Anti-blocking structure of blast pipe of wind power coal separator

By designing an anti-clogging structure in the wind coal separator and using the discharging funnel and screw conveyor to introduce materials into the silo, the problem of blockage of the blast pipe is solved, the air volume and air pressure are stabilized, and production efficiency and safety are improved. .

CN221847464UActive Publication Date: 2024-10-18TANGSHAN JINZE COAL PREPARATION MASCH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420174095.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-24
Publication Date
2024-10-18
Estimated Expiration
2034-01-24

AI Technical Summary

Technical Problem

The blast pipe of the wind coal separator is easily blocked, resulting in reduced air pressure and air volume, affecting production efficiency and safety.

Method used

An anti-clogging structure is designed, including a blower pipe, a blower, a discharging funnel, a screw conveyor and a gate valve. The falling materials are introduced into the silo through the discharging funnel and screw conveyor to avoid clogging and are inserted into the silo. The plate valves work alternately to ensure air volume and air pressure.

Benefits of technology

It effectively prevents the blower pipe from being blocked, ensures the normal operation of the pneumatic coal separator, ensures the stability of air volume and air pressure, and improves production efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221847464U_ABST
    Figure CN221847464U_ABST
Patent Text Reader

Abstract

The utility model relates to a wind power coal separator, in particular to an anti-blocking structure of a blast pipe of the wind power coal separator. Comprising a blast pipe and an air blower, the blast pipe is located below a selection bed of the wind power coal separator, a plurality of blast chambers are installed at the bottom of the selection bed, an air inlet of the blast pipe is communicated with an outlet of the air blower, the blast pipe is provided with a plurality of air outlet branch pipes, and the air outlet branch pipes of the blast pipe are communicated with a plurality of inlets of the blast chambers through hoses respectively. A discharge port is formed in a bottom plate of the blast pipe, the discharge port of the bottom plate is positioned below the air outlet branch pipe close to the air inlet of the blast pipe, a discharge funnel is mounted at the bottom of the discharge port of the bottom plate, a discharge port of the discharge funnel is communicated with an inlet of the conveyor through a connecting pipeline, and a first gate valve and a second gate valve are mounted on the connecting pipeline. According to the utility model, materials are prevented from blocking the blast pipe, the normal operation of production is ensured, the first gate valve and the second gate valve work alternately, and the air volume and air pressure of normal production are ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a wind-powered coal separator, in particular to an anti-blocking structure for an air blast pipe of a wind-powered coal separator. Background Art

[0002] Coal is widely used in various industries as an energy source. After coal is mined from coal mines, it needs to be sorted through a coal preparation process to separate impurities and gangue from the raw coal. At present, dry coal preparation is generally used in coal preparation processes. Dry coal preparation uses a wind-powered coal preparation machine. The blower of the wind-powered dry coal preparation machine delivers high-pressure air to the blast chamber at the bottom of the selection bed through a blast pipe to blow up the raw coal on the selection bed. During the production process, some raw coal particles will pass through the selection bed and fall into the blast pipe from the blast chamber. They will gather in the blast pipe, causing the blast pipe to be blocked, reducing wind pressure and air volume, affecting normal production, and cleaning the blast chamber is time-consuming and laborious. The Chinese utility model with the authorization announcement number CN2482457Y discloses a wind-powered dry coal preparation machine, and the air supply duct of the utility model is easily blocked. Utility Model Content

[0003] The utility model aims to solve the above technical problems, thereby providing an anti-blocking structure for the blast pipe of a wind coal preparation machine to prevent the blast pipe from being blocked.

[0004] The utility model solves the technical problem and adopts the following technical solution:

[0005] A blast pipe anti-clogging structure for a wind coal preparation machine comprises a blast pipe and a blower, wherein the blast pipe is located below a selection bed of the wind coal preparation machine, a plurality of blast chambers are installed at the bottom of the selection bed, an air inlet of the blast pipe is connected with an outlet of the blower, the blast pipe is provided with a plurality of air outlet branches, the plurality of air outlet branches of the blast pipe are respectively connected with a plurality of inlets of the blast chamber through hoses, a discharge port is provided on a bottom plate of the blast pipe, the discharge port of the bottom plate is located below the air outlet branch pipe close to the air inlet of the blast pipe, a discharge funnel is installed at the bottom of the discharge port of the bottom plate, the discharge port of the discharge funnel is connected with an inlet of a screw conveyor through a connecting pipe, and a first gate valve and a second gate valve are installed on the connecting pipe.

[0006] Compared with the prior art, the utility model adopting the above technical solution has the following beneficial effects:

[0007] The material falling into the blast pipe enters the discharge funnel and the connecting pipe, and falls onto the first gate valve. After the first gate valve is opened, the material falls onto the second gate valve. The first gate valve is closed, and the second gate valve is opened. The material enters the feed port of the screw conveyor. The material is transported to the silo by the screw conveyor to prevent the material from clogging the blast pipe and ensure normal production operation. The first gate valve and the second gate valve work alternately to ensure the air volume and air pressure for normal production.

[0008] Further, the optimization scheme of the utility model is:

[0009] A material blocking plate is provided at one end of the material outlet of the bottom plate close to the blower.

[0010] The windward side of the baffle plate is provided with an obliquely arranged wind guide plate.

[0011] A support plate is provided between the inner end of the air guide plate and the bottom plate of the blast pipe. The support plate is L-shaped, and the corner of the support plate faces the discharge port.

[0012] A plug-in hole is provided on a side plate at one side of the blast pipe, the inner end of the material baffle plate passes through the plug-in hole, the outer end of the material baffle plate is fixedly connected with a connecting plate, and the connecting plate is screwed to the side plate.

[0013] A sealing gasket is provided between the connecting plate and the side plate.

[0014] The outer side of the baffle plate is provided with a guide groove with a T-shaped cross section, the vertical part of the support plate is installed with a T-shaped guide pin, the guide groove and the guide pin are slidably matched, and the bottom surface of the baffle plate is placed on the horizontal part of the support plate.

[0015] The conveyor is a screw conveyor.

[0016] The connecting pipeline is equipped with an upper flap valve and a lower flap valve.

[0017] An inclined filter screen or screen plate is arranged between the upper end of the air guide plate and the top plate of the blast pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 This is a schematic diagram of the overall structure of the first embodiment of the utility model;

[0019] Figure 2 It is a schematic diagram of the blast pipe;

[0020] Figure 3 This is a schematic diagram of the connection between the screw conveyor and the blast pipe;

[0021] Figure 4 It is a schematic diagram of the connection between the baffle plate, the support plate and the air guide plate;

[0022] Figure 5 for Figure 4 Figure A of ;

[0023] Figure 6 This is a schematic diagram of the structure of the second embodiment of the present utility model.

[0024] In the figure: bed selection 1; bed selection drive mechanism 2; base 3; blast chamber 4; blast pipe 5; first air outlet branch pipe 5-1; second air outlet branch pipe 5-2; third air outlet branch pipe 5-3; fourth air outlet branch pipe 5-4; bottom plate 5-5; blower 6; hose 7; discharge funnel 8; connecting pipe 9; screw conveyor 10; frame 10-1; first gate valve 11; second gate valve 12; baffle plate 13; air guide plate 14; support plate 15; connecting plate 16; guide pin 17; flap valve 18; filter screen 19. DETAILED DESCRIPTION

[0025] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. Embodiment 1

[0026] See also Figure 1-Figure 5 The present embodiment provides an anti-blocking structure for the blast pipe of a wind-driven coal preparation machine. The wind-driven coal preparation machine is mainly composed of a selection bed 1, a selection bed driving mechanism 2, a base 3, a blast chamber 4, a blast pipe 5 and a blower 6. The selection bed 1 is installed on the selection bed driving mechanism 2, and the selection bed driving mechanism 2 is installed on the base 3. The base 3 is a supporting frame, and the selection bed driving mechanism 2 drives the selection bed 1 to swing back and forth.

[0027] Four blast chambers 4 are installed at the bottom of the selection bed 1. The blast pipe 5 is located below the selection bed 1. The air inlet of the blast pipe 5 is connected with the outlet of the blower 6. The blast pipe 5 is provided with four air outlet branches, which are the first air outlet branch 5-1, the second air outlet branch 5-2, the third air outlet branch 5-3 and the fourth air outlet branch 5-4 along the air flow direction. The first air outlet branch 5-1, the second air outlet branch 5-2, the third air outlet branch 5-3 and the fourth air outlet branch 5-4 are connected with the inlets of the four blast chambers 4 through the hose 7 in sequence.

[0028] The bottom plate 5-5 of the blast pipe 5 is provided with a discharge port, which is rectangular and arranged horizontally. The discharge port is located below the first air outlet branch pipe 5-1. A discharge funnel 8 is installed at the bottom of the discharge port of the bottom plate 5-5. A connecting pipe 9 is installed at the lower end of the discharge funnel 8. The lower end of the connecting pipe 9 is connected to the feed port of the screw conveyor 10. The screw conveyor 10 is installed on the frame 10-1. The discharge port of the screw conveyor 10 is connected to the silo. The upper part and the middle part of the connecting pipe 9 are respectively installed with the first gate valve 11 and the second gate valve 12. The first gate valve 11 and the second gate valve 12 are both sealed gate valves. The first gate valve 11 and the second gate valve 12 are electric gate valves. The two gate valves are electrically connected to the control system.

[0029] A baffle plate 13 is provided at one end of the discharge port of the bottom plate 5-5 near the blower 6, the plate surface of the baffle plate 13 is perpendicular to the bottom plate 5-5, the inner plate surface of the baffle plate 13 faces the inner plate surface of the outer plate of the first air outlet branch pipe 5-1, the baffle plate 13 prevents the granular material from entering the blower 5 and causing damage to the blower 5, and the baffle plate 13 allows all the granular material to enter the discharge port of the bottom plate 5-5. A wind deflector 14 is provided on the windward side of the baffle plate 13, the wind deflector 14 is arranged obliquely, and the wind deflector 14 prevents the baffle plate 13 from causing turbulence of the high-pressure wind.

[0030] A support plate 15 is provided between the inner end of the air guide plate 14 and the bottom plate 5-5. The support plate 15 is L-shaped, the corner of the support plate 15 faces the discharge port, and the horizontal portion of the support plate 15 is welded to the bottom plate 5-5. A plug-in hole is provided on the side plate at the front side of the blast pipe 5, and the plug-in hole corresponds to the horizontal portion of the support plate 15. The inner end of the baffle plate 13 passes through the plug-in hole, and the bottom surface of the baffle plate 13 is placed on the horizontal portion of the support plate 15. A connecting plate 16 is welded to the outer end of the baffle plate 13. The connecting plate 16 is connected to the side plate of the blast pipe 5 by bolts. A sealing gasket is provided between the connecting plate 16 and the side plate, and the sealing gasket improves the sealing performance, prevents air leakage and reduces the wind pressure. The lower edge of the insertion hole is flush with the top surface of the horizontal portion of the support plate 15. The horizontal portion of the support plate 15 allows a certain distance between the insertion hole and the bottom plate 5-5 to ensure the contact area between the connecting plate 16 and the side plate of the blast pipe 5, thereby improving the sealing performance between the connecting plate 16 and the blast pipe 5 and ensuring the wind pressure and air volume. A guide groove with a T-shaped cross section is provided on the outer side of the baffle plate 13, and a T-shaped guide pin 17 is installed on the vertical portion of the support plate 15. The guide groove and the guide pin 17 are slidably matched, and the baffle plate 13 is easy to disassemble and replace, and easy to clean.

[0031] The working process of this embodiment is: during normal production, when the wind pressure suddenly decreases or the wind is stopped for maintenance, the raw coal particles fall into the blast chamber 4, enter the blast pipe 5, and enter the discharge funnel 8 through the discharge port of the blast pipe 5. The baffle plate 13 blocks the raw coal particles to prevent them from entering the blower 6. The raw coal particles fall onto the first gate valve 11. After the first gate valve 11 is opened, the material falls onto the second gate valve 12. The first gate valve 11 is closed, and the second gate valve 12 is opened. The material enters the feed port of the screw conveyor 10. The material is transported to the silo by the screw conveyor 10. The first gate valve 11 and the second gate valve 12 work alternately to ensure the air volume and wind pressure for normal production. When it is necessary to clean or replace the baffle plate 13, loosen the fastening bolts of the connecting plate 16 and pull the baffle plate 13 out. Embodiment 2

[0032] Figure 6As shown, the connecting pipe 9 is equipped with two flap valves 18, namely an upper flap valve and a lower flap valve, which are composed of a flap, a rotating shaft, a lever and a heavy hammer. The upper flap valve and the lower flap valve work alternately to ensure the air volume and air pressure of normal production. An inclined filter screen 19 is provided between the upper end of the air guide plate 14 and the top plate of the blast pipe 5. The filter screen 19 can also be a sieve plate. The filter screen 19 prevents large particles from entering the fan.

[0033] The above description is only a preferred feasible embodiment of the present utility model, and does not limit the scope of rights of the present utility model. All equivalent structural changes made using the contents of the present utility model specification and drawings are included in the scope of rights of the present utility model.

Claims

1. An anti-blocking structure for a blast pipe of a wind-driven coal preparation machine, comprising a blast pipe and a blower, wherein the blast pipe is located below a selection bed of the wind-driven coal preparation machine, a plurality of blast chambers are installed at the bottom of the selection bed, an air inlet of the blast pipe is connected to an outlet of the blower, the blast pipe is provided with a plurality of air outlet branches, and the plurality of air outlet branches of the blast pipe are respectively connected to a plurality of inlets of the blast chambers through hoses, Features: The bottom plate of the blast pipe is provided with a discharge port, which is located below the outlet branch pipe close to the air inlet of the blast pipe. A discharge funnel is installed at the bottom of the discharge port of the bottom plate. The discharge port of the discharge funnel is connected with the inlet of the conveyor through a connecting pipe, and the connecting pipe is installed with a first gate valve and a second gate valve.

2. The anti-blocking structure of the blast pipe of the wind coal preparation machine according to claim 1, Features: A material blocking plate is provided at one end of the material outlet of the bottom plate close to the blower.

3. The anti-blocking structure of the blast pipe of the wind coal preparation machine according to claim 2, Features: The windward side of the baffle plate is provided with an obliquely arranged wind guide plate.

4. The anti-blocking structure of the blast pipe of the wind coal preparation machine according to claim 3, Features: A support plate is provided between the inner end of the air guide plate and the bottom plate of the blast pipe. The support plate is L-shaped, and the corner of the support plate faces the discharge port.

5. The anti-blocking structure of the blast pipe of the wind coal preparation machine according to claim 1, Features: A plug-in hole is provided on a side plate at one side of the blast pipe, the inner end of the material baffle plate passes through the plug-in hole, the outer end of the material baffle plate is fixedly connected with a connecting plate, and the connecting plate is screwed to the side plate.

6. The anti-blocking structure of the blast pipe of the wind coal preparation machine according to claim 5, Features: A sealing gasket is provided between the connecting plate and the side plate.

7. The anti-blocking structure of the blast pipe of the wind coal preparation machine according to claim 5, Features: The outer side of the baffle plate is provided with a guide groove with a T-shaped cross section, the vertical part of the support plate is installed with a T-shaped guide pin, the guide groove and the guide pin are slidably matched, and the bottom surface of the baffle plate is placed on the horizontal part of the support plate.

8. The anti-blocking structure of the blast pipe of the wind coal preparation machine according to claim 1, Features: The conveyor is a screw conveyor.

9. The anti-blocking structure of the blast pipe of the wind coal preparation machine according to claim 1, Features: The connecting pipeline is equipped with an upper flap valve and a lower flap valve.

10. The anti-blocking structure of the blast pipe of the wind coal preparation machine according to claim 3, Features: An inclined filter screen or screen plate is arranged between the upper end of the air guide plate and the top plate of the blast pipe.

Citation Information

Cited By

  • Multi-air-supply coal dry separation device and separation method

    CN120079583A