Blowout prevention conveying device for drilling and punching of coal mine

By designing an anti-blasting conveying device for drilling and punching coal mines, using technical means such as motor-driven conveying pumps and gas pumping outlets, the problem of poor anti-blasting effect of existing devices is solved, and long-distance conveying of coal water and gas is realized. Safe collection improves drilling efficiency and safety.

CN221957629UActive Publication Date: 2024-11-05ZHENG HONG (HENAN) MASCH MFG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420429414.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-06
Publication Date
2024-11-05
Estimated Expiration
2034-03-06

AI Technical Summary

Technical Problem

The existing anti-blasting conveying device for drilling and punching of coal mines has poor anti-blasting effect when alleviating collapsed holes and spraying holes, resulting in the spraying of coal water and gas, causing dirty and messy on the site, posing a major safety hazard, affecting drilling. Progress and duration.

Method used

A blow-off conveying device for drilling and punching coal mines including a blow-off assembly and a frame assembly is designed. The motor drives the conveying pump, and the coal water is transported to the cut-off coal water buffer box through a tee pipe and a connecting pipe. The gas pumping port is connected to the mine gas negative pressure pumping pipeline, and the filter plate and inclined baffle are used to achieve effective collection and filtration of coal water and gas to prevent spewing and overflow. The support can adjust the angle of the anti-blasting assembly to optimize the discharge. material.

Benefits of technology

It realizes long-distance transportation and safe collection of coal water and gas, avoids on-site pollution and drilling shutdown, improves drilling efficiency and the practicality of the device, and conveniently rinses clean water, reduces the risk of particle deposition and blocks the pipe, and enhances the Safety and convenience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221957629U_ABST
    Figure CN221957629U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of blowout prevention conveying devices for coal mine drilling and punching, in particular to a blowout prevention conveying device for coal mine drilling and punching, which comprises a blowout prevention assembly and a frame assembly, the blowout prevention assembly is mounted at the upper end of the frame assembly, a conveying structure is arranged in the frame assembly, a blowout prevention structure is arranged at the upper end of the frame assembly, and the frame assembly is connected with the blowout prevention assembly. The conveying structure comprises a motor, the motor is arranged in the frame assembly, the output end of the motor is connected with a conveying pump, and the end, away from the motor, of the conveying pump is connected with a three-way pipe. According to the blowout prevention conveying device for drilling and punching of the coal mine, flushing-out coal water is remotely conveyed to a designated place through the pumping system, the problems of on-site coal water pollution and ditch and sedimentation tank clogging are solved, the coal water is discharged in time after being collected, drilling is not needed to be stopped, the drilling efficiency is guaranteed, clear water is switched in time to flush the conveying pipeline after the pump is stopped, and the production cost is reduced. And pipe blockage caused by particle deposition is avoided, and the practicability and convenience of the device are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of blowout prevention and conveying devices for drilling and punching holes in coal mines, in particular to a blowout prevention and conveying device for drilling and punching holes in coal mines. Background Art

[0002] In the process of pre-extraction measures by drilling through layers in high-gas mines, hydraulic punching is often used to relieve pressure and increase permeability. In this process, hole collapse and hole blowout often occur. At this time, a large amount of coal, water and gas are instantly sprayed out, causing gas to exceed the limit in the tunnel, affecting the safety of on-site workers. If the gas exceeds the limit, drilling needs to be stopped, resulting in suspension of drilling progress and delay of construction period.

[0003] In order to alleviate the large amount of coal, water and gas that appear in collapsed holes and blowout holes, the existing blowout prevention and conveying devices for drilling and punching in coal mines currently use homemade blowout prevention boxes in various shapes to buffer the blowout hole phenomenon. The coal and water after passing through the blowout prevention boxes can only flow into the tunnel by themselves, and the resulting dirty and messy phenomenon seriously affects the workers' operations. There are major safety hazards caused by the cross-flow of coal and water on site.

[0004] For example, the patent document with announcement number CN213766150U discloses

[0005] In order to alleviate the large amount of coal, water and gas that appear in the collapsed holes and blowout holes, the existing blowout prevention and conveying devices for drilling and punching in coal mines currently use homemade blowout prevention boxes in various shapes to buffer the blowout hole phenomenon. The blowout prevention effect is poor. The coal and water after passing through the blowout prevention box can only flow into the tunnel by themselves, and the dirty and messy phenomenon formed seriously affects the workers' work. There is a great safety hazard in the cross-flow of coal and water on site. Therefore, it is urgent to design a blowout prevention and conveying device for drilling and punching in coal mines to solve the above problems. Utility Model Content

[0006] The purpose of the utility model is to provide a blowout prevention and conveying device for drilling and punching in coal mines, so as to solve the problem proposed in the above background technology that in order to alleviate the large amount of coal water and gas appearing in the collapsed holes and blowout holes in the existing blowout prevention and conveying device for drilling and punching in coal mines, each mine currently uses a self-made blowout prevention box for buffering the blowout hole phenomenon, which has different shapes and has a poor blowout prevention effect. After passing through the blowout prevention box, the coal and water can only flow into the tunnel by themselves, and the resulting dirty and messy phenomenon seriously affects the workers' work, and there is a great safety hazard in the cross-flow of coal and water on site.

[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a blowout prevention and conveying device for drilling and punching in coal mines, comprising: a blowout prevention assembly and a frame assembly, wherein the blowout prevention assembly is installed at the upper end of the frame assembly, a conveying structure is arranged inside the frame assembly, a blowout prevention structure is arranged at the upper end of the frame assembly, the conveying structure comprises a motor, the motor is arranged inside the frame assembly, the output end of the motor is connected to a conveying pump, the end of the conveying pump away from the motor is connected to a tee pipe, the other end of the tee pipe is connected to a connecting pipe, the end of the connecting pipe away from the tee pipe is connected to a cut-off coal and water buffer box, a valve is arranged on the connecting pipe, a feed inlet is arranged at the left end of the blowout prevention assembly, the feed inlet is connected to a slag discharge port of a drilling rig, and a coal and water discharge port and a rock powder discharge port are arranged at the right end of the blowout prevention assembly.

[0008] Preferably, a gas extraction port is provided at the upper end of the blowout prevention assembly, and the gas extraction port is connected to the mine's gas negative pressure extraction pipeline.

[0009] Preferably, a pressure gauge is provided on the blowout prevention assembly.

[0010] Preferably, a filter plate is provided inside the frame assembly.

[0011] Preferably, an inclined baffle is rotatably provided at the right end of the coal-water discharge port.

[0012] Preferably, the blowout prevention structure includes a rotating support, which is fixedly arranged on the right side of the upper end of the frame assembly. The rotating support can be connected to the blowout prevention assembly through a rotating rod. An adjustment support is arranged on the left side of the upper end of the frame assembly. An adjustment hole is arranged inside the adjustment support. The blowout prevention assembly can be connected to the adjustment hole using a connecting rod.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] 1. The blowout prevention conveying device for drilling and punching in coal mines is provided with a conveying structure. When the blowout prevention conveying device for drilling and punching in coal mines is used, the motor is started, and the motor provides power for the conveying pump to ensure the long-distance conveying of drilling coal water, so that the drilling coal water is conveyed to the cut-off coal water buffer box through the connecting pipe. When replenishing water during the drilling stop period, the three-way pipe can be used to connect the external clean water pipeline for convenient water replenishment, so as to realize the flushing of the conveying pipeline and avoid the blockage of the pipe by particle deposition. The valve is used to cut off the water passage of the coal water buffer box. The gas extraction port is connected to the negative pressure gas extraction pipeline of the mine for the gas in the blowout prevention assembly. The pressure gauge is connected to a higher position of the blowout prevention assembly to monitor the gas in the blowout prevention assembly. The filter plate is installed obliquely in the frame assembly to filter out larger particles, which is convenient for the transportation of the connecting pipe. The inclined baffle is connected to the coal-water discharge port through a hinge, which is used for the opening of the coal-water discharge port to prevent the large amount of coal, water and gas from gushing and overflowing. Through this design, the coal and water flushed out of the anti-blowout conveying device for drilling and punching in the coal mine can be remotely transported to the designated location by the pumping system, avoiding on-site coal and water pollution, ditch and sedimentation tank clogging problems, and the coal and water are discharged in time after collection without stopping drilling, thereby ensuring the drilling efficiency. After stopping the pump, switch to clean water to flush the conveying pipeline in time to avoid particle deposition and pipe clogging, thereby improving the practicability and convenience of the device.

[0015] 2. The blowout prevention and conveying device for drilling and punching in coal mines is provided with a blowout prevention structure. When the blowout prevention and conveying device for drilling and punching in coal mines is used, the rotating support is used to install the blowout prevention assembly so that the blowout prevention assembly can rotate around the rotating point. The adjusting support enables the blowout prevention assembly to be connected to different adjusting holes opened inside the adjusting support, which is used to adjust the discharging inclination angle of the blowout prevention assembly. Through this design, the blowout prevention and conveying device for drilling and punching in coal mines can adjust the angle of the blowout prevention assembly, buffer the gas and a large amount of coal water rushed out during drilling, and fully release the gas in the coal water, thereby improving the practicability and convenience of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a front view cross-sectional schematic diagram of the structure of the utility model;

[0017] Figure 2 It is a front cross-sectional schematic diagram of the structure of the blowout prevention assembly of the utility model in a moving state;

[0018] Figure 3 It is a schematic side cross-sectional view of the structure of the utility model.

[0019] In the figure: 111, blowout prevention assembly; 112, frame assembly; 2, conveying structure; 211, motor; 212, conveying pump; 213, three-way pipe; 214, valve; 215, connecting pipe; 216, cut-off coal-water buffer box; 217, feed inlet; 218, coal-water discharge outlet; 219, gas extraction outlet; 220, pressure gauge; 221, filter plate; 222, inclined baffle; 3, blowout prevention structure; 311, rotating support; 312, adjusting support; 313, adjusting hole. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] See also Figure 1-3 , an embodiment provided by the utility model:

[0022] A blowout prevention and conveying device for drilling and punching in a coal mine, comprising: a blowout prevention assembly 111 and a frame assembly 112, wherein the blowout prevention assembly 111 is installed at the upper end of the frame assembly 112, wherein a conveying structure 2 is arranged inside the frame assembly 112, wherein a blowout prevention structure 3 is arranged at the upper end of the frame assembly 112, wherein the conveying structure 2 comprises a motor 211, wherein the motor 211 is arranged inside the frame assembly 112, wherein the output end of the motor 211 is connected to a conveying pump 212, wherein one end of the conveying pump 212 away from the motor 211 is connected to a tee pipe 213, wherein the other end of the tee pipe 213 is connected to a connecting pipe 215, wherein one end of the connecting pipe 215 away from the tee pipe 213 is connected to a cut-off coal-water buffer box 216, wherein a A valve 214 is provided, and a feed inlet 217 is provided at the left end of the blowout prevention assembly 111, and the feed inlet 217 is connected to the slag discharge port of the drilling rig, and a coal-water discharge port 218 and a rock powder discharge port 223 are provided at the right end of the blowout prevention assembly 111. Through this design, when the blowout prevention and conveying device for drilling and punching in a coal mine is used, the motor 211 is started, and the motor 211 provides power for the conveying pump 212 to ensure the long-distance conveying of drilling coal and water, so that the drilling coal and water are conveyed to the cut-off coal and water buffer box 216 through the connecting pipe 215. When replenishing water during the drilling stop period, the three-way pipe 213 can be used to connect the clean water pipeline to conveniently replenish water, so as to realize the flushing of the conveying pipeline and avoid the blockage of the pipe by particle deposition. The valve 214 is used to cut off the water supply passage of the coal-water buffer box 216.

[0023] Furthermore, a gas extraction port 219 is provided at the upper end of the blowout prevention assembly 111, and the gas extraction port 219 is connected to the mine's gas negative pressure extraction pipeline. Through this design, the gas extraction port 219 is connected to the mine's gas negative pressure extraction pipeline for the gas in the blowout prevention assembly 111.

[0024] Furthermore, a pressure gauge 220 is provided on the blowout prevention assembly 111. Through this design, the pressure gauge 220 is connected to a higher position of the blowout prevention assembly 111 to monitor the gas pressure in the blowout prevention assembly 111, so as to facilitate adjustment of the extraction and discharge volume.

[0025] Furthermore, a filter plate 221 is provided inside the frame assembly 112 . With this design, the filter plate 221 is installed obliquely inside the frame assembly 112 to filter out larger particles, thereby facilitating transportation of the connecting pipe 215 .

[0026] Furthermore, an inclined baffle 222 is rotatably provided at the right end of the coal-water discharge port 218. Through this design, the inclined baffle 222 is connected to the coal-water discharge port 218 through a hinge, which is used to adjust the opening of the coal-water discharge port 218 to prevent a large amount of coal, water and gas from gushing out and overflowing.

[0027] Furthermore, the blowout prevention structure 3 includes a rotating support 311, which is fixedly arranged on the right side of the upper end of the frame assembly 112. The rotating support 311 can be connected to the blowout prevention assembly 111 through a rotating rod. An adjusting support 312 is arranged on the left side of the upper end of the frame assembly 112. An adjusting hole 313 is arranged inside the adjusting support 312. The blowout prevention assembly 111 can be connected to the adjusting hole 313 using a connecting rod. Through this design, the rotating support 311 is used to install the blowout prevention assembly 111 so that the blowout prevention assembly 111 can rotate around the rotating point. The adjusting support 312 allows the blowout prevention assembly 111 to be connected to different adjusting holes 313 opened inside the adjusting support 312, so as to adjust the discharge inclination angle of the blowout prevention assembly 111.

[0028] Working principle:

[0029] When using the blowout prevention and delivery device for drilling and punching in coal mines, start the motor 211, which provides power for the delivery pump 212 to ensure the long-distance delivery of drilling coal water, so that the drilling coal water is delivered to the cut-off coal water buffer box 216 through the connecting pipe 215. When replenishing water during the drilling stop, the three-way pipe 213 can be used to connect the external clean water pipeline for convenient water replenishment, so as to achieve flushing of the delivery pipeline and avoid clogging of the pipe by particle deposition. The valve 214 is used to cut off the water passage of the coal water buffer box 216, and the gas extraction port 219 is connected to the gas extraction port 219. The mine's gas negative pressure extraction pipeline is connected to the gas in the blowout prevention assembly 111. The pressure gauge 220 is connected at a higher position of the blowout prevention assembly 111 to monitor the gas pressure in the blowout prevention assembly 111 to facilitate adjustment of the extraction volume. The filter plate 221 is installed at an angle in the frame assembly 112 to filter out larger particles that are flushed out to facilitate the transportation of the connecting pipe 215. The inclined baffle 222 is connected to the coal-water discharge port 218 through a hinge to control the opening of the coal-water discharge port 218 to prevent large amounts of coal, water and gas from gushing out.

[0030] When using the blowout prevention and conveying device for drilling and punching in coal mines, the rotating support 311 is used to install the blowout prevention assembly 111 so that the blowout prevention assembly 111 can rotate around the rotation point, and the adjusting support 312 allows the blowout prevention assembly 111 to be connected to different adjustment holes 313 opened inside the adjusting support 312, which is used to adjust the discharge inclination angle of the blowout prevention assembly 111, and the operation is completed.

[0031] The above description is only a preferred embodiment of the utility model and does not limit the utility model in any form. Any ordinary technician in the industry can smoothly implement the utility model as shown in the drawings of the specification and described above. However, any equivalent changes, modifications and evolutions made by technicians familiar with the profession without departing from the scope of the technical solution of the utility model using the technical content disclosed above are all equivalent embodiments of the utility model. At the same time, any equivalent changes, modifications and evolutions made to the above embodiments based on the essential technology of the utility model are still within the protection scope of the technical solution of the utility model.

Claims

1. A blowout prevention and conveying device for drilling and punching in coal mines, comprising: A blowout prevention assembly (111) and a frame assembly (112), wherein the blowout prevention assembly (111) is mounted on the upper end of the frame assembly (112), and is characterized in that: a conveying structure (2) is arranged inside the frame assembly (112), a blowout prevention structure (3) is arranged on the upper end of the frame assembly (112), the conveying structure (2) comprises a motor (211), the motor (211) is arranged inside the frame assembly (112), an output end of the motor (211) is connected to a conveying pump (212), and the conveying pump (212) is far away from the motor (211). ) is connected to a tee pipe (213), the other end of the tee pipe (213) is connected to a connecting pipe (215), the end of the connecting pipe (215) away from the tee pipe (213) is connected to a cut-off coal-water buffer box (216), a valve (214) is provided on the connecting pipe (215), a feed inlet (217) is provided at the left end of the blowout prevention assembly (111), the feed inlet (217) is connected to a slag discharge port of a perforating drill, and a coal-water discharge port (218) and a rock dust discharge port (223) are provided at the right end of the blowout prevention assembly (111).

2. The anti-blowout conveying device for drilling and punching in coal mines according to claim 1, characterized in that: A gas extraction port (219) is provided at the upper end of the blowout prevention assembly (111), and the gas extraction port (219) is connected to a gas negative pressure extraction pipeline of the mine.

3. The anti-blowout conveying device for drilling and punching in coal mines according to claim 1, characterized in that: The blowout prevention assembly (111) is provided with a pressure gauge (220).

4. The anti-blowout conveying device for drilling and punching in coal mines according to claim 1, characterized in that: A filter plate (221) is arranged inside the frame assembly (112).

5. The anti-blowout conveying device for drilling and punching in coal mines according to claim 1, characterized in that: An inclined baffle (222) is rotatably provided at the right end of the coal-water discharge port (218).

6. The anti-blowout conveying device for drilling and punching in coal mines according to claim 1, characterized in that: The blowout prevention structure (3) comprises a rotating support (311), the rotating support (311) being fixedly arranged on the right side of the upper end of the frame assembly (112), the rotating support (311) being connectable to the blowout prevention assembly (111) via a rotating rod, an adjusting support (312) being arranged on the left side of the upper end of the frame assembly (112), an adjusting hole (313) being arranged inside the adjusting support (312), and the blowout prevention assembly (111) being connectable to the adjusting hole (313) via a connecting rod.