raising the elevator entrance barrier to prevent subsequent overhead cranes from accidentally entering during elevator operation. After completing the above locking, the elevator carries the overhead crane to its destination.

[0078] The destination is determined by the type of overhead crane unloading / reloading task information. If the task type is an overhead crane unloading task, the destination is ground level; the elevator descends from the overhead rail height to ground level, allowing the overhead crane to be moved out of the elevator for maintenance or repair. If the task type is an overhead crane loading task, the destination is the overhead rail height; if the overhead crane is loaded into the elevator on the ground, the elevator rises from ground level to the overhead rail height, allowing the overhead crane to enter the overhead rail and begin operation.

[0079] This embodiment ensures dual safety protection during the lifting process by locking the crane's movement capability and disabling the crane's passenger access before the elevator moves: even if the elevator shakes or vibrates unexpectedly during the lifting process, the crane will not shift or fall off inside the elevator; even if a subsequent crane mistakenly drives towards the elevator, the entrance baffle can prevent it from entering and avoid collision.

[0080] Step 212: In response to the elevator reaching the destination, control the crane to be dispatched to leave the elevator and update the response status of the crane to be dispatched.

[0081] Once the elevator carrying the overhead crane has reached its destination, the elevator's movable rail reaches the target height and connects with the rail at that height (ceiling rail or ground rail). At this point, the overhead crane needs to leave the elevator so that the elevator can serve the next overhead crane or allow the overhead crane to enter its target working state.

[0082] The overhead crane departs from the elevator at low speed and travels to a dedicated station behind the elevator exit to complete its positioning. Subsequently, the crane sends a departure completion signal to the elevator via a short-range communication protocol, informing the elevator that the crane has safely departed. The crane's response status is updated according to the task type. Specifically, if it is a task to bring the crane online, after the crane departs from the elevator at the height of the overhead rail and enters the rail, it is added to the work vehicle sequence corresponding to the main rail, and its response status is marked as online (or responsive). Afterward, the crane can accept new handling tasks. If it is a task to take the crane offline, the crane is removed from the work vehicle sequence, and its response status is marked as offline (or non-responsive). No new handling tasks will be assigned to this crane afterward. By updating the response status of the crane after it departs from the elevator, an accurate understanding of the current working status of each crane is ensured, avoiding the assignment of tasks to cranes that were just brought online or to cranes that have been taken offline, thus ensuring the correctness and effectiveness of scheduling instructions.

[0083] Compared to related technologies that require manual operation of each overhead crane for loading and unloading, this method achieves a complete automated process, from task acquisition and multi-crane queuing to automatic crane movement to the waiting area, safety verification, automatic elevator transport, and automatic crane departure and status update. The entire loading and unloading process requires no manual intervention, significantly improving efficiency and safety. For scenarios where multiple cranes need to load and unload simultaneously, this method achieves continuous automatic loading and unloading by rationally arranging the boarding order and using queuing buffers in the waiting area, greatly shortening the overall operation time and effectively solving the problem of low efficiency caused by multiple cranes having to be processed serially in related technologies. Furthermore, by isolating the waiting area from the main track, this method ensures that loading and unloading operations do not interfere with the normal transport tasks of the semiconductor handling system, guaranteeing the overall operating efficiency of the system.

[0084] In some embodiments, the riding constraints are used to constrain the elevator's carrying capacity and queuing capacity; determining the riding order and route of multiple overhead cranes to be scheduled for the elevator based on the onboarding and offboarding scheduling task information and the elevator's riding constraints includes:

[0085] The online and offline scheduling task information is parsed to obtain the scheduling priority, crane position, and planned elevator occupancy of each crane to be scheduled.

[0086] Obtain the planned load information and location of the elevator, as well as the traffic status of the main track;

[0087] Based on the location of the overhead crane, the setting location, and the traffic conditions, route planning is performed to obtain the boarding route for each of the overhead cranes to be dispatched;

[0088] The boarding order of each of the overhead cranes to be scheduled is determined based on the scheduling priority, the task load, and the boarding constraints.

[0089] The online / offline scheduling task information, serving as the input instruction, contains several key parameters required to execute the online / offline operations. Upon receiving this task information, it is first parsed and processed. Scheduling priority characterizes the urgency of each overhead crane's online / offline operation. Priority can be determined by various factors: for example, the offline task of a faulty overhead crane has the highest priority because if a faulty crane cannot be taken offline for repair in a timely manner, it may occupy overhead rail resources for an extended period, even affecting the normal operation of the entire handling system. Optionally, the offline priority of maintenance tasks can be determined based on the maintenance plan's time window, with overhead cranes approaching their maintenance deadline having higher priority. In another example, tasks manually initiated by the operator through the scheduling interface can have a higher priority than automated tasks, reflecting the need for timely human intervention. When parsing the task information, the priority field carried in the task is extracted as the basis for subsequent sorting.

[0090] The crane position refers to the precise location of each crane to be dispatched on the overhead rail at the current moment. During operation, the crane obtains its own location information in real time by scanning barcodes or QR codes set on the overhead rail and reports the location information. When parsing task information, the system queries the latest position of the crane from the real-time database using the crane identifier carried in the task information.

[0091] The planned elevator occupancy refers to the elevator that the overhead crane to be scheduled will use, as specified in the online / offline scheduling task information. In a semiconductor handling system equipped with multiple elevators, different overhead cranes may be assigned to use different elevators for online / offline operations, such as an elevator close to the current position of the overhead crane or an elevator dedicated to maintenance of a specific area.

[0092] Task load status characterizes the current service pressure on scheduled overhead cranes and serves as the basis for determining whether and when an elevator can accommodate new cranes awaiting dispatch. Specifically, task load status includes the number of cranes currently being carried by the elevator (i.e., current capacity) and the number of cranes waiting in the queue (i.e., current queue size). The current capacity reflects whether the elevator is currently occupied. If the current capacity is 1, the elevator is performing loading / unloading operations and is occupied, unable to immediately accommodate new cranes; if the current capacity is 0, the elevator is idle and can accommodate new cranes. The current queue size reflects the congestion level of the waiting area. If the queue size has reached the maximum capacity of the area, new cranes cannot temporarily enter the queue.

[0093] The installation location refers to the coordinates of the elevator's position on the overhead rail. The elevator's installation location determines the travel distance and path required for the overhead crane to travel from its current location to that elevator, and is a crucial input parameter for path planning. Different elevators may be located in different areas of the factory, such as elevators near high-risk maintenance areas on the production line and elevators near storage areas.

[0094] The traffic status of the main track refers to the distribution and movement status of all currently operating overhead cranes on the main track. Specifically, this includes: the current position of each crane on the main track, its direction of travel, its current speed, and whether each track section is occupied by a crane. The traffic status view of the main track is maintained by receiving real-time position and status information reported by each crane. Obtaining the traffic status of the main track is crucial for planning travel routes to avoid congested sections and moving cranes, thus preventing route conflicts and collisions.

[0095] Specifically, path planning can be collision-free path planning, which means generating a feasible route while ensuring that the crane to be scheduled will not collide or conflict with other cranes in operation on the main track during its journey from its current position to the elevator to be occupied.

[0096] Specifically, the path search is performed starting from the current position of the overhead crane and ending at the entrance to the elevator's waiting area, taking into account the topology of the overhead rail system (including straight tracks, curved tracks, switches, merging points, and diverging points). During the search, the traffic status of the main rail is also considered to avoid track sections already occupied by other overhead cranes and intersections with collision risks. For example, if an overhead crane is currently traveling on section A of the main rail, a path through section A will not be planned for another overhead crane awaiting dispatch; instead, it will detour through other available sections.

[0097] For example, if the overhead crane is located in the eastern area of ​​the overhead rail system while the planned elevator is located in the western area, a route can be planned to bypass the congested central section by going from the east side through the north side to the west side. Alternatively, if the shortest route for the overhead crane to the elevator requires passing through a switch point that is currently occupied by another overhead crane, the crane to be dispatched can wait at a safe distance in front of the switch point until the other crane passes before continuing its journey, or an alternative route that does not pass through the switch point can be chosen.

[0098] Collision-free path planning ensures the safe travel of each overhead crane to the elevator, avoiding rear-end or head-on collisions caused by path conflicts, and also preventing scheduling chaos caused by temporary stops of overhead cranes due to congestion ahead.

[0099] Determining the boarding order can take into account several factors, including scheduling priority, the real-time feasibility of the boarding order due to task load, and capacity limitations imposed by boarding constraints. Among these, higher-priority cranes should use the elevator first. For example, the task of taking a faulty crane offline usually has the highest priority; even if the crane is far from the elevator, it should be prioritized for use of the elevator to remove the faulty crane from the overhead rails as quickly as possible and restore the main track's operational capacity.

[0100] If the elevator is currently occupied (e.g., carrying a crane), it cannot immediately accommodate the next crane, even if that crane has a higher scheduling priority. It can only enter after the current crane completes its lift and leaves the elevator. Therefore, it is necessary to determine when the next crane can begin its journey based on the elevator's current capacity.

[0101] If the maximum number of overhead cranes that can queue in the waiting area is 3, and there are already 3 overhead cranes waiting in the queue, then even if the 4th overhead crane has a higher priority, it cannot enter the waiting area to queue. It will have to wait for the existing overhead cranes to enter the elevator and release their queuing positions before it can move towards the waiting area from a more distant location.

[0102] For example, suppose there are three overhead cranes, A, B, and C, waiting to be dispatched. A is a faulty crane (highest priority), B is a crane undergoing scheduled maintenance (medium priority), and C is a crane undergoing emergency repairs (higher priority), and all three cranes are scheduled to use the same elevator. Currently, the elevator is idle, and the waiting area is empty. First, they can be sorted by priority in descending order: A, C, B. Then, the elevator availability is checked, and the final boarding order is: A first, C second, and B last. After A enters the elevator, the elevator becomes occupied, and C and B queue in the waiting area. After A completes its journey and leaves the elevator, the elevator becomes available again, C then enters the elevator, and B moves one position forward in the queue.

[0103] In this embodiment, the scheduling task information is parsed to obtain scheduling priority, crane location, and planned elevator occupancy, providing a complete data foundation for scheduling decisions. By acquiring the elevator's task load and the main track's traffic status, scheduling decisions can respond to real-time system dynamic changes. Collision-free path planning, combining crane location, elevator placement location, and main track traffic status, ensures the crane's safe journey to the elevator. By comprehensively considering scheduling priority, task load, and boarding constraints to determine the boarding order, a reasonable allocation of elevator resources is achieved in multi-vehicle scenarios. This ensures that emergency tasks are prioritized while ensuring the full and orderly utilization of elevator resources, avoiding resource conflicts and operational chaos caused by multiple vehicles simultaneously competing for the same elevator.

[0104] In some embodiments, the task load status includes the current number of elevators scheduled to be used and the current number of waiting vehicles in the waiting area; the riding constraints include the number of overhead cranes that the elevators can carry and the rated waiting capacity of the waiting area; determining the riding order of each overhead crane to be scheduled based on the scheduling priority, the task load status, and the riding constraints includes:

[0105] The current carrying capacity is compared with the number of overhead cranes that can be carried to obtain the available carrying capacity of the elevators that are planned to be occupied;

[0106] The current number of people waiting in the waiting area is compared with the rated waiting capacity of the waiting area to obtain the remaining waiting capacity of the waiting area.

[0107] The overhead cranes to be scheduled are filtered based on the remaining waiting capacity and the number of available carrying capacity to obtain the filtered overhead cranes to be sorted.

[0108] The boarding order of the filtered overhead cranes is determined based on the descending order of the scheduling priorities.

[0109] The elevator can support one crane at a time, and its movable rail can only support one crane for lifting and lowering at any given moment. This is determined by the mechanical structural load-bearing limit and safety regulations of the elevator. The rated waiting capacity is three cranes. The physical length of the waiting area allows a maximum of three cranes to wait side by side. The specific number is determined by the actual rail length of the waiting area and the length of the crane body.

[0110] The current load capacity refers to the number of overhead cranes that the elevator is currently carrying at any given moment. For example, if the elevator can carry a maximum of one overhead crane at a time, the current load capacity can only be 0 or 1. When the elevator is idle and not carrying any overhead cranes, the current load capacity is 0; when the elevator is carrying an overhead crane in a lifting motion, the current load capacity is 1.

[0111] The maximum number of overhead cranes that the elevator can carry simultaneously under safe operating conditions, such as 1. The available carrying capacity refers to the number of additional overhead cranes the elevator can currently accommodate, calculated by subtracting the current carrying capacity from the maximum carrying capacity. If the current carrying capacity is 0, the available carrying capacity is 1, meaning the elevator can immediately accommodate a new overhead crane. If the current carrying capacity is 1, the available carrying capacity is 0, meaning the elevator is currently fully loaded and cannot accommodate new overhead cranes. New overhead cranes must wait in the waiting area until the elevator completes its current transport and releases the crane before being accommodated.

[0112] The calculation of available capacity is the basis for determining whether an entry command can be sent to the elevator immediately. When the available capacity is 1, the crane at the front of the queue in the waiting area can be controlled to enter the elevator; when the available capacity is 0, all cranes waiting to be dispatched are controlled to remain in their queue positions in the waiting area, waiting for the elevator to release.

[0113] The current waiting number refers to the number of overhead cranes currently queuing in the waiting area to enter the elevator. This number is maintained in real time by the overhead crane dispatch center. Every time an overhead crane enters the waiting area and completes its positioning, the current waiting number is incremented by 1; every time an overhead crane leaves the waiting area and enters the elevator, the current waiting number is decremented by 1.

[0114] Rated waiting capacity refers to the maximum number of waiting cranes that a waiting area can accommodate under safe operating conditions. This number is determined by the physical length of the waiting area and the length of the crane. When the waiting area is a straight section and the standard crane length is L, the rated waiting capacity can be expressed as: Rated waiting capacity = Waiting area length ÷ (Crane length + Safety clearance). The safety clearance ensures sufficient buffer distance between adjacent waiting cranes to prevent collisions caused by the crane in front accidentally rolling backward or by deviations in the speed control of the crane behind.

[0115] The remaining waiting capacity refers to the number of additional waiting cranes that the passenger waiting area can accommodate at the current moment. It is calculated by subtracting the current number of waiting cranes from the rated waiting capacity. If the current number of waiting cranes is 2 and the rated waiting capacity is 3, then the remaining waiting capacity is 1, meaning the passenger waiting area can accommodate one more crane. If the current number of waiting cranes has reached the rated waiting capacity, then the remaining waiting capacity is 0, meaning the passenger waiting area is full. In this case, subsequent cranes waiting to be dispatched must temporarily wait at a location away from the passenger waiting area until a waiting crane enters the elevator and releases its waiting space before proceeding to the passenger waiting area.

[0116] The calculation of remaining waiting capacity is the basis for determining whether to continue dispatching overhead cranes to the waiting area. When the remaining waiting capacity is greater than 0, the next overhead crane to be dispatched can be controlled to move along the boarding path to the waiting area; when the remaining waiting capacity is 0, the subsequent overhead cranes to be dispatched are controlled to postpone their departure in order to avoid overcrowding in the waiting area.

[0117] The purpose of the screening is to identify the set of overhead cranes that can be scheduled at any given moment from all cranes awaiting scheduling, excluding those that cannot be scheduled temporarily due to the elevator or waiting area being full. Specifically, the screening process can be as follows: If the available capacity is greater than 0 and there are queued cranes in the waiting area, then those queued cranes can be identified as cranes that can currently enter the elevator. If the waiting area is empty and the available capacity is greater than 0, then one crane (usually the highest priority) is selected from the cranes awaiting scheduling that have not yet departed as the currently scheduled crane, and its movement towards the waiting area is controlled. If the available capacity is 0, then all cranes awaiting scheduling cannot enter the elevator temporarily and must wait for the elevator to release its capacity.

[0118] For overhead cranes that have not yet reached the waiting area, the selection also depends on the remaining queue size: if the remaining queue size is greater than 0, the next overhead crane to be dispatched can be selected as one that can move toward the waiting area and controlled to move along the boarding path; if the remaining queue size is 0, the subsequent overhead cranes to be dispatched will remain in place and not enter the waiting area.

[0119] After obtaining the set of dispatchable overhead cranes through the above screening, the cranes are sorted in descending order of scheduling priority to determine the order in which they will use the elevator. Specifically, the selected overhead cranes are arranged in descending order according to their respective scheduling priority fields, with cranes having higher priority values ​​(or higher levels) listed first. For cranes with the same priority, auxiliary sorting rules can be used, such as sorting them according to their current location's distance from the elevator, prioritizing closer cranes to shorten the overall scheduling time.

[0120] For example, suppose there are four overhead cranes A, B, C, and D waiting to be dispatched, with priorities A (highest), C (high), B (medium), and D (medium), respectively. The elevator can carry 1 crane, and the rated waiting capacity of the waiting area is 2. The elevator is currently idle (current capacity is 0, available capacity is 1), and the waiting area is empty (current waiting capacity is 0, remaining waiting capacity is 2). The selection and sorting process is as follows: First, since the available capacity is 1 and the waiting area is empty, the highest priority crane A is selected as the target crane, and A is controlled to move towards the waiting area. Simultaneously, since the remaining waiting capacity is 2 (greater than 0), C is selected as the next candidate crane to enter the waiting area, and C is controlled to follow A towards the waiting area. When A arrives at the waiting area, the current waiting capacity becomes 1, and the remaining waiting capacity becomes 1. B is then selected as the next candidate crane, and B is controlled to depart. At this point, A enters the elevator, the elevator becomes occupied (available capacity becomes 0), the current waiting capacity remains 1 (C is waiting), and the remaining waiting capacity becomes 1. After crane A completes its lifting operation and leaves the elevator, the elevator is released to an idle state (the available capacity becomes 1). At this time, C is in the first position in the waiting area, and B is in the second position. C is controlled to enter the elevator, and since the available capacity becomes 0, B remains in the waiting area. After C leaves the elevator, B enters the elevator. The final boarding order is A, C, B. D is not scheduled because its priority is lower than B and its waiting area is full. D will be released from its waiting position after B enters the elevator, and then D will be controlled to move to the waiting area. This embodiment compares the current waiting number with the rated waiting capacity to obtain the remaining waiting capacity, which can accurately determine whether there is still room in the waiting area. This avoids the overhead crane from being stuck on the main track outside the waiting area and blocking the main track due to over-scheduling. By screening overhead cranes to be scheduled based on the remaining waiting capacity and the available capacity, it is ensured that the number of overhead cranes controlled to move at any time will not exceed the combined carrying capacity of the elevator and the waiting area. By determining the boarding order according to descending priority, it ensures that emergency tasks (such as a malfunctioning overhead crane being offline) can obtain elevator resources first, improving the system's responsiveness to emergencies. In some embodiments, in response to the arrival of the overhead crane to be dispatched in the waiting area, the elevator's active track is controlled to move to dock with the fixed track where the waiting area is located, and a safety check is performed on the relative position status between the elevator and the overhead crane to be dispatched, including:

[0121] In response to the arrival of the overhead crane to be dispatched in the waiting area, it is detected whether the overhead crane to be dispatched is within the safe stopping range corresponding to the elevator entrance / exit, and a safety verification result is obtained;

[0122] After performing a safety verification on the relative position status between the elevator and the overhead crane to be dispatched, the method further includes: if the overhead crane to be dispatched is not located within the safe stopping range, controlling the elevator to close its passenger access and controlling the overhead crane to be dispatched to move to the safe stopping range.

[0123] The safe stopping range refers to a specific area pre-defined on the overhead rail in front of the elevator entrance. This area is the precise stopping position that the overhead crane to be dispatched must accurately stop before entering the elevator. The centerline of the safe stopping range is aligned with the centerline of the elevator's moving rail, and a preset safety margin is maintained between the two ends of the safe stopping range and the elevator entrance frame.

[0124] Once the overhead crane arrives at the waiting area along its designated route, it needs to slow down and stop within the safe stopping range using its own positioning system (e.g., scanning a barcode or QR code on the track). After coming to a complete stop, the crane needs to confirm that it is accurately within this safe stopping range; this confirmation process is the starting point of the safety verification.

[0125] For example, the detection of the safe stopping range is achieved through radar baffles installed at the elevator entrance. These radar baffles are positioned on both sides of the overhead rail at the elevator entrance, and their emitted radar beams cover a predetermined area in front of the elevator entrance. When the crane enters this predetermined area, the radar baffles detect the distance and lateral offset of the crane relative to the elevator entrance through reflected waves. When the crane accurately stops within the safe stopping range, the distance value detected by the radar baffle matches the preset standard distance value, and the lateral offset is within the allowable deviation range; in this case, the safety verification result is passed. When the crane's stopping position deviates from the safe stopping range, the distance value or lateral offset detected by the radar baffle exceeds a preset threshold; in this case, the safety verification result is failed.

[0126] Optionally, the detection of the safe stopping range can be achieved using position sensors installed on the overhead crane in conjunction with position markers on the overhead rail. During its journey, the overhead crane continuously scans the QR codes on the overhead rail. When the crane arrives at the waiting area, it uses the position information from the scanned QR code data to determine whether its coordinates fall within the safe stopping range. If it does, the safety check passes; otherwise, the safety check fails.

[0127] Optionally, the detection of the safe stopping range can be achieved through a light grating installed at the elevator entrance. The light grating consists of a transmitter and a receiver, forming multiple parallel light curtains in front of the elevator entrance. When the crane enters the light curtain area, it will block some of the light beams. By analyzing the position and number of blocked light beams, the horizontal stopping position of the crane and whether the crane is within the safe stopping range can be accurately determined.

[0128] The safety verification result includes at least two states: pass and fail. A pass indicates that the crane has accurately stopped within the safe stopping range, and subsequent entry into the elevator operation can continue; a fail indicates that the crane's stopping position is off, and position adjustment is required.

[0129] When the safety check result is negative, it means that the overhead crane has not accurately stopped within the safe stopping range. If the overhead crane is blindly allowed to enter the elevator at this time, it may scrape or collide with the elevator entrance frame, posing a serious safety hazard. Therefore, safety protection measures need to be implemented.

[0130] Specifically, the elevator control system closes passenger access, preventing the crane from entering. This closure can be achieved by the elevator controller issuing a prohibition signal, such as the elevator sending a "prohibit entry" command to the crane via a short-range communication protocol, or the elevator controller switching the entrance indicator light to a red prohibition state. Simultaneously, the elevator can maintain the entrance hard barrier in the raised state, physically preventing the crane from entering. The crane is then controlled to adjust its position. The specific method of position adjustment depends on the type and degree of deviation. For example, if the crane stops too far forward relative to the safe stopping range (too close to the elevator entrance), a reverse command is sent to the crane, controlling it to move backward at a low speed a preset distance until it reaches the safe stopping range. Alternatively, if the crane stops too far backward (too far from the elevator entrance), a forward command is sent to the crane, controlling it to move forward at a low speed a preset distance until it reaches the safe stopping range. In another example, if there is a lateral offset in the crane's stopping position, that is, the center line of the crane is not aligned with the center line of the elevator's moving rail, the crane can correct its position through its own lateral fine-tuning mechanism or through the path fine-tuning command, so that the crane is realigned to the safe stopping range.

[0131] After the overhead crane completes its position adjustment, a safety check is performed again to verify that the crane is within the safe stopping range. If the re-check passes, subsequent operations continue; if it fails, the position adjustment and re-check process is repeated until the check passes or the preset retry limit is reached. Optionally, if the crane still cannot accurately stop within the safe stopping range after reaching the preset retry limit (e.g., 3 times), it is determined that the crane may have a positioning system malfunction or other abnormality. In this case, the crane is marked as abnormal, online / offline operations are stopped, and an alarm signal is issued to notify maintenance personnel for manual intervention to prevent the faulty crane from repeatedly attempting to enter the elevator and causing greater safety hazards.

[0132] In addition, if the safety check fails because the moving rail of the elevator is not in the correct position, such as a height difference or horizontal misalignment between the moving rail and the overhead rail, the elevator should be controlled to readjust the position of the moving rail before the check is performed again.

[0133] This embodiment prevents the crane from blindly entering the elevator without proper alignment by promptly disabling the elevator's access when the safety check fails, thus avoiding safety accidents such as scraping or colliding between the crane and the elevator's entrance frame. By controlling the crane to adjust its position and recalibrate, the crane can automatically correct stopping deviations without manual intervention, improving the automation and fault tolerance of the loading and unloading process. Setting a maximum number of retries and issuing an alarm when this limit is exceeded prevents the crane from endlessly attempting retrying when the positioning system malfunctions, ensuring timely reporting of anomalies to maintenance personnel and improving the system's fault handling efficiency.

[0134] In some embodiments, the step of controlling the elevator to move the overhead crane to the destination indicated by the online / offline scheduling task information, after the safety verification is passed, includes:

[0135] Upon successful security verification, the elevator is moved to the waiting area and boarding access is granted.

[0136] Control the crane to be dispatched to decelerate and enter the elevator, and stop after traveling to the target parking position inside the elevator, and brake the traveling drive mechanism of the crane to be dispatched;

[0137] In response to the completion of the locking of the crane to be dispatched, the elevator is controlled to close the passenger access and carry the crane to be dispatched to the destination.

[0138] The safety verification process indicates that the crane has accurately stopped within the safe stopping range, the elevator's moving rails are in place, and the two are correctly aligned. At this point, the elevator needs to move further to a position precisely aligned with the waiting area, and then grant boarding access to allow the crane to enter.

[0139] Moving the elevator to the waiting area may involve further fine-tuning the elevator's movable rail from its docking height with the overhead rail to the precise boarding position. Considering that although the movable rail has been confirmed to be in place during safety checks, the elevator may still require millimeter-level adjustments based on the actual stopping position of the overhead crane before opening boarding access, to ensure a smooth joint between the movable rail and the overhead rail without any step differences.

[0140] Opening passenger access for an elevator can mean that the elevator sends an "entry permission" signal to the overhead crane via a pre-defined communication protocol such as a short-range communication protocol. Simultaneously, it controls the entrance signal lights to switch to a green pass mode and lowers the radar or physical barrier at the entrance, allowing the overhead crane to safely enter. Furthermore, in some deployment scenarios, opening passenger access also includes the elevator controller switching the elevator's status from "queue mode" or "standby mode" to "passenger mode" and starting to record real-time data on the overhead crane's entry.

[0141] After receiving the "permission to enter" signal from the elevator, the overhead crane departs from the safe stopping area of ​​the waiting area and enters the elevator at a first preset speed lower than the normal operating speed. The purpose of slowing down during entry is to ensure that the overhead crane does not experience violent vibrations or impacts due to excessive speed when passing through the elevator entrance joint and entering the elevator interior.

[0142] As the overhead crane travels from the waiting area into the elevator, it needs to pass through a transition zone between the fixed overhead rail and the elevator's moving rail. This transition zone inevitably contains minor seams and height differences, and the elevator will experience slight settlement after carrying the crane, possibly due to the moving rail sinking under the crane's weight. If the crane passes through this transition zone at its normal speed (e.g., 1.5 m / s to 2.0 m / s), excessive speed may cause severe vibrations, leading to instantaneous changes in the contact force between the crane's wheels and the rail, affecting power supply stability, and in severe cases, even causing derailment. Therefore, the crane enters the elevator at a first preset speed (e.g., 0.2 m / s to 0.5 m / s), lower than its normal operating speed, allowing it to pass smoothly through the transition zone and minimizing vibration and impact.

[0143] After the overhead crane enters the elevator, it continues to travel at a low speed to the target parking position on the moving track inside the elevator, and stops upon reaching that position. The target parking position is usually located in the exact center of the moving track. When the crane stops at this position, its center of gravity coincides with the elevator's lifting center, ensuring even force distribution and preventing uneven loading or tilting during subsequent lifting operations. The overhead crane senses its position on the moving track in real time by scanning QR codes or location markers, and fine-tunes its speed based on the scanning results until it accurately reaches the target parking position.

[0144] After the overhead crane reaches its target parking position and stops, it needs to lock its movement capability. This means the crane's controller cuts off power to all drive motors, preventing the crane's wheels from rotating and the lifting mechanism from operating. Once its movement capability is locked, the crane can only respond to power-off reset operations and will not respond to any driving, steering, or lifting commands from the crane dispatching system or manual control console. The purpose of locking is to prevent the crane from moving autonomously during the lifting process due to unforeseen circumstances (such as electrical faults, signal interference, or operator error), which could lead to the crane shifting inside the elevator, colliding with the elevator frame, or falling off the moving rails.

[0145] Once the overhead crane locks, it sends a locking completion signal to the elevator. Upon receiving this signal, the elevator executes the operation to close passenger access. Specifically, the elevator controller sends a "Do Not Enter" signal to subsequent overhead cranes in the waiting area, and simultaneously raises the entrance hard barrier and radar barrier to physically prevent subsequent overhead cranes from accidentally entering the elevator during operation. Furthermore, the elevator switches its current response status from "Idle" to "Occupied," indicating that the elevator is occupied and subsequent overhead cranes cannot enter.

[0146] After the passenger access is closed, the elevator carries the crane to the corresponding destination based on the type of online / offline scheduling task information. If it is a crane offline task, the elevator carries the crane down from the height of the overhead rail to the ground level; if it is a crane online task, the elevator carries the crane up from the ground level to the height of the overhead rail.

[0147] Optionally, during the operation of the elevator, the actual position and movement status of the elevator's moving rail can be continuously monitored by comparing real-time data from the cable encoder and the lifting shaft encoder. The cable encoder is connected to the moving rail via a cable and directly measures the lifting displacement of the moving rail; the lifting shaft encoder is installed at the drive shaft of the elevator and measures the rotational displacement of the drive shaft, which is then converted into the theoretical displacement of the moving rail through the transmission ratio. The two are compared in real time. If the deviation exceeds a preset threshold (e.g., ±2mm), it is determined that there is an abnormality in the mechanical transmission components (such as wire ropes, chains, gears, etc.) (e.g., tensile deformation, breakage, or slippage). The elevator immediately triggers a safety stop and issues an alarm signal, awaiting inspection and handling by maintenance personnel. This monitoring mechanism ensures the safe operation of the elevator while carrying the overhead crane, preventing falls caused by mechanical failures.

[0148] In this embodiment, after passing safety verification, the elevator is controlled to move to the waiting area and boarding access is granted, ensuring that the elevator and overhead crane only enter the actual boarding operation stage after sufficient safety confirmation. By controlling the overhead crane to decelerate and enter the elevator, the crane smoothly passes through the transition area between the overhead rail and the elevator's moving rail, avoiding the risks of vibration, unstable power supply, and derailment caused by excessive speed. The parameterized setting of the first preset speed provides flexibility for speed adjustment under different operating conditions. By locking the crane's movement capability after it reaches the target parking position, it is ensured that the crane will not move autonomously during the elevator's ascent and descent, eliminating the safety hazards of displacement, collision, or falling within the elevator. By locking the crane before deactivating boarding access and executing the ascent and descent, a safe timing logic of "crane locked first, elevator moves later" is formed, ensuring that the crane remains under control throughout the entire ascent and descent process. Furthermore, by deactivating boarding access after the crane enters the elevator, it effectively prevents subsequent cranes from accidentally entering during elevator operation, avoiding resource conflicts and safety accidents caused by multiple cranes entering the same elevator simultaneously.

[0149] In some embodiments, a positioning marker is provided inside the elevator; controlling the crane to be dispatched to travel to the target parking position inside the elevator and then stopping, and locking the movement capability of the crane to be dispatched, includes:

[0150] The overhead crane to be scheduled is controlled to scan the positioning marker, and the positional deviation between the overhead crane to be scheduled and the target parking position is determined based on the scanning result.

[0151] Based on the position deviation, the overhead crane to be scheduled is controlled to move to the target parking position;

[0152] In response to the crane to be dispatched reaching the target parking position, the drive enable of the crane's travel drive mechanism is cut off and the travel wheel brake is activated.

[0153] Positioning markers are identifiable marks placed on or around the moving rails inside the elevator to help the crane determine its precise position on the rails. Because the elevator's interior space is relatively enclosed and the moving rail length is limited, the crane requires more precise positioning methods to achieve accurate stopping within this area. For example, the positioning marker can be a QR code (Quick Response Code), placed on or beside the moving rail surface. The QR code encodes position information data, such as its absolute coordinates on the moving rail or its offset relative to the target stopping position. When the crane travels over the QR code, a scanner at the bottom of the crane reads the QR code and decodes it to obtain the crane's current position relative to the moving rail. QR code recognition features high precision and high reliability, can be stably read even when the crane is traveling at low speeds, and is unaffected by minor contamination such as oil or dust on the rail surface.

[0154] Optionally, the positioning identifier is a barcode sequence, with multiple barcodes spaced at intervals along the length of the moving track. When the crane travels past the barcode, the scanner reads the position code in the barcode. By continuously reading multiple barcodes and combining this with the crane's mileage counting, a high-precision calculation of the crane's position can be achieved.

[0155] Optionally, the positioning marker may also include a magnetic position mark or an inductive position switch. A permanent magnet is embedded in the moving rail at the target parking position, and a Hall sensor is installed at the corresponding position on the overhead crane. When the overhead crane moves to the target parking position, the Hall sensor detects a change in the magnetic field and triggers a positioning signal. This inductive positioning method eliminates the need for the overhead crane to actively scan and decode, offering advantages such as fast response speed and strong anti-interference capabilities, making it suitable for scenarios requiring precise positioning within a short time. This application does not limit the specific implementation form of the positioning marker, as long as it enables the overhead crane to perceive its precise position on the elevator's moving rail.

[0156] After the overhead crane decelerates and enters the elevator, the barcode scanner or position sensor installed on it continuously scans the positioning marks on the moving rail. Each time the overhead crane passes a positioning mark, it reads the position information encoded in the mark and compares this information with the target parking position coordinates stored in the overhead crane controller to calculate the deviation between the current actual position and the target parking position.

[0157] Deviation can be categorized into two dimensions: distance deviation and direction deviation. Distance deviation refers to the difference in straight-line distance between the current position of the overhead crane and the target parking position, expressed as a positive value (the crane is in front of the target parking position) or a negative value (the crane is behind the target parking position). Direction deviation refers to whether the crane's direction of travel on the moving track is correct. If the crane deviates from the expected direction of travel due to unforeseen factors (such as track slope or drive wheel slippage), it needs to be corrected promptly.

[0158] For example, suppose the target parking position is located at the midpoint of the total length of the moving track, and its coordinate code is "POS_MID". After the overhead crane enters the elevator, it scans the first QR code and decodes it to obtain the position coordinates as "POS_25%", meaning that the position is located at 25% of the total length of the moving track. The overhead crane controller compares "POS_25%" with "POS_MID" and calculates the distance deviation as "still needs to advance approximately 25% of the total length of the moving track", with the direction being "forward". Based on this, the overhead crane determines that it has not yet reached the target parking position and needs to continue moving forward.

[0159] As the overhead crane continues its journey, it continuously scans subsequent positioning markers. For example, when scanning the second QR code, the decoded position coordinates are "POS_45%", with a deviation of "still needs to advance approximately 5% of the total length of the moving track". When scanning the third QR code, the decoded position coordinates are "POS_50%", with a deviation of "0", indicating that the overhead crane has reached the target parking position.

[0160] Optionally, if the overhead crane travels beyond the target parking position due to drive wheel slippage or speed control deviation, for example, if the overhead crane scans the position coordinates as "POS_55%", then the deviation is "approximately 5% of the total length of the moving track has exceeded the target parking position", and the direction is "reverse". The overhead crane needs to travel in the opposite direction at low speed to the target parking position.

[0161] Based on the position deviation, the crane controller generates precise motion control commands to drive the crane's travel motor, moving the crane from its current position to the target parking position. Specifically, if the deviation indicates the crane is far ahead of the target parking position, for example, if the deviation is greater than a preset first distance threshold, the crane continues to move forward at a moderate speed, gradually decelerating as it approaches the target parking position. If the deviation indicates the crane is close to the target parking position, for example, if the deviation is less than the first distance threshold but greater than a preset second distance threshold (where the second distance threshold is less than the first distance threshold), the crane moves forward slightly at a low speed to ensure accurate parking. If the deviation indicates the crane has exceeded the target parking position, the crane reverses at a very low speed to return to the target parking position.

[0162] After the overhead crane reaches the target parking position and stops, a motion function locking operation needs to be performed. Specifically, the crane controller cuts off the drive enable of the travel drive mechanism, completely cutting off the drive signal of the travel motor, and the travel motor no longer outputs drive torque. At the same time, the crane controller activates the travel wheel brakes, causing the brakes to engage and remain locked, mechanically locking the crane's travel wheels to the current rotation position. After the above operations are completed, the crane's travel wheels cannot rotate, the crane cannot move autonomously, and can only respond to power failure reset operations, not to any driving, steering, or lifting commands from the crane dispatch center or manual control console.

[0163] By disengaging the drive enable of the traveling drive mechanism and activating the traveling wheel brakes, the overhead crane is reliably secured to the target parking position inside the elevator. The purpose of this locking operation is to ensure that, during the subsequent movement of the overhead crane from the plane of the overhead rails towards the target area (or in the opposite direction), even if the elevator experiences unexpected shaking, vibration, or tilting, the overhead crane will not shift, slip, or fall from the moving track section within the elevator, thus ensuring the safety and stability of the overhead crane itself and the material carrier (such as FOUP) it carries during the lifting process.

[0164] After the overhead crane completes locking, it sends a locking completion signal to the elevator. Upon receiving this signal, the elevator executes the operation to close passenger access. Specifically, the elevator controller sends a "Do Not Enter" signal to subsequent overhead cranes in the waiting area, and simultaneously raises the entrance hard barrier and radar barrier to physically prevent subsequent overhead cranes from accidentally entering the elevator during operation. In addition, the elevator switches its current response status from "Idle" to "Occupied," informing the overhead crane dispatch center that the elevator is occupied and subsequent overhead cranes cannot enter.

[0165] After the boarding permission is closed, the elevator carries the crane to the corresponding destination according to the type of online / offline scheduling task information. If it is a crane offline task, the elevator carries the crane down from the plane of the overhead rail to the target area; if it is a crane online task, the elevator carries the crane up from the target area to the plane of the overhead rail.

[0166] Furthermore, the placement of positioning markers helps ensure the safe buffering of the overhead crane within the elevator. In some scenarios, multiple positioning markers can be installed on the elevator's moving rails, such as "deceleration markers" placed at the entrance of the moving rails. When the overhead crane scans this marker, it triggers a deceleration command, reducing its travel speed from a first preset speed to a lower crawling speed in advance, allowing the overhead crane to approach the target parking position more smoothly. This multi-stage deceleration mechanism further improves the stability of the overhead crane's stopping within the elevator.

[0167] This embodiment achieves high-precision positioning of the overhead crane inside the elevator by setting a positioning marker inside the elevator and having the crane scan the marker to determine the deviation from the target parking position. Diverse positioning methods such as QR codes, barcodes, or magnetic markers provide flexible options for different deployment scenarios, considering both accuracy requirements and cost. By dynamically controlling the crane's movement to the target parking position based on the deviation, a closed-loop position control circuit is formed. This automatically corrects positional deviations caused by speed fluctuations, track incline, or drive wheel slippage during the crane's entry process, ensuring that the crane ultimately stops accurately in the center of the moving track. This ensures balanced force on the elevator during subsequent lifting and lowering, preventing tilting, swaying, or mechanical damage caused by uneven loading.

[0168] In some embodiments, the step of controlling the crane to be dispatched to leave the elevator and updating the response status of the crane to be dispatched in response to the elevator reaching the destination includes:

[0169] If the online / offline scheduling task information indicates that the overhead crane is to be put online, the overhead crane to be scheduled is added to the working vehicle sequence corresponding to the main track, and the response status of the overhead crane to be scheduled is marked as online.

[0170] If the online / offline scheduling task information indicates that the overhead crane is offline, the overhead crane to be scheduled is removed from the work vehicle sequence, and the response status of the overhead crane to be scheduled is marked as offline.

[0171] When the online / offline scheduling task information is "crane online task," it means that the crane to be scheduled is loaded into the elevator from the ground area (e.g., after maintenance or repair), and then lifted to the height of the overhead rail by the elevator. The ultimate goal of online crane operation is to return the crane to the overhead rail for normal material handling work.

[0172] After the hoist carrying the overhead trolley reaches the height of the overhead rail, the hoist's moving rail connects with the overhead rail. At this point, the trolley's movement capability is locked; that is, after the trolley enters the hoist and completes its positioning, its movement function is cut off, only responding to power-off reset operations. After the hoist reaches its destination, the trolley needs to first unlock its movement capability, that is, the trolley's controller restores power to the drive motor, allowing the traveling wheels to rotate again. After unlocking, the trolley departs from the hoist at a second preset speed lower than the normal travel speed, smoothly transitioning from the overhead rail height through the hoist exit to the main rail.

[0173] After the overhead crane leaves the elevator, it travels to the second dedicated station behind the elevator exit and completes its positioning. It then sends a departure completion signal to the elevator via a short-range communication protocol, informing the elevator that the crane has safely departed. Upon receiving the departure completion signal, the elevator changes its current response status from "occupied" to "idle" and reports the status change information to its superiors, so that the next overhead crane to be dispatched can use the elevator.

[0174] After completing its departure and sending a departure completion signal to the elevator, the overhead crane needs to initiate a registration request to the overhead crane dispatching system via a short-range communication protocol. The registration request carries the crane's equipment identifier and current location information. Upon receiving the registration request, the crane undergoes identity verification to confirm that it is a registered crane in the system and is currently in a valid online position (i.e., the second dedicated station after the elevator exit). After successful verification, the crane is added to the work vehicle sequence corresponding to the main track.

[0175] The working vehicle sequence refers to a list of operating overhead cranes maintained by the overhead crane dispatching system. Cranes in this list are considered available for currently performing transport tasks. When assigning a new transport task, only cranes are selected from the working vehicle sequence. After a crane is added to the working vehicle sequence, its response status is marked as online (or response status). The online status indicates that the crane is on the overhead track, has completed automatic initialization, and is ready to receive and execute any assigned transport task.

[0176] For example, after a crane completes maintenance, an operator pushes it into the elevator and clicks the "confirm" button. The elevator then lifts the crane to the height of the overhead rail. After leaving the elevator, the crane initiates a registration request, adding it to the work vehicle sequence and marking it as online. Afterward, the crane can receive handling instructions, such as going to a workstation to retrieve a vehicle or transporting a vehicle to another workstation.

[0177] Optionally, a comprehensive online status check can be performed on the crane before it is added to the work vehicle sequence. This check includes verifying that all sensors are functioning normally, the communication link is stable, and the braking system is working properly. Only after passing the status check is the crane added to the work vehicle sequence to ensure that the crane is in good condition before being put into operation on the main track.

[0178] Correspondingly, when the online / offline scheduling task information is a crane offline task, it means that the crane to be scheduled needs to be removed from the overhead rail to the ground area for maintenance, repair, or upkeep. The crane offline operation begins after the crane enters the elevator and completes the relative position status verification, not after it leaves the elevator.

[0179] Specifically, once the overhead crane has moved from the overhead rail into the elevator and completed its positioning at the target parking location, it is known that the crane is about to be taken offline. At this point, the crane is removed from the current work vehicle sequence and marked as offline (or unresponsive). After marking, no new transport tasks will be assigned to the crane to avoid situations where tasks are assigned to the crane even though it is offline, resulting in task failure.

[0180] Subsequently, the elevator carrying the overhead crane descends from the overhead rail height to ground level. Once the crane reaches the ground, its movement functions are locked, and no operation is possible except for a power outage. Maintenance personnel then remove the crane from the elevator to designated equipment for maintenance or repair. After the crane is decommissioned, the elevator switches its current response status from "occupied" to "idle" and reports the status change information so that the next crane to be dispatched can use the elevator.

[0181] In the overhead crane deployment task, the overhead crane is added to the work vehicle sequence and marked as online. This ensures that available online overhead cranes can be identified in a timely manner and included in the task allocation scope, preventing newly deployed overhead cranes from being idle due to outdated status. In the overhead crane decommissioning task, the overhead crane is removed from the work vehicle sequence and marked as offline immediately after entering the elevator. This ensures that the overhead crane will not be assigned new handling tasks during the decommissioning operation, avoiding handling task failures and system scheduling chaos caused by assigning tasks to offline overhead cranes. By defining the status update logic for online and offline scenarios separately, accurate management of the overhead crane status can be maintained in both opposite workflows.

[0182] In some embodiments, after controlling the crane to be dispatched to leave the elevator in response to the elevator reaching the destination and updating the response status of the crane to be dispatched, the method further includes:

[0183] In response to the crane to be dispatched leaving the elevator, the current response state of the elevator is switched from occupied to idle, and the crane to be dispatched in the next dispatching cycle is controlled to move to the waiting area according to the boarding order.

[0184] The departure of a crane from the elevator refers to the crane completing its lifting motion and exiting the elevator to the target height on the track (ceiling rail or ground rail). After the crane leaves the elevator, the moving rail inside the elevator no longer carries any cranes, and the elevator returns to an empty state, ready to serve the next crane to be dispatched.

[0185] The elevator's response status can be a dynamically maintained status indicator, used to characterize whether the elevator can currently be assigned a new crane carrying task. This status includes at least two types: occupied and idle. The occupied status indicates that the elevator is currently carrying a crane in lifting or lowering motion, or is performing a crane entry / departure operation; in this case, the elevator cannot accept a new crane. The idle status indicates that there is no crane inside the elevator, the moving rails have been reset to the standby position, and all safety devices (such as entrance barriers, radar barriers, etc.) have been restored to their initial state; the elevator is ready to accept the next crane.

[0186] After detecting that the overhead crane has left the elevator, the elevator's response status will switch from occupied to idle. This status switch can be triggered either by the overhead crane sending a departure completion signal to the elevator, or automatically by the elevator's own position sensors (such as the moving rail positioning sensor) detecting that the moving rail is in an unloaded state. Once the status switch is complete, it is known that the elevator is now available.

[0187] After the elevator's response status is switched to idle, if there are other waiting elevators in the queue for the next scheduling cycle, the next waiting elevator in the queue will move to the waiting area according to the boarding order. The waiting elevator for the next scheduling cycle refers to the elevator that follows the current elevator that has completed its lift operation in the boarding order. For example, the boarding order is elevator A, elevator B, and elevator C. After elevator A completes its lift operation and leaves the elevator, the elevator switches to idle, and elevator B moves from its current position or queue position along its boarding path to the waiting area. After elevator B completes its lift operation and leaves the elevator, the elevator switches to idle again, and elevator C moves to the waiting area. This cycle continues until all waiting elevators have completed their boarding and disembarking operations.

[0188] The dispatch command is sent to the next crane, which then travels to the waiting area according to its planned route and completes its positioning. If the current queue size in the waiting area has not yet reached the number of cranes that can queue, the crane can directly travel to the waiting area to join the queue. If the queue size in the waiting area has reached its limit, the crane is controlled to temporarily stop in the safe waiting area on the main track until a crane enters the elevator and releases its queue position before proceeding.

[0189] After the hoist is switched to an idle state, it can also perform necessary reset operations to ensure that it is in a state where it can safely receive the next crane. The reset operation includes, but is not limited to: confirming that the entrance hard barrier and radar barrier have been fully lowered or reset to the position that allows entry; confirming that the moving rail has been accurately positioned at the docking height with the overhead rail; confirming that the real-time comparison deviation between the pull rope encoder and the lifting shaft encoder is within the allowable range; and confirming that the short-range communication module is in normal condition and can establish communication with the next crane.

[0190] After completing the above reset operation, the elevator reports a ready signal, and in response to this signal, controls the next crane to move to the boarding waiting area, thereby ensuring that the elevator is in a completely safe state before accepting the next crane. Optionally, if all cranes in the boarding sequence have completed their boarding and disembarking operations, the elevator's response status is maintained in an idle state, and it waits for new boarding and disembarking scheduling information to arrive.

[0191] This embodiment ensures real-time and accurate perception of the elevator resource status by switching the elevator's response status from occupied to idle after the crane leaves the elevator, avoiding the erroneous allocation of new cranes to the elevator while it is still occupied. By controlling the movement of the cranes to be scheduled in the next scheduling cycle to the waiting area according to the boarding order, a pipeline-style automatic scheduling mechanism is formed: "one completes, the next one automatically moves forward." The departure of the current crane triggers the automatic movement of the next crane to the waiting area, without manual intervention or additional scheduling instructions. This continuous automatic scheduling mechanism significantly shortens the overall operation time in scenarios where multiple cranes need to be logged on and off sequentially: the action of the previous crane leaving the elevator itself becomes the trigger signal for the next crane to start moving, eliminating the time delay of manual judgment and instruction issuance, and achieving zero-wait continuous utilization of elevator resources. At the same time, after switching to the idle state, the elevator performs a reset operation and reports a ready signal, ensuring that the elevator is in a completely safe state before accepting the next crane, preventing the safety of subsequent operations from being affected by status issues left over from the previous operation.

[0192] To better understand the overall process of the automatic crane removal method in this application embodiment, specifically including the interaction logic between the crane controller (including at least a path management module), the branch access controller (TCU), the crane dispatch center (MSTC), and the lift, it is explained as follows: The automatic crane removal process begins with the crane dispatch center issuing an automatic removal command (DownSet) to the crane controller. After receiving the command, the crane controller first checks whether the crane is currently out of stock (i.e., not carrying a wafer cassette). If the out-of-stock condition is met, the removal process begins, and the automatic removal operation is executed.

[0193] During the command issuance process, the overhead crane dispatch center sends the crane the travel path and the location information of the short-range communication module on the elevator track. The crane travels along the planned path to the safe waiting area in front of the elevator and completes the track positioning. After positioning, the crane interacts with the elevator through the short-range communication module, sending an entry request. The elevator responds to the request, confirms that its track and radar barriers are in place, and sends an entry permission signal back to the crane through short-range communication, waiting for the crane to enter the elevator.

[0194] After the overhead crane is granted access, the crane dispatch center sends the crane section number and the internal QR code information to the crane, and activates the low-speed positioning mode. The crane enters the crane at low speed and completes precise positioning by scanning the internal QR code. After reaching the target stopping area, the crane interacts with the crane again through the short-range communication module inside the crane, sending a message indicating that the crane is ready to board.

[0195] After receiving the message that the elevator is ready to board, it performs a radar baffle locking operation and sends a baffle locking completion signal to the overhead crane after the baffle is fixed. Once the overhead crane confirms that the baffle is locked, it updates its own status to Idle, sets the automatic offline command signal (DownSet) to OFF, sets the offline process status (Removing) to OFF, and sets the arrival status (Arrived) to OFF, thus informing the overhead crane dispatch center that the relevant statuses of the current offline process have been switched.

[0196] Subsequently, the overhead crane updates its current position information to a preset value (e.g., 0xFFFFFFFF, indicating it has left the normal operating area), locks its own motion function, and performs a brake cut-off enable operation to complete the crane locking. After the crane is locked, it again notifies the elevator that it can perform a descent operation through the short-range communication module inside the elevator.

[0197] After receiving the descent notification, the elevator executes the descent operation, moving the overhead crane from the plane of the overhead track to the target area. The crane controller enters a program lock state, awaiting a power outage and restart to complete the entire offline process. If any fault occurs during the entire automatic offline process, the system will pause the automatic execution process, awaiting manual intervention (e.g., manual troubleshooting after a power outage and restart).

[0198] It should be noted that in the above process, the crane dispatch center monitors and schedules the crane's travel path in real time through the path management module, ensuring that the crane is not interfered with by other tasks as it approaches the elevator. Simultaneously, once the crane enters the elevator's dedicated track, its task status is locked, and it no longer accepts task change instructions from the dispatching layer, thus guaranteeing the integrity and safety of the offline process.

[0199] Correspondingly, Figure 3 This is a schematic diagram of signal interaction during the loading process of the overhead crane in one embodiment of this application.

[0200] like Figure 3 As shown, the communication interaction between the overhead crane and the elevator begins with a status confirmation phase. The overhead crane first sends a "Crane Ready" signal through its first communication module, indicating that it has arrived at the safe waiting area and completed its positioning, and is ready to enter the elevator. After receiving this signal through its second communication module, the elevator sends a "Elevator Online" signal back to the overhead crane, indicating that the elevator is currently online and its control system is operating normally; simultaneously, it sends a "Elevator Ready" signal, indicating that the elevator has completed the docking of the moving track with the fixed track section, the entrance and exit passages are open, and there are no other overhead cranes occupying the interior, thus being ready to receive the elevator.

[0201] After completing the above status confirmation, the overhead crane enters the boarding request phase. The overhead crane sends a "Crane Request Entry" signal to the elevator via the established first communication connection, formally requesting to enter the elevator. Upon receiving the "Crane Request Entry" signal, the elevator confirms that it is still in a receptive state and then sends the corresponding entry permission response to the overhead crane via the first communication connection. During this phase, the elevator simultaneously outputs a "Elevator BUSY" signal, indicating that the elevator is already occupied and will no longer accept boarding requests from other overhead cranes. This implements an interlocking mechanism in multi-crane scenarios, preventing multiple overhead cranes from simultaneously requesting to enter the same elevator.

[0202] After the overhead crane completes its entry into the elevator and reaches the target parking area, both the overhead crane and the elevator reset their proximity signals. The elevator sets its "Elevator BUSY" signal to OFF, and the overhead crane sets its "Overhead Crane Request Entry" signal to OFF. Other relevant proximity signals (such as "Overhead Crane Ready," "Elevator Ready," etc.) are also set to OFF. At this time, only the elevator retains its "Elevator BUSY" signal in the OFF state (indicating that the elevator is idle). After the signal reset is complete, the elevator performs a descent or ascent, carrying the overhead crane to the destination. After the overhead crane reaches the destination, it performs a departure operation. Once the status sensors inside the elevator (such as the optical grating assembly) detect that the overhead crane has completely left, the elevator status is restored to the idle state.

[0203] It should be noted that during the above signal interaction process, the "Elevator BUSY" signal remains valid while the elevator is occupied, serving as an interlock between multiple cranes. When the elevator is in BUSY mode, any entry request initiated by any other crane will not be responded to by the elevator, thus effectively preventing safety accidents caused by multiple cranes simultaneously occupying the same elevator resource.

[0204] The aforementioned communication interaction process covers the entire process of the overhead crane riding the elevator—from the crane being positioned and confirming the elevator's status, to requesting entry and obtaining permission, and finally to signal reset after the ride is completed. Through the signal sequence of "Crane Ready - Elevator Ready - Crane Requests Entry - Elevator BUSY," bidirectional status confirmation and interlocking control between the crane and the elevator are achieved, providing reliable communication assurance for the automatic loading and unloading of the crane.

[0205] Correspondingly, in order to better understand the close-range communication interaction process during the process of the overhead crane disembarking from the elevator in the embodiments of this application, the following is combined with Figure 4 Please provide an explanation. Figure 4 This is a schematic diagram of signal interaction during the crane unloading process in one embodiment of this application. It should be noted that "unloading" here refers to the process of the crane descending from the plane of the overhead rail to the target area after it enters the elevator.

[0206] like Figure 4 As shown, after the overhead crane enters the elevator and completes the positioning of the target docking area, the overhead crane sends a "Crane Ready" signal to the elevator through the third communication module inside the elevator (i.e., the short-range communication module inside the elevator), confirming that the overhead crane is in position and has completed the motion function lock. After receiving this signal, the elevator sends a "Elevator Ready" signal back to the overhead crane through the third communication module, confirming that the elevator has completed preparations such as closing the entrance and exit passages and locking the radar baffle, and is ready to perform the descent operation.

[0207] After completing the above status confirmation, the overhead crane enters the locking request phase. The overhead crane sends a "lock request" signal to the elevator via the established second communication connection, requesting the elevator to confirm the overhead crane's locked status inside the elevator. Upon receiving the "lock request" signal, the elevator performs an internal locking confirmation, confirming that the overhead crane has completed its motion function locking by disengaging the brake. It then sends a "lock complete" signal back to the overhead crane via the third communication module, indicating that the overhead crane is safely secured inside the elevator, and the elevator can proceed with the descent operation.

[0208] Once the overhead crane has confirmed locking, it sends a "Crane Request to Descend" signal to the elevator via the third communication module, formally requesting a descent. Upon receiving this signal, the elevator activates its drive mechanism, carrying the overhead crane from the plane of the overhead track towards the target area. During the descent operation, the elevator continuously sends a "Elevator Descending" signal to the overhead crane via the third communication module, informing the crane that it is currently descending. Upon receiving the "Elevator Descending" signal, the overhead crane maintains its motion function locked, not responding to any driving commands, ensuring that the overhead crane remains stationary inside the elevator during the elevator's movement.

[0209] Once the hoist reaches the target area, it stops descending and sets the "Hoist Descending" signal to OFF. At this time, the crane is inside the hoist at the target area location, awaiting manual intervention (such as manually pushing the crane from inside the hoist to the designated tooling). After the crane reaches the target area, its movement function remains locked, and no operation can be performed except by power-off reset, to ensure the safety of the operators.

[0210] It should be noted that during the aforementioned disembarkation process, the close-range communication between the overhead crane and the elevator forms a complete signal sequence of "position confirmation → lock confirmation → descent request → descent execution." Through the signal interaction of "overhead crane Ready - elevator Ready - lock request - lock completed - overhead crane requesting descent - elevator descent in progress," two-way status confirmation between the overhead crane and the elevator is achieved throughout the entire disembarkation process. This ensures that the elevator only performs the descent operation after confirming that the overhead crane has been safely locked, effectively preventing safety accidents caused by the overhead crane not being fully locked or the elevator not being ready.

[0211] To better understand the automatic crane online process in the crane control method of this application embodiment, the following is combined with... Figure 5 Please provide an explanation. Figure 5 This is a schematic diagram of the automatic online process of the overhead crane in one embodiment of this application.

[0212] like Figure 5 As shown, the automatic crane deployment process begins with the operator triggering an automatic deployment command via the elevator control panel. In response to this command, the elevator first raises the radar shield to prevent other cranes or objects from accidentally entering the elevator area during descent. Subsequently, the elevator performs a descent maneuver, lowering the active track section from its current height (usually the plane where the overhead rail is located) to the target area (i.e., the ground), allowing the operator to place the crane to be deployed inside the elevator.

[0213] The operator pushes the overhead crane along the lower transition track to the movable track section inside the elevator and confirms that the crane has reached the target stopping area. After confirmation, the operator confirms via the confirmation button on the elevator control panel. Upon receiving the confirmation signal, the elevator activates the drive mechanism, raising the movable track section carrying the crane from the target area to the plane where the overhead rail is located. After the movable track section rises to the plane where the overhead rail is located, it connects with the fixed track section via a transition track section.

[0214] After the movable track section reaches the height of the overhead rail and completes docking, the elevator lowers its radar barrier, opening the entrance and exit passage. Subsequently, the elevator sends a departure notification to the overhead crane via short-range communication (i.e., notifying the crane to enter; "entering" here describes its entry into the overhead rail from the crane's perspective). Upon receiving this notification, the crane releases its motion function lock and exits from inside the elevator at low speed, moving along the transition track section into the fixed track section, ultimately reaching the safe release area on the overhead rail and completing its positioning. After reaching the safe release area, the crane sends a departure completion message to the elevator via short-range communication.

[0215] After confirming that the overhead crane has completely departed, the elevator raises the radar barrier again, closing the entrance and exit passage. Then, the elevator descends from the plane where the overhead rail is located back to the target area, awaiting the next onboard / offboard operation. At this point, the automatic onboarding process for the overhead crane is complete; the crane has successfully moved from the target area to the overhead rail and can now send a registration request to the crane dispatch center and join the work vehicle sequence.

[0216] In the above process, the radar baffle is raised before the elevator descends and after the trolley leaves. It is only lowered when the moving track section is raised to the correct position and the trolley needs to leave. The raising and lowering control of the radar baffle enables safe management of the elevator entrance and exit passage.

[0217] Correspondingly, in order to better understand the automatic crane decommissioning process in the embodiments of this application, the following is combined with Figure 6 Please provide an explanation. Figure 6 This is a schematic diagram of the automatic unloading process of the overhead crane in one embodiment of this application.

[0218] like Figure 6 As shown, the automatic crane decommissioning process begins with the operator selecting the automatic decommissioning command via the elevator control panel, or the crane dispatch center automatically triggering the decommissioning command based on the maintenance plan or PHM alarm. In response to this command, the elevator first raises the radar baffle to prevent other cranes from accidentally entering the elevator area during the descent. Subsequently, the elevator performs the descent, lowering the moving track section from its current height (usually the plane where the overhead rail is located) to the target area (i.e., the ground), allowing the operator to push the crane to be decommissioned into the elevator.

[0219] After the elevator reaches the ground, the operator pushes the trolley from the external track along the lower transition track to the moving track section inside the elevator, and confirms that the trolley has reached the target stopping area. After confirmation, the operator confirms via the confirmation button on the elevator control panel. Upon receiving the confirmation signal, the elevator sends a self-check notification to the trolley via short-range communication. The trolley responds to this notification by executing a self-check procedure, restoring all its positions to their original states and completing automatic initialization. After completing the self-check, the trolley sends a self-check completion signal back to the elevator.

[0220] After receiving the self-check completion signal from the overhead crane, the elevator activates the drive mechanism, raising the movable track segment carrying the overhead crane from the target area to the plane of the overhead rail. Once the movable track segment reaches the plane of the overhead rail, it connects with the fixed track segment via a transition track segment. After the movable track segment is in position, the elevator sends a departure notification to the overhead crane via short-range communication. Upon receiving the departure notification, the overhead crane unlocks its movement function and exits from the elevator at low speed, moving along the transition track segment into the fixed track segment, ultimately reaching the safety release area on the overhead rail and completing its positioning. After reaching the safety release area, the overhead crane sends a departure completion message to the elevator via short-range communication, switches to overhead crane dispatch center mode, initiates a registration application with the overhead crane dispatch center, and joins the work vehicle sequence.

[0221] Once the elevator confirms that the overhead crane has completely departed, the automatic offline process ends, and the elevator can wait to perform the next online / offline operation or return to standby mode.

[0222] It should be understood that although the steps in the flowcharts of the embodiments described above are shown sequentially according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless explicitly stated herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least some steps in the flowcharts of the embodiments described above may include multiple steps or multiple stages. These steps or stages are not necessarily completed at the same time, but can be executed at different times. The execution order of these steps or stages is not necessarily sequential, but can be performed alternately or in turn with other steps or at least some of the steps or stages in other steps. It is understood that the steps in different embodiments can be freely combined as needed, and all non-contradictory solutions formed by such combinations are within the scope of protection of this application.

[0223] Based on the same inventive concept, this application also provides a semiconductor transport system control device for implementing the semiconductor transport system control method described above. The solution provided by this device is similar to the solution described in the above method; therefore, the specific limitations in one or more embodiments of the semiconductor transport system control device provided below can be found in the limitations of the semiconductor transport system control method described above, and will not be repeated here.

[0224] In one exemplary embodiment, such as Figure 7 As shown, a semiconductor handling system control device 300 is provided, comprising:

[0225] The acquisition module 302 is used to acquire online and offline scheduling task information for multiple overhead cranes to be scheduled;

[0226] The determination module 304 is used to determine the boarding order and boarding path of each crane to be dispatched to the elevator based on the online and offline scheduling task information and the elevator's boarding constraints.

[0227] Control module 306 is used to control each of the overhead cranes to be dispatched to move along the boarding path to the boarding waiting area corresponding to the elevator according to the boarding order; the boarding waiting area is isolated from the main track of the semiconductor handling system;

[0228] The verification module 308 is used to control the movable track of the elevator to move to dock with the fixed track where the waiting area is located in response to the arrival of the crane to be dispatched in the waiting area, and to perform a safety verification on the relative position status between the elevator and the crane to be dispatched.

[0229] The scheduling module 310 is used to control the active track to move the crane to be scheduled to the destination corresponding to the online and offline scheduling task information, provided that the safety verification is passed.

[0230] The update module 312 is used to control the crane to be dispatched to leave the elevator in response to the elevator reaching the destination, and to update the response status of the crane to be dispatched.

[0231] Each module in the aforementioned semiconductor handling system control device can be implemented entirely or partially through software, hardware, or a combination thereof. These modules can be embedded in or independent of the processor in a computer device, or stored in the memory of a computer device as software, so that the processor can call and execute the operations corresponding to each module.

[0232] In one exemplary embodiment, a computer device is provided, which may be a terminal, and its internal structure diagram may be as follows: Figure 8As shown, the computer device includes a processor, memory, input / output interface, communication interface, display unit, and input device. The processor, memory, and input / output interface are connected via a system bus, and the communication interface, display unit, and input device are also connected to the system bus via the input / output interface. The processor provides computing and control capabilities. The memory includes non-volatile storage media and internal memory. The non-volatile storage media stores the operating system and computer programs. The internal memory provides an environment for the operation of the operating system and computer programs stored in the non-volatile storage media. The input / output interface is used for exchanging information between the processor and external devices. The communication interface is used for wired or wireless communication with external terminals; wireless communication can be achieved through Wi-Fi, mobile cellular networks, Near Field Communication (NFC), or other technologies. When the computer program is executed by the processor, it implements a semiconductor handling system control method. The display unit is used to form a visually visible image and can be a display screen, projection device, or virtual reality imaging device. The display screen can be an LCD screen or an e-ink screen. The input device of the computer device can be a touch layer covering the display screen, or buttons, trackballs, or touchpads set on the casing of the computer device, or external keyboards, touchpads, or mice, etc.

[0233] Those skilled in the art will understand that Figure 8 The structure shown is merely a block diagram of a portion of the structure related to the present application and does not constitute a limitation on the computer device to which the present application is applied. Specific computer devices may include more or fewer components than those shown in the figure, or combine certain components, or have different component arrangements.

[0234] In one exemplary embodiment, a computer device is provided, including a memory and a processor, wherein the memory stores a computer program, and the processor executes the computer program to implement the steps included in any of the foregoing method embodiments.

[0235] In one embodiment, a computer-readable storage medium is provided having a computer program stored thereon, which, when executed by a processor, implements the steps included in any of the foregoing method embodiments.

[0236] In one embodiment, a computer program product is provided, including a computer program that, when executed by a processor, implements the steps included in any of the foregoing method embodiments.

[0237] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, data stored, data displayed, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of the relevant data must comply with relevant regulations.

[0238] Those skilled in the art will understand that all or part of the processes in the methods of the above embodiments can be implemented by a computer program instructing related hardware. The computer program can be stored in a non-volatile computer-readable storage medium, and when executed, it can include the processes of the embodiments of the above methods. Any references to memory, databases, or other media used in the embodiments provided in this application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. By way of illustration and not limitation, RAM can take many forms, such as Static Random Access Memory (SRAM) or Dynamic Random Access Memory (DRAM). The databases involved in the embodiments provided in this application may include at least one type of relational database and non-relational database. Non-relational databases may include, but are not limited to, blockchain-based distributed databases. The processors involved in the embodiments provided in this application may be general-purpose processors, central processing units, graphics processing units, digital signal processors, programmable logic devices, quantum computing-based data processing logic devices, artificial intelligence (AI) processors, etc., and are not limited to these.

[0239] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.

[0240] The embodiments described above are merely illustrative of several implementation methods of this application, and while the descriptions are specific and detailed, they should not be construed as limiting the scope of this patent application. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of this application, and these all fall within the protection scope of this application. Therefore, the protection scope of this application should be determined by the appended claims.

Claims

1. A control method for a semiconductor handling system, characterized in that, The method is applied to a semiconductor handling system; the semiconductor handling system includes an elevator and multiple overhead cranes; the method includes: Obtain online / offline scheduling information for multiple overhead cranes awaiting scheduling; Based on the online and offline scheduling task information and the elevator's riding constraints, determine the riding order and riding path of each crane to be scheduled to the elevator. According to the boarding sequence, each of the overhead cranes to be dispatched is controlled to move along the boarding path to the boarding waiting area corresponding to the elevator; the boarding waiting area is isolated from the main track of the semiconductor handling system; In response to the arrival of the overhead crane to be dispatched in the waiting area, the elevator's movable track is controlled to move to dock with the fixed track where the waiting area is located, and a safety check is performed on the relative position status between the elevator and the overhead crane to be dispatched. If the safety check passes, control the active track to carry the crane to be scheduled to the destination corresponding to the online and offline scheduling task information; In response to the elevator reaching the destination, the overhead crane to be dispatched is controlled to leave the elevator, and the response status of the overhead crane to be dispatched is updated.

2. The method according to claim 1, characterized in that, The riding constraints are used to constrain the elevator's carrying capacity and queuing capacity; determining the riding order and route of multiple cranes to be dispatched for the elevator based on the onboarding and offboarding scheduling task information and the elevator's riding constraints includes: The online and offline scheduling task information is parsed to obtain the scheduling priority, crane position, and planned elevator occupancy of each crane to be scheduled. Obtain the planned load information and location of the elevator, as well as the traffic status of the main track; Based on the location of the overhead crane, the setting location, and the traffic conditions, route planning is performed to obtain the boarding route for each of the overhead cranes to be dispatched; The boarding order of each of the overhead cranes to be scheduled is determined based on the scheduling priority, the task load, and the boarding constraints.

3. The method according to claim 2, characterized in that, The task load status includes the current number of elevators currently in use and the current number of passengers waiting in the waiting area; the passenger constraints include the number of overhead cranes that the elevators can carry and the rated waiting capacity of the waiting area. The step of determining the boarding order of each of the overhead cranes to be scheduled based on the scheduling priority, the task load, and the boarding constraints includes: The current carrying capacity is compared with the number of overhead cranes that can be carried to obtain the available carrying capacity of the elevators that are planned to be occupied; The current number of people waiting in the waiting area is compared with the rated waiting capacity of the waiting area to obtain the remaining waiting capacity of the waiting area. The overhead cranes to be scheduled are filtered based on the remaining waiting capacity and the number of available carrying capacity to obtain the filtered overhead cranes to be sorted. The boarding order of the filtered overhead cranes is determined based on the descending order of the scheduling priorities.

4. The method according to claim 1, characterized in that, In response to the arrival of the overhead crane to be dispatched at the waiting area, the system controls the movable track of the elevator to move to dock with the fixed track where the waiting area is located, and performs a safety check on the relative position between the elevator and the overhead crane to be dispatched, including: In response to the arrival of the overhead crane to be dispatched in the waiting area, it is detected whether the overhead crane to be dispatched is within the safe stopping range corresponding to the elevator entrance / exit, and a safety verification result is obtained; After performing a safety verification on the relative position status between the elevator and the overhead crane to be dispatched, the method further includes: If the crane to be dispatched is not located within the safe stopping range, the elevator is controlled to close the passenger access and the crane to be dispatched is controlled to move to the safe stopping range.

5. The method according to claim 1, characterized in that, The step of controlling the elevator to move the overhead crane to the destination indicated by the online / offline scheduling task information, after the safety verification is passed, includes: Upon successful security verification, the elevator is moved to the waiting area and boarding access is granted. Control the crane to be dispatched to decelerate and enter the elevator, and stop after traveling to the target parking position inside the elevator, and brake the traveling drive mechanism of the crane to be dispatched; In response to the completion of the locking of the crane to be dispatched, the elevator is controlled to close the passenger access and carry the crane to be dispatched to the destination.

6. The method according to claim 5, characterized in that, The elevator is equipped with a positioning marker; the step of controlling the crane to be dispatched to travel to the target parking position inside the elevator and then stopping, and braking the traveling drive mechanism of the crane to be dispatched, includes: The overhead crane to be scheduled is controlled to scan the positioning marker, and the positional deviation between the overhead crane to be scheduled and the target parking position is determined based on the scanning result. Based on the position deviation, the overhead crane to be scheduled is controlled to move to the target parking position; In response to the crane to be dispatched reaching the target parking position, the drive enable of the crane's travel drive mechanism is cut off and the travel wheel brake is activated.

7. The method according to claim 4, characterized in that, The response to the elevator reaching the destination includes controlling the overhead crane to be dispatched to leave the elevator and updating the response status of the overhead crane to be dispatched, including: If the online / offline scheduling task information indicates that the overhead crane is to be put online, the overhead crane to be scheduled is added to the working vehicle sequence corresponding to the main track, and the response status of the overhead crane to be scheduled is marked as online. If the online / offline scheduling task information indicates that the overhead crane is offline, the overhead crane to be scheduled is removed from the work vehicle sequence, and the response status of the overhead crane to be scheduled is marked as offline.

8. The method according to claim 4, characterized in that, After responding to the elevator reaching the destination, controlling the overhead crane to be dispatched to leave the elevator, and updating the response status of the overhead crane to be dispatched, the method further includes: In response to the crane to be dispatched leaving the elevator, the current response state of the elevator is switched from occupied to idle, and the crane to be dispatched in the next dispatching cycle is controlled to move to the waiting area according to the boarding order.

9. A control device for a semiconductor handling system, characterized in that, The device is applied to a semiconductor handling system; the semiconductor handling system includes an elevator and multiple overhead cranes, and the device includes: The acquisition module is used to acquire online and offline scheduling task information for multiple overhead cranes to be scheduled; The determination module is used to determine the boarding order and boarding path of each crane to be dispatched to the elevator based on the online and offline scheduling task information and the elevator's boarding constraints. The control module is used to sequentially control each of the overhead cranes to be dispatched to move along the boarding path to the boarding waiting area corresponding to the elevator according to the boarding order; the boarding waiting area is isolated from the main track of the semiconductor handling system; The verification module is used to control the movable track of the elevator to move to dock with the fixed track where the waiting area is located in response to the arrival of the overhead crane to be dispatched, and to perform a safety verification of the relative position status between the elevator and the overhead crane to be dispatched. The scheduling module is used to control the active track to move the crane to be scheduled to the destination corresponding to the online and offline scheduling task information, provided that the safety verification is passed. An update module is used to control the overhead crane to be dispatched to leave the elevator in response to the elevator reaching the destination, and to update the response status of the overhead crane to be dispatched.

10. A computer device comprising a memory and a processor, wherein the memory stores a computer program, characterized in that, When the processor executes the computer program, it implements the steps of the method according to any one of claims 1 to 8.