Assembling and aligning structure for tower crane attachment rod piece
By designing the assembly and alignment structure of port connecting plate, fixed casing, displacement working block and pitch adjustment bolt in the tower machine attachment rod, the bending problem caused by the non-parallel positional relationship between the telescopic rod and the channel steel sleeve is solved, and the bending problem is achieved Cost reduction and stability improvement.
Patent Information
- Application Number
- CN202420142233.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-19
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-01-19
AI Technical Summary
During the expansion and contraction process, the attachment rods of the existing tower machine are not parallel to each other due to the positional relationship between the telescopic rods and the channel steel sleeve, which leads to the bending of the attachment rods, which reduces the stability and safety of use.
A tower machine attachment rod assembly alignment structure is designed, including port connection plate, fixed sleeve, displacement working block and pitch adjustment bolt. The position of displacement working block is adjusted through pitch adjustment bolts to ensure the telescopic rod and channel steel sleeve. Keep parallel, use the matching of threaded holes and bolts to achieve any distance adjustment and maintain stability.
It effectively reduces the production and installation costs of the attachment rods, ensures the parallel position relationship between the telescopic rods and the channel steel sleeve, and improves the stability and use safety of the attachment rods.
Smart Images

Figure CN221939952U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of tower crane auxiliary equipment, in particular to an assembly alignment structure of tower crane attachment rods. Background Art
[0002] The prior art discloses a tower crane attachment rod with a telescopic function, which comprises a telescopic rod 4, a channel steel sleeve 3, a transfer screw 2, a transfer end 1, a connecting pin 22 (such as Figure 1 As shown); wherein the telescopic rod is provided with two assembly holes 5, the channel steel sleeve is welded by a group of channel steels and a plurality of connecting plates 6, the composition principle is that a group of channel steels are convexly opposed, a connecting plate is welded in the middle, the connecting plates at both ends of the channel steel sleeve are different from the middle connecting plate, and positioning holes 7 are provided on the connecting plates at the two ends of the channel steel sleeve. The function of the positioning holes is to connect the assembly holes on the telescopic rod with the corresponding positioning holes on the channel steel sleeve by pins when the length of the attached rod needs to be adjusted, so as to complete the length adjustment.
[0003] A tension and compression test was carried out on the tower crane attachment rod with telescopic function. The adapter ends at both ends of the attachment rod were connected to the ear plate supports. One end of the rod was fixed and the other end was ballasted using a horizontal low-cycle reciprocating loading test system. The attachment device included a telescopic rod 4, a channel steel sleeve 3, an adapter screw 2, an adapter end 1, an ear plate support 21, a connecting pin 22, and a connecting bolt. When the attachment device was loaded to 29 tons, the positional relationship between the telescopic rod and the channel steel sleeve became an intersection relationship, and the attachment rod had undergone obvious bending, that is, the positional relationship between the telescopic rod and the channel steel sleeve had a great influence on the stability of the attachment rod.
[0004] For the attached rods in the experiment, since the rods are only subjected to pressure loads, that is, the attached rods are two-force rods, once the position relationship between the telescopic rods and the channel steel sleeves is not parallel or not in a straight line, when the attached rods are subjected to pressure loads, the pressure loads will produce a certain bending moment on the attached rods themselves, thereby reducing the original stability of the attached rods, which poses a non-negligible threat to the safety of the attached rods.
[0005] During the experimental preparation, it was found that there are two factors that affect the positional relationship between the telescopic rod and the channel steel sleeve. First, when the telescopic rod is installed in the channel steel sleeve, the cross-sectional size of the installation port of the channel steel sleeve is larger than the cross-sectional size of the telescopic rod, and the installation methods are divided into manual installation and hoisting installation. During the installation process, the direction of the installation force is not fixed, resulting in the positional relationship between the telescopic rod and the channel steel sleeve not being parallel or on a straight line; second, when fixing the position of the telescopic rod in the channel steel sleeve, the position of the telescopic rod in the channel steel sleeve is adjusted because the attached rod is required to reach a certain length. After the position is determined, the assembly hole of the telescopic rod and the locating hole of the channel steel sleeve must be connected with the pin shaft. In the process of matching the pin shaft with the assembly hole of the telescopic rod and the locating hole of the channel steel sleeve, a certain impact load needs to be used to drive the installation. The applied impact load will also affect the position change of the telescopic rod.
[0006] According to the two influencing factors found above, we provide an assembly alignment structure of tower crane attachment rods. The end connecting plates on both sides of the channel steel sleeve are located at the installation opening of the channel steel sleeve. If the designed structure is placed at this connecting plate, it can not only fix the parallel position relationship between the telescopic rod and the channel steel sleeve when the telescopic rod is just installed to the installation opening of the channel steel sleeve, but also ensure that the position of the telescopic rod does not change when assembling the pin shaft. Moreover, using the existing structural foundation of the attachment rod to design this utility model can greatly reduce the production cost and installation cost of the attachment rod. Summary of the invention
[0007] In order to overcome the defects of the prior art, the purpose of the utility model is to provide a tower crane attachment rod assembly alignment structure to solve the problem that the telescopic rod in the attachment rod is installed in the channel steel sleeve and tilted, resulting in a large bending moment when the attachment rod is compressed, affecting the stability of the tower crane attachment rod.
[0008] To this end, the utility model proposes an assembly alignment structure for a tower crane attachment rod, comprising a port connecting plate, a fixed sleeve, a displacement working block and a distance adjusting bolt; the upper and lower ends of the port connecting plate are respectively fixedly connected to the channel steel sleeve of the tower crane attachment rod; the fixed sleeve is fixed to the outer side of the port connecting plate by a fixing bolt, the displacement working block is located on the inner side of the port connecting plate, the displacement working block is fixedly connected to the front end of the distance adjusting bolt, and the middle part of the distance adjusting bolt is movably connected to the fixed sleeve threaded pair at the same time, and the front and rear positions of the displacement working block are adjusted by rotating the distance adjusting bolt, so as to adjust the contact area between the displacement working block and the telescopic rod of the tower crane attachment rod, so that the telescopic rod and the channel steel sleeve remain parallel.
[0009] Furthermore, the fixing sleeve includes a pair of fixing ear plates; the port connecting plate is provided with a connecting plate threaded hole; the fixing bolt passes through the fixing ear plates and is connected to the connecting plate threaded hole, so that the fixing sleeve is fixed to the outside of the port connecting plate.
[0010] Furthermore, an embedded groove is provided on the outer side of the threaded hole of the connecting plate, and the fixing ear plate cooperates with the embedded groove.
[0011] Furthermore, the fixing sleeve includes a distance-adjusting threaded hole in the middle, and the distance-adjusting threaded hole cooperates with the distance-adjusting bolt.
[0012] Furthermore, the displacement working block is in the shape of a stepped shaft, including displacement block one and displacement block two; the fixed sleeve is roughly in the shape of a bottle cap, with a displacement groove on the inner side; and a circular through hole is provided on the port connecting plate.
[0013] Furthermore, the diameter of the displacement block 1 is equal to the diameter of the displacement groove, and the diameter of the displacement block 2 is equal to the diameter of the circular through hole.
[0014] Furthermore, the diameter of the displacement block 1 is smaller than the diameter of the displacement block 2.
[0015] Furthermore, the displacement working block is provided with a fastening threaded hole, and the fastening threaded hole is threadedly fixed to the distance adjusting bolt.
[0016] The tower crane attachment rod assembly alignment structure provided by the utility model utilizes the existing structure of the attachment rod, and arranges an adjustment structure including a distance adjustment bolt, a fixed sleeve, and a displacement working block on the port connection plate of the channel steel sleeve, which can greatly reduce the production cost and installation cost of the attachment rod; by utilizing the cooperation between the threaded hole and the bolt, the telescopic distance can be arbitrarily adjusted within the range of the bolt spiral telescopic expansion and contraction, and both the adjustment of any distance and the stability and invariance of the adjusted distance are satisfied.
[0017] In addition to the above-described purposes, features and advantages, the present application also has other purposes, features and advantages. The present application will be further described in detail with reference to the drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The drawings constituting part of the present application are used to provide a further understanding of the present application. The exemplary embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0019] Figure 1 It is a structural schematic diagram of a tower crane attachment rod with telescopic function in the prior art;
[0020] Figure 2 The schematic diagram of the tower crane attachment rod assembly alignment structure working state of the utility model Figure 1 ;
[0021] Figure 3 The schematic diagram of the tower crane attachment rod assembly alignment structure working state of the utility model Figure 2 ;
[0022] Figure 4 The utility model is a tower crane attachment rod assembly alignment structure explosion Figure 1 ;
[0023] Figure 5 The utility model is a tower crane attachment rod assembly alignment structure explosion Figure 2 ;
[0024] Description of Reference Numerals
[0025] 1. Adapter terminal; 2. Adapter screw; 3. Channel steel sleeve; 4. Telescopic rod; 5. Assembly hole; 6. Connecting plate; 7. Positioning hole; 8. Port connecting plate; 9. Embedded groove; 10. Connecting plate threaded hole; 11. Fixed sleeve; 12. Fixed bolt; 13. Adjusting bolt; 14. Fixed ear plate; 15. Adjusting threaded hole; 16. Displacement groove; 17. Displacement working block; 18. Displacement block one; 19. Displacement block two; 20. Fastening threaded hole; 21. Ear plate support; 22. Connecting pin. DETAILED DESCRIPTION
[0026] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0027] like Figure 2-Figure 3 As shown, the tower crane attachment rod assembly alignment structure of the utility model includes a port connecting plate 8, a fixed sleeve 11, a displacement working block 17, a fixed bolt 12 and a distance adjusting bolt 13. The upper and lower ends of the port connecting plate 8 are respectively fixedly connected to the channel steel sleeve 3 of the tower crane attachment rod; the fixed sleeve 11 is fixed to the outer side of the port connecting plate 8 by the fixed bolt 12, the displacement working block 17 is located on the inner side of the port connecting plate 8, the front end of the distance adjusting bolt 13 is fixedly connected to the displacement working block 17, and the middle part of the distance adjusting bolt 13 is connected to the fixed sleeve 11 threaded pair at the same time. The front and rear positions of the displacement working block 17 are adjusted by rotating the distance adjusting bolt 13, and then the contact area between the displacement working block 17 and the telescopic rod 4 is adjusted, so that the parallel position relationship between the telescopic rod 4 and the channel steel sleeve 3 is more stable.
[0028] Specifically, Figure 4 , Figure 5As shown, the fixed sleeve 11 is roughly in the shape of a bottle cap, including a hollow displacement groove 16, a distance adjustment threaded hole 15 in the middle and a pair of fixed ear plates 14 on the outside; a circular through hole is provided on the port connecting plate 8, and an embedded groove 9 and a connecting plate threaded hole 10 are provided on the outside of the through hole; the fixed ear plate 14 cooperates with the embedded groove 9 of the port connecting plate 8, and is assembled with the fixing bolt 12, the fixing ear plate 14 and the threaded hole of the embedded groove 9 to fasten the fixed sleeve 11 to the port connecting plate 8, and the outer diameter of the fixed sleeve 11 structure is equal to the diameter of the circular through hole of the port connecting plate 8; the displacement groove 16 of the fixed sleeve 11 is used in conjunction with the displacement working block 17, and its purpose is to fix the displacement path; the distance adjustment threaded hole 15 is located at the center of the fixed sleeve 11, and is used in conjunction with the distance adjustment bolt 13.
[0029] The displacement working block 17 is in the shape of a stepped shaft, including a displacement block 18, a displacement block 2 19 and a fastening threaded hole 20 in the middle. The diameter of the displacement block 18 is equal to the diameter of the displacement slot 16, the diameter of the displacement block 2 19 is equal to the diameter of the circular through hole of the port connecting plate 8, and the diameter of the displacement block 18 is smaller than the diameter of the displacement block 2 19. The unequal diameter design is adopted here to limit the displacement path of the displacement working block 17 and also increase the contact area with the telescopic rod 4, so that the parallel position relationship between the telescopic rod 4 and the channel steel sleeve 3 is more stable.
[0030] The fastening threaded hole 20 is assembled with the distance adjusting bolt 13 so that the distance adjusting bolt 13 and the displacement working block 17 become one body, so that the distance of the spiral expansion and contraction of the distance adjusting bolt 13 is equal to the distance of movement of the displacement working block 17 .
[0031] Since the distances between the two sides of the telescopic rod 4 and the inner sides of the connecting plates on both sides of the channel steel sleeve 3 will change with installation factors, the distance adjusting threaded holes 15 and the distance adjusting bolts 13 are used to enable the displacement working blocks 17 on both sides of the channel steel sleeve 3 to be adjusted to any size within the moving range of the distance adjusting bolts 13, so that the contact between the displacement block 2 19 and the telescopic rod 4 is flexible and changeable.
[0032] like Figure 1 As shown, a tower crane attachment rod with telescopic function has a structure of a telescopic rod 4, a channel steel sleeve 3, a transfer screw 2, a transfer end 1, and a connecting pin 22; wherein the telescopic rod is provided with two assembly holes 5, and the channel steel sleeve is welded by a group of channel steels and a plurality of connecting plates. Since the port connecting plate 8 is located at the installation port of the channel steel sleeve, if the design structure is installed to the port connecting plate, the parallel position relationship between the telescopic rod and the channel steel sleeve can be controlled during the initial period of installing the telescopic rod.
[0033] First, the telescopic rod is placed in the position of the connection plate of the channel steel sleeve port, and then the tower crane attachment rod assembly installed on both sides of the channel steel sleeve is adjusted to align the displacement working block in the structure so that the second working block of the displacement working block is completely in contact with the side of the telescopic rod, thereby driving the establishment of a parallel relationship between the telescopic rod and the channel steel sleeve and ensuring that the parallel relationship is maintained and fixed, while not affecting the installation of the telescopic rod. If the cross-sectional area of the installation port of the channel steel sleeve is equal to the cross-sectional area of the telescopic rod, that is, the telescopic rod and the channel steel sleeve are coaxial and the telescopic rod does not deviate in the channel steel sleeve, but the damping force of the telescopic rod and the channel steel sleeve will be greatly increased, making the installation of the telescopic rod more difficult.
[0034] In summary, the tower crane attachment rod assembly alignment structure of the present application has the following characteristics:
[0035] 1. By using the combination of threaded holes and bolts, the telescopic distance can be adjusted arbitrarily within the range of the bolt spiral telescopic, and it can meet the requirements of both the adjustment of any distance and the stability of the adjusted distance;
[0036] 2. Assemble the distance adjusting bolt and the displacement working block so that the distance adjusting bolt and the displacement working block become an integrated structure;
[0037] 3. The displacement working block adopts unequal diameter design, namely displacement block 1 and displacement block 2. The size design is for fixed displacement path, and the diameter of displacement block 2 is larger than that of displacement block 1 in order to increase the contact area between displacement block 2 and telescopic rod and make the parallel position relationship between telescopic rod and channel steel sleeve more stable;
[0038] 4. The existing port connection plate of the attachment rod is used to process the connection plate with round holes, embedded grooves and threaded holes. The fixed sleeve is well fixed on the port connection plate under the action of the fixing bolts, saving the manufacturing cost and installation cost of the device.
[0039] The working principle and working process of the tower crane attachment rod assembly alignment structure of the utility model are briefly described below with reference to the accompanying drawings.
[0040] First, assemble the fixed ear plate 14 with the embedded groove 9 of the port connecting plate 8, and tighten the fixed sleeve 11 under the cooperation of the fixing bolt 12 and the threaded hole 10 of the connecting plate, and then install the adjusting bolt 13 into the adjusting threaded hole 15, and then assemble the displacement working block 17 with the adjusting bolt 13 so that the displacement working block 17 and the adjusting bolt 13 become an integrated structure, and finally, before the telescopic rod 4 is installed in the channel steel sleeve 3, the displacement block 2 19 of the displacement working block 17 is moved into the circular through hole of the port connecting plate 8 through the action of the adjusting bolt 13, so that the side of the displacement block 2 19 in contact with the telescopic rod 4 and the inner side surface of the port connecting plate 8 are on the same surface, when the telescopic rod 4 is installed in the channel steel sleeve 3, according to the distance between the two side surfaces of the telescopic rod 4 and the inner surfaces of the connecting plates on both sides of the channel steel sleeve 3, the adjusting bolts 13 on both sides of the channel steel sleeve are adjusted, that is, the displacement working block 17 is adjusted to move, so that the displacement blocks 2 19 on both sides completely contact the telescopic rod 4.
[0041] A structure that can fix the parallel relationship between the telescopic rod and the channel steel sleeve is installed on each of the connecting plates welded on both sides of the channel steel sleeve port. When the telescopic rod is installed parallel to the channel steel sleeve mounting port, the cross-sectional size of the channel steel sleeve mounting port is larger than the cross-sectional size of the telescopic rod, that is, there is a certain distance between the two sides of the telescopic rod and the inner side surfaces of the connecting plates on both sides of the channel steel sleeve. As long as the distances between the two sides of the telescopic rod and the inner side surfaces of the connecting plates on both sides of the channel steel sleeve are fixed, the change in the parallel position relationship between the telescopic rod and the channel steel sleeve due to various factors during subsequent installation can be solved.
[0042] Due to the influence of installation factors, the parallel distance between the two sides of the telescopic rod and the inner side surfaces of the connecting plates on both sides of the channel steel sleeve is uncertain. At the same time, it is necessary to ensure that the parallel distance between the two sides of the telescopic rod and the inner side surfaces of the connecting plates on both sides of the channel steel sleeve is fixed after the distance is determined. By using the cooperation between the threaded hole and the bolt, the telescopic distance can be adjusted arbitrarily within the range of the bolt spiral telescopic. The bolt distance adjustment can meet the requirements of both the adjustment of any distance and the stability of the distance after adjustment.
[0043] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A tower crane attachment rod assembly alignment structure, characterized in that: It comprises a port connection plate (8), a fixed sleeve (11), a displacement working block (17) and a distance adjusting bolt (13); the upper and lower ends of the port connection plate (8) are respectively fixedly connected to the channel steel sleeve (3) of the tower crane attachment rod; The fixed sleeve (11) is fixed to the outside of the port connection plate (8) by means of a fixing bolt (12); the displacement working block (17) is located on the inside of the port connection plate (8); the displacement working block (17) is fixedly connected to the front end of the adjustable bolt (13); and the middle of the adjustable bolt (13) is movably connected to the threaded pair of the fixed sleeve (11); the front and rear positions of the displacement working block (17) are adjusted by rotating the adjustable bolt (13) so as to adjust the contact area between the displacement working block (17) and the telescopic rod (4) of the tower crane attachment rod, so that the telescopic rod (4) and the channel steel sleeve (3) remain parallel.
2. The tower crane attachment rod assembly alignment structure according to claim 1, characterized in that: The fixing sleeve (11) comprises a pair of fixing ear plates (14); a connecting plate threaded hole (10) is provided on the port connecting plate (8); the fixing bolt (12) passes through the fixing ear plates (14) and is connected to the connecting plate threaded hole (10), so that the fixing sleeve (11) is fixed to the outside of the port connecting plate (8).
3. The tower crane attachment rod assembly alignment structure according to claim 2, characterized in that: An embedded groove (9) is also provided on the outside of the threaded hole (10) of the connecting plate, and the fixing ear plate (14) cooperates with the embedded groove (9).
4. The tower crane attachment rod assembly alignment structure according to claim 1, characterized in that: The fixed sleeve (11) comprises a distance-adjusting threaded hole (15) in the middle, and the distance-adjusting threaded hole (15) cooperates with the distance-adjusting bolt (13).
5. The tower crane attachment rod assembly alignment structure according to claim 1, characterized in that: The displacement working block (17) is in the shape of a stepped shaft and comprises a displacement block 1 (18) and a displacement block 2 (19); the fixed sleeve (11) is roughly in the shape of a bottle cap and has a displacement groove (16) on the inner side; and a circular through hole is provided on the port connecting plate (8).
6. The tower crane attachment rod assembly alignment structure according to claim 5, characterized in that: The diameter of the displacement block 1 (18) is equal to the diameter of the displacement groove (16), and the diameter of the displacement block 2 (19) is equal to the diameter of the circular through hole.
7. The tower crane attachment rod assembly alignment structure according to claim 6, characterized in that: The diameter of the displacement block 1 (18) is smaller than the diameter of the displacement block 2 (19).
8. The tower crane attachment rod assembly alignment structure according to claim 1, characterized in that: The displacement working block (17) is provided with a fastening threaded hole (20), and the fastening threaded hole (20) is threadedly fixed to the distance adjusting bolt (13).