Automatic control system of railway open truck loading crane
By designing an automatic control system for railway open truck loading cranes, and using technologies such as touch screens, laser ranging sensors, and PLC controllers, automated hoisting is realized and the problem of low work efficiency caused by multi-person operations in the existing technology is solved. , improving loading efficiency and ensuring safety.
Patent Information
- Application Number
- CN202420495750.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-14
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-03-14
AI Technical Summary
The loading process of existing railway open trucks requires multiple people to operate, which results in low work efficiency and is affected by operating proficiency, which affects the efficiency of loading.
Design an automatic control system for railway open truck loading crane, including track, gantry, longitudinal moving structure, transverse moving structure and lifting structure, combined with touch screen, laser ranging sensor, PLC controller, trolley control unit, large The vehicle control unit and lifting control unit use obstacle avoidance radar and remote control to realize automated hoisting control.
It realizes the automatic execution of hoisting plans according to different models, reduces the number of staff and work intensity, improves loading efficiency, and ensures the safety of ground personnel.
Smart Images

Figure CN221796812U_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of crane control. Background Art
[0002] At present, after the imported bulk fertilizers are transported to the domestic freight yard by rail, they need to be weighed and packed by a ton bag packaging machine in the freight yard and then transferred to the domestic railway open trucks. The existing transfer method requires the use of a forklift to transfer to the bottom of a truck crane or a gantry crane after packaging, and then a dedicated crane operator uses a crane to lift it to the open truck. Depending on the type of vehicle, each carriage needs to be loaded with 62 to 70 packaging bags. The lifting operation requires many people, low work efficiency, and is affected by the operator's proficiency, which directly affects the efficiency of the transfer work. Utility Model Content
[0003] The invention aims to solve the problem that the existing railway open truck loading process needs to be replaced and the working efficiency is low. An automatic control system for a railway open truck loading crane is provided.
[0004] The present invention discloses an automatic control system for a railway open truck loading crane, which is used to control the crane, wherein the crane comprises a track, a gantry, a longitudinal moving structure, a transverse moving structure and a lifting structure;
[0005] The two ends of the track are fixed on a gantry or a wall, the longitudinal moving structure moves along the track, the transverse moving structure is arranged on the longitudinal moving structure and moves in a direction perpendicular to the track; the lifting structure is arranged on the lower side of the transverse moving structure and is used to lift heavy objects;
[0006] The automatic control system includes: a touch screen, a laser distance sensor, a PLC controller, a trolley control unit, a truck control unit and a lifting control unit;
[0007] The touch screen is used to provide the staff with loading plan settings, lifting position, longitudinal moving structure, lateral moving structure and lifting structure moving speed settings. It is also used to display the position and moving speed of the lateral moving structure and longitudinal moving structure, and the real-time lifting speed and position of the lifting structure, and transmit the set information to the PLC controller;
[0008] The laser distance sensor is used to measure the distance between the lower surface of the longitudinal moving structure and the bottom of the truck compartment or the surface of the object in the compartment, and sends the collected distance to the PLC controller;
[0009] The PLC controller sends control signals to the trolley control unit, the truck control unit and the lifting control unit respectively according to the setting information sent by the touch screen;
[0010] The trolley control unit is used to control the movement speed and displacement of the longitudinal moving structure along the track, and the trolley control unit is used to control the speed and displacement of the lateral moving structure in a direction perpendicular to the track; the lifting control unit is used to control the lifting or lowering of the lifting structure and its corresponding speed and displacement.
[0011] Furthermore, the present invention further includes: a forward obstacle avoidance radar and a backward obstacle avoidance radar;
[0012] The forward obstacle avoidance radar and the reverse obstacle avoidance radar are respectively installed at the front and rear ends of the truck to detect whether there are people or objects in a fixed range in front of and behind the truck, and send the collected signals to the PLC controller.
[0013] Furthermore, in the present invention, the PLC controller is implemented using a Siemens S7-1215 PLC chip.
[0014] Furthermore, the present invention also includes a remote controller and a remote control receiver;
[0015] The remote controller is used to send to the remote control receiver a control signal of the direction, speed and distance of movement of the longitudinal moving structure along the track, a control signal of the speed and distance of movement of the transverse moving structure in a direction perpendicular to the track, and a control signal of hoisting lifting or lowering and its corresponding height;
[0016] The remote control receiver transmits the received signal to the PLC controller.
[0017] Furthermore, in the present invention, the trolley control unit, the carriage control unit and the lifting control unit have the same structure, and all include: a frequency converter, a motor and an encoder;
[0018] The frequency converter receives the control signal output by the PLC controller, adjusts the frequency of the motor, the encoder records the rotation speed of the motor, and sends the rotation speed to the PLC controller. The PLC controller calculates the moving speed and displacement of the lateral moving structure and the longitudinal moving structure, and the rising or falling speed and displacement of the lifting structure in real time according to the received rotation speed.
[0019] Compared with the prior art, the system of the utility model has good effects. The control system can automatically execute different lifting schemes according to different selected models under the environment of on-site application, realize automatic lifting of ton bags to the corresponding bag unloading position on the railway open truck, reduce the number of staff and work intensity, and use obstacle avoidance radar to fully ensure the safety of ground personnel, so as to achieve the purpose of reducing staff, increasing efficiency and safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a block diagram of the system principle of the utility model;
[0021] Figure 2This is a schematic diagram of the structure of a railway open freight car loading crane;
[0022] Figure 3 Layout diagram of loading operation for railway open freight car loading crane. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0024] Specific implementation method 1: refer to Figure 1 and Figure 2 Specifically describe this embodiment, an automatic control system for a railway open truck loading crane described in this embodiment, the system is used to control the crane, the crane includes a track, a gantry, a longitudinal moving structure, a transverse moving structure and a lifting structure;
[0025] The two ends of the track are fixed on a gantry or a wall, the longitudinal moving structure moves along the track, the transverse moving structure is arranged on the longitudinal moving structure and moves in a direction perpendicular to the track; the lifting structure is arranged on the lower side of the transverse moving structure and is used to lift heavy objects;
[0026] The automatic control system includes: a touch screen 3, a laser distance sensor 6, a PLC controller 7, a trolley control unit, a truck control unit and a lifting control unit;
[0027] The touch screen 3 is used to provide the staff with a port for setting the loading plan, the lifting position, the longitudinal moving structure, the lateral moving structure and the moving speed of the lifting structure, and is also used to display the position and moving speed of the lateral moving structure and the longitudinal moving structure, and the real-time speed and position of the lifting structure, and transmit the set information to the PLC controller 7;
[0028] The laser distance measuring sensor 6 is used to measure the distance between the lower surface of the longitudinal moving structure and the bottom of the truck compartment or the surface of the object in the compartment, and sends the collected distance to the PLC controller 7;
[0029] The PLC controller 7 sends control signals to the trolley control unit, the truck control unit and the lifting control unit respectively according to the setting information sent by the touch screen 3;
[0030] The trolley control unit is used to control the speed and displacement of the longitudinal moving structure along the track, and the trolley control unit is used to control the speed and displacement of the transverse moving structure in a direction perpendicular to the track; the lifting control unit is used to control the lifting or lowering of the lifting structure and its corresponding speed and displacement;
[0031] The PLC controller in the utility model also receives the real-time speed and position of the longitudinal moving structure, the lateral moving structure and the lifting moving structure in real time, and sends the real-time speed and position of the movement to the touch screen for display.
[0032] Furthermore, the utility model further comprises: a forward obstacle avoidance radar 4 and a backward obstacle avoidance radar 5;
[0033] The forward obstacle avoidance radar 4 and the backward obstacle avoidance radar 5 are respectively arranged at the front end and the rear end of the truck, and are used to detect whether there are people or objects in a fixed range in front of and behind the truck, and send the collected signals to the PLC controller 7.
[0034] The touch screen in this embodiment communicates with the PLC via Ethernet to set the loading plan, display the position, speed, operating status and alarm information of the trolley, car and lifting, etc. The encoder uses the PROFINET communication protocol to communicate with the PLC via Ethernet to provide real-time feedback on the current position and speed of the trolley, car and lifting.
[0035] The crane described in this embodiment is a semi-gantry crane. A laser ranging sensor is installed on the trolley walking beam. The sensor outputs an analog signal that is connected to the PLC analog input point to provide real-time and accurate feedback on the measured distance between the trolley walking beam and the carriage to determine the edge position of the carriage as the starting point for loading.
[0036] The forward and backward walking beam ends of the longitudinal moving structure (trolley) are each equipped with an obstacle avoidance radar, and the output signal is connected to the PLC input point. When a person or a forklift intrudes within a certain range on the ground walking track while the cart is moving, the cart will stop moving to avoid safety accidents.
[0037] Furthermore, in the present invention, the PLC controller 7 is implemented using a Siemens S7-1215 PLC chip.
[0038] Furthermore, the utility model further comprises a remote controller 1 and a remote control receiver 2;
[0039] The remote controller 1 is used to send to the remote control receiver 2 a control signal of the direction, speed and distance of movement of the longitudinal moving structure along the track, a control signal of the speed and distance of movement of the transverse moving structure in a direction perpendicular to the track, and a control signal of hoisting raising or lowering and its corresponding height;
[0040] The remote control receiver 2 transmits the received signal to the PLC controller 7 .
[0041] The wireless receiver described in this embodiment can receive the wireless control signal sent by the wireless remote controller, which sends out the crane operation command by connecting the wireless receiver output interface with the PLC input point, and uses the button to connect with the PLC input point to select the manual, automatic, vehicle type and other working modes. The sent command is connected to the input terminals of the trolley inverter, car inverter and lifting inverter respectively through the PLC output point, and can control the start, stop, forward, reverse, high speed, low speed and other working states of each motor.
[0042] Furthermore, in the present invention, the trolley control unit, the carriage control unit and the lifting control unit have the same structure, and all include: a frequency converter 8, a motor and an encoder 10;
[0043] The frequency converter 8 receives the control signal output by the PLC controller 7, adjusts the frequency of the motor (9), and the encoder records the rotation speed of the motor 9 and sends the rotation speed to the PLC controller 7. The PLC controller calculates the moving speed and displacement of the lateral moving structure and the longitudinal moving structure, and the rising or falling speed and displacement of the lifting structure in real time according to the received rotation speed.
[0044] The control system of this utility model adopts Siemens S7-1215 PLC chip as the main control unit. This PLC chip has input and output units, two analog input units, and two Ethernet interfaces, which fully meets the system requirements of small and medium-sized automation. In the process of research and development, the requirements of seamless integration and efficient coordination of the system, controller, human-machine interface and software are fully considered.
[0045] The control system operation box is equipped with a touch screen, which communicates with the PLC through Ethernet to set the unloading position of each ton bag. According to the loading plan of different vehicle models, the ton bag is hoisted from the lifting position to the unloading position. It can also display the trolley, car, lifting position, speed, operating status and alarm information. The buttons on the operation box are connected to the PLC input point to select manual, automatic and vehicle model. The PLC controller receives the control instructions from the wireless remote control through the wireless receiver. In the automatic mode, the lifting and return instructions can be issued. In the manual mode, the trolley, car, lifting, forward and reverse rotation of the crane can be operated by the wireless remote control.
[0046] The wireless remote control sends out instructions which are connected to the input terminals of the trolley inverter, car inverter and lifting inverter through the intermediate relay through the output point of the PLC controller, so as to control the start, stop, forward, reverse, high speed, low speed and other working states of each motor.
[0047] The encoder uses a high-precision multi-turn absolute encoder with PROFINET industrial communication protocol. Because it is an absolute encoder, the position represented by its output signal is unique, so it has very high identifiability and reliability in places where length, height and displacement are required to be measured. The maximum number of multi-turn absolute turns can reach 16384 turns. And data will never be lost after power failure.
[0048] The PLC controller, touch screen and three encoders in the system all have independent and unique IP addresses, which are connected through industrial Ethernet switches and special shielded industrial Ethernet communication cables to ensure stable and efficient communication in complex industrial environments.
[0049] The crane controlled by this control system is a semi-gantry crane. The laser ranging sensor is installed on the ground walking beam of the truck facing the direction of the loading carriage. The sensor outputs an analog signal that is connected to the analog input point of the PLC controller to provide real-time and accurate feedback on the measured distance between the truck walking beam and the carriage to determine the edge position of the carriage as the starting point of the truck when loading.
[0050] This control system adopts open-loop control. First, the PLC controller receives the position signal fed back by the encoder connected to the motor of the trolley (longitudinal moving structure), trolley (lateral moving structure), and lifting structure, and controls the operation of each inverter drive motor. The ton bags are hoisted from the bagging position to the bag unloading position in sequence according to the loading plan. The high-precision encoder ensures the positioning accuracy and can ensure that the repetition accuracy of the lifting winch is less than 10 mm. In automatic mode, the edge of the carriage is first detected to determine the loading starting position, and then the crane hook is moved to the lifting position of the conveyor belt of the ton bag packaging machine to locate the lifting position. According to the loading sequence, the remote control presses the lifting button to lift the ton bag from the bagging position to the bag unloading position for unloading, and then presses the return button to return the hook to the bagging position. In this way, the hook goes back and forth between the bagging position and the bag unloading position according to the loading plan until the loading is completed. This can reduce labor intensity, and even unskilled crane operators can operate the equipment. For example Figure 3 shown.
[0051] Although the present invention is described herein with reference to specific embodiments, it should be understood that these embodiments are merely examples of the principles and applications of the present invention. It should therefore be understood that many modifications may be made to the exemplary embodiments and that other arrangements may be devised without departing from the spirit and scope of the present invention as defined by the appended claims. It should be understood that the various dependent claims and features described herein may be combined in a manner different from that described in the original claims. It should also be understood that the features described in conjunction with a single embodiment may be used in other described embodiments.
Claims
1. An automatic control system for a railway open truck loading crane, characterized in that: The system is used to control a crane, which includes a track, a gantry, a longitudinal moving structure, a transverse moving structure and a lifting structure; The two ends of the track are fixed on a gantry or a wall, the longitudinal moving structure moves along the track, the transverse moving structure is arranged on the longitudinal moving structure and moves in a direction perpendicular to the track; the lifting structure is arranged on the lower side of the transverse moving structure and is used to lift heavy objects; The automatic control system comprises: a touch screen (3), a laser distance measuring sensor (6), a PLC controller (7), a trolley control unit, a truck control unit and a lifting control unit; The touch screen (3) is used to provide the staff with a port for setting the loading plan, the lifting position, the longitudinal moving structure, the transverse moving structure and the moving speed of the lifting structure, and is also used to display the position and moving speed of the transverse moving structure and the longitudinal moving structure, and the real-time lifting speed and position of the lifting structure, and transmit the set information to the PLC controller (7); The laser distance measuring sensor (6) is used to measure the distance between the lower surface of the longitudinal moving structure and the bottom of the truck compartment or the surface of an object in the compartment, and sends the collected distance to the PLC controller (7); The PLC controller (7) sends control signals to the trolley control unit, the carriage control unit and the lifting control unit respectively according to the setting information sent by the touch screen (3); The trolley control unit is used to control the movement speed and displacement of the longitudinal moving structure along the track, and the trolley control unit is used to control the speed and displacement of the lateral moving structure in a direction perpendicular to the track; the lifting control unit is used to control the lifting or lowering of the lifting structure and its corresponding speed and displacement.
2. The automatic control system for a railway open truck loading crane according to claim 1, characterized in that: Also includes: Forward obstacle avoidance radar (4) and backward obstacle avoidance radar (5); The forward obstacle avoidance radar (4) and the backward obstacle avoidance radar (5) are respectively arranged at the front end and the rear end of the truck, and are used to collect information on whether there are people or objects within a fixed range in front of and behind the truck, and send the collected signals to a PLC controller (7).
3. The automatic control system for a railway open truck loading crane according to claim 1, characterized in that: The PLC controller (7) is implemented using Siemens S7-1215 PLC chip.
4. The automatic control system for a railway open truck loading crane according to claim 1, characterized in that: Also includes a remote controller (1) and a remote control receiver (2); The remote controller (1) is used to send to the remote control receiver (2) a control signal of the direction, speed and distance of movement of the longitudinal moving structure along the track, a control signal of the speed and distance of movement of the transverse moving structure in a direction perpendicular to the track, and a control signal of hoisting raising or lowering and its corresponding height; The remote control receiver (2) transmits the received signal to the PLC controller (7).
5. An automatic control system for a railway open truck loading crane according to claim 1, 2 or 3, characterized in that: The trolley control unit, the carriage control unit and the lifting control unit have the same structure, and all include: a frequency converter (8), a motor (9) and an encoder (10); The frequency converter (8) receives the control signal output by the PLC controller (7) and adjusts the frequency of the motor (9). The encoder records the rotation speed of the motor (9) and sends the rotation speed to the PLC controller (7). The PLC controller calculates the moving speed and displacement of the transverse moving structure and the longitudinal moving structure, and the rising or falling speed and displacement of the lifting structure in real time based on the received rotation speed.