Road construction early warning device

By adopting the design of sliding connection and screw driver in the road construction early warning device, the cleaning board can promptly clean the stains on the scraper, solving the problem of secondary pollution of the scraper in windy and rainy weather, and improving the quality of the display board. Cleanliness and early warning effects.

CN221895629UActive Publication Date: 2024-10-25CHENGDU TECH UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420487284.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-13
Publication Date
2024-10-25
Estimated Expiration
2034-03-13

AI Technical Summary

Technical Problem

In the existing road construction early warning device, in windy and rainy weather, when the cleaning rod reciprocates to scrape the stains on the display panel, the stains will adhere to the scraper and contaminate the display panel again when it returns, affecting the cleaning effect.

Method used

An early warning device including a support board, a display board, a scraper and a cleaning board is designed. The sliding connection and screw driver are used to move the cleaning board up and down the scraper slope to clean the attached stains and prevent secondary contamination. Rubber or silicone material improves scraping performance.

Benefits of technology

It effectively prevents secondary contamination of the display board by the scraper when it returns, keeps the display board clean, improves the early warning effect, and ensures that the display content is clearly visible in windy and rainy weather.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221895629U_ABST
    Figure CN221895629U_ABST
Patent Text Reader

Abstract

The utility model discloses a road construction early warning device, and belongs to the field of road construction. A road construction early warning device comprises a supporting plate, a display plate is fixedly connected to the supporting plate, the road construction early warning device further comprises a first movable block connected to the supporting plate in a sliding mode, a scraper is fixedly connected to the bottom of the first movable block, and the contact end of the scraper is attached to the end face of the display plate; the second movable block is connected to the side wall of the supporting plate in a sliding mode, a cleaning plate is fixedly connected to the second movable block, and the cleaning plate is matched with the scraping plate; according to the scraper cleaning device, stains attached to the scraper can be cleaned in time, secondary pollution to the display board when the scraper returns is prevented, and the cleaning effect of the scraper in windy and rainy days is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of road construction, in particular to a road construction early warning device. Background Art

[0002] During road construction, early warning devices are needed to remind passing vehicles to reduce the occurrence of accidents. Road construction early warning devices can better protect the safety of passing vehicles and construction sites. With the development of the times, in order to meet market demand, manufacturers will use Internet of Things technology in combination with their hardware equipment to achieve the intelligent development of road construction early warning devices.

[0003] After searching, the Chinese patent application number CN202320618486.X discloses an early warning device for municipal road construction, including a supporting frame, two fixed plates are connected to the supporting frame, a bearing is provided on one side of the fixed plate, the same rotating shaft is sleeved in the two bearings, and a drive assembly is connected to one end of the rotating shaft.

[0004] However, it was found in actual use that in windy and rainy weather, gravel, mud and dust on the road mixed to form mixed stains. At this time, passing vehicles are likely to splash the stains onto the warning display panel, thereby blocking the warning content. The above-mentioned device uses a cleaning rod to scrape the stains on the display panel back and forth, but the stains adhered to the scraper when it returns will secondary contaminate the display panel, affecting the cleaning effect of the scraper. Utility Model Content

[0005] The utility model aims to solve the problem that in the prior art, a cleaning rod is used to reciprocately scrape off stains on a display panel, but when the scraper returns, the stains adhered to the scraper will secondary contaminate the display panel, affecting the cleaning effect of the scraper, and proposes a road construction early warning device.

[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0007] A road construction early warning device comprises a support plate, to which a display board is fixedly connected, and further comprises: a first movable block slidably connected to the support plate, wherein a scraper is fixedly connected to the bottom of the first movable block, and the contact end of the scraper is in contact with the end surface of the display board; a second movable block slidably connected to the side wall of the support plate, wherein a cleaning plate is fixedly connected to the second movable block, and the cleaning plate cooperates with the scraper.

[0008] In order to facilitate the movement of the cleaning plate, preferably, a working box is fixedly connected to the support plate, a second screw rod is rotatably connected inside the working box, and the second movable block is threadedly connected to the second screw rod and fits against the inner wall of the working box.

[0009] In order to facilitate driving the second screw rod, further, a contact rod is fixedly connected to the first movable block, a button switch is fixedly connected in the working box, a driving machine is arranged in the working box, the second screw rod is fixedly connected to the output end of the driving machine, and the button switch is electrically coordinated with the driving machine.

[0010] In order to facilitate the reciprocating movement of the scraper, preferably, a mounting box is fixedly connected to the top of the support plate, a first screw rod is rotatably connected inside the mounting box, and the first movable block is threadedly connected to the first screw rod and fits against the inner wall of the mounting box.

[0011] In order to improve the scraping effect of the scraper and the cleaning plate, preferably, the scraper and the cleaning plate are made of rubber or silicone.

[0012] In order to facilitate supporting the support plate, preferably, a base is fixedly connected to the bottom of the support plate.

[0013] Compared with the prior art, the utility model provides a road construction early warning device, which has the following beneficial effects:

[0014] 1. The road construction early warning device scrapes the inclined surface of the scraper by moving the cleaning plate up and down, thereby timely cleaning the stains attached to the scraper to prevent the scraper from causing secondary pollution to the display board when returning, and ensure the cleaning effect of the scraper in windy and rainy weather.

[0015] 2. The road construction warning device can keep the surface of the display board clean and tidy by scraping the stains on the surface of the display board with a scraper, thereby improving the display effect, reducing the impact of stains on the display board in windy and rainy weather, making the display content clearly visible, and improving the warning effect;

[0016] 3. The road construction warning device can post or annotate warning signs or warning pictures on the display board to warn passers-by or vehicles during the road construction process.

[0017] The parts not involved in the device are the same as the existing technology or can be implemented by using the existing technology. The utility model can clean the stains attached to the scraper in time to prevent the scraper from causing secondary pollution to the display board when returning, and ensure the cleaning effect of the scraper in windy and rainy weather. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 This is a three-dimensional structural diagram of a road construction early warning device proposed by the utility model;

[0019] Figure 2 This is a partial structural diagram of a road construction early warning device proposed by the utility model;

[0020] Figure 3 This is a schematic cross-sectional structural diagram of a road construction early warning device proposed by the utility model;

[0021] Figure 4 This is a schematic diagram of the structure of a scraper of a road construction early warning device proposed by the utility model when viewed from above.

[0022] In the figure: 1, support plate; 101, base; 2, display board; 3, installation box; 301, first screw rod; 302, first movable block; 4, contact rod; 5, scraper; 6, working box; 601, second screw rod; 602, second movable block; 7, cleaning plate; 8, push button switch. DETAILED DESCRIPTION

[0023] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0024] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0025] Example:

[0026] Reference Figure 1-Figure 4 A road construction early warning device comprises a support plate 1, a base 101 is installed at the bottom of the support plate 1 for supporting the support plate 1, and a display board 2 is fixedly connected to the support plate 1, and early warning signs or warning pictures can be posted or annotated on the display board 2 to warn passers-by or vehicles during road construction.

[0027] In addition, a mounting box 3 is installed on the top of the display board 2, a rotatable first screw rod 301 is installed in the mounting box 3, a motor is installed in the mounting box 3, and the first screw rod 301 is fixedly connected to the output end of the motor, and then a first movable block 302 is threadedly connected to the first screw rod 301 and fits with the inner wall of the mounting box 3, and a scraper 5 is fixedly connected to the first movable block 302, and there are two sets of staggered inclined surfaces on the bottom end of the scraper 5, please refer to Figure 4, and then the stains on the surface of the display board 2 can be scraped off, so as to keep the surface of the display board 2 clean and tidy, improve the display effect, reduce the impact of stains on the display board 2 in windy and rainy weather, make the display content clearly visible, and improve the warning effect.

[0028] In addition, a working box 6 is fixedly connected to the side wall of the display board 2, and a second screw rod 601 is rotatably connected in the working box 6. Then, a second movable block 602 is threadedly connected to the second screw rod 601 and fits with the inner wall of the working box 6. A cleaning plate 7 is fixedly connected to the second movable block 602. The inclined surface of the cleaning plate 7 has the same angle as the inclined surface of one side of the scraper 5. Please refer to Figure 4 shown.

[0029] In addition, a contact rod 4 is fixedly connected to the first movable block 302, a button switch 8 is fixedly connected in the working box 6, a driving machine is arranged in the working box 6, and the second screw rod 601 is fixedly connected to the output end of the driving machine. The button switch 8 is electrically coordinated with the driving machine, that is, the button switch 8 can control the opening and closing of the driving machine. The button switch 8 refers to a switch that utilizes a button to push the transmission to connect or disconnect the moving contact and the static contact and realize circuit switching. This is a prior art and will not be elaborated on here.

[0030] The working principle is as follows: when the scraper 5 is scraping the stains on the surface of the display board 2, when the first movable block 302 moves to the leftmost side of the installation box 3, the motor in the installation box 3 stops working. This process can be controlled by observing the position of the scraper 5 or by controlling the circuit board. The contact rod 4 on the first movable block 302 presses the button of the button switch 8. At this time, the second screw 601 in the working box 6 rotates, so that it can drive the cleaning plate 7 to move up and down to scrape the inclined surface of the scraper 5, thereby timely cleaning the stains attached to the scraper 5 to prevent the scraper 5 from causing secondary pollution to the display board 2 when returning, and ensure the cleaning effect of the scraper 5 in windy and rainy weather.

[0031] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A road construction early warning device, comprising a support plate (1), to which a display plate (2) is fixedly connected, characterized in that: Also includes: a first movable block (302) slidably connected to the support plate (1), The bottom of the first movable block (302) is fixedly connected with a scraper (5), and the contact end of the scraper (5) is in contact with the end surface of the display board (2); a second movable block (602) slidably connected to the side wall of the support plate (1), Wherein, a cleaning plate (7) is fixedly connected to the second movable block (602), and the cleaning plate (7) cooperates with the scraper (5).

2. A road construction early warning device according to claim 1, characterized in that: The support plate (1) is fixedly connected to a working box (6), a second screw rod (601) is rotatably connected inside the working box (6), and the second movable block (602) is threadedly connected to the second screw rod (601) and fits against the inner wall of the working box (6).

3. A road construction early warning device according to claim 2, characterized in that: A contact rod (4) is fixedly connected to the first movable block (302), a button switch (8) is fixedly connected inside the working box (6), a driving machine is arranged inside the working box (6), the second screw rod (601) is fixedly connected to the output end of the driving machine, and the button switch (8) is electrically coordinated with the driving machine.

4. A road construction early warning device according to claim 1, characterized in that: The top of the support plate (1) is fixedly connected to a mounting box (3), a first screw rod (301) is rotatably connected inside the mounting box (3), and the first movable block (302) is threadedly connected to the first screw rod (301) and fits against the inner wall of the mounting box (3).

5. A road construction early warning device according to claim 1, characterized in that: The scraper (5) and the cleaning plate (7) are both made of rubber or silicone.

6. A road construction early warning device according to claim 1, characterized in that: The bottom of the support plate (1) is fixedly connected to a base (101).