Simulation test tool for planet-level lubricating oil quantity of wind power gear box
Patent Information
- Application Number
- CN202420213397.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-29
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-01-29
AI Technical Summary
The amount of lubricating oil in the planetary part of the wind power gear box is difficult to accurately count after the parts are installed, resulting in the amount of lubricating oil being too large or small, which may cause oil seepage or component failure.
A planetary lubricating oil quantity simulation test tool for wind power gear box is designed to simulate the oil circuit through components such as slip ring, tee pipe joint and oil injection ring to realize the oil quantity test statistics of the lubricating point to ensure the appropriate oil quantity.
Accurately count the lubricant amount before installing the parts, avoid faults caused by deviations in lubricant amount after operation, and extend the life of the gearbox.
Smart Images

Figure CN222013505U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of wind power gear boxes, in particular to a planetary-level lubricating oil quantity simulation test tool for wind power gear boxes. Background Art
[0002] Wind power generation has developed rapidly in recent years due to its advantages such as zero pollution and low construction cost.
[0003] During the operation of the wind turbine gearbox, all gear meshing points and bearings need lubrication to reduce wear and friction between parts and reduce power loss, thereby extending the life of the gearbox. At the same time, through the circulation of lubricating oil, the cooling generated during the operation between the friction pairs of parts is taken away to prevent the failure of parts due to high temperature. Among them, each gear meshing point and bearing requires a suitable amount of lubricating oil for forced lubrication, so it is necessary to test and count the actual amount of oil at each lubrication point. Since the planetary part of the wind turbine gearbox often lubricates each point after the main parts form an oil circuit, it is difficult to perform statistical measurements after the parts are installed, so it is necessary to have corresponding tooling to simulate the oil circuit in the parts and then perform oil quantity test statistics for the corresponding lubrication points. Utility Model Content
[0004] The utility model provides a planetary-level lubricating oil quantity simulation test tool for a wind turbine gearbox, which aims to solve the shortcomings of the prior art and realize the lubricating oil quantity test statistics of each lubrication point for the planetary-level oil circuit of the wind turbine gearbox.
[0005] The technical solution adopted by the utility model to solve its technical problems is:
[0006] A planetary-level lubricating oil quantity simulation test tool for a wind turbine gearbox, characterized in that:
[0007] The first tooling slip ring is connected to the side wall of the box body, the planetary oil circuit is connected to the first tooling slip ring, and the first tooling slip ring is connected to the three-way pipe joint;
[0008] One outlet of the three-way pipe joint is connected to a tooling oil pipe simulating a pin shaft, and the tooling oil pipe simulating a pin shaft has a plurality of oil injection ports simulating oil injection points of a planetary gear bearing;
[0009] The other outlet of the tee pipe joint is connected to one outlet of the oil pipe, and the other outlet of the oil pipe is connected to the straight pipe joint;
[0010] The tooling oil injection ring is fixedly connected to the box body, and the second tooling slip ring simulating the oil injection ring is fixedly sleeved outside the tooling oil injection ring;
[0011] The straight pipe joint passes through the side wall of the second tooling slip ring simulating the oil injection ring and is connected to the first inner pipe of the tooling oil injection ring;
[0012] The first inner tube of the tooling fuel injection ring is connected to the fuel injection port simulating the fuel injection point of the planetary gear meshing with the sun gear and the fuel injection port simulating the fuel injection point of the sun gear meshing with the spline;
[0013] The planetary oil circuit of the box is connected to the second inner tube of the tooling oil injection ring;
[0014] The second inner tube of the tooling oil injection ring is connected to the oil injection port simulating the oil injection point of the planetary motor side bearing.
[0015] The planetary oil circuit is connected to the first tooling slip ring through a first oil circuit communicated with the side wall of the box body.
[0016] The inner hole of the second tooling slip ring simulating the oil injection ring is fixed with the journal of the tooling oil injection ring by interference connection.
[0017] The tooling oil injection ring is fixedly connected to the box body by bolts.
[0018] The planetary oil passage of the casing is connected to the second inner tube of the tooling oil injection ring through an inclined second oil passage communicated with the side wall of the casing.
[0019] The utility model is beneficial in that:
[0020] The utility model can more effectively and accurately test and count the amount of lubricating oil at each lubrication point of the planetary oil circuit of the wind turbine gearbox before the parts are installed, and adjust the amount of lubricating oil to a suitable theoretical amount according to the test results, so as to avoid oil leakage or component failure caused by too much or too little lubricating oil after the gearbox is installed and operated. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The utility model is further described below in conjunction with the accompanying drawings and embodiments.
[0022] Figure 1 It is a schematic diagram of the structure of the utility model. DETAILED DESCRIPTION
[0023] In order to more clearly illustrate the technical solution of the utility model, the following will briefly introduce the drawings required for the description. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other embodiments can be obtained based on these drawings without creative work. In order to facilitate the understanding of the utility model, the following will be combined with the drawings and specific embodiments to explain the utility model in more detail.
[0024] It should be noted that when an element is described as being "fixed to" another element, it can be directly on the other element, or one or more centered elements can exist between them. When an element is described as being "connected" to another element, it can be directly connected to the other element, or one or more centered elements can exist between them. The terms "upper", "lower", "inner", "outer", "bottom", etc. used in this specification indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model. In addition, the terms "first", "second", "third", etc. are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0025] like Figure 1 As shown:
[0026] The first tooling slip ring 2 is connected to the side wall of the housing 1 , and the planetary oil circuit 10 is connected to the first tooling slip ring 2 via a first oil circuit 101 communicating with the side wall of the housing 1 .
[0027] The first tooling slip ring 2 is connected to the three-way pipe joint 3 , so that the planetary oil circuit 10 is connected to the three-way pipe joint 3 .
[0028] One outlet of the three-way pipe joint 3 is connected to the tooling oil pipe 4 simulating the pin shaft. The tooling oil pipe 4 simulating the pin shaft has several injection ports d simulating the injection points of the planetary gear bearings. The position of the tooling oil pipe 4 simulating the pin shaft corresponds to the position of the pin shaft, and the position of the injection ports d simulating the injection points of the planetary gear bearings corresponds to the injection points of the planetary gear bearings.
[0029] The other outlet of the three-way pipe joint 3 is connected to one outlet of the oil pipe 5 , and the other outlet of the oil pipe 5 is connected to the straight pipe joint 6 .
[0030] The tooling oil injection ring 8 is fixedly connected to the housing 1 by bolts 9, and the inner hole of the second tooling slip ring 7 simulating the oil injection ring is interference-connected with the journal of the tooling oil injection ring 8.
[0031] The straight pipe joint 6 passes through the side wall of the second tooling slip ring 7 simulating the oil injection ring and is connected to the first inner tube 81 of the tooling oil injection ring 8 .
[0032] The first inner tube 81 of the tooling injection ring 8 connects the injection port b (the injection point that simulates the meshing of the planetary gear and the sun gear) that simulates the injection point that meshes with the sun gear and the injection port c (the injection point that simulates the meshing of the sun gear and the spline) that simulates the injection point that meshes with the sun gear.
[0033] The planetary oil passage 10 of the housing 1 is connected to the second inner tube 82 of the tooling oil injection ring 8 through an inclined second oil passage 102 communicating with the side wall of the housing 1 .
[0034] The second inner tube 82 of the tooling oil injection ring 8 is connected to the oil injection port a (simulating the oil injection point of the bearing of the planetary motor side) which simulates the oil injection point of the bearing of the planetary motor side.
[0035] The lubricating oil is distributed from the oil circuit to the housing 1 to the planetary oil circuit 10, and is connected to the three-way pipe joint 3 through the first tooling slip ring 2. One path of lubricating oil enters the tooling oil pipe 4 simulating the pin shaft, and is sprayed from the injection port d simulating the injection point of the planetary gear bearing, which simulates the injection point of the planetary gear bearing. The other path enters the second tooling slip ring 7 and tooling oil injection ring 8 simulating the injection ring from the oil pipe 5 and the straight pipe joint 6. The lubricating oil is sprayed from the injection port b simulating the injection point of the planetary gear meshing with the sun gear and the injection port c simulating the injection point of the sun gear meshing with the spline of the tooling oil injection ring 8, which respectively simulate the injection point of the planetary gear meshing with the sun gear and the injection point of the spline meshing. In addition, there is a path of lubricating oil directly entering the tooling oil injection ring 8 from the housing 1, and spraying from the injection port a simulating the injection point of the planetary motor side bearing, simulating the injection point of the planetary motor side bearing.
[0036] During the test, the lubricating oil injection amount is measured from the injection port a simulating the injection point of the planetary motor side bearing, the injection port b simulating the injection point of the planetary gear and the sun gear meshing, the injection port c simulating the injection point of the sun gear and the spline meshing, and the injection port d simulating the injection point of the planetary gear bearing. The appropriate theoretical oil amount is adjusted according to the test results to avoid oil leakage or component failure caused by too much or too little lubricating oil after the gearbox is installed and operated.
[0037] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments, and the same and similar parts between the embodiments can be referred to each other. The above description of the disclosed embodiments enables professionals and technicians in this field to implement or use the utility model. Various modifications to these embodiments will be obvious to professionals and technicians in this field, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the utility model. Therefore, the utility model will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features disclosed herein.
Claims
1. A planetary-level lubricating oil quantity simulation test tool for a wind turbine gearbox, characterized in that: The first tooling slip ring is connected to the side wall of the housing, the planetary oil circuit is connected to the first tooling slip ring, and the first tooling slip ring is connected to the three-way pipe joint; one outlet of the three-way pipe joint is connected to the tooling oil pipe simulating the pin shaft, and the tooling oil pipe simulating the pin shaft has several injection ports simulating the injection points of the planetary gear bearings; the other outlet of the three-way pipe joint is connected to an outlet of the oil pipe, and the other outlet of the oil pipe is connected to the straight pipe joint; the tooling injection ring is fixedly connected to the housing, and the second tooling slip ring simulating the injection ring is fixedly sleeved outside the tooling injection ring; the straight pipe joint passes through the side wall of the second tooling slip ring simulating the injection ring and is connected to the first inner tube of the tooling injection ring; the first inner tube of the tooling injection ring is connected to the injection ports simulating the injection points of the planetary gear meshing with the sun gear and the injection ports simulating the injection points of the sun gear meshing with the spline; the planetary oil circuit of the housing is connected to the second inner tube of the tooling injection ring; the second inner tube of the tooling injection ring is connected to the injection ports simulating the injection points of the planetary gear and the sun gear.
2. A wind turbine gearbox planetary lubricating oil quantity simulation test fixture as claimed in claim 1, characterized in that: The planetary oil circuit is connected to the first tooling slip ring through a first oil circuit communicated with the side wall of the box body.
3. A wind turbine gearbox planetary lubricating oil quantity simulation test fixture as claimed in claim 1, characterized in that: The inner hole of the second tooling slip ring simulating the oil injection ring is fixed with the journal of the tooling oil injection ring by interference connection.
4. A wind turbine gearbox planetary lubricating oil quantity simulation test fixture as claimed in claim 1, characterized in that: The tooling oil injection ring is fixedly connected to the box body by bolts.
5. A wind turbine gearbox planetary lubricating oil quantity simulation test fixture as claimed in claim 1, characterized in that: The planetary oil passage of the casing is connected to the second inner tube of the tooling oil injection ring through an inclined second oil passage communicated with the side wall of the casing.