Device for judging on-off of power supply of vibration meter in high-speed rail tunnel

By designing an electromagnetic induction detection device in the vibrometer and using lights to indicate the power on-off status, the on-off problem caused by easy damage to power lines during railway tunnel construction is solved, the fault detection and maintenance process is simplified, and the power supply in the high-speed railway environment is improved. maintenance efficiency.

CN221804240UActive Publication Date: 2024-10-01CENT SOUTH UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420010946.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-03
Publication Date
2024-10-01
Estimated Expiration
2034-01-03

AI Technical Summary

Technical Problem

During railway tunnel construction, the external power cord of the vibration meter is easily damaged, causing power on and off problems, affecting equipment operation, and making maintenance difficult. Especially in high-speed railway environments, it is necessary to simplify fault detection and improve maintenance efficiency.

Method used

Design a device that includes an operation panel, battery box, switch, indicator light and motor. It uses the principle of electromagnetic induction to detect the on-off status of the power cord, and uses lights to indicate the on-off status to simplify fault analysis and location.

Benefits of technology

It can quickly determine whether the power supply of the vibration meter is on or off at night and in complex environments, simplifying fault detection, reducing reliance on professional technicians, and improving maintenance efficiency and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221804240U_ABST
    Figure CN221804240U_ABST
Patent Text Reader

Abstract

The utility model discloses a device for judging on-off of a vibration meter power supply in a high-speed rail tunnel, and relates to the technical field of vibration meters. The device comprises a first operation panel. The upper side of the first operation panel is provided with a first battery box, a first switch electrically matched with the first battery box, a first indicating lamp electrically matched with the first battery box, and a first line on-off button electrically matched with the first battery box. According to the utility model, the on-off condition is represented by lamplight, so that night observation is facilitated, the working state is represented by simple lamplight with different colors, and the on-off condition of a cable can be reported by a worker during daily line patrol, so that reasons for abnormal working of the vibration meter, power problems / equipment technical faults can be analyzed briefly, and the working efficiency is improved. Each power line is independently installed, so that a fault line can be conveniently determined.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of vibration measuring instruments, and in particular relates to a device for judging whether a power supply of a vibration measuring instrument in a high-speed railway tunnel is on or off. Background Art

[0002] In railway infrastructure construction, especially tunnel construction, it is often necessary to monitor the construction area and adjacent existing tunnels to ensure that the construction will not affect the safety and operation of the existing line. Railway tunnel construction usually adopts blasting method, and vibration meters are needed to monitor the vibration caused by blasting to protect the existing structure. However, the power supply of the vibration velocity sensor is usually external and not part of the tunnel design. As a result, the sensor cable is often arranged in a complex natural environment and is prone to damage, such as disconnection or aging, which in turn affects the operation of the vibration meter.

[0003] Generally, there are two situations that can cause the vibration meter to work abnormally: 1. The vibration meter equipment hardware and software failure; 2. The instrument power supply is abnormal. After the equipment is abnormal, it needs to be inspected and repaired. Due to the particularity of high-speed railways, maintenance work can only be carried out during a specific "window period". The window time is only 3-5 hours, usually at night, and the working environment is complex, which poses a huge challenge to the maintenance team. For the railway maintenance department on site, the conventional practice is to contact the equipment manufacturer and wait for the technicians to arrive. However, for the problem of abnormal power supply of the equipment (loose external power supply, broken cable, etc.), it is only necessary to find the damaged cable and repair it. The process of waiting for the technicians is undoubtedly time-consuming and cost-increasing. To address this problem, a new device is proposed to determine the power on and off status of the vibration meter in the high-speed railway tunnel. This device is designed to simplify the fault detection process, improve maintenance efficiency, and reduce dependence on professional technicians. Utility Model Content

[0004] The technical problem to be solved by the utility model is to overcome the deficiencies of the prior art and provide a device for judging whether the power supply of a vibration meter in a high-speed railway tunnel is on or off.

[0005] In order to solve the above technical problems, the basic concept of the technical solution adopted by the utility model is:

[0006] A device for judging whether the power supply of a vibration meter in a high-speed railway tunnel is on or off, comprising a first operating panel, wherein a first battery box, a first switch electrically matched with the first battery box, a first indicator light electrically matched with the first battery box, and a first line on / off button electrically matched with the first battery box are installed on the upper side of the first operating panel.

[0007] Optionally, two recesses are provided on the upper side of the first operating panel, a first motor is installed inside the recess, the first motor is electrically coordinated with the first switch, a first rotating shaft is installed at the output end of the first motor, a first clamping plate is installed on the first rotating shaft, and the cross-section of the first clamping plate is arc-shaped.

[0008] After adopting the above technical solution, the utility model has the following beneficial effects compared with the prior art. Of course, any product implementing the utility model does not necessarily need to achieve all the advantages described below at the same time:

[0009] The on / off status is indicated by lights for easy observation at night, and the working status is indicated by simple lights of different colors. During daily line inspections, workers can report the on / off status of the cables, thereby briefly analyzing the reasons for the abnormal operation of the vibration meter, power supply problems / equipment technical failures, and it is installed independently on each power line to facilitate the identification of the faulty line.

[0010] The specific implementation of the utility model is further described in detail below with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] The drawings described below are only some embodiments. For those skilled in the art, other drawings can be obtained based on these drawings without creative work.

[0012] In the figure:

[0013] Figure 1 This is a schematic diagram of the clamp structure of an embodiment of the utility model.

[0014] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0015] The first operating panel 2 , the first switch 201 , the first indicator light 202 , the first line on / off button 203 , the first battery box 204 , and the first card board 205 .

[0016] It should be noted that these drawings and textual descriptions are not intended to limit the conceptual scope of the present invention in any way, but rather to illustrate the concept of the present invention for those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION

[0017] The utility model will now be further described in detail with reference to the accompanying drawings.

[0018] See also Figure 1As shown, in this embodiment, a device for determining whether the power of a vibration meter in a high-speed railway tunnel is on or off is provided, including a first operating panel 2, on the upper side of which are mounted a first battery box 204, a first switch 201 electrically coordinated with the first battery box 204, a first indicator light 202 electrically coordinated with the first battery box 204, and a first line on / off button 203 electrically coordinated with the first battery box 204.

[0019] When current flows through the power line to be tested, it generates a magnetic field. The clamp head uses an electromagnetic current transformer. Through a coil with a certain turns ratio, the alternating current can generate electromagnetic induction in the clamp head coil, and obtain a current proportional to the alternating current. The jaws of the clamp meter are designed to be opened and closed, so that it can be easily clamped around the power line to be tested without disconnecting the circuit. When the jaws are closed, it forms a closed magnetic loop, so that the magnetic field passing through the power line to be tested is concentrated through this loop. The alternating magnetic field generated by the alternating current of the power line to be tested induces an alternating current on the iron core of the clamp meter. The magnitude of this induced current is proportional to the current passing through the power line to be tested. The induced current is then converted into voltage and processed by the built-in circuit.

[0020] Based on the above proportional relationship, the traditional clamp meter converts the electrical signal into a digital signal, analyzes its characteristics, calculates the current in the circuit and displays it. However, the utility model simplifies its current detection function and only needs to distinguish whether the circuit is on or off. After judging the on-off state, different colors of lights are used for indication.

[0021] The on / off status is indicated by lights for easy observation at night, and the working status is indicated by simple lights of different colors. During daily line inspections, workers can report the on / off status of the cables, thereby briefly analyzing the reasons for the abnormal operation of the vibration meter: power supply problems / equipment technical failures. It is installed independently on each power line to facilitate the identification of the faulty line.

[0022] Specifically, two recesses are provided on the upper side of the first operating panel 2, a first motor is installed inside the recess, the first motor is electrically coordinated with the first switch 201, a first rotating shaft is installed at the output end of the first motor, a first clamping plate 205 is installed on the first rotating shaft, and the cross-section of the first clamping plate 205 is arc-shaped.

[0023] The present invention is not limited to the above-mentioned implementation modes. Anyone should be aware of the structural changes made under the inspiration of the present invention. Any technical solution that is the same or similar to the present invention falls within the protection scope of the present invention. The technology, shape, and structure that are not described in detail in the present invention are all known technologies.

Claims

1. A device for judging whether the power supply of a vibration meter in a high-speed railway tunnel is on or off, characterized in that: include: a first operating panel (2), wherein the upper side of the first operating panel (2) is provided with a first battery box (204), a first switch (201) electrically coordinated with the first battery box (204), a first indicator light (202) electrically coordinated with the first battery box (204), and a first circuit on / off button (203) electrically coordinated with the first battery box (204); Two notches are provided on the upper side of the first operating panel (2), a first motor is installed inside the notch, the first motor is electrically coordinated with the first switch (201), a first rotating shaft is installed at the output end of the first motor, a first clamping plate (205) is installed on the first rotating shaft, and the cross section of the first clamping plate (205) is arc-shaped.