Civil engineering air duct lining flange connecting air pipe construction installation tool
The construction and installation tools, consisting of a long-handled wrench, a steel handle, and a magnetic socket, solved the problem of incomplete duct flange connections caused by the limited construction space in the civil engineering shaft, thus ensuring the airtightness of the duct.
Patent Information
- Application Number
- CN202420537706.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-19
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-03-19
AI Technical Summary
In situations where the construction space inside a civil engineering shaft is limited, existing technologies cannot guarantee that the bolts and nuts connecting the flanges of the civil engineering ventilation duct are fully tightened, which affects the airtightness of the ventilation duct.
The construction and installation tool consists of a long-handled wrench, a steel handle, an extended steel handle, and a magnetic socket. The magnetic socket attracts nuts and washers, and the design of the long-handled wrench and extended handle enables the bolts at the duct flange connection to be tightened.
The duct flange connection bolts and nuts were fully tightened in a confined space, ensuring the airtightness of the duct.
Smart Images

Figure CN221967953U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a construction and installation tool for connecting an air duct with a flange in a civil engineering air duct lining, and is particularly used when the walls of three sides of a civil engineering vertical shaft are cast-in-place concrete walls or built brick walls, the floor is high, the cross-section of the inner lining air duct is large, and the installation space is narrow. Background Art
[0002] According to the latest "General Specification for Fire Protection Facilities" GB55036-2022, both mechanical pressurized air supply ducts and mechanical smoke exhaust ducts should be made of non-combustible materials, and the inner surface of the ducts should be smooth, and the airtightness of the ducts should meet the requirements for pressurized air supply or smoke exhaust during fire. Since there are currently no specific technical data requirements and practices for "smoothness and airtightness" of civil engineering air ducts, in order to meet the requirements of the specifications for mechanical smoke exhaust ducts, the practice of lining civil engineering air ducts with galvanized steel plates is still used during project implementation.
[0003] When connecting the flanges of the lined air ducts in the civil engineering shaft, sufficient operating space is required to tighten the bolts and nuts. However, in actual projects, the construction space in the civil engineering shaft is very narrow. When the three walls of the civil engineering air duct are cast-in-place concrete walls or built brick walls, and the front is a rear-built wall, there is a certain distance between the back and the left and right sides of the lined pipe and the civil engineering shaft. The flange bolts on both sides and the back can be tightened with conventional wrenches, ratchet wrenches, and electric ratchet wrenches. However, there is insufficient operating space for tightening the bolts in the middle of the back of the lined air duct, and the pipe flange cannot be fully connected and tightened, which affects the tightness of the air duct and becomes a difficult point in the installation of the lined air duct in the civil engineering shaft. Utility Model Content
[0004] The utility model aims to provide a construction and installation tool for connecting an air duct with a flange in a civil engineering air duct lining, which can ensure that bolts and nuts around the air duct connected with a flange in a civil engineering air duct lining are completely connected and tightened when the installation space is limited.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] A construction and installation tool for connecting an air duct with a flange in a civil engineering air duct liner, characterized in that it comprises a long-bar spanner, a steel handle, a steel extension handle and a magnetic sleeve, a reinforcing sleeve being sleeved on the upper end of the long-bar spanner, a penetrating clamping hole being provided at a position corresponding to the long-bar spanner and the reinforcing sleeve, an elastic steel ball buckle A being installed at one end of the steel handle, the steel handle being vertically inserted into the sleeve, and its elastic steel ball buckle A being clamped at the clamping hole, a bayonet being provided at the other end of the steel handle, and the steel extension handle being provided with an elastic steel buckle B corresponding to the bayonet to realize a movable connection between the steel handle and the steel extension handle, and a magnetic sleeve being movably connected to the lower end of the long-bar spanner.
[0007] The lower end of the long-bar wrench is provided with an elastic steel buckle C, which is engaged with the upper end of the magnetic sleeve.
[0008] The height of the extended wrench is 930-1380 mm, and the diameter Φ is 22 mm.
[0009] The total length of the steel handle and the extended steel handle ranges from 200 to 450 mm, the diameter of the steel handle is Φ18 mm, and the diameter of the extended steel handle is Φ16 mm.
[0010] The magnetic sleeve is matched with bolts of specifications M6-20, M8-25 and M10-30.
[0011] Before installing the flange-connected air duct, the lower flange of the upper air duct is welded and fixed with bolts, and a gasket and nut matching the bolts are placed in the magnetic sleeve;
[0012] Before installing the flange-connected air duct, welding bolts are welded and fixed to the lower flange of the upper air duct, and gaskets and nuts matching the bolts are placed in the magnetic sleeve.
[0013] Before installing the flange-connected air duct, the nut is welded and fixed to the lower flange of the upper air duct, and the bolts and gaskets matching the nut are placed in the magnetic sleeve.
[0014] The beneficial effects of the utility model are as follows: the utility model can ensure that the bolts and nuts around the air duct connected to the flange of the civil construction air duct lining are completely connected and tightened. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the embodiment of the utility model, the embodiment will be described below in conjunction with the accompanying drawings.
[0016] Figure 1 It is a schematic diagram of the exploded structure of the utility model.
[0017] Figure 2 It is a schematic diagram of the structure of the utility model in use state.
[0018] Figure 3 It is a schematic diagram of the structure that is fixed to the lower flange of the upper section air duct by bolts welding.
[0019] Figure 4 It is a structural diagram of the welding bolts welded and fixed to the lower flange of the upper section of the air duct.
[0020] Figure 5 It is a structural diagram of a nut welded and fixed to the lower flange of the upper air duct. DETAILED DESCRIPTION
[0021] The following examples are merely used to illustrate possible implementations of the present invention, but are not intended to limit the scope of protection of the present invention, so it is necessary to make it clear in advance.
[0022] like Figure 1 As shown, a construction and installation tool for connecting an air duct with a flange of a lining of a civil engineering air duct of the utility model comprises a long-bar spanner 1, a steel handle 2, a steel extension handle 3 and a magnetic sleeve 4. A reinforcing sleeve 11 is sleeved on the upper end of the long-bar spanner 1, and a penetrating clamping hole is provided at a position corresponding to the long-bar spanner 1 and the reinforcing sleeve 11. An elastic steel ball buckle A21 is installed at one end of the steel handle 2. The steel handle is vertically penetrated through the long-bar spanner 1 where the reinforcing sleeve is located, and its elastic steel ball buckle A21 is clamped at the clamping hole. A bayonet is provided at the other end of the steel handle 2, and the steel extension handle 3 is provided with an elastic steel buckle B31 corresponding to the bayonet to realize a movable connection between the steel handle 2 and the steel extension handle 3. The magnetic sleeve 4 is movably connected to the lower end of the long-bar spanner 1, and the magnetic sleeve absorbs the nut to prevent the nut or screw from falling off during installation.
[0023] The lower end of the long-bar wrench 1 is provided with an elastic steel buckle C12, which is engaged with the perforated buckle at the upper end of the magnetic sleeve 4. The bolt specifications of the magnetic sleeve 4 are M6-20, M8-25, and M10-30.
[0024] The height of the extended wrench 1 is 930-1380 mm, and the diameter Φ is 22 mm. The total length of the steel handle 2 and the extended steel handle 3 is 200-450 mm, the diameter of the steel handle 2 is Φ18 mm, and the diameter of the extended steel handle 3 is Φ16 mm.
[0025] like Figure 2 As shown, it is a schematic diagram of the construction and installation of the utility model patent. The three walls of the civil engineering air duct are cast-in-place concrete walls (or built brick walls), the front is a back-built wall, and a distance of 100 to 150 mm is left on the back of the civil engineering air duct. Before connecting the upper air duct with the lower air duct, the lower flange of the upper air duct is first welded and fixed with bolts (or nuts, welding bolts), and the upper flange of the lower air duct is aligned with the lower flange of the upper air duct. The nuts on both sides and both ends of the back of the upper flange of the lower air duct can be tightened with conventional wrenches, ratchet wrenches, and electric ratchet wrenches. The middle part of the back of the upper flange of the lower air duct needs to be tightened with the utility model installation tool. According to the size of the air duct, a sleeve with corresponding bolt specifications is selected, and nuts and washers (or bolts and washers) are placed in the sleeve. The long rod is extended into the back of the two air ducts, and the sleeve is aligned with the bolts connecting the flanges of the two air ducts. The steel handle linkage sleeve is turned to tighten the nuts and bolts.
[0026] The utility model provides three methods for fastening bolts when the flange of the civil engineering air duct lining is connected to the air duct during installation. Figure 3Method 1: Before connecting the upper air duct to the lower air duct, weld the lower flange of the upper air duct to the bolts, align the upper flange of the lower air duct with the lower flange of the upper air duct, and tighten the air duct flange on the back of the civil engineering air duct using the gasket and nut connected to the bolt placed in the magnetic sleeve of the installation tool of the utility model. Figure 4 Method 2: Before connecting the upper air duct to the lower air duct, weld and fix the welding bolts on the lower flange of the upper air duct, align the upper flange of the lower air duct with the lower flange of the upper air duct, and use the gasket and nut connected with the welding bolts placed in the magnetic sleeve of the new installation tool to connect the air duct flange on the back of the civil engineering air duct. Figure 5 Method three: Before connecting the upper section of the air duct with the lower section of the air duct, weld the nut to the lower flange of the upper section of the air duct, align the upper flange of the lower section of the air duct with the lower flange of the upper section of the air duct, and use this new installation tool to tighten the bolts on the air duct flange on the back of the civil engineering air duct.
Claims
1. A construction and installation tool for connecting air ducts with flanges in civil engineering ducts, characterized by: The utility model comprises a long-rod wrench, a steel handle, a steel extension handle and a magnetic sleeve. A reinforcing sleeve is sleeved on the upper end of the long-rod wrench, and a penetrating clamping hole is provided at the position corresponding to the long-rod wrench and the reinforcing sleeve. An elastic steel ball buckle A is installed at one end of the steel handle, and the steel handle is vertically penetrated on the sleeve, and its elastic steel ball buckle A is clamped at the clamping hole. A bayonet is provided at the other end of the steel handle, and the steel extension handle is provided with an elastic steel buckle B corresponding to the bayonet to realize the movable connection between the steel handle and the steel extension handle, and the magnetic sleeve is movably connected to the lower end of the long-rod wrench.
2. A construction and installation tool for connecting air ducts with flanges in civil engineering air ducts according to claim 1, characterized in that: The lower end of the long-bar wrench is provided with an elastic steel buckle C, which is engaged with the upper end of the magnetic sleeve.
3. A construction and installation tool for connecting air ducts with flanges in civil engineering air ducts according to claim 1, characterized in that: The height of the long-bar wrench is 930-1380 mm, and the diameter Φ is 22 mm.
4. The construction and installation tool for connecting the air duct with the flange of the civil engineering air duct lining according to claim 1 is characterized by: The total length of the steel handle and the steel extension handle ranges from 200 to 450 mm, the diameter of the steel handle is Φ18 mm, and the diameter of the steel extension handle is Φ16 mm.
5. A construction and installation tool for connecting air ducts with flanges in civil engineering air duct linings according to claim 1 or 3, characterized in that: The matching bolt specifications of the magnetic sleeve are M6-20, M8-25, and M10-30.
6. A construction and installation tool for connecting air ducts with flanges in civil engineering air ducts according to claim 1, characterized in that: Before installing the flange-connected air duct, the lower flange of the upper air duct is welded and fixed with bolts, and gaskets and nuts matching the bolts are placed in the magnetic sleeve.
7. The construction and installation tool for connecting the air duct with the flange of the civil engineering air duct lining according to claim 1 is characterized by: Before installing the flange-connected air duct, welding bolts are welded and fixed to the lower flange of the upper air duct, and gaskets and nuts matching the bolts are placed in the magnetic sleeve.
8. The construction and installation tool for connecting the air duct with the flange of the civil engineering air duct lining according to claim 1 is characterized by: Before installing the flange-connected air duct, the nut is welded and fixed to the lower flange of the upper air duct, and the bolts and gaskets matching the nut are placed in the magnetic sleeve.