RAT receiving and releasing valve integrated manual test platform
Through the integrated manual test platform, the combination of manual switch valve and rotary throttle valve, combined with pressure sensor and flow meter, solves the problem of inconvenient testing of RAT retractable valve in the existing technology, and realizes high-pressure throttling and low-pressure flow resistance. and accurate testing of internal leakage performance, improving testing accuracy and efficiency.
Patent Information
- Application Number
- CN202323548849.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-25
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2033-12-25
AI Technical Summary
The existing technology cannot effectively test the throttling of the RAT retracting and releasing valve under high pressure, the flow resistance under low pressure, and the severe internal leakage indicators. Moreover, it is inconvenient to disassemble and assemble between different test benches, which affects the accuracy of the test results and the quality of batch products. Test efficiency.
An integrated manual test platform is designed to achieve high-pressure throttling of the RAT retracting and releasing valve through different combinations of 5 manual switching valves and the adjustment of 1 manual rotating throttle valve, combined with pressure sensors, flow meters and pressure gauges. , Low-pressure flow resistance and internal leakage performance testing.
It achieves accurate testing of the high-pressure throttling, low-pressure flow resistance and internal leakage performance of the RAT retracting and releasing valve, improving the accuracy of the test results and the testing efficiency of batch products.
Smart Images

Figure CN221838677U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of hydraulics, in particular to an integrated manual testing platform for a RAT retractable valve. Background Art
[0002] As a new type of manual hydraulic valve for retracting and extending ram air turbine systems, the RAT retractable valve needs to be tested for indicators such as throttling under high pressure, flow resistance under low pressure, and strict internal leakage. Disassembly and assembly back and forth between different test benches cannot guarantee the accuracy of test results and is not conducive to mass product testing. Utility Model Content
[0003] Purpose of the utility model: In view of the above-mentioned situation of the prior art, the purpose of the utility model is to provide an integrated manual testing platform, which can realize integrated manual testing of the RAT retractable valve through different combinations of opening and closing of 5 manual switch valves and manual throttling adjustment of 1 manual rotary throttle valve.
[0004] Technical Solution
[0005] A RAT retractable valve integrated manual test platform includes an oil inlet end, an oil return end, manual switch valves K1 to K5, a manual rotary throttle valve R6, pressure sensors PS1 and PS2, flowmeter 1, flowmeter 2, a pressure gauge, and three-way connections 1 to 5. The oil inlet end is connected to the oil source on one side and is split by the three-way connection 5 on the other side. One side of the split pipeline is connected to the oil supply port P of the RAT retractable valve through the switch valve K1, and the other side is connected to the flowmeter 1 through the switch valve K2. The flowmeter 1 is split by the three-way connection 4. One side of the split pipeline is connected to the flowmeter 2, and the other side is connected to the manual rotary throttle valve R6, flowmeter 2 is connected to tee 2 through switch valve K4, tee 2 is connected to load port B of RAT retractable valve, one of the ports of tee 2 is provided with a plugging cap, manual rotary throttle valve R6 is divided into three diversions through tee, one of the diverted pipelines is connected to the pressure gauge, and the other is connected to tee 1 through switch valve K3, tee 1 is connected to load port A of RAT retractable valve, one of the ports of tee 1 is provided with a plugging cap, the return oil port T of RAT retractable valve is connected to the return oil end through switch valve K5, the pressure sensor PS1 is provided on the pipeline close to the oil source, and the pressure sensor PS2 is provided on the pipeline close to the return oil end.
[0006] Furthermore, the measuring range of the pressure sensor PS1 is 0-60 MPa, and the measuring range of the pressure sensor PS2 is 0-25 MPa.
[0007] Furthermore, the measurement range of flow meter 1 is 0 to 10 L / min, and the measurement range of flow meter 2 is 0 to 2 L / min.
[0008] Furthermore, the pressure gauge has a measuring range of 0 to 40 MPa.
[0009] Furthermore, the flow meter 1 is connected to the digital display 1 through a cable.
[0010] Furthermore, the flow meter 2 is connected to the digital display meter 2 via a cable.
[0011] Technical effects:
[0012] By manually controlling the opening and closing combination of 5 switch valves K1, K2, K3, K4, and K5, as well as the manual throttling adjustment of the R6 manual rotary throttle valve and the disassembly and assembly of the three-way plugging cap, the high-pressure throttling, low-pressure flow resistance and internal leakage performance of the RAT retractable valve are tested. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a design principle diagram of the present utility model. DETAILED DESCRIPTION
[0014] The following embodiments are provided in conjunction with the accompanying drawings
[0015] like Figure 1 As shown, a RAT retractable valve integrated manual testing platform is provided.
[0016] Specifically, it includes an oil inlet end, an oil return end, manual switch valves K1 to K5, a manual rotary throttle valve R6, a pressure sensor PS1, a pressure sensor PS2, a flow meter 1, a flow meter 2, a pressure gauge, and three-way connections 1 to 5. One side of the oil inlet end is connected to the oil source, and the other side is split through the three-way connection 5. One side of the split pipeline is connected to the oil supply port P of the RAT retractable valve through the switch valve K1, and the other side is connected to the flow meter 1 through the switch valve K2. The flow meter 1 is split through the three-way connection 4. One side of the split pipeline is connected to the flow meter 2, and the other side is connected to the manual rotary throttle valve R6. The flow meter 2 It is connected to tee 2 through switch valve K4, tee 2 is connected to load port B of RAT retractable valve, one of the ports of tee 2 is provided with a plugging cap, and manual rotary throttle valve R6 is divided into three branches through tee, one of the diverted pipelines is connected to the pressure gauge, and the other is connected to tee 1 through switch valve K3, tee 1 is connected to load port A of RAT retractable valve, one of the ports of tee 1 is provided with a plugging cap, the return oil port T of RAT retractable valve is connected to the return oil end through switch valve K5, the pressure sensor PS1 is provided on the pipeline close to the oil source, and the pressure sensor PS2 is provided on the pipeline close to the return oil end.
[0017] (1) By connecting the K1, K3, K4, and K5 switch valves, disconnecting the K2 switch valve, and adjusting the R6 manual rotary throttle valve until the load port A pressure displayed on the observed pressure gauge reaches the specified pressure value, observe the value displayed on the digital display 2 connected to the flow meter 2 to realize the throttling flow test and data reading of the high-pressure oil from the RAT retractable valve oil supply port P to the load port A.
[0018] (2) By connecting the K2, K3, and K5 switch valves and disconnecting the K1 and K4 switch valves, the R6 manual rotary throttle valve is adjusted until the digital display 1 connected to the flow meter 1 displays the specified flow value. By observing the difference between the pressure value displayed on the pressure gauge and the pressure value displayed by the PS2 pressure sensor, the flow resistance test and data reading of the RAT retractable valve are achieved when the load flow flows from the load port A to the return oil under low pressure.
[0019] (3) By disconnecting the K1, K2, K3, K4, and K5 switch valves, opening the plugs of T-way 1 and T-way 2, and observing the volume of oil flowing under T-way 1 and T-way 2, the RAT retractable valve internal leakage test and data reading are realized.
[0020] The above describes specific embodiments of the present invention. It should be understood that the present invention is not limited to the specific embodiments described above, and those skilled in the art may make various changes or modifications within the scope of the claims, which do not affect the essence of the present invention. The embodiments of this application and the features in the embodiments may be combined with each other in any manner unless there is a conflict.
Claims
1. A RAT retractable valve integrated manual test platform, It is characterized in that It includes an oil inlet end, an oil return end, manual switch valves K1 to K5, a manual rotary throttle valve R6, a pressure sensor PS1, a pressure sensor PS2, a flow meter 1, a flow meter 2, a pressure gauge and three-way 1 to three-way 5. The oil inlet end is connected to the oil source on one side and is split by the three-way 5 on the other side. One side of the split pipeline is connected to the oil supply port P of the RAT retractable valve through the switch valve K1, and the other side is connected to the flow meter 1 through the switch valve K2. The flow meter 1 is split by the three-way 4. One side of the split pipeline is connected to the flow meter 2, and the other side is connected to the manual rotary throttle valve R6. The flow meter 2 is split by the three-way 4. The switch valve K4 is connected to the three-way two, the three-way two is connected to the load port B of the RAT retractable valve, one of the three-way two is provided with a plugging cap, the manual rotary throttle valve R6 is divided into two parts through the three-way, one of the divided pipelines is connected to the pressure gauge, and the other is connected to the three-way one through the switch valve K3, the three-way one is connected to the load port A of the RAT retractable valve, one of the three-way one is provided with a plugging cap, the return oil port T of the RAT retractable valve is connected to the return oil end through the switch valve K5, the pressure sensor PS1 is arranged on the pipeline close to the oil source, and the pressure sensor PS2 is arranged on the pipeline close to the return oil end.
2. A RAT retractable valve integrated manual test platform according to claim 1, It is characterized in that The measuring range of the pressure sensor PS1 is 0-60 MPa, and the measuring range of the pressure sensor PS2 is 0-25 MPa.
3. A RAT retractable valve integrated manual test platform according to claim 1, It is characterized in that The measuring range of flow meter 1 is 0-10L / min, and the measuring range of flow meter 2 is 0-2L / min.
4. A RAT retractable valve integrated manual test platform according to claim 1, It is characterized in that The pressure gauge measurement range is 0~40MPa.
5. A RAT retractable valve integrated manual test platform according to claim 3, It is characterized in that The flow meter 1 is connected to the digital display meter 1 through a cable.
6. A RAT retractable valve integrated manual test platform according to claim 3, It is characterized in that The flow meter 2 is connected to the digital display meter 2 via a cable.