Calibration ground drill rod for civil construction

By using a combined design of base plate, elastic support and articulation frame in the calibration ground brazing for civil construction, the problem of labor-intensive disassembly and removal operations in the prior art is solved, and a more labor-saving device disassembly effect is achieved.

CN222049062UActive Publication Date: 2024-11-22JIANGSU HONGYUAN TECHNOLOGY ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420176248.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-24
Publication Date
2024-11-22
Estimated Expiration
2034-01-24

AI Technical Summary

Technical Problem

The existing calibration ground brazing for civil engineering construction is laborious when disassembly and unplugged, and is not easy to disassemble, resulting in inconvenience in use.

Method used

The design of the elastic support member including a base plate, annular distribution, a drill rod, a positioning block, a hinge frame, a first butt part and a second butt part is realized by the relative movement of the hinge frame and the absorption of vibration of the elastic support. Strength-saving to pull out.

Benefits of technology

It has achieved more labor-saving operation of calibrated ground brazing for civil construction, facilitated disassembly and removal, and solved the problem of labor-intensive operation in the existing technology.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222049062U_ABST
    Figure CN222049062U_ABST
Patent Text Reader

Abstract

The utility model discloses a calibration ground drill rod for civil construction, which comprises a base disc, the bottom of the base disc is provided with annularly distributed elastic supporting pieces, a drill rod is inserted in the center of the base disc, the outer side of the drill rod is fixedly connected with a positioning block, and a hinge frame is arranged between the bottom of the positioning block and the base disc. When the drill rod goes deep downwards, the hinge frames on the two sides can be driven to expand outwards and be separated, the first butt joint part and the second butt joint part are always horizontally opposite, when the drill rod needs to be pulled out, the first butt joint part and the second butt joint part are in butt joint, and then the first butt joint part is rotated to enable the second butt joint part to rotate synchronously; when the drill rod is pulled out, the two hinged frames are relatively close to each other, at the moment, under the supporting effect of the base disc, when the hinged frames are relatively close to each other, the drill rod is pushed upwards through the positioning blocks to be pulled out, and therefore the device has the advantages of being more labor-saving and convenient to operate and convenient to disassemble and pull out.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of calibrating ground rods, in particular to a calibrating ground rod for civil construction. Background Art

[0002] In the process of building construction, construction that requires leveling is often used. In the past, workers used two wooden sticks to level the ground, then hammered the two sticks into the ground, tied a wire between the two exposed sticks, and leveled the ground in one go.

[0003] For example, patent application No. 202020601511.X discloses a calibration ground drill for civil engineering construction, including a base, the top of the base is movably connected with an anchor rod passing through it, the upper fixed sleeve of the anchor rod is provided with a connecting plate, the bottom of the connecting plate is connected with a symmetrically arranged stabilizing rod that movably passes through the base, the top of the base is fixed with an elastic device arranged in a matrix, the top of the elastic device is connected with a horizontally arranged movable plate, the movable plate is movably sleeved on the outside of the anchor rod, and the stabilizing rod movably passes through the movable plate, and the bottom of the movable plate is fixed with a plug-in rod arranged in a matrix and movably passes through the base, so that under the joint action of various components, when the anchor rod is plugged in, it can be inserted vertically into the ground to ensure its verticality, and at the same time it can be fixedly plugged into the ground more stably, so that it is not easy to tilt, and when it is stored, the sharp end of its end can be stored in the base to prevent accidental injury.

[0004] However, in the prior art, since the anchor rod is inserted into the ground to a great depth to ensure the support stability, the operation is very laborious and difficult to dismantle when it is removed. Utility Model Content

[0005] In view of the problems existing in the prior art, the purpose of the utility model is to provide a calibration ground drill for civil construction to solve the background technical problems.

[0006] To achieve the above purpose, the utility model adopts the following technical solution.

[0007] A calibration ground drill for civil construction comprises a base plate, the bottom of which is provided with annularly distributed elastic support members, a drill rod is inserted at the center of the base plate, a positioning block is fixedly connected to the outer side of the drill rod, an articulated frame is installed between the bottom of the positioning block and the base plate, a first docking portion and a second docking portion are respectively threadedly installed inside the two articulated frames, and the second docking portion is docked with an end opposite to the first docking portion.

[0008] As a further description of the above technical solution: the first docking part includes a driving cylinder, a sliding rod, a spring and a clamp, the outer side of the driving cylinder is threadedly connected to the interior of the articulated frame, one end of the sliding rod is inserted into the interior of the driving cylinder and is movably connected to the driving cylinder through a spring, and the other end of the sliding rod is fixedly connected to the clamp.

[0009] As a further description of the above technical solution: the second docking part includes a connecting tube, a guide rod, a tension spring and a docking joint, the outer side of the connecting tube is threadedly connected to the interior of the articulated frame, one end of the guide rod is inserted into the interior of the connecting tube, one end of the tension spring is fixedly connected to the interior of the connecting tube, the other end of the tension spring is fixedly connected to the guide rod, the docking joint is fixedly installed to one end of the guide rod away from the tension spring, and the docking joint is clamped into place with the clamp and connected by bolts.

[0010] As a further description of the above technical solution: the elastic support member includes a grounding block, a support spring and a connecting block, the bottom end of the support spring is fixedly connected to the grounding block, the top end of the connecting block is fixedly connected to the bottom of the base plate, and the bottom end of the connecting block is inserted into the interior of the grounding block and fixedly connected to the top end of the support spring.

[0011] As a further description of the above technical solution: a striking block is fixedly connected to the top end of the drill rod.

[0012] As a further description of the above technical solution: a handle rod is fixedly connected to the outer side of the driving cylinder.

[0013] Compared with the prior art, the advantages of the present invention are:

[0014] In this solution, the first docking part cooperates with the second docking part and the two hinged frames to achieve the advantages of more labor-saving and convenient operation and easy disassembly and removal of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a front view cross-sectional structural schematic diagram of the utility model;

[0016] Figure 2 This is a schematic diagram of the front view combined structure of the utility model;

[0017] Figure 3 It is a partial three-dimensional structural schematic diagram of the utility model;

[0018] Figure 4 It is a schematic diagram of the structure of the utility model when viewed from above.

[0019] Description of the numbers in the figure:

[0020] 1. Base plate; 2. Elastic support member; 21. Ground block; 22. Support spring; 23. Connecting block; 3. Drill rod; 4. Positioning block; 5. Articulated frame; 6. First docking part; 61. Drive cylinder; 611. Handle rod; 62. Slide rod; 63. Spring; 64. Chuck; 7. Second docking part; 71. Connecting cylinder; 72. Guide rod; 73. Tension spring; 74. Butt joint; 8. Knocking block. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0022] See also Figures 1 to 4 In the utility model, a calibration ground drill for civil engineering construction comprises a base plate 1, a ring-shaped elastic support member 2 is installed at the bottom of the base plate 1, a drill rod 3 is inserted at the center of the base plate 1, a positioning block 4 is fixedly connected to the outside of the drill rod 3, and an articulated frame 5 is installed between the bottom of the positioning block 4 and the base plate 1, and a first docking portion 6 and a second docking portion 7 are respectively threadedly installed inside the two articulated frames 5, and the second docking portion 7 is docked with the end opposite to the first docking portion 6.

[0023] When the drill rod 3 is pushed deep into the ground, the elastic support member 2 absorbs the vibration transmitted by the base plate 1 to keep it stable. When the drill rod 3 goes deep into the ground, the hinged frames 5 on both sides are driven to expand and separate outward, and the first docking portion 6 and the second docking portion 7 are always horizontally opposite to each other. When the drill rod 3 needs to be pulled out, the first docking portion 6 is docked with the second docking portion 7, and then the first docking portion 6 is rotated to make the second docking portion 7 rotate synchronously, so that the two hinged frames 5 are relatively close to each other. At this time, under the supporting effect of the base plate 1, when the hinged frames 5 are relatively close, the drill rod 3 will be pushed upward by the positioning block 4 to be pulled out, thereby realizing that the device has the advantages of being more labor-saving and convenient to operate and easy to disassemble and pull out, and solves the problem in the prior art that the anchor rod is inserted into the ground to ensure the support stability, which causes the operation to be very laborious and difficult to disassemble and pull out.

[0024] See also Figure 1 and Figure 2 , wherein: the first docking portion 6 includes a driving cylinder 61, a sliding rod 62, a spring 63 and a clamp 64, the outer side of the driving cylinder 61 is threadedly connected to the interior of the articulated frame 5, one end of the sliding rod 62 is inserted into the interior of the driving cylinder 61 and is movably connected to the driving cylinder 61 through the spring 63, and the other end of the sliding rod 62 is fixedly connected to the clamp 64.

[0025] In the utility model, by pulling the slide rod 62, the tension spring 63 drives the clamping head 64 to translate and connect with the second docking part 7, and then the clamping head 64 is connected with the second docking part 7 by bolts, and then the driving cylinder 61 is rotated to drive the second docking part 7 to rotate synchronously, so that the two articulated frames 5 are relatively close, and it is more labor-saving and convenient to pull out the drill rod 3.

[0026] See also Figure 1 and Figure 2 , wherein: the second docking portion 7 includes a connecting tube 71, a guide rod 72, a tension spring 73 and a docking joint 74, the outer side of the connecting tube 71 is threadedly connected to the interior of the hinge frame 5, one end of the guide rod 72 is inserted into the interior of the connecting tube 71, one end of the tension spring 73 is fixedly connected to the interior of the connecting tube 71, the other end of the tension spring 73 is fixedly connected to the guide rod 72, the docking joint 74 is fixedly installed to the end of the guide rod 72 away from the tension spring 73, and the docking joint 74 is clamped and matched with the clamp head 64 and connected by bolts.

[0027] In the utility model, by pulling the guide rod 72 to stretch the tension spring 73, the docking joint 74 is clamped with the clamping head 64 and fixed by bolts, and then the driving cylinder 61 is rotated to drive the connecting cylinder 71 to rotate synchronously, so as to drive the two articulated frames 5 to be relatively close to each other and realize the upward thrust of the drill rod 3.

[0028] See also Figure 1 and Figure 4 , wherein: the elastic support member 2 includes a grounding block 21, a support spring 22 and a connecting block 23, the bottom end of the support spring 22 is fixedly connected to the grounding block 21, the top end of the connecting block 23 is fixedly connected to the bottom of the base plate 1, and the bottom end of the connecting block 23 is inserted into the interior of the grounding block 21 and fixedly connected to the top end of the support spring 22.

[0029] In the utility model, the grounding block 21 contacts the ground and the base plate 1 is elastically supported in the vertical direction through the support spring 22 and the connecting block 23, so as to reduce the vibration of the base plate 1 when the drill rod 3 is struck, so as to keep it stable and achieve the effect of vertical stable support.

[0030] See also Figure 1 and Figure 2 , wherein: the top of the drill rod 3 is fixedly connected with a striking block 8

[0031] In the utility model, the striking block 8 makes the contact area larger and easier during striking.

[0032] See also Figure 1 , wherein: a handle rod 611 is fixedly connected to the outer side of the driving cylinder 61 .

[0033] In the utility model, it is more convenient and labor-saving to rotate the driving cylinder 61 through the handle rod 611.

[0034] The above is a preferred specific implementation of the utility model; however, the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the utility model according to the technical solution and its improved conception of the utility model, which should be included in the protection scope of the utility model.

Claims

1. A ground drill for civil engineering construction, comprising a base plate (1), characterized in that: The bottom of the base plate (1) is provided with an annularly distributed elastic support member (2), a drill rod (3) is inserted at the center of the base plate (1), a positioning block (4) is fixedly connected to the outer side of the drill rod (3), an articulated frame (5) is installed between the bottom of the positioning block (4) and the base plate (1), a first docking portion (6) and a second docking portion (7) are respectively threadedly installed inside the two articulated frames (5), and the second docking portion (7) is docked with the end opposite to the first docking portion (6).

2. A calibration ground drill for civil engineering construction according to claim 1, characterized in that: The first docking portion (6) comprises a driving cylinder (61), a sliding rod (62), a spring (63) and a clamp (64); the outer side of the driving cylinder (61) is threadedly connected to the interior of the hinged frame (5); one end of the sliding rod (62) is inserted into the interior of the driving cylinder (61) and is movably connected to the driving cylinder (61) via the spring (63); the other end of the sliding rod (62) is fixedly connected to the clamp (64).

3. A ground-marking drill for civil engineering construction according to claim 2, characterized in that: The second docking portion (7) comprises a connecting tube (71), a guide rod (72), a tension spring (73) and a docking joint (74); the outer side of the connecting tube (71) is threadedly connected to the interior of the hinged frame (5); one end of the guide rod (72) is inserted into the interior of the connecting tube (71); one end of the tension spring (73) is fixedly connected to the interior of the connecting tube (71); the other end of the tension spring (73) is fixedly connected to the guide rod (72); the docking joint (74) is fixedly installed to one end of the guide rod (72) away from the tension spring (73); the docking joint (74) is snap-fitted with the clamp (64) and connected by bolts.

4. The ground-marking drill for civil engineering construction according to claim 1, characterized in that: The elastic support member (2) comprises a grounding block (21), a support spring (22) and a connection block (23); the bottom end of the support spring (22) is fixedly connected to the grounding block (21); the top end of the connection block (23) is fixedly connected to the bottom of the base plate (1); the bottom end of the connection block (23) is plugged into the inside of the grounding block (21) and fixedly connected to the top end of the support spring (22).

5. The ground-marking drill for civil engineering construction according to claim 1, characterized in that: A striking block (8) is fixedly connected to the top end of the drill rod (3).

6. A ground-marking drill for civil engineering construction according to claim 2, characterized in that: A handle bar (611) is fixedly connected to the outer side of the driving cylinder (61).