Gas purification system
By designing a gas purification system, each absorption tower is allowed to operate independently or in series, the shutdown problem of the flue gas desulfurization system in the series of the dual absorption tower is solved when the flue gas desulfurization system is shut down during the failure, the continuous maintenance and production are achieved, and the reliability of the desulfurization system is improved. and efficiency.
Patent Information
- Application Number
- CN202420662548.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-02
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-04-02
AI Technical Summary
The flue gas desulfurization system in series of double absorption towers cannot be independently inspected when a single absorption tower fails, resulting in production shutdown and desulfurization system output, affecting the unit load and coal-fired sulfur.
A gas purification system is designed to allow each absorption tower to operate independently or in series by introducing pipes, discharge pipes, first and second absorption towers, bypass components and control valves, ensuring that the fault tower can be operated in the event of a fault. Carry out maintenance without affecting production.
It realizes maintenance of the faulty absorption tower without shutdown in the event of a fault, and quickly restores the operation of the double tower, reducing the impact on production, and improving the reliability and efficiency of the desulfurization system.
Smart Images

Figure CN222076298U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of gas purification, in particular to a gas purification system. Background Art
[0002] The flue gas from thermal power plants must be purified before being discharged to meet environmental protection requirements. Currently, the limestone-gypsum wet method is used to desulfurize and purify the sulfides in the flue gas.
[0003] Limestone-gypsum wet flue gas desulfurization mainly includes single absorber desulfurization and double absorber series desulfurization. The double absorber series flue gas desulfurization system sets up two absorbers in series. The functions and working principles of the two absorbers are the same. During operation, the two absorbers are shared, which increases the sulfur content of the coal and reduces the fuel cost.
[0004] However, when the internal equipment of a single absorber fails, the other absorber is in operation, and the flue gas always passes through the two absorbers, making it impossible to repair the failed absorber. In order to repair the double-absorber series flue gas desulfurization system, all of them must be shut down for maintenance, which seriously affects continuous production. If it continues to operate without stopping, the double-absorber series flue gas desulfurization system will always operate as a single absorber, causing a long-term decrease in the output of the desulfurization system, affecting the unit load or the sulfur content of the coal. Utility Model Content
[0005] The utility model aims to provide a gas purification system, which can reduce downtime caused by failures, reduce the impact on production, and enable it to quickly recover to double-tower operation.
[0006] To achieve this purpose, the utility model adopts the following technical solutions:
[0007] Gas purification system, including:
[0008] Introduction tube;
[0009] discharge pipe;
[0010] a first absorption tower, wherein a first air inlet pipe and a first air outlet pipe are connected to the first absorption tower, the first air inlet pipe is connected to the introduction pipe, a first air inlet valve is arranged on the first air inlet pipe, and a first air outlet valve is arranged on the first air outlet pipe;
[0011] a second absorption tower, the second absorption tower being connected with a second air inlet pipe and a second air outlet pipe, the second air inlet pipe being connected with the first air outlet pipe, the second air outlet pipe being connected with the exhaust pipe, the second air inlet pipe being provided with a second air inlet valve, the second air outlet pipe being provided with a second air outlet valve;
[0012] A bypass assembly, the bypass assembly includes a first bypass pipe and a second bypass pipe, one end of the first bypass pipe is connected to the first output pipe, and the other end is connected to the exhaust pipe, the first bypass pipe is provided with a first bypass valve, one end of the second bypass pipe is connected to the inlet pipe, and the other end is connected to the second intake pipe, and the second bypass pipe is provided with a second bypass valve.
[0013] Optionally, one end of the first output pipe, one end of the second intake pipe, and one end of the first bypass pipe are connected via a first three-way joint.
[0014] Optionally, one end of the second bypass pipe, one end of the first air inlet pipe, and one end of the introduction pipe are connected via a second three-way joint.
[0015] Optionally, the first output pipe is connected to the upper end of the first absorption tower, the first air inlet pipe is located below the first output pipe, the second output pipe is connected to the upper end of the second absorption tower, and the second air inlet pipe is located below the second output pipe.
[0016] Optionally, a first spray cooling device is provided on the first air inlet pipe, and a second spray cooling device is provided on the second air inlet pipe.
[0017] Optionally, the first spray cooling device includes a first flushing pipe and a plurality of first nozzles arranged on the first flushing pipe, and the first flushing pipe extends into the first air inlet pipe. The second spray cooling device includes a second flushing pipe and a plurality of second nozzles arranged on the second flushing pipe, and the second flushing pipe extends into the second air inlet pipe.
[0018] Optionally, a first vent valve is provided at the top of the first absorption tower, and a second vent valve is provided at the top of the second absorption tower.
[0019] Optionally, a first spray element and a first demister are provided in the first absorption tower, and the first demister is arranged above the first spray element; a second spray element and a second demister are provided in the second absorption tower, and the second demister is arranged above the second spray element.
[0020] Optionally, it further comprises a chimney communicated with the exhaust pipe, and the exhaust pipe is connected to the chimney after passing through a dust collector.
[0021] Optionally, it further includes an induced draft fan connected to the inlet pipe, the inlet pipe is provided with an induced draft valve, and the induced draft valve is located between the induced draft fan and the first air inlet pipe.
[0022] Beneficial effects:
[0023] The gas purification system provided in this embodiment can make the first absorption tower free of gas to be purified while the second absorption tower is running, so that it is convenient to overhaul the first absorption tower when it fails, avoid affecting production, and facilitate rapid recovery to the double-tower operation. It can also make the second absorption tower free of gas to be purified while the first absorption tower is running, so that it is convenient to overhaul the second absorption tower when it fails, avoid affecting production, and facilitate rapid recovery to the double-tower operation. It can realize the operation of the first absorption tower and the second absorption tower separately, and it can also realize the operation of the first absorption tower and the second absorption tower in series. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a structural schematic diagram of a gas purification system provided in an embodiment of the utility model.
[0025] In the figure:
[0026] 1. Introduction pipe;
[0027] 2. First absorption tower; 21. First air inlet pipe; 22. First air outlet pipe; 23. First air inlet valve; 24. First outlet valve; 25. First spray cooling device; 26. First vent valve;
[0028] 3. Second absorption tower; 31. Second air inlet pipe; 32. Second air outlet pipe; 33. Second air inlet valve; 34. Second outlet valve; 35. Second spray cooling device; 36. Second vent valve;
[0029] 4. Bypass assembly; 41. First bypass pipe; 42. Second bypass pipe; 43. First bypass valve; 44. Second bypass valve;
[0030] 5. Discharge pipe;
[0031] 6. Chimney;
[0032] 7. Dust collector;
[0033] 8. Induced draft fan;
[0034] 9. Air induced valve. DETAILED DESCRIPTION
[0035] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only the parts related to the present invention, rather than all structures, are shown in the accompanying drawings.
[0036] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0037] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0038] In the description of this embodiment, the terms "upper", "lower", "right", "left" and other directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplified operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.
[0039] like Figure 1 As shown, this embodiment provides a gas purification system. Exemplarily, the gas purification system can be used as a wet desulfurization system for purifying boiler flue gas in a thermal power plant.
[0040] like Figure 1 As shown, the gas purification system specifically includes a first absorption tower 2, a second absorption tower 3, an inlet pipe 1 and a discharge pipe 5. The first absorption tower 2 is connected to a first air inlet pipe 21 and a first outlet pipe 22, and the first air inlet pipe 21 is connected to the inlet pipe 1. The second absorption tower 3 is connected to a second air inlet pipe 31 and a second outlet pipe 32, and the second air inlet pipe 31 is connected to the first outlet pipe 22, and the second outlet pipe 32 is connected to the outlet pipe 5. The gas to be purified introduced from the inlet pipe 1 passes through the first air inlet pipe 21, the first absorption tower 2, the first outlet pipe 22, the second air inlet pipe 31, the second absorption tower 3 and the second outlet pipe 32 in sequence, and is discharged from the outlet pipe 5. The first absorption tower 2 and the second absorption tower 3 are operated in series to improve the purification capacity.
[0041] Furthermore, if Figure 1 As shown, the gas purification system also includes a bypass assembly 4. The bypass assembly 4 includes a first bypass pipe 41 and a second bypass pipe 42. One end of the first bypass pipe 41 is connected to the first output pipe 22, and the other end is connected to the discharge pipe 5. The first bypass pipe 41 is provided with a first bypass valve 43, the second air inlet pipe 31 is provided with a second air inlet valve 33, and the second output pipe 32 is provided with a second output valve 34. One end of the second bypass pipe 42 is connected to the introduction pipe 1, and the other end is connected to the second air inlet pipe 31. The second bypass pipe 42 is provided with a second bypass valve 44. The first air inlet pipe 21 is provided with a first air inlet valve 23, and the first output pipe 22 is provided with a first output valve 24.
[0042] The first air inlet valve 23, the first output valve 24 and the first bypass valve 43 are opened, and the second air inlet valve 33, the second output valve 34 and the second bypass valve 44 are closed. The gas to be purified from the inlet pipe 1 flows through the first air inlet pipe 21, the first absorption tower 2, the first output pipe 22 and the first bypass pipe 41 in sequence, and flows out from the discharge pipe 5. While the first absorption tower 2 is running, there is no gas to be purified in the second absorption tower 3, which is convenient for the maintenance of the second absorption tower 3 when it fails. This avoids affecting production and is conducive to rapid recovery to dual-tower operation.
[0043] Close the first air inlet valve 23, the first output valve 24 and the first bypass valve 43, open the second air inlet valve 33, the second output valve 34 and the second bypass valve 44, and the gas to be purified from the inlet pipe 1 flows through the second bypass pipe 42, the second air inlet pipe 31, the second absorption tower 3 and the second output pipe 32 in sequence, and flows out from the discharge pipe 5; while the second absorption tower 3 is running, there is no gas to be purified in the first absorption tower 2, which is convenient for the maintenance of the first absorption tower 2 when it fails, avoiding affecting the production, and facilitating a rapid recovery to the dual-tower operation.
[0044] Open the first air inlet valve 23 and the first outlet valve 24, open the second air inlet valve 33 and the second outlet valve 34, and close the first bypass valve 43 and the second bypass valve 44. The gas to be purified passes through the first absorption tower 2 and the second absorption tower 3 from the inlet pipe 1 in sequence and is discharged from the discharge pipe 5. The first absorption tower 2 and the second absorption tower 3 are operated in series to improve the purification capacity.
[0045] In this embodiment, one end of the first output pipe 22, one end of the second air intake pipe 31 and one end of the first bypass pipe 41 are connected through a first three-way joint. That is, the inlet end of the first bypass pipe 41 is connected to the connection between the first output pipe 22 and the second air intake pipe 31. The ends of the three are connected, and there is no need to set additional openings on the three pipes to form a connection, thereby improving the sealing performance.
[0046] In order to ensure that there is no gas to be purified in the faulty first absorption tower 2 or the second absorption tower 3, a first vent valve 26 is provided on the top of the first absorption tower 2 for emptying the first absorption tower 2, and a second vent valve 36 is provided on the top of the second absorption tower 3 for emptying the second absorption tower 3. This is beneficial to protecting the personal safety of maintenance personnel.
[0047] In this embodiment, one end of the second bypass pipe 42, one end of the first air intake pipe 21 and one end of the introduction pipe 1 are connected through a second three-way joint. In other words, the inlet end of the second bypass pipe 42 is connected to the connection between the first air intake pipe 21 and the introduction pipe 1. The ends of the three are connected, and there is no need to set up additional openings and connections on the three pipes, thereby improving the sealing performance.
[0048] In this embodiment, the first output pipe 22 is connected to the upper end of the first absorption tower 2, the first air inlet pipe 21 is located below the first output pipe 22, the second output pipe 32 is connected to the upper end of the second absorption tower 3, and the second air inlet pipe 31 is located below the second output pipe 32. The gas to be purified enters the first absorption tower 2 and the second absorption tower 3, and flows through the tower bodies from bottom to top.
[0049] like Figure 1 As shown, in order to cool the gas to be purified and prevent the high-temperature gas to be purified from damaging the equipment in the first absorption tower 2 and the second absorption tower 3, optionally, a first spray cooling device 25 is provided on the first air inlet pipe 21, and a second spray cooling device 35 is provided on the second air inlet pipe 31.
[0050] In this embodiment, the first spray cooling device 25 includes a first flushing pipe and a plurality of first nozzles arranged on the first flushing pipe, the first flushing pipe extends into the first air inlet pipe 21, and the second spray cooling device 35 includes a second flushing pipe and a plurality of second nozzles arranged on the second flushing pipe, the second flushing pipe extends into the second air inlet pipe 31. Using a plurality of first nozzles and second nozzles to spray water to cool the gas to be purified has a simple structure, low cost, does not affect the circulation of the gas to be purified, and has a good cooling effect.
[0051] The first absorption tower 2 is provided with a first spraying part and a first demister, and the first demister is arranged above the first spraying part. The second absorption tower 3 is provided with a second spraying part and a second demister, and the second demister is arranged above the second spraying part. The gas to be purified is boiler flue gas, which flows from bottom to top in the absorption tower and first encounters the first spraying part and the second spraying part below. The first spraying part and the second spraying part are used to spray atomized limestone slurry, which fully contacts and reacts with the gas to be purified to remove the sulfur in the boiler flue gas. The first demister and the second demister are used to remove the droplets carried by the boiler flue gas after desulfurization.
[0052] In this embodiment, the first intake valve 23, the first output valve 24, the second intake valve 33, the second output valve 34, the first bypass valve 43 and the second bypass valve 44 are all desulfurization damper doors.
[0053] In this embodiment, the gas purification system further includes a chimney 6 connected to the exhaust pipe 5. The purified gas is discharged by utilizing the chimney effect of the chimney 6. The exhaust pipe 5 is connected to the chimney 6 after passing through the dust collector 7, and the dust collector 7 further removes dust particles in the gas. Exemplarily, the dust collector 7 is a wet electrostatic precipitator.
[0054] In this embodiment, the gas purification system further includes an induced draft fan 8 connected to the inlet pipe 1 . The inlet pipe 1 is provided with an induced draft valve 9 . The induced draft valve 9 is located between the induced draft fan 8 and the first air inlet pipe 21 .
[0055] Obviously, the above embodiments of the present invention are merely examples for the purpose of clearly illustrating the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the scope of protection of the present invention. It is not necessary and impossible to list all implementation methods here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention shall be included in the scope of protection of the claims of the present invention.
Claims
1. A gas purification system, characterized in that: include: Introduction tube (1); A discharge pipe (5); A first absorption tower (2), the first absorption tower (2) being connected to a first air inlet pipe (21) and a first air outlet pipe (22), the first air inlet pipe (21) being connected to the introduction pipe (1), the first air inlet pipe (21) being provided with a first air inlet valve (23), and the first air outlet pipe (22) being provided with a first air outlet valve (24); a second absorption tower (3), the second absorption tower (3) being connected to a second air inlet pipe (31) and a second air outlet pipe (32), the second air inlet pipe (31) being connected to the first air outlet pipe (22), the second air outlet pipe (32) being connected to the discharge pipe (5), the second air inlet pipe (31) being provided with a second air inlet valve (33), and the second air outlet pipe (32) being provided with a second air outlet valve (34); A bypass assembly (4), the bypass assembly (4) comprising a first bypass pipe (41) and a second bypass pipe (42), one end of the first bypass pipe (41) being connected to the first output pipe (22), and the other end being connected to the discharge pipe (5), the first bypass pipe (41) being provided with a first bypass valve (43), one end of the second bypass pipe (42) being connected to the inlet pipe (1), and the other end being connected to the second intake pipe (31), the second bypass pipe (42) being provided with a second bypass valve (44).
2. The gas purification system according to claim 1, characterized in that: One end of the first output pipe (22), one end of the second air inlet pipe (31) and one end of the first bypass pipe (41) are connected via a first three-way joint.
3. The gas purification system according to claim 1, characterized in that: One end of the second bypass pipe (42), one end of the first air inlet pipe (21) and one end of the introduction pipe (1) are connected via a second three-way joint.
4. The gas purification system according to claim 1, characterized in that: The first output pipe (22) is connected to the upper end of the first absorption tower (2), the first air inlet pipe (21) is located below the first output pipe (22), the second output pipe (32) is connected to the upper end of the second absorption tower (3), and the second air inlet pipe (31) is located below the second output pipe (32).
5. The gas purification system according to claim 1, characterized in that: The first air inlet pipe (21) is provided with a first spray cooling device (25), and the second air inlet pipe (31) is provided with a second spray cooling device (35).
6. The gas purification system according to claim 5, characterized in that: The first spray cooling device (25) comprises a first flushing pipe and a plurality of first nozzles arranged on the first flushing pipe, the first flushing pipe extends into the first air inlet pipe (21), and the second spray cooling device (35) comprises a second flushing pipe and a plurality of second nozzles arranged on the second flushing pipe, the second flushing pipe extends into the second air inlet pipe (31).
7. The gas purification system according to claim 1, characterized in that: The first absorption tower (2) is provided with a first vent valve (26) on the top, and the second absorption tower (3) is provided with a second vent valve (36) on the top.
8. The gas purification system according to claim 1, characterized in that: The first absorption tower (2) is provided with a first spray element and a first demister, and the first demister is arranged above the first spray element. The second absorption tower (3) is provided with a second spray element and a second demister, and the second demister is arranged above the second spray element.
9. The gas purification system according to claim 1, characterized in that: It also comprises a chimney (6) connected to the exhaust pipe (5); the exhaust pipe (5) is connected to the chimney (6) after passing through a dust collector (7).
10. The gas purification system according to claim 1, characterized in that: It also includes an induced draft fan (8) connected to the inlet pipe (1), and an induced draft valve (9) is provided on the inlet pipe (1), and the induced draft valve (9) is located between the induced draft fan (8) and the first air inlet pipe (21).
