Steel structure grid roof of large-span elevated station building
By designing the steel structure grid roof of the large-span elevated station building, combined with hydraulic block lifting and lifting platform devices on structural columns, the problem of long construction period and high cost has been solved, and efficient and precise steel structure installation has been achieved, improving Improve construction quality and economic benefits.
Patent Information
- Application Number
- CN202420280756.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-05
- Publication Date
- 2024-10-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the construction of high-speed railway stations, the existing construction methods of steel structure roofs of large-span elevated stations have problems such as long construction period, high cost, and low precision. Especially when the construction period is tight and the site is small, it is difficult to achieve safety. , fast and economical construction effect.
The design of the steel structure grid roof of the large-span elevated station building is adopted, including grid units, anti-deformation tire frames, portal lifting frames, original grid structure hanger lifting devices and concrete columns. Through hydraulic block lifting technology, the structure The lifting platform device on the column and the hanging point ball structure realize the efficient installation of the steel structure roof.
It improves the construction quality and precision, saves construction costs and other measures, achieves better economic benefits, and avoids the construction impact caused by the narrow side span area.
Smart Images

Figure CN221878362U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of steel structure grid installation and construction, and in particular comprises a steel structure grid roof of a large-span elevated station building. Background Art
[0002] With the rapid development of high-speed rail construction in my country, steel structures play an increasingly important role in the construction of high-speed rail stations; large-span steel roofs with novel shapes and complex supporting boundary conditions are widely used in high-speed rail stations in the new era. Steel roofs have the advantages of short construction period, high degree of industrial assembly, large span, light weight, high strength, reasonable material stress performance, flexible and changeable structural forms, and good seismic performance. They have been widely used in high-speed rail station roofs. At the same time, with the emergence of a large number of steel structure roofs of stations with complex shapes, large spans, large cantilevers, and large volumes, the difficulty of steel roof manufacturing and on-site construction has increased, which in turn puts higher requirements on structural safety, process control, construction quality and precision during steel structure construction.
[0003] For the construction of large-span steel structure roofs, a variety of mature construction methods have been developed, including high-altitude bulk method, high-altitude sliding method, strip and block hoisting method, overall jacking method, overall lifting method, and overall hoisting method folding and unfolding method. Each construction method has its unique scope of application, use conditions, and technical characteristics; in the case of relatively unfixed and unified steel roof installation construction methods, comprehensive consideration should be given to the three aspects of safety, applicability, and economy to find an optimal balance point for steel roof construction plan selection. The high-speed railway station project has a tight schedule, a small and limited on-site construction site, and cross-construction of steel structure and track laying, roofing, and interior decoration. In addition, the cost of steel structure installation measures is relatively high. It is crucial to reasonably select a steel structure installation plan according to the station structure form and on-site construction conditions to achieve the purpose of safe, fast, and economical construction.
[0004] In order to smoothly carry out the construction of the steel structure grid roof of the large-span elevated station building, it is urgent to address the shortcomings of the current construction methods, summarize the traditional construction methods, and innovate the steel structure grid roof of the large-span elevated station building so that it can save construction costs compared with the traditional roof structure, while saving related other measures costs, improving construction efficiency, and achieving better economic benefits. Utility Model Content
[0005] The utility model aims to overcome the deficiencies in the prior art and provide a large-span elevated station building steel structure grid roof.
[0006] The steel structure grid roof of the large-span elevated station building comprises a grid unit, an anti-deformation frame, a gantry lifting frame, an original grid structure hanger lifting device and a concrete column; the grid unit comprises a grid cross bar and an inclined bar, and a bolt ball is arranged at a node of the grid unit; the anti-deformation frame comprises a channel steel base, a short column is slidably arranged on the channel steel base, a long column is arranged between two channel steel bases, and the long column and the short column are respectively supported on the top layer and below the top layer of the grid unit;
[0007] The gantry lifting frame includes a transfer beam and a gantry lifting frame unit. The gantry lifting frame unit is vertically erected on the transfer beam, and a top cross beam is fixed on the top through a cross beam hoop plate. A lifting device placement groove is arranged on the top cross beam.
[0008] A lifting platform device A or a lifting platform device B is installed on the concrete column. The top of the lifting platform device A is supported by a long cantilever beam, and the top of the lifting platform device B is supported by a short cantilever beam. Steel wire ropes are arranged at the ends of the long cantilever beam and the short cantilever beam, and a hanging point ball is arranged on the steel wire rope.
[0009] Preferably, a channel steel base is provided at the bottom of the anti-deformation tire frame, a tire frame short column slide rail is provided on the channel steel base, a short column is provided in the tire frame short column slide rail, the bottom of the short column slides left and right in the tire frame short column slide rail through the short column base, and can be fixed by bolts on the short column base, a plurality of long columns are provided between the two channel steel bases, a base limit block is provided on the long column base of the long column, the long column base is fixed to the ground, a short column cross plate is provided on the short column, a cross bar arc drag is provided on the short column cross plate, the cross bar arc drag is used to place the grid cross bar, bolt ball placement grooves are provided on the tops of the long columns and the short columns for placing bolt balls, a telescopic joint is provided on the short column, and a height adjustment rod is provided on the outer side of the telescopic joint.
[0010] Preferably, the conversion beam of the gantry lifting frame is installed on the concrete structure and connected by an anchor plate. Stiffening beams are arranged between the conversion beams. A unit base is arranged on the conversion beam. A gantry lifting frame unit is arranged on the unit base. Vertically adjacent gantry lifting frame units are connected by flanges. A top beam is arranged on the top of the gantry lifting frame unit. The top beam is in an I-shape. A top sleeve is arranged at the bottom of the top beam. Cross supports are arranged on both sides of the top beam. A cross beam hoop plate is arranged on the top of the top beam. A top cross beam is arranged in the cross beam hoop plate. The top of the cross beam hoop plate is fixed by tension bolts. A cross partition is arranged between the top cross beams. A lifting device placement groove is arranged on the top.
[0011] Preferably, the hanging point ball has a reinforced base at the bottom, crossbar fixing sleeves on the left and right sides, side end plates on the front and rear sides, rear connecting sleeves welded on the side end plates, and a wire rope through hole vertically arranged on the hanging point ball.
[0012] Preferably, the lifting platform device A comprises a pre-embedded cross I-beam, which is embedded in a concrete column, and column positioning cylinders are arranged on the four ends of the pre-embedded cross I-beam, and a column with a diagonal brace is arranged on the column positioning cylinder, and an inner column is arranged on the top of the middle position of the concrete column, and a connecting plate is arranged at the diagonal brace end of the diagonal brace column for fixing, and the top of the diagonal brace column supports one end of the long cantilever beam, and a supporting steel and a folding brace are arranged on one side of the diagonal brace column in sequence, and the supporting steel and the folding brace are supported under the long cantilever beam; Tensioning struts are arranged between the supporting steel and the diagonal supporting columns, a shelf plate is arranged on the top of the diagonal supporting column, a top sleeve is arranged on the bottom of the shelf plate, a cantilever beam limit plate and a beam pressure top are arranged on the shelf plate, a concrete column clamp plate is arranged between the supporting steel and the concrete column, the supporting steel and the long cantilever beam are connected through the steel column clamp plate, the long cantilever beam is arranged between the cantilever beam limit plates, short square steel is arranged at the end of the long cantilever beam, a lifting device is arranged on the top of the short square steel, a steel wire rope is vertically penetrated through the middle position of the short square steel, and the steel wire rope is connected to the lower hanging point ball.
[0013] Preferably, the lifting platform device B includes a triangular I-beam frame, the middle part of the triangular I-beam frame is cast in a concrete column, columns are arranged on the upper part of the three end points of the triangular I-beam frame through column positioning tubes, reinforcing bolt balls are arranged between the columns, and the columns are provided with oblique rods intersecting with the reinforcing bolt balls. A top plate is provided on the top of the column of the lifting platform device B, a cross beam is arranged on the top plate, a short cantilever cross beam is arranged on one side of the cross beam, and a short square steel is arranged at the end of the short cantilever cross beam.
[0014] Preferably, the original grid structure hanger lifting device includes a bolt ball, a conical reinforcement plate is arranged on the bolt ball, a hanger column is arranged on the conical reinforcement plate on one bolt ball, and T-shaped reinforcement plates are arranged on the other conical reinforcement plates. A hanger connecting plate is arranged on the top of the hanger column, a hanger crossbeam is arranged on the hanger connecting plate, a hanger diagonal brace is arranged at the lower part, a stiffening I-beam is arranged at the end of the hanger diagonal brace, a short square steel is arranged at the end of the hanger crossbeam, a steel wire rope is vertically penetrated through the middle position of the short square steel, and the steel wire rope is connected to the lower hanging point ball.
[0015] The beneficial effects of the utility model are:
[0016] 1) The utility model is provided with a gantry lifting frame system of the grid unit in the intermediate lifting area for installing the grid. After the partitions are hydraulically lifted, they are spliced into a whole with the high-altitude bulk area through supplementary rods, thereby ensuring the construction quality of the steel structure grid roof.
[0017] 2) An original grid structure hanger device is provided for lifting the side span grid, thus avoiding the impact of grid installation construction caused by the narrow side span construction area.
[0018] 3) The structure of the hanging point ball is innovated. The horizontal bar fixing sleeves on the left and right sides are prefabricated in the factory, and the rear connecting sleeves on the front and rear sides are welded according to the actual situation on site, which improves the installation accuracy on the construction site. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 is a schematic diagram of a lifting platform device A lifting a grid unit;
[0020] Figure 2 It is a schematic diagram of assembling the overall lifting unit of the grid;
[0021] Figure 3 It is a schematic diagram of the tire frame structure;
[0022] Figure 4 It is a schematic diagram of a portal lifting frame;
[0023] Figure 5 It is a schematic diagram of the bottom of the portal lifting frame;
[0024] Figure 6 It is a schematic diagram of the top of the portal lifting frame;
[0025] Figure 7 It is a schematic diagram of the structure of the hanging penalty kick;
[0026] Figure 8 is a three-dimensional schematic diagram of a lifting platform device A;
[0027] Fig. 9 is a three-dimensional schematic diagram of the top of the lifting platform device A;
[0028] Fig.10 is a schematic diagram of a lifting platform device B;
[0029] Fig.11 This is a schematic diagram of the original grid hanger.
[0030] Among them: 1. Tire frame short column slide rail 2. Short column cross plate 3. Channel steel base 4. Short column 5. Grid cross bar 6. Bolt ball 7. Long column 8. Cross bar arc drag 9. Telescopic joint 10. Base limit block 11. Short column base 12. Long column base 13. Height adjustment rod 14. Bolt ball shelf groove 15. Anchor plate 16. Conversion beam 17. Top sleeve 18. Top beam 19. Cross beam hoop plate 20. Lifting device shelf groove 21. Top cross beam 22. Tension screw 23. Cross support 24. Flange 25. Door-type lifting frame unit 26. Stiffening beam 27. Unit base 28. Side end plate 29. Lower suspension point ball 30. Wire rope through hole 31. Rear sleeve 32. Cross Rod fixing sleeve 33. Strengthened base 34. Concrete column 35. Embedded cross I-beam 36. Column positioning tube 37. Inner column 38. Column with diagonal brace 39. Connecting plate 40. Cantilever beam limit plate 41. Long cantilever beam 42. Beam top pressure 43. Lifting device 44. Short square steel 45. Steel column clamp plate 46. Tensioning strut 47. Wire rope 48. Concrete column clamp 49. Triangular I-beam frame 50. Internal reinforcement bolt ball 51. Diagonal rod 52. Short cantilever beam 53. Top plate 54. Reinforced I-beam 55. Hanger beam 56. Hanger diagonal brace 57. Hanger connecting plate 58. T-shaped reinforcement plate 59. Hanger column 60. Conical reinforcement plate 61. Folding strut. DETAILED DESCRIPTION
[0031] The utility model is further described below in conjunction with the embodiments. The description of the following embodiments is only used to help understand the utility model. It should be pointed out that for ordinary people in this technical field, the utility model can also be modified in some ways without departing from the principle of the utility model, and these improvements and modifications also fall within the scope of protection of the claims of the utility model.
[0032] As an example, Figures 1 to 11 As shown, this large-span elevated station steel structure grid roof mainly involves the high-altitude bulk-block lifting and hydraulic block lifting technology, the accurate assembly technology of the roof segment anti-deformation tire frame, the gantry lifting platform device on the structural column, the original grid structure hanger structure lifting device, the column top lifting frame form, and the lower hanging point structure technology, etc. It includes grid units, anti-deformation tire frames, gantry lifting frames, original grid structure hanger lifting devices and concrete columns 34.
[0033] like Figure 2 and Figure 3As shown, a channel steel base 3 is arranged at the bottom of the anti-deformation tire frame, a tire frame short column slide rail 1 is arranged on the channel steel base 3, a short column 4 is arranged in the tire frame short column slide rail 1, a short column base 11 at the bottom of the short column 4 can slide left and right in the tire frame short column slide rail 1, and can be fixed by bolts on the base limit block 10, a plurality of long columns 7 are arranged between the two channel steel bases 3, a base limit block 10 is arranged on the long column base 12 of the long column 7, and is fixed on the ground, a short column cross plate 2 is arranged on the short column cross plate 2, a cross bar arc drag 8 is arranged on the short column cross plate 2, and the cross bar arc drag 8 is used to place the grid cross bar 5, a bolt ball placing groove 14 is arranged on the top of the long column 7 and the short column 4 for placing the bolt ball 6, a telescopic section 9 is arranged on the short column, and a height adjustment rod 13 is arranged on the outer side of the telescopic section 9.
[0034] like Figures 4 to 6 As shown, the conversion beam 16 of the gantry lifting frame is installed on the concrete structure and connected by an anchor plate 15. A stiffening beam 26 is arranged between the conversion beams 16. A unit base 27 is arranged on the conversion beam 16. A gantry lifting frame unit 25 is arranged on the unit base 27. The gantry lifting frame units 25 are connected by a flange 24. A top beam 18 is arranged on the top, a top sleeve 17 is arranged at the bottom of the top beam 18, and cross supports 23 are arranged on both sides. The top beam 18 is in an I-shape, and a cross beam hoop plate 19 is arranged on the top. A top cross beam 21 is arranged in the cross beam hoop plate 19 and fixed by tension bolts 22. A cross partition is arranged between the top cross beams 21, and a lifting device placement groove 20 is arranged on the top.
[0035] like Figure 7 As shown, the lower hanging point ball 29 has a reinforcing base 33 at the bottom, crossbar fixing sleeves 32 at the left and right sides, side end plates 28 at the front and rear sides for welding the rear connecting sleeves 31 on site, and a wire rope through hole 30 is provided at the lower hanging point ball.
[0036] like Figure 1 , Figure 8 and Fig. 9As shown, the lifting platform device A on the structural column has a cross I-beam 35 embedded in the concrete column 34, a column positioning tube 36 is arranged on the embedded cross I-beam 35, a column 38 with a diagonal brace is arranged on the column positioning tube 36, an inner column 37 is arranged at the top of the middle position of the concrete column 34, a connecting plate 39 is arranged at the diagonal brace end of the diagonal brace column 38 for fixing, a supporting steel and a folding strut 61 are arranged on one side of the diagonal brace column 38 in sequence, a tensioning strut 46 is arranged between the supporting steel and the diagonal brace column 38, and the diagonal brace column A shelf plate is arranged on the top of 38, a top sleeve 17 is arranged on the bottom of the shelf plate, a cantilever beam limit plate 40 and a beam pressure top 42 are arranged on the shelf plate, a concrete column clamp plate 48 is arranged between the supporting steel and the concrete column 34, the supporting steel and the cantilever long beam are connected through the steel column clamp plate 45, a long cantilever beam 41 is arranged between the cantilever beam limit plates 40, a short square steel 44 is arranged at the end of the long cantilever beam 41, a lifting device 43 is arranged on the top of the short square steel 44, a steel wire rope 47 is arranged through the middle position, and the steel wire rope is connected to the lower hanging point ball 29.
[0037] like Fig.10 As shown, the lifting platform device B includes a triangular I-beam frame 49, the triangular I-beam frame 49 is arranged in the concrete column 34, a column positioning tube 36 is arranged on the upper part of the triangular I-beam frame, an inclined rod 51 is arranged between the columns, and the inclined rod 51 intersects with a reinforcing bolt ball 50. A crossbeam pressure top 42 is arranged on the top plate 53 of the lifting platform device B, a short cantilever crossbeam 52 is arranged on one side of the crossbeam pressure top, and a short square steel 44 is arranged at the end of the short cantilever crossbeam 52.
[0038] like Fig.11 As shown, in the original grid structure hanger lifting device, a conical reinforcement plate 60 is arranged on the bolt ball 6, a T-shaped reinforcement plate 58 is arranged on the conical reinforcement plate 60, a hanger connecting plate 57 is arranged on the top of the hanger column 59, a hanger cross beam 55 is arranged below the hanger connecting plate 57, a hanger diagonal brace 56 is arranged at the lower part, a stiffening I-beam 54 is arranged at the end of the hanger diagonal brace 56, and a short square steel 44 is arranged at the end of the hanger cross beam 55.
Claims
1. A large-span elevated station building steel structure grid roof, characterized in that: It includes a grid unit, an anti-deformation frame, a gantry lifting frame, an original grid structure hanger lifting device and a concrete column; the grid unit includes a grid cross bar and an inclined bar, and the nodes of the grid unit are provided with bolt balls; the anti-deformation frame includes a channel steel base, a short column is slidably provided on the channel steel base, a long column is provided between the two channel steel bases, and the long column and the short column are supported on the top layer and below the top layer of the grid unit respectively; The gantry lifting frame includes a transfer beam and a gantry lifting frame unit. The gantry lifting frame unit is vertically erected on the transfer beam, and a top cross beam is fixed on the top through a cross beam hoop plate. A lifting device placement groove is arranged on the top cross beam. A lifting platform device A or a lifting platform device B is installed on the concrete column. The top of the lifting platform device A is supported by a long cantilever beam, and the top of the lifting platform device B is supported by a short cantilever beam. Steel wire ropes are arranged at the ends of the long cantilever beam and the short cantilever beam, and a hanging point ball is arranged on the steel wire rope.
2. The large-span elevated station building steel structure grid roof according to claim 1 is characterized in that: A channel steel base is provided at the bottom of the anti-deformation tire frame, and a tire frame short column slide rail is provided on the channel steel base, and a short column is provided in the tire frame short column slide rail. The bottom of the short column slides left and right in the tire frame short column slide rail through the short column base, and can be fixed by bolts on the short column base. A plurality of long columns are provided between the two channel steel bases, and a base limit block is provided on the long column base of the long column. The long column base is fixed to the ground, and a short column cross plate is provided on the short column cross plate, and a cross bar arc drag is provided on the short column cross plate, and the cross bar arc drag is used to place the grid cross bar, and bolt ball placement grooves are provided on the tops of the long columns and the short columns for placing bolt balls, and a telescopic section is provided on the short column, and a height adjustment rod is provided on the outer side of the telescopic section.
3. The large-span elevated station building steel structure grid roof according to claim 1 is characterized in that: The transfer beam of the gantry lifting frame is installed on the concrete structure and connected by an anchor plate. A stiffening beam is arranged between the transfer beams. A unit base is arranged on the transfer beam. A gantry lifting frame unit is arranged on the unit base. Vertically adjacent gantry lifting frame units are connected by flanges. A top beam is arranged on the top of the gantry lifting frame unit. The top beam is in an I-shape. A top sleeve is arranged at the bottom of the top beam. Cross supports are arranged on both sides of the top beam. A cross beam hoop plate is arranged on the top of the top beam. A top cross beam is arranged in the cross beam hoop plate. The top of the cross beam hoop plate is fixed by tension bolts. A cross partition is arranged between the top cross beams. A lifting device placement groove is arranged on the top.
4. The large-span elevated station building steel structure grid roof according to claim 1 is characterized in that: The lower hanging point ball has a reinforced base at the bottom, horizontal rod fixing sleeves on the left and right sides, side end plates on the front and rear sides, rear connecting sleeves welded on the side end plates, and a wire rope through hole vertically arranged on the lower hanging point ball.
5. The large-span elevated station building steel structure grid roof according to claim 1 is characterized in that: The lifting platform device A includes a pre-buried cross I-beam, which is pre-buried in a concrete column. A column positioning cylinder is arranged on the four ends of the pre-buried cross I-beam, and a column with a diagonal brace is arranged on the column positioning cylinder. An inner column is arranged at the top of the middle position of the concrete column, and a connecting plate is arranged at the diagonal brace end of the diagonal brace column for fixing. The top of the diagonal brace column supports one end of a long cantilever beam, and a supporting steel and a folding brace are arranged on one side of the diagonal brace column in sequence. The supporting steel and the folding brace are supported under the long cantilever beam; the supporting steel A tensioning strut is arranged between the diagonal braced columns, a shelf plate is arranged on the top of the diagonal braced columns, a top sleeve is arranged at the bottom of the shelf plate, a cantilever beam limit plate and a beam pressure top are arranged on the shelf plate, a concrete column clamp plate is arranged between the supporting steel and the concrete column, the supporting steel and the long cantilever beam are connected through the steel column clamp plate, the long cantilever beam is arranged between the cantilever beam limit plates, short square steel is arranged at the end of the long cantilever beam, a lifting device is arranged on the top of the short square steel, a steel wire rope is vertically penetrated through the middle position of the short square steel, and the steel wire rope is connected to the lower hanging point ball.
6. The large-span elevated station building steel structure grid roof according to claim 1 is characterized in that: The lifting platform device B includes a triangular I-beam frame, the middle part of which is cast in a concrete column, columns are arranged on the upper part of the three end points of the triangular I-beam frame through column positioning tubes, reinforcing bolt balls are arranged between the columns, and the columns are provided with oblique rods intersecting the reinforcing bolt balls. A top plate is provided on the top of the column of the lifting platform device B, a crossbeam is arranged on the top plate, a short cantilever crossbeam is arranged on one side of the crossbeam, and a short square steel is arranged at the end of the short cantilever crossbeam.
7. The large-span elevated station building steel structure grid roof according to claim 1 is characterized in that: The original grid structure hanger lifting device includes a bolt ball, a conical reinforcement plate is arranged on the bolt ball, a hanger column is arranged on the conical reinforcement plate on one bolt ball, and T-shaped reinforcement plates are arranged on the other conical reinforcement plates. A hanger connecting plate is arranged on the top of the hanger column, a hanger crossbeam is arranged on the hanger connecting plate, a hanger diagonal brace is arranged at the lower part, a stiffening I-beam is arranged at the end of the hanger diagonal brace, a short square steel is arranged at the end of the hanger crossbeam, a steel wire rope is vertically penetrated through the middle position of the short square steel, and the steel wire rope is connected to the lower hanging point ball.