Combined ecological pile positioning device
By designing and combining ecological pile positioning devices in the ecological combined pile protection bank, using the frame structure and mechanical linkage system, the problems of inaccurate splicing and difficult construction are solved, the integration of soil and water and construction efficiency are improved, and the health of aquatic ecology is promoted. develop.
Patent Information
- Application Number
- CN202420348351.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-26
- Publication Date
- 2024-12-20
- Estimated Expiration
- 2034-02-26
AI Technical Summary
The existing pile driving positioning device cannot guarantee the accuracy of splicing in the ecological combined pile protection structure, resulting in the disfusion of water and soil, affecting the growth of aquatic animals and plants, and is prone to produce soil extrusion and friction piles during construction, affecting the construction efficiency and Effect.
A combined ecological pile positioning device is designed, and the positioning device body adopts a frame structure is equipped with a visual frame, a mobile frame, a connecting plate, a clamping plate and a driving motor. Through mechanical linkage and threaded rod system, the level of the stressed pile is ensured. Accurate positioning and spacing, reduce joint and soil extrusion effects, and improve construction accuracy and stability.
The precise splicing between piles is achieved, the construction difficulty is reduced, the soil and water blending effect is improved, the growth of aquatic animals and plants is promoted, and the bank protection facade is beautified and aesthetic fatigue is reduced.
Smart Images

Figure CN222206192U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of river bank protection projects, in particular to a combined ecological pile positioning device. Background Art
[0002] Depending on the location of the river channel, the forms of revetment vary greatly, and can be roughly divided into two types: upright revetment and slope revetment. Upright revetment can be divided into cast-in-place retaining wall revetment and precast pile revetment. We are accustomed to calling cast-in-place retaining wall revetment traditional revetment. Its construction process is mostly: cofferdam → pumping, dredging → foundation treatment → tying steel bars → erecting formwork → pouring concrete → maintenance → dismantling formwork → backfilling earthwork. The construction process requires cofferdam dry water construction, with many types of work, complex construction, low degree of mechanization, and great impact from the flood season. With the rapid development of domestic infrastructure, the application field of precast concrete piles has become more and more extensive. A series of advantages such as efficient production, stable quality, and convenient transportation have led to the emergence of various types of precast concrete revetment piles in water conservancy revetment. Through the splicing of piles, they are connected into one to form a high-strength retaining wall to achieve the purpose of rapid construction. However, there are still certain problems with the existing pile positioning device when it is used:
[0003] For example, a steel pipe pile positioning device with announcement number CN214460401U has the following technical solution: it includes a positioning body, the positioning body is fixed on the pile foundation, a plurality of positioning holes are opened on the positioning body, the steel pipe piles to be positioned pass through the positioning holes and sink into the pile foundation, and the distance between the side wall of the positioning hole and the steel pipe pile is used to control the verticality of the steel pipe pile not to exceed a preset value. By adopting this positioning device, when positioning the steel pipe piles, it is not necessary to use additional detection equipment to control the verticality of the steel pipe piles within the range required by the process, thereby effectively solving the problem of steel pipe pile interference and influence on foundation bearing capacity caused by the deflection of the steel pipe piles; and this steel pipe pile positioning device has the advantages of simple structure and convenient operation during positioning, but the existing pile positioning adopts the form of spacer piles and connecting plates for the ecological combination pile revetment structure, and the splicing accuracy of the piles cannot be guaranteed, and it is easy to produce joints that exceed the requirements of the specification, which is not conducive to the control of soil and water loss. The continuous construction of the piles is easy to produce soil squeezing effect, which affects the construction of the rear piles, and the verticality of the pile body cannot be guaranteed. The construction of the rear piles is easy to produce friction with the front piles, affecting the pile top elevation. The irregular joints between the piles have a greater impact on the facade effect, and the soil behind them forms a barrier with the water, and the water and soil do not blend, so aquatic animals and aquatic plants cannot grow in the revetment.
[0004] In view of this, we conducted in-depth research on the above issues, which led to the present case.
[0005] In view of the above problems, an innovative design is carried out on the basis of the original pile positioning device. Utility Model Content
[0006] The purpose of the utility model is to provide a combined ecological pile positioning device to solve the problem in the above background technology that the splicing of piles cannot guarantee the splicing accuracy and affects the ecological water-soil integration and the growth of aquatic plants and animals.
[0007] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0008] A combined ecological pile positioning device includes a positioning device body, which is a frame structure, and frame boxes are arranged at the front and back of the bottom of the positioning device body, a visible frame is opened on the top surface of the positioning device body, and a mobile frame is connected to the bottom of the top of the positioning device body, and a connecting plate is installed inside the mobile frame, force piles are horizontally installed inside the frame box, and there is a spacing distance between the force piles, and connecting plates are connected and installed between the force piles, clamping plates are arranged at the front and back of the force piles, and the clamping plates are located on the front and back inner sides of the frame box, and the clamping plates form a clamping and fixing structure for the front and back faces of the force piles.
[0009] Preferably, a first drive motor is fixedly installed on the right side of the positioning device body, and a first threaded rod is connected to the output shaft at the left end of the first drive motor, and the left end of the first threaded rod is rotatably connected to the left side surface inside the positioning device body.
[0010] By adopting the above technical solution, the first drive motor is started and its output shaft drives the first threaded rod to rotate, thereby providing mechanical power for the left and right movement of the movable frame, so as to predetermine the position of the connecting plate.
[0011] Preferably, a movable frame is installed on the outer side of the first threaded rod through a threaded connection, and a threaded groove is opened at the bottom of the movable frame, and the first threaded rod is connected to the threaded groove through, and the top of the movable frame is located at the bottom of the top surface of the positioning device body to form a left and right movable structure, and a connecting plate is placed inside the top of the movable frame.
[0012] By adopting the above technical solution, when the first threaded rod rotates, its threaded connection drives the mobile frame to move left and right, and the connecting plate is placed above the mobile frame, so that the position of the ecological warehouse can be observed through the connecting plate for positioning.
[0013] Preferably, a second drive motor is fixedly installed on the rear side of the frame box, and the second drive motor is located on the side close to the river bank, a rotating shaft is connected to the front output shaft of the second drive motor, and the rotating shaft passes through the front side of the frame box, and a transmission belt is connected to the left and right sides of the rotating shaft located in the internal space of the frame box.
[0014] By adopting the above technical solution, when the second drive motor is started, its output shaft drives the rotating shaft to rotate, and the mechanical linkage performance is improved through the connected transmission belt, thereby providing mechanical power for the movement of the clamping plate.
[0015] Preferably, the outer ends of the transmission belts are connected and installed with threaded sleeves, and the outer sides of the threaded sleeves are rotatably connected to the inner sides of the frame box, and the inner sides of the threaded sleeves are threadedly connected and installed with second threaded rods.
[0016] By adopting the above technical solution, when the rotating shaft rotates, the transmission belt can be used to drive the threaded sleeve to rotate and then drive the second threaded rod to rotate and extend, thereby providing mechanical power for the movement of the clamping plate.
[0017] Preferably, the ends of the second threaded rods are fixedly mounted with clamping plates, and support rods are installed through both left and right sides of the clamping plates, and the support rods are fixedly mounted on the outer side of the frame box body to support the clamping plates to form a forward and backward moving structure.
[0018] By adopting the above technical solution, when the second threaded rod rotates, it simultaneously drives the clamping plate to clamp the front and back faces of the load-bearing pile through the support of the support rod, so that the load-bearing piles remain on the same horizontal plane, and the controlled spacing facilitates the mortise and tenon connection with the connecting plate.
[0019] Preferably, an ecological warehouse is provided through the bottom of the connecting plate, and a pile hole is provided through the inside of the load-bearing pile. The vertical length of the connecting plate is much longer than the vertical length of the load-bearing pile, and the connecting plate and the left and right sides of the load-bearing pile form a closed mortise and tenon structure through concave and convex joints.
[0020] By adopting the above technical scheme, the position of the load-bearing pile is determined after the position of the connecting plate is determined by the positioning device body. In actual operation, the load-bearing pile is first driven, and then the connecting plate is lowered to be connected with the load-bearing pile by mortise and tenon. The vertical length of the connecting plate is much smaller than the vertical length of the load-bearing pile, so there is no obvious soil squeezing effect, the construction difficulty is greatly reduced, the stability and force performance of the mortise and tenon connection structure are more reasonable, and on the facade, the load-bearing pile and the connecting plate form a concave and convex facade effect, which is beneficial to eliminate the joints between the pile and the plate, beautify the facade and eliminate aesthetic fatigue.
[0021] Compared with the prior art, the beneficial effects of the utility model are: the combined ecological pile positioning device,
[0022] 1. A connecting plate for protecting the ecological warehouse is provided. The ecological warehouse is provided at the bottom of the connecting plate, and a pile hole is provided inside the stressed pile. The vertical length of the connecting plate is much longer than the vertical length of the stressed pile, and the connecting plate and the left and right sides of the stressed pile form a closed mortise and tenon structure through concave and convex. The position of the connecting plate is determined by the positioning device body before the position of the stressed pile is determined. In actual operation, the stressed pile is first driven, and then the connecting plate is lowered to connect with the stressed pile by mortise and tenon. The vertical length of the connecting plate is much shorter than the vertical length of the stressed pile, so there is no obvious soil squeezing effect, the construction difficulty is greatly reduced, the stability and stress performance of the mortise and tenon connection structure are more reasonable, and on the facade, the stressed pile and the connecting plate form a concave and convex facade effect, which is beneficial to eliminate the joints between the pile and the plate, beautify the facade and eliminate aesthetic fatigue;
[0023] 2. A clamping plate is provided for clamping and fixing the stressed piles, the clamping plates are fixedly installed at the ends of the second threaded rods, and support rods are installed through the left and right sides of the clamping plates, and the support rods are fixedly installed on the outer side of the frame box body to support the clamping plate to form a forward and backward moving structure. When the second threaded rod rotates, the clamping plate is driven to clamp the front and rear faces of the stressed piles through the support of the support rods, so that the stressed piles are kept on the same horizontal plane, and the spacing is controlled to facilitate the mortise and tenon connection with the connecting plate. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 This is a schematic diagram of the front structure of the utility model;
[0025] Figure 2 This is a schematic diagram of the top view structure of the utility model;
[0026] Figure 3 For this utility model Figure 2 The enlarged structural diagram at A in the middle;
[0027] Figure 4 This is a schematic diagram of the three-dimensional structure of the connecting plate of the utility model;
[0028] Figure 5 It is a schematic diagram of the three-dimensional structure of the load-bearing pile of the utility model.
[0029] In the figure: 1. Positioning device body; 2. Frame box; 3. Visible frame; 4. First drive motor; 5. First threaded rod; 6. Moving frame; 7. Threaded groove; 8. Connecting plate; 9. Ecological warehouse; 10. Force pile; 11. Pile hole; 12. Second drive motor; 13. Rotating shaft; 14. Transmission belt; 15. Threaded sleeve; 16. Second threaded rod; 17. Clamping plate; 18. Support rod. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0031] See also Figure 1-5 , the utility model provides a technical solution:
[0032] The combined ecological pile positioning device includes a positioning device body 1, which is a frame structure, and a frame box body 2 is arranged at the front and back of the bottom of the positioning device body 1, a visible frame 3 is opened on the top surface of the positioning device body 1, and a mobile frame 6 is connected to the bottom of the top of the positioning device body 1, and a connecting plate 8 is installed inside the mobile frame 6, force piles 10 are horizontally installed on the inner side of the frame box body 2, and there is a spacing distance between the force piles 10, and a connecting plate 8 is connected and installed between the force piles 10, clamping plates 17 are arranged at the front and back of the force piles 10, and the clamping plates 17 are located on the front and back inner sides of the frame box body 2, and the clamping plates 17 constitute a clamping and fixing structure for the front and back of the force piles 10.
[0033] A first drive motor 4 is fixedly installed on the right side of the positioning device body 1, and a first threaded rod 5 is connected and installed on the output shaft at the left end of the first drive motor 4, and the left end of the first threaded rod 5 is rotatably connected to the left side of the interior of the positioning device body 1. A mobile frame 6 is threadedly connected and installed on the outer side of the first threaded rod 5, and a thread groove 7 is provided at the bottom of the mobile frame 6, and the first threaded rod 5 is connected to the thread groove 7 through the top of the mobile frame 6. The top of the mobile frame 6 is located at the bottom of the top surface of the positioning device body 1 to form a left-right movable structure, and a connecting plate 8 is placed inside the top of the mobile frame 6. Start the first drive motor 4 and its output shaft drives the first threaded rod 5 to rotate, thereby providing mechanical power for the left-right movement of the mobile frame 6, which is convenient for predetermining the position of the connecting plate 8. When the first threaded rod 5 rotates, its threaded connection drives the mobile frame 6 to move left and right, and the connecting plate 8 is placed above the mobile frame 6, which is convenient for observing the position of the ecological warehouse 9 through the connecting plate 8 for positioning.
[0034] A second drive motor 12 is fixedly installed on the rear side of the frame box 2, and the second drive motor 12 is located on a side close to the river bank. The output shaft at the front end of the second drive motor 12 is connected with a rotating shaft 13, and the rotating shaft 13 runs through the front side of the frame box 2, and the rotating shaft 13 is located in the frame box 2. The left and right sides of the internal space are connected and installed with a transmission belt 14. The outer ends of the transmission belt 14 are connected and installed with a threaded sleeve 15, and the outer sides of the threaded sleeve 15 are rotatably connected to the inner side of the frame box 2, and the inside of the threaded sleeve 15 is threadedly connected and installed with a second threaded rod 16. The ends of the second threaded rod 16 are fixedly installed with a clamping plate 17, and the left and right sides of the clamping plate 17 are penetrated and installed with a support rod 18, and the support rod 18 is fixedly installed on the outer side of the frame box 2 to support the clamping plate 17 to form a forward and backward moving structure. When the second drive motor 12 is started, its output shaft drives the rotating shaft 13 to rotate, and the connected transmission belt 14 is convenient for improving the mechanical linkage performance, thereby providing mechanical power for the movement of the clamping plate 17. When the rotating shaft 13 rotates, the transmission belt 14 drives the threaded sleeve 15 to rotate, and then drives the second threaded rod 16 to rotate and extend, providing mechanical power for the movement of the clamping plate 17.
[0035] When the second threaded rod 16 rotates, it drives the clamping plate 17 to clamp the front and back faces of the stressed pile 10 through the support of the support rod 18, so that the stressed pile 10 is kept on the same horizontal plane, and the distance is controlled to facilitate the mortise and tenon connection of the connecting plate 8.
[0036] The bottom of the connecting plate 8 is provided with an ecological warehouse 9, and a pile hole 11 is provided inside the stressed pile 10. The vertical length of the connecting plate 8 is much longer than the vertical length of the stressed pile 10, and the connecting plate 8 and the left and right sides of the stressed pile 10 form a closed mortise and tenon structure through the concave and convex. The position of the stressed pile 10 is determined after the position of the connecting plate 8 is determined by the positioning device body 1. In actual operation, the stressed pile 10 is first driven, and then the connecting plate 8 is lowered to connect with the stressed pile 10 by mortise and tenon. The vertical length of the connecting plate 8 is much shorter than the vertical length of the stressed pile 10, so there is no obvious soil squeezing effect, the construction difficulty is greatly reduced, the stability and force performance of the mortise and tenon connection structure are more reasonable, and on the facade, the stressed pile 10 and the connecting plate 8 form a concave and convex facade effect, which is beneficial to eliminate the joints between the pile and the board, beautify the facade and eliminate aesthetic fatigue.
[0037] Working principle:
[0038] When the utility model is in use, the ecological status of the river channel is penetrated through the visual frame 3 to determine the appropriate position of the ecological warehouse 9, the first driving motor 4 is started, and its output shaft drives the first threaded rod 5 to rotate, and its threaded connection drives the mobile frame 6 to move left and right, and the connecting plate 8 is placed above the mobile frame 6, and the position of the connecting plate 8 and the ecological warehouse 9 is accurately positioned, and the position of the pile hole 11 is determined by calculating the width of the stressed pile 10 to carry out piling, and when the second driving motor 12 is started, its output shaft drives the rotating shaft 13 to rotate, and through the action of the connected transmission belt 14, it is convenient to drive the threaded sleeve 15 to rotate and then drive the second threaded rod 16 to rotate and extend, and at the same time drive the clamping plate 17 to clamp the front and back of the stressed pile 10 through the support of the support rod 18, so that the stressed pile 10 is kept on the same horizontal plane, and then the connecting plate 8 is lowered by the crane to connect and fix it to the stressed pile 10.
[0039] The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.
[0040] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A combined ecological pile positioning device, comprising a positioning device body (1), characterized in that: The positioning device body (1) is a frame structure, and frame boxes (2) are arranged at the front and rear of the positioning device body (1), the top surface of the positioning device body (1) is provided with a visible frame (3), and a movable frame (6) is connected to the bottom of the positioning device body (1), and a connecting plate (8) is installed inside the movable frame (6), force piles (10) are horizontally installed inside the frame box (2), and there is a spacing distance between the force piles (10), and connecting plates (8) are connected and installed between the force piles (10), and clamping plates (17) are arranged at the front and rear of the force piles (10), and the clamping plates (17) are located on the front and rear inner sides of the frame box (2), and the clamping plates (17) form a clamping and fixing structure for the front and rear sides of the force piles (10).
2. The combined ecological pile positioning device according to claim 1 is characterized in that: A first drive motor (4) is fixedly mounted on the right side of the positioning device body (1), and a first threaded rod (5) is connected to the output shaft at the left end of the first drive motor (4), and the left end of the first threaded rod (5) is rotatably connected to the left side surface inside the positioning device body (1).
3. The combined ecological pile positioning device according to claim 2 is characterized in that: The first threaded rod (5) is threadedly connected to a movable frame (6) on its outer side, and a thread groove (7) is provided at the bottom of the movable frame (6). The first threaded rod (5) is connected to the thread groove (7) through the top of the movable frame (6), and the top of the movable frame (6) is located at the bottom of the top surface of the positioning device body (1) to form a left-right movable structure, and a connecting plate (8) is placed inside the upper part of the movable frame (6).
4. The combined ecological pile positioning device according to claim 1, characterized in that: A second drive motor (12) is fixedly mounted on the rear side of the frame box (2), and the second drive motor (12) is located on a side close to the river bank; a rotating shaft (13) is connected to the front output shaft of the second drive motor (12), and the rotating shaft (13) passes through and is connected to the front side of the frame box (2); and transmission belts (14) are connected to and mounted on both left and right sides of the rotating shaft (13) located in the internal space of the frame box (2).
5. The combined ecological pile positioning device according to claim 4 is characterized in that: The outer ends of the transmission belts (14) are connected and installed with threaded sleeves (15), and the outer sides of the threaded sleeves (15) are rotatably connected to the inner side of the frame box (2), and the inside of the threaded sleeves (15) are threadedly connected and installed with second threaded rods (16).
6. The combined ecological pile positioning device according to claim 5, characterized in that: The ends of the second threaded rods (16) are fixedly mounted with clamping plates (17), and support rods (18) are installed through the left and right sides of the clamping plates (17), and the support rods (18) are fixedly mounted on the outer side of the frame box (2) to support the clamping plates (17) to form a forward and backward moving structure.
7. The combined ecological pile positioning device according to claim 1 is characterized in that: The bottom of the connecting plate (8) is penetrated by an ecological warehouse (9), and a pile hole (11) is penetrated inside the stressed pile (10). The vertical length of the connecting plate (8) is much longer than the vertical length of the stressed pile (10), and the connecting plate (8) and the stressed pile (10) form a closed mortise and tenon structure on the left and right sides through concave and convex joints.
