Device for simulating excavation of foundation pit
By designing a simulated foundation pit excavation device including main body, model column and sand storage box, the pressure component and conveying component are used to simulate the deformation of the foundation pit during excavation, the foundation pit support cannot be considered in the prior art. The problem of protection and impact of sand and gravel soil has achieved accurate simulation and prediction of the foundation pit excavation process.
Patent Information
- Application Number
- CN202420564763.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-03-22
AI Technical Summary
The existing simulated foundation pit excavation device cannot effectively consider the impact of foundation pit support and surrounding sand and gravel soil, which makes it difficult to accurately simulate and predict the deformation of foundation pits.
A simulated foundation pit excavation device including the main body, model column and sand storage box was designed. The model column was affected by the pressure by the pressure component, and the leakage gravel was recovered through the conveying component to simulate the foundation pit during excavation. Deformation.
The intuitive simulation of foundation pit deformation during foundation pit excavation is realized, which can simulate the movement of model columns under stress in different parts, and simulate the deformation of foundation pits through the sand storage box, which improves the accuracy of prediction of foundation pit excavation process. sex.
Smart Images

Figure CN222044297U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of simulated foundation pit excavation devices, in particular to a simulated foundation pit excavation device. Background Art
[0002] Simulated foundation pit excavation refers to the use of computer software or physical models to simulate and emulate the actual foundation pit excavation process. By simulating foundation pit excavation, it is possible to predict possible problems that may arise during the excavation process, optimize construction plans, improve construction efficiency, and reduce construction risks.
[0003] In order to predict the problems that may arise during the excavation process, it is necessary to use a simulated foundation pit excavation device for simulation prediction. For example, the prior art Chinese patent publication number "CN108627359B" discloses a foundation pit excavation process simulation device, including a reaction frame, a pressure component, a pressure transmission component, a positioning adjustment component, a model pile and a test system; a plurality of the pressure components are symmetrically arranged on the side of the reaction frame, the pressure transmission component and the positioning adjustment component correspond to the pressure component and are both located in the reaction frame, the pressure component and the pressure transmission component are connected together to apply load to the model pile arranged in the reaction frame, and the test system is used to test the pressure on the side of the model pile and the displacement of the offset; the present invention can be widely used in the fields of construction and civil engineering design and construction.
[0004] Some foundation pit excavation simulation devices can simulate the impact of pressure on the model column through a pressure component. However, in actual operation, similar simulation foundation pit excavation devices cannot take into account the impact of foundation pit support and surrounding sand and gravel land during foundation pit excavation, and cannot simulate and predict the deformation of the foundation pit well. Utility Model Content
[0005] The purpose of the utility model is to solve the above-mentioned shortcomings in the prior art that the influence of foundation pit support and surrounding sand and gravel land cannot be taken into account during foundation pit excavation, and a device for simulating foundation pit excavation is proposed.
[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0007] A device for simulating foundation pit excavation is designed, comprising a main body, a model column and a sand storage box, wherein the model column is slidably connected in the main body, one side of the bottom of the main body penetrates the side wall to form a sand discharge port, and the other side thereof penetrates the bottom to form a sand discharge channel and communicates with the sand discharge port, and the top of the main body is located above the model column and fixedly installed with the sand storage box;
[0008] Wherein, a conveying component for recovering sand and gravel is provided on the side of the main body, and a pressure component is provided on the side of the main body, and the pressure component can apply pressure to the model column.
[0009] Furthermore, guide grooves are opened on both sides of the bottom of the main body, guide rods are fixedly installed in the guide grooves, the bottom of the model column is slidably connected to the guide rods, springs are sleeved on both ends of the guide rods, and both sides of the springs are fixedly connected to the guide grooves and the sides of the model column.
[0010] Furthermore, the conveying assembly includes a conveying pipe, which is fixedly installed on the side of the main body and whose bottom is communicated with the sand discharge port. A sand outlet is opened on the top of the conveying pipe, and the sand outlet passes through the side wall of the main body and is arranged above the sand storage box.
[0011] Furthermore, an auger is rotatably connected in the conveying pipeline, a worm gear is fixedly installed at the bottom of the auger, a motor is fixedly installed on the side of the main body, a worm is fixedly installed on the shaft end of the motor, and the worm gear meshes and rotates.
[0012] Furthermore, the pressure-applying assembly includes a sleeve, straight grooves are opened on both sides of the main body, and a toothed plate is fixedly installed on the inner side surface next to the straight groove. The sleeve is slidably connected in the straight groove and a gear is fixedly installed on the shaft end, and the gear meshes and rotates with the toothed plate.
[0013] Furthermore, one end of the sleeve is rotatably connected to a handle, one end of the handle is fixedly installed with a screw rod, the screw rod passes through the sleeve, an extension rod is slidably connected inside the sleeve, the extension rod is threadedly connected to the screw rod, and the other end of the extension rod is fixedly installed with a pressure block, which conflicts with the model column.
[0014] Furthermore, one end of the sleeve is threadedly connected to a clamping block via a thread line, and the clamping block can abut against the side surface of the main body to fix the sleeve.
[0015] The utility model proposes a device for simulating foundation pit excavation, and its beneficial effect lies in that: the utility model can simulate how a model column will move when different parts are affected by different forces through a pressure-applying component, and when the model column moves, the sand storage box on the top begins to leak sand to simulate the deformation of the foundation pit, so that various situations that may occur when simulating foundation pit excavation can be intuitively seen, and in addition, the leaked sand and gravel can be transported back to the sand storage box through the conveying component. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the structure of the utility model;
[0017] Figure 2 It is a cross-sectional view of the guide rod of the utility model;
[0018] Figure 3 It is a cross-sectional view of the utility model;
[0019] Figure 4 It is a structural schematic diagram of the model column of the utility model;
[0020] Figure 5 for Figure 4 A schematic diagram of the enlarged structure of area A;
[0021] Figure 6 It is a cross-sectional view of the sleeve of the utility model.
[0022] In the figure: 1. main body; 11. baffle; 12. cover plate; 2. model column; 21. displacement sensor; 3. sand storage box; 4. sand outlet; 5. sand outlet channel; 6. conveying assembly; 61. conveying pipe; 62. sand outlet; 63. auger; 64. worm gear; 65. motor; 66. worm; 7. pressure assembly; 71. sleeve; 711. threaded line; 72. tooth plate; 73. gear; 74. handle; 75. screw rod; 76. extension rod; 77. pressure block; 771. pressure sensor; 78. tightening block; 8. guide groove; 81. guide rod; 82. spring; 9. straight groove. DETAILED DESCRIPTION
[0023] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0024] Reference Figure 1-6 A device for simulating foundation pit excavation includes a main body 1, a model column 2 and a sand storage box 3. The model column 2 is slidably connected to the main body 1. One side of the bottom of the main body 1 penetrates the side wall to form a sand discharge port 4, and the other side penetrates the bottom to form a sand discharge channel 5 and communicates with the sand discharge port 4. The top of the main body 1 is located above the model column 2 and the sand storage box 3 is fixedly installed. The sand storage box 3 is filled with gravel needed to simulate the deformation of the foundation pit.
[0025] It should be supplemented that a baffle 11 is slidably arranged on the side of the main body 1, and the baffle 11 is used to block the entrance of the sand discharge port 4 and the sand discharge channel 5. A sand baffle is provided on the side of the model column 2, and the sand baffle is used to block the guide groove 8 to prevent affecting the simulation data. An outlet is provided at the bottom of the sand storage box 3, and the top of the model column 2 can block the outlet. When the model column 2 is moved by the pressure assembly 7, the outlet of the sand storage box 3 opens and starts to leak sand.
[0026] It is worth mentioning that a data collection device is provided next to the main body 1, a plurality of displacement sensors 21 are provided in the model column 2, a pressure sensor 771 is provided in the pressure block 77, the displacement sensor 21 and the pressure sensor 771 are electrically connected to the data collection device, and a cover plate 12 is hinged on the side of the main body 1, and an observation window is provided on the cover plate 12.
[0027] A conveying assembly 6 for recovering gravel is disposed on the side of the main body 1 , and a pressure assembly 7 is disposed on the side of the main body 1 , and the pressure assembly 7 can apply pressure to the model column 2 .
[0028] Furthermore, guide grooves 8 are opened on both sides of the bottom of the main body 1, and guide rods 81 are fixedly installed in the guide grooves 8. The bottom of the model column 2 is slidably connected to the guide rods 81. Springs 82 are sleeved on both ends of the guide rods 81. Both sides of the spring 82 are fixedly connected to the guide grooves 8 and the sides of the model column 2. The guide grooves 8 provide space for the movement of the model column 2.
[0029] Furthermore, the conveying assembly 6 includes a conveying pipe 61, which is fixedly installed on the side of the main body 1 and whose bottom is communicated with the sand discharge port 4. A sand outlet 62 is opened at the top of the conveying pipe 61. The sand outlet 62 passes through the side wall of the main body 1 and is arranged above the sand storage box 3. The top of the sand storage box 3 is provided with an inlet for recovering sand and gravel.
[0030] In more detail, an auger 63 is rotatably connected in the conveying pipe 61, a worm gear 64 is fixedly installed at the bottom of the auger 63, a motor 65 is fixedly installed on the side of the main body 1, a worm 66 is fixedly installed on the shaft end of the motor 65, the worm gear 64 meshes and rotates with the worm gear 66, the auger 63 is used to convey sand and gravel to achieve the purpose of recycling, and the motor 65 is electrically connected to an external power supply. It is worth mentioning that a baffle is fixedly installed above the worm gear 64 in the conveying pipe 61, and the baffle is used to prevent sand and gravel from clogging the worm gear 64.
[0031] In general, the pressure-applying assembly 7 includes a sleeve 71, straight grooves 9 are opened on both sides of the main body 1, and a toothed plate 72 is fixedly installed on the inner side thereof next to the straight groove 9. The sleeve 71 is slidably connected in the straight groove 9 and a gear 73 is fixedly installed on the shaft end. The gear 73 meshes and rotates with the toothed plate 72. The toothed plate 72 and the gear 73 are used to facilitate the movement of the sleeve 71. Moving the sleeve 71 facilitates the application of pressure to the model column 2 at different positions to achieve different sliding distances and leak different amounts of gravel.
[0032] In addition, one end of the sleeve 71 is rotatably connected to a handle 74, and one end of the handle 74 is fixedly installed with a screw rod 75, and the screw rod 75 passes through the sleeve 71. An extension rod 76 is slidably connected inside the sleeve 71, and the extension rod 76 is threadedly connected to the screw rod 75. A pressure block 77 is fixedly installed on the other end of the extension rod 76, and the pressure block 77 is in conflict with the model column 2. The outer periphery of the handle 74 is provided with anti-slip grooves, and the pressure block 77 is made to conflict with and push the model column 2 by rotating the handle 74 to cooperate with the screw rod 75. It should be noted that a straight groove is provided on the outer wall of the extension rod 76, and a guide block is provided on the inner wall of the sleeve 71. The guide block is slidably connected to the straight groove so that the extension rod 76 moves in a straight line.
[0033] Finally, one end of the sleeve 71 is threadedly connected to a clamping block 78 via a thread line 711, and the clamping block 78 can abut against the side of the main body 1 to fix the sleeve 71. The clamping block 78 fixes the sleeve 71 by abutting against the side of the main body 1 to prevent it from sliding.
[0034] Working method: When working, the handle 74 cooperates with the screw rod 75 to make the pressure block 77 contact and push the model column 2 to move it, and the model column 2 produces moving gravel and starts to leak out. After that, the model column 2 returns to its original position and the gravel no longer leaks out. Then the baffle 11 is pulled out and the gravel is transported back to the sand storage box 3 through the sand discharge port 4 by the auger 63.
[0035] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A device for simulating foundation pit excavation, comprising a main body (1), a model column (2) and a sand storage box (3), characterized in that: The model column (2) is slidably connected inside the main body (1); one side of the bottom of the main body (1) penetrates the side wall to form a sand discharge port (4); the other side penetrates the bottom to form a sand discharge channel (5) and communicates with the sand discharge port (4); the top of the main body (1) is located above the model column (2) and is fixedly mounted with the sand storage box (3); Wherein, a conveying assembly (6) for recovering sand and gravel is provided on the side of the main body (1), and a pressure-applying assembly (7) is provided on the side of the main body (1), and the pressure-applying assembly (7) is capable of applying pressure to the model column (2).
2. The device for simulating foundation pit excavation according to claim 1, characterized in that: Guide grooves (8) are provided on both sides of the bottom of the main body (1), guide rods (81) are fixedly installed in the guide grooves (8), the bottom of the model column (2) is slidably connected to the guide rods (81), springs (82) are sleeved on both ends of the guide rods (81), and both sides of the spring (82) are fixedly connected to the guide grooves (8) and the side surfaces of the model column (2).
3. The device for simulating foundation pit excavation according to claim 1, characterized in that: The conveying assembly (6) comprises a conveying pipe (61), the conveying pipe (61) is fixedly mounted on the side of the main body (1), and the bottom of the conveying pipe (61) is communicated with the sand discharge port (4), a sand outlet (62) is formed at the top of the conveying pipe (61), and the sand outlet (62) passes through the side wall of the main body (1) and is arranged above the sand storage box (3).
4. The device for simulating foundation pit excavation according to claim 3, characterized in that: An auger (63) is rotatably connected in the conveying pipe (61), a worm gear (64) is fixedly mounted on the bottom of the auger (63), a motor (65) is fixedly mounted on the side of the main body (1), a worm (66) is fixedly mounted on the shaft end of the motor (65), and the worm gear (64) is meshed and rotatably engaged with the worm gear (66).
5. The device for simulating foundation pit excavation according to claim 1, characterized in that: The pressure-applying assembly (7) comprises a sleeve (71), straight grooves (9) are provided on both sides of the main body (1), and a toothed plate (72) is fixedly installed on the inner side surface thereof next to the straight groove (9), the sleeve (71) is slidably connected in the straight groove (9) and a gear (73) is fixedly installed on the shaft end, and the gear (73) meshes and rotates with the toothed plate (72).
6. The device for simulating foundation pit excavation according to claim 5, characterized in that: One end of the sleeve (71) is rotatably connected to a handle (74), one end of the handle (74) is fixedly mounted with a screw rod (75), the screw rod (75) passes through the sleeve (71), an extension rod (76) is slidably connected inside the sleeve (71), the extension rod (76) is threadedly connected to the screw rod (75), the other end of the extension rod (76) is fixedly mounted with a pressure block (77), and the pressure block (77) is in conflict with the model column (2).
7. The device for simulating foundation pit excavation according to claim 5, characterized in that: One end of the sleeve (71) is threadedly connected to a clamping block (78) via a thread line (711); the clamping block (78) can abut against the side surface of the main body (1) to fix the sleeve (71).
