Small compressed air energy storage system of CNG (compressed natural gas) filling station
By adopting heat recovery and recycling technology in the small compressed air energy storage system of CNG filling stations, the problems of waste of thermal resources and low energy storage efficiency of the compressed air system are solved, and efficient energy storage peak shaving and system safety and stability are achieved. Improved the efficiency of out-of-service CNG filling stations.
Patent Information
- Application Number
- CN202422057639.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-08-23
AI Technical Summary
The existing compressed air energy storage system fails to effectively utilize the heat source generated during the operation of the compressed air system, resulting in waste of thermal resources and low energy storage efficiency. In addition, the out-of-service CNG filling stations have poor efficiency and lack of methods for transformation and utilization.
Transform the out-of-service CNG filling station into a small compressed air energy storage system, using a primary air-liquid heat exchanger and a secondary air-liquid heat exchanger to recover and store the heat in the compressed air process, and use high-temperature and low-temperature storage The circulating liquid in the tank is utilized in a thermal circulation loop to improve energy storage efficiency and system safety and stability.
It achieves high speed and flexible peak-shaving effect of energy storage, improves energy storage efficiency and energy utilization, extends the service life of the system, and converts out-of-service CNG filling stations into efficient compressed air energy storage systems. Enhanced use of green renewable energy.
Smart Images

Figure CN221806555U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of compressed air energy storage, and specifically relates to a small compressed air energy storage system for a CNG filling station. Background Art
[0002] At present, a new round of global energy revolution and technological revolution is accelerating, and vigorously developing renewable energy has become a major strategic direction for global energy transformation and a concerted grand action of the international community to address climate change. Accelerating the development of renewable energy and implementing renewable energy substitution actions are key links in promoting green economic and social development and high-quality development of a low-carbon society. They are also an inevitable choice to ensure national energy security and an objective requirement for ecological civilization construction and sustainable development.
[0003] Energy storage is an important component and key supporting technology of energy internet, smart grid and energy system with high proportion of renewable energy. It can provide peak load regulation and demand response support for power grid operation, and is an important means to improve the flexibility, economy and safety of traditional power system. In recent years, my country's energy storage has shown a good trend of diversified development, and has initially possessed the foundation of industrialization. With the acceleration of global energy transformation, market demand has further expanded. Compressed air energy storage is a reliable energy storage method with advantages such as safety and environmental protection, long energy storage cycle, high efficiency, flexible site selection, short construction cycle and long system life. It has gradually become one of the key development directions of energy storage industry. Existing compressed air energy storage mainly uses electric compressed air during the low load period of power grid, and stores it in high-pressure sealed containers. It is released during the peak power consumption period to drive turbine expander and motor to generate electricity, and realizes peak load regulation of power grid by using the peak-valley electricity price difference. However, it does not involve the recovery and utilization of heat source generated during the operation of compressed air system, resulting in waste of heat resources and low energy storage efficiency.
[0004] In recent years, with the continuous innovation and breakthrough of new energy fuel cell technology, new energy fuel cell vehicles have grown rapidly and gradually replaced CNG power source vehicles, resulting in increasingly poor efficiency of CNG filling stations and an increasing number of discontinued operations. How to use the discontinued CNG filling stations to develop small compressed air energy storage systems and achieve increased efficiency of discontinued CNG filling stations is a technical problem to be solved by this utility model. Utility Model Content
[0005] The technical problem to be solved by the utility model is: to transform a CNG filling station that has been shut down into a compressed air energy storage system, recover the heat in the compressed air process, and improve the energy storage efficiency, project economy and system safety and stability.
[0006] The utility model provides the following technical solutions: a small compressed air energy storage system for a CNG filling station, comprising a compressor, a primary air-liquid heat exchanger, a secondary air-liquid heat exchanger, a gas storage device, a low-temperature storage tank, a high-temperature storage tank, a first circulating pump, a second circulating pump, a turbine expander and a generator;
[0007] The compressor, the primary air-liquid heat exchanger, the gas storage device, the secondary air-liquid heat exchanger and the turbine expander are connected in sequence according to the gas flow direction to form a gas charging energy storage circuit, a valve for controlling the on-off and flow direction is arranged in the gas charging energy storage circuit, and the torque output end of the turbine expander is connected to the torque input end of the generator;
[0008] The low temperature storage tank, the first circulation pump, the primary air-liquid heat exchanger, the high temperature storage tank, the second circulation pump, the secondary air-liquid heat exchanger, and the low temperature storage tank are sequentially connected according to the flow direction of the circulating liquid to form a heat circulation loop; a valve for controlling on and off is arranged in the heat circulation loop;
[0009] The gas storage device includes a gas storage well, a CNG bottle group, an inflow main line, an outflow main line and a plurality of parallel branches. The plurality of parallel branches are connected to the primary air-liquid heat exchanger through the inflow main line, and the plurality of parallel branches are connected to the secondary air-liquid heat exchanger through the outflow main line. Each branch is connected to a gas storage well or a CNG bottle group.
[0010] Furthermore, the valves in the air charging energy storage circuit include a first one-way valve, a first solenoid valve, a second solenoid valve and a second one-way valve; the first one-way valve is connected between the compressor and the first-stage air-liquid heat exchanger; the second one-way valve is connected between the second-stage air-liquid heat exchanger and the turbine expander; the first solenoid valve is connected between the first-stage air-liquid heat exchanger and the gas storage device; the second solenoid valve is connected between the gas storage device and the second-stage air-liquid heat exchanger.
[0011] Furthermore, the valves in the heat circulation loop include a third solenoid valve and a fourth solenoid valve; the third solenoid valve is connected between the secondary air-liquid heat exchanger and the low-temperature storage tank; the fourth solenoid valve is connected between the primary air-liquid heat exchanger and the high-temperature storage tank.
[0012] Furthermore, it also includes a liquid infusion pipeline, which includes a liquid storage device, a fifth solenoid valve and a liquid infusion pump connected in sequence according to the flow direction of the circulating liquid, and the liquid outlet of the liquid infusion pump is connected to the low-temperature storage tank.
[0013] Furthermore, solenoid valves are installed on both sides of the gas storage well on the branch line of the gas storage device; solenoid valves are installed on both sides of the CNG bottle group on the branch line of the gas storage device.
[0014] Furthermore, the circulating fluid in the thermal circulation loop is water.
[0015] Furthermore, an air purifier is installed at the gas suction port of the compressor.
[0016] Compared with the prior art, the advantages of the present invention are:
[0017] The utility model provides a small compressed air energy storage system for CNG gas filling stations, which has a high peak-shaving effect speed and flexible peak-shaving, and can improve energy storage efficiency. It has a wide range of application scenarios and can be applied to CNG gas filling station substations and CNG gas filling station mother stations that are out of service. Compressed air energy storage is carried out by using the out-of-service CNG gas filling station substations and CNG gas filling station mother stations to improve the utilization of green renewable energy and achieve CNG gas filling station gain and efficiency as much as possible.
[0018] The primary air-liquid heat exchanger and the secondary air-liquid heat exchanger are used to recover and store heat in the air compression process, which improves energy utilization and energy storage release efficiency. In the process of compressing air, the primary air-liquid heat exchanger recovers heat from high-temperature and high-pressure air through water circulation and stores it in a high-temperature storage tank; the high-pressure and low-temperature air coming out of the air outlet of the primary air-liquid heat exchanger is injected and stored through the gas storage well and the air inlet of the CNG bottle group, and the energy storage process is completed (i.e., heat storage and gas storage). When the energy storage is released, the air outlet of the gas storage well and the CNG bottle group is connected to the air inlet of the secondary air-liquid heat exchanger, the air outlet of the secondary air-liquid heat exchanger is connected to the air inlet of the turbine expander, and the turbine expander is connected to the generator. The outlet of the high-temperature storage tank is connected to the liquid inlet of the secondary air-liquid heat exchanger, and the liquid outlet of the secondary air-liquid heat exchanger is connected to the low-temperature storage tank. The high-pressure and low-temperature gas coming out of the gas storage well and the CNG bottle group is heated through heat circulation, and the heated gas enters the turbine expander, which improves the operation efficiency and power generation efficiency. The liquid storage device is connected to the low-temperature storage tank and is used to supplement the circulating water in the high-temperature storage tank and the low-temperature storage tank. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 Schematic diagram of a small compressed air energy storage system for a CNG filling station.
[0020] In the figure: 1-air purifier; 2-compressor; 3-first non-return valve; 4-primary air-liquid heat exchanger; 5-first solenoid valve; 6-sixth solenoid valve; 7-eighth solenoid valve; 8-tenth solenoid valve; 9-gas storage well; 10-first CNG bottle group; 11-second CNG bottle group; 12-seventh solenoid valve; 13-ninth solenoid valve; 14-eleventh solenoid valve; 15-second solenoid valve; 16-secondary air-liquid heat exchanger; 17-third solenoid valve; 18-low-temperature storage tank; 19-liquid replenishment pump; 20-fifth solenoid valve; 21-liquid storage device; 22-first circulation pump; 23-fourth solenoid valve; 24-high-temperature storage tank; 25-second circulation pump; 26-second non-return valve; 27-turbine expander; 28-generator; 29-exhaust port. DETAILED DESCRIPTION
[0021] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0022] like Figure 1 As shown: A small compressed air energy storage system for a CNG filling station, including a compressor 2, a primary air-liquid heat exchanger 4, a secondary air-liquid heat exchanger 16, an air storage device, a low-temperature storage tank 18, a high-temperature storage tank 24, a first circulating pump 22, a second circulating pump 25, a turbine expander 27 and a generator 28.
[0023] The compressor 2, the primary air-liquid heat exchanger 4, the gas storage device, the secondary air-liquid heat exchanger 16 and the turbine expander 27 are connected in sequence according to the gas flow direction to form an air-charging energy storage circuit. Valves for controlling the on-off and flow direction are arranged in the air-charging energy storage circuit. The torque output end of the turbine expander 27 is connected to the torque input end of the generator 28.
[0024] The low temperature storage tank 18, the first circulation pump 22, the primary air-liquid heat exchanger 4, the high temperature storage tank 24, the second circulation pump 25, the secondary air-liquid heat exchanger 16, and the low temperature storage tank 18 are sequentially connected according to the flow direction of the circulating liquid to form a heat circulation loop; a valve for controlling the on-off is arranged in the heat circulation loop. The circulating liquid in the heat circulation loop is water.
[0025] The gas storage device includes a gas storage well 9, a CNG bottle group, an inflow main line, an outflow main line and a plurality of parallel branches. The plurality of parallel branches are connected to the primary air-liquid heat exchanger 4 through the inflow main line, and the plurality of parallel branches are connected to the secondary air-liquid heat exchanger 16 through the outflow main line. Each branch is connected to a gas storage well 9 or a CNG bottle group.
[0026] An air purifier 1 is installed at the gas inlet of the compressor 2; it purifies the moisture, dust or particulate matter in the air, greatly improving the life and safety stability of the system. The air outlet of the compressor 2 is connected to the air inlet port of the primary air-liquid heat exchanger 4 with a stainless steel seamless steel pipe. The type of compressor 2 should match the capacity and storage pressure (working pressure not exceeding 25MPa) of the gas storage well 9 and the CNG bottle group, and the peak and valley time of the power grid.
[0027] The valves in the charging energy storage circuit include a first one-way valve 3, a first solenoid valve 5, a second solenoid valve 15 and a second one-way valve 26; the first one-way valve 3 is connected between the compressor 2 and the first-stage air-liquid heat exchanger 4; the second one-way valve 26 is connected between the second-stage air-liquid heat exchanger 16 and the turbine expander 27; the first solenoid valve 5 is connected between the first-stage air-liquid heat exchanger 4 and the gas storage device; the second solenoid valve 15 is connected between the gas storage device and the second-stage air-liquid heat exchanger 16.
[0028] The valves in the heat circulation loop include a third solenoid valve 17 and a fourth solenoid valve 23 ; the third solenoid valve 17 is connected between the secondary air-liquid heat exchanger 16 and the low-temperature storage tank 18 ; the fourth solenoid valve 23 is connected between the primary air-liquid heat exchanger 4 and the high-temperature storage tank 24 .
[0029] It also includes a liquid infusion pipeline, which includes a liquid storage device 21, a fifth solenoid valve 20 and a liquid infusion pump 19 connected in sequence according to the flow direction of the circulating liquid. The liquid outlet of the liquid infusion pump 19 is connected to the low-temperature storage tank 18.
[0030] Solenoid valves are installed on both sides of the gas storage well 9 on the branch line of the gas storage device; solenoid valves are installed on both sides of the CNG bottle group on the branch line of the gas storage device.
[0031] Specifically, the gas storage device includes three branches, the first branch is connected to the gas storage well 9, the second branch is connected to the first CNG bottle group 10, and the third branch is connected to the second CNG bottle group 11; the first branch is connected to the sixth solenoid valve 6 and the seventh solenoid valve 12 on both sides of the gas storage well 9; the second branch is connected to the eighth solenoid valve 7 and the ninth solenoid valve 13 on both sides of the first CNG bottle group 10; the third branch is connected to the tenth solenoid valve 8 and the eleventh solenoid valve 14 on both sides of the second CNG bottle group 11.
[0032] During the valley period (including deep valley period) of the power grid, gas charging and energy storage begins. Compressor 2 uses the power of the valley period (including deep valley period) of the power grid to charge and store gas in the gas well 9, the first CNG bottle group 10 and the second CNG bottle group 11. At this time, the PLC (programmable controller) of the system sends start and open signals to compressor 2, the first one-way valve 3, the first solenoid valve 5, and the sixth solenoid valve 6, and sends a closing signal to the eighth solenoid valve 7, the tenth solenoid valve 8, the seventh solenoid valve 12, the ninth solenoid valve 13, and the eleventh solenoid valve 14 to close, and gives priority to charging gas in the gas well 9. When the gas storage well 9 is charged with gas pressure reaching 25MPa, the PLC (programmable controller) sends a shutdown signal to the sixth solenoid valve 6 to shut it down. The PLC (programmable controller) sends opening signals to the eighth solenoid valve 7 and the tenth solenoid valve 8 in turn to open them, and inflates the first CNG bottle group 10 and the second CNG bottle group 11 in turn. When the inflation pressure of the first CNG bottle group 10 and the second CNG bottle group 11 reaches 25MPa, the PLC (programmable controller) sends closing signals to the first check valve 3, the first solenoid valve 5, the sixth solenoid valve 6, the eighth solenoid valve 7, and the tenth solenoid valve 8 to close them, thereby completing the inflation and energy storage process.
[0033] When charging and storing energy, the PLC (programmable controller) sends an opening signal to the third solenoid valve 17, the fourth solenoid valve 23, the first circulating pump 22, and the second circulating pump 25 to open them. The circulating liquid (water) of the low-temperature storage tank 18 enters from the circulating liquid (water) inlet end of the primary air-liquid heat exchanger 4 under the operation of the first circulating pump 22, and exchanges heat with the compressed air passing through the primary air-liquid heat exchanger 4. The circulating liquid (water) after the heat exchange is heated, and the high-temperature and high-pressure air entering the primary air-liquid heat exchanger 4 is converted into high-pressure and low-temperature air after heat exchange and enters the gas storage well 9, the first CNG bottle group 10 and the second CNG bottle group 11 for storage. The circulating liquid after temperature increase enters the high-temperature storage tank 24 through the fourth solenoid valve 23. The circulating liquid below 50°C enters and exits through the circulating liquid (water) inlet and outlet of the secondary air-liquid heat exchanger 16 under the operation of the second circulating pump 25, and then enters the low-temperature storage tank 18 for circulation; until the circulating liquid (water) temperature in the high-temperature storage tank 24 reaches 50°C, the system PLC (programmable logic controller) sends a shutdown signal to the third solenoid valve 17, the fourth solenoid valve 23, the first circulating pump 22, and the second circulating pump 25 to shut them down.
[0034] During the peak period of the power grid (including the peak period), the energy storage release begins. When the energy storage is released, the PLC (programmable controller) sends an opening signal to the seventh solenoid valve 12, the ninth solenoid valve 13, the eleventh solenoid valve 14, the second solenoid valve 15, the third solenoid valve 17, the second circulating pump 25, and the second non-return valve 26 in turn to open them, and releases gas to the gas storage well 9, the first CNG bottle group 10, and the second CNG bottle group 11 in turn. The released high-pressure and low-temperature gas enters the secondary air-liquid heat exchanger 16, and the high-temperature circulating liquid (water) in the high-temperature storage tank 24 enters the secondary air-liquid heat exchanger 16 for heat exchange. The high-pressure and low-temperature gas is heated after heat exchange, and the circulating liquid (water) after heat exchange is temporarily stored in the low-temperature storage tank 18; the gas after heating enters the nozzle of the turbine expander 27, where the gas undergoes isentropic expansion to convert pressure energy into kinetic energy. Subsequently, the high-speed gas enters the turbo expander 27, driving the impeller of the turbo expander 27 to rotate, thereby driving the rotor of the turbo expander 27 to rotate at a high speed. Since the shaft of the generator 28 is connected to the shaft of the turbo expander 27, the rotor of the turbo expander 27 rotates at a high speed, thereby driving the rotor of the generator 28 to operate, thereby generating electricity. The internal energy and temperature of the gas after work are reduced, and the gas is discharged through the exhaust port 29 of the turbo expander 27.
[0035] The type selection of the turbo expander 27 should be suitable for the gas storage capacity of the gas storage well 9, the first CNG bottle group 10, and the second CNG bottle group 11, as well as the duration of the peak period of the power grid; as the high-pressure and low-temperature gas in the gas storage well 9, the first CNG bottle group 10, and the second CNG bottle group 11 is continuously released, the pressure of the compressed air stored in them also decreases. When the pressure is lower than 8MPa, the PLC (programmable logic controller) sends a closing signal to the solenoid valve at the outlet of the gas storage well 9, the first CNG bottle group 10 or the second CNG bottle group 11 to close it, and the energy storage release process ends.
[0036] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A small compressed air energy storage system for a CNG filling station, characterized by: It comprises a compressor (2), a primary air-liquid heat exchanger (4), a secondary air-liquid heat exchanger (16), a gas storage device, a low-temperature storage tank (18), a high-temperature storage tank (24), a first circulating pump (22), a second circulating pump (25), a turbine expander (27), and a generator (28); The compressor (2), the primary air-liquid heat exchanger (4), the gas storage device, the secondary air-liquid heat exchanger (16) and the turbine expander (27) are connected in sequence according to the gas flow direction to form a gas charging energy storage circuit, a valve for controlling on / off and flow direction is arranged in the gas charging energy storage circuit, and the torque output end of the turbine expander (27) is connected to the torque input end of the generator (28); The low-temperature storage tank (18), the first circulation pump (22), the primary air-liquid heat exchanger (4), the high-temperature storage tank (24), the second circulation pump (25), the secondary air-liquid heat exchanger (16), and the low-temperature storage tank (18) are connected in sequence according to the flow direction of the circulating liquid to form a heat circulation loop; a valve for controlling on and off is arranged in the heat circulation loop; The gas storage device comprises a gas storage well (9), a CNG bottle group, an inflow main line, an outflow main line, and a plurality of parallel branches, wherein the plurality of parallel branches are connected to a primary air-liquid heat exchanger (4) via the inflow main line, and the plurality of parallel branches are connected to a secondary air-liquid heat exchanger (16) via the outflow main line, and each branch is connected to a gas storage well (9) or a CNG bottle group.
2. A small-scale compressed air energy storage system for a CNG filling station according to claim 1, characterized in that: The valves in the gas charging energy storage circuit include a first one-way valve (3), a first solenoid valve (5), a second solenoid valve (15) and a second one-way valve (26); the first one-way valve (3) is connected between the compressor (2) and the first-stage air-liquid heat exchanger (4); the second one-way valve (26) is connected between the second-stage air-liquid heat exchanger (16) and the turbine expander (27); the first solenoid valve (5) is connected between the first-stage air-liquid heat exchanger (4) and the gas storage device; and the second solenoid valve (15) is connected between the gas storage device and the second-stage air-liquid heat exchanger (16).
3. A small-scale compressed air energy storage system for a CNG filling station according to claim 2, characterized in that: The valves in the heat circulation loop include a third solenoid valve (17) and a fourth solenoid valve (23); the third solenoid valve (17) is connected between the secondary air-liquid heat exchanger (16) and the low-temperature storage tank (18); and the fourth solenoid valve (23) is connected between the primary air-liquid heat exchanger (4) and the high-temperature storage tank (24).
4. A small-scale compressed air energy storage system for a CNG filling station according to claim 1, characterized in that: It also includes a liquid infusion pipeline, which includes a liquid storage device (21), a fifth solenoid valve (20) and a liquid infusion pump (19) which are connected in sequence according to the flow direction of the circulating liquid, and the liquid outlet of the liquid infusion pump (19) is connected to the low-temperature storage tank (18).
5. A small-scale compressed air energy storage system for a CNG filling station according to claim 1, characterized in that: Solenoid valves are installed on both sides of the gas storage well (9) on the branch line of the gas storage device; solenoid valves are installed on both sides of the CNG bottle group on the branch line of the gas storage device.
6. A small-scale compressed air energy storage system for a CNG filling station according to claim 4, characterized in that: The circulating fluid in the thermal circulation loop is water.
7. A small-scale compressed air energy storage system for a CNG filling station according to any one of claims 1 to 6, characterized in that: An air purifier (1) is installed at the gas suction port of the compressor (2).