The adjustment mechanism drives the movement of the second clamp, combined with the engagement of the screw and the worm, the rubber pads are used to achieve the clamping and fixing of the pipeline, which solves the problem of easy wear of the pipeline during construction, extends the service life of the pipeline and improves safety.
Patent Information
- Application Number
- CN202323669158.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2024-12-20
- Estimated Expiration
- 2033-12-29
AI Technical Summary
During construction, the pipeline is prone to wear due to chaotic placement, which affects its service life and safety. An effective protective structure is needed to solve this problem.
The second clamping plate is driven to move through the adjustment mechanism, and combined with the proximity of the first clamping plate and the second clamping plate, the clamping and fixing of the pipeline is achieved by using screws, worms and rubber pads to prevent chaotic winding.
Effectively prevent pipelines from winding, extend the service life of the pipeline, and improve construction efficiency and safety.
Smart Images

Figure CN222215031U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of protection structures, and in particular to a construction pipeline protection structure. Background Art
[0002] As we all know, the wiring in the project generally includes high-voltage wires, low-voltage wires, post and telecommunications, radio and television, broadband and other strong and weak wires. These pipelines are set up to improve and expand the use functions and service scope of the construction project. The names of the various pipelines reflect their uses. For example, network cables are used to transmit network signals.
[0003] Due to the large number of these pipelines, the lines are arranged in a chaotic manner during construction, which easily causes wear on the outer walls of the pipelines, is not conducive to the protection of the pipelines, reduces work efficiency, and further affects the service life and safety of the pipelines. Therefore, a construction pipeline protection structure is needed to improve the above problems. Utility Model Content
[0004] 1. Technical issues to be resolved
[0005] In response to the deficiencies in the prior art, the present application provides a construction pipeline protection structure with high practicality, which drives the second clamping plate to move by means of an adjustment mechanism, and clamps and fixes the pipeline between the first clamping plate and the second clamping plate by bringing the first clamping plate and the second clamping plate closer together, thereby achieving the fixation of the pipeline, preventing the pipeline from being placed in a disorderly manner and entangled, effectively protecting the pipeline, and extending the service life of the pipeline.
[0006] (II) Technical solution
[0007] To achieve the above-mentioned purpose, the present application provides the following technical solutions: a construction pipeline protection structure, comprising a mounting plate and a second clamping plate, wherein the first clamping plate is fixedly mounted on the mounting plate, the second clamping plate is connected to the mounting plate through a first limiting mechanism, a connecting plate is fixedly mounted on the mounting plate, a first fixed plate and a second fixed plate are fixedly mounted on the connecting plate, a movable plate is fixedly mounted on the second clamping plate, a first sliding groove is provided on the connecting plate, and the movable plate is slidably connected to the first sliding groove;
[0008] The movable plate is provided with an adjustment mechanism, which includes two screws, the two ends of which are rotatably connected to the first fixed plate and the second fixed plate respectively, two threaded holes are provided on the movable plate corresponding to the two screws, and the two screws are screwed with the two threaded holes respectively, a working chamber is provided on the first fixed plate, a worm is rotatably installed in the working chamber, worm wheels are fixedly installed on the two screws, the two worm wheels are meshed with the worm, a hand wheel is fixedly installed on one end of the worm, a top plate is fixedly installed on the mounting plate, and the top plate is connected to the wall through a plurality of bolts;
[0009] The mounting plate is provided with a second limiting mechanism for limiting the second clamping plate.
[0010] Preferably, the first limiting mechanism comprises two telescopic rods, both of which are fixedly mounted on the inner side wall of the bottom end of the mounting plate, and one end of the two telescopic rods away from the mounting plate is fixedly connected to the bottom end of the second clamping plate.
[0011] Furthermore, the second limiting mechanism includes two limiting blocks, both of which are fixedly mounted on the outer side wall of the second clamping plate, and limiting grooves are provided on the mounting plate corresponding to the two limiting blocks, and the two limiting blocks are slidably connected to the limiting grooves respectively.
[0012] Furthermore, the first fixed plate and the second fixed plate are connected by a protective shell, a second slide groove is provided on the protective shell, the second slide groove is connected to the first slide groove, the movable plate is slidably connected to the second slide groove, and the two screws and the two worm gears are located inside the protective shell.
[0013] Based on the above solution, rubber pads are provided at the inner ends of the first clamping plate and the second clamping plate.
[0014] (III) Beneficial effects
[0015] Compared with the prior art, the present application provides a construction pipeline protection structure, which has the following beneficial effects:
[0016] In the construction pipeline protection structure, the pipeline passes through the first clamping plate and the second clamping plate, and the hand wheel is rotated to drive the worm to rotate. When the worm rotates, the meshing of the worm and the two worm wheels synchronously drives the two worm wheels to rotate, and then drives the two screws to rotate, so that the movable plate drives the second clamping plate to move, and the cooperation of the first limiting mechanism and the second limiting mechanism makes the second clamping plate more stable when moving, and the pipeline between the first clamping plate and the second clamping plate is clamped and fixed by the proximity of the first clamping plate and the second clamping plate, thereby realizing the fixing operation of the pipeline, preventing the pipeline from being placed in a disorderly manner and entangled, and effectively protecting the pipeline, extending the service life of the pipeline, and having high practicality. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the overall structure of this application;
[0018] Figure 2 A schematic diagram of the structure of two worm wheels and a worm engaged with each other for this application;
[0019] Figure 3 For this application Figure 2 The enlarged structural diagram of the middle A part;
[0020] Figure 4 This is a schematic diagram of the cross-sectional structure of this application.
[0021] Markings in the accompanying drawings: 1. Mounting plate; 2. First clamping plate; 3. Second clamping plate; 4. Telescopic rod; 5. First fixed plate; 6. Second fixed plate; 7. Moving plate; 8. Screw; 9. Worm; 10. Worm gear; 11. Handwheel; 12. Connecting plate; 13. Protective shell; 14. Top plate; 15. Bolt; 16. Limiting groove; 17. Limiting block; 18. Rubber pad. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0023] Example
[0024] See also Figure 1 , Figure 2 and Figure 4 A construction pipeline protection structure includes a mounting plate 1 and a second clamping plate 3, a first clamping plate 2 is fixedly mounted on the mounting plate 1, and the second clamping plate 3 is connected to the mounting plate 1 through a first limiting mechanism, the first limiting mechanism includes two telescopic rods 4, the two telescopic rods 4 are fixedly mounted on the inner side wall of the bottom end of the mounting plate 1, one end of the two telescopic rods 4 away from the mounting plate 1 is fixedly connected to the bottom end of the second clamping plate 3, and the cooperation of the two telescopic rods 4 makes the second clamping plate 3 more stable when moving, a connecting plate 12 is fixedly mounted on the mounting plate 1, a first fixed plate 5 and a second fixed plate 6 are fixedly mounted on the connecting plate 12, a movable plate 7 is fixedly mounted on the second clamping plate 3, a first sliding groove is opened on the connecting plate 12, and the movable plate 7 is slidably connected to the first sliding groove.
[0025] See also Figure 1-4, an adjusting mechanism is provided on the movable plate 7, the adjusting mechanism includes two screw rods 8, the two ends of the two screw rods 8 are rotatably connected with the first fixed plate 5 and the second fixed plate 6 respectively, two threaded holes are provided on the movable plate 7 corresponding to the two screw rods 8, and the two screw rods 8 are screwed with the two threaded holes respectively, a working chamber is provided on the first fixed plate 5, a worm 9 is rotatably installed in the working chamber, worm wheels 10 are fixedly installed on the two screw rods 8, and the two worm wheels 10 are meshed with the worm 9, a hand wheel 11 is fixedly installed on one end of the worm 9, a top plate 14 is fixedly installed on the mounting plate 1, the top plate 14 is connected to the wall by a plurality of bolts 15, the pipeline passes through between the first clamping plate 2 and the second clamping plate 3, and the hand wheel 11 is rotated to drive the worm 9 to rotate. When the worm 9 rotates, the meshing of the worm 9 and the two worm wheels 10 synchronously drives the two worm wheels 10 to rotate, and then drives the two screw rods 8 to rotate, so that the movable plate 7 drives the second clamping plate 3 to move.
[0026] See also Figure 1 , Figure 2 and Figure 4 A second limiting mechanism is provided on the mounting plate 1 for limiting the second clamping plate 3. The second limiting mechanism includes two limiting blocks 17. The two limiting blocks 17 are fixedly mounted on the outer wall of the second clamping plate 3. Limiting grooves 16 are provided on the mounting plate 1 corresponding to the two limiting blocks 17. The two limiting blocks 17 are respectively slidably connected to the limiting grooves 16. The second clamping plate 3 is limited by the cooperation of the two limiting grooves 16 and the two limiting blocks 17, so that the second clamping plate 3 is more stable when moving.
[0027] See also Figure 1 and Figure 4 The first fixed plate 5 and the second fixed plate 6 are connected by a protective shell 13. A second slide groove is provided on the protective shell 13. The second slide groove is connected to the first slide groove. The movable plate 7 is slidably connected to the second slide groove. The two screws 8 and the two worm gears 10 are all located inside the protective shell 13. The installation of the protective shell 13 protects the two screws 8 and the two worm gears 10.
[0028] See also Figure 1 , Figure 2 and Figure 4 The inner ends of the first clamping plate 2 and the second clamping plate 3 are both provided with rubber pads 18, and the outer wall of the cable is protected by the provision of the two rubber pads 18.
[0029] In summary, when the construction pipeline protection structure is in use, the pipeline is passed through the first clamping plate 2 and the second clamping plate 3, and the hand wheel 11 is rotated, and the hand wheel 11 drives the worm 9 to rotate. While the worm 9 rotates, the worm 9 is meshed with the two worm wheels 10, and the two worm wheels 10 are synchronously driven to rotate, thereby driving the two screw rods 8 to rotate, so that the movable plate 7 moves on the two screw rods 8, and then drives the second clamping plate 3 to move. While the second clamping plate 3 moves, the two limit blocks 17 slide on the two limit grooves 16 respectively, and the cooperation of the two telescopic rods 4 makes the second clamping plate 3 more stable when moving. Through the approach of the first clamping plate 2 and the second clamping plate 3, the two rubber pads 18 clamp and fix the pipeline between the first clamping plate 2 and the second clamping plate 3, thereby realizing the fixing operation of the pipeline, preventing the pipelines from being placed in a disorderly manner and entangled, and effectively protecting the pipeline.
[0030] Although the embodiments of the present application have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the appended claims and their equivalents.
Claims
1. A construction pipeline protection structure, comprising a mounting plate (1) and a second clamping plate (3), characterized in that: The mounting plate (1) is fixedly mounted with a first clamping plate (2), the second clamping plate (3) is connected to the mounting plate (1) via a first limiting mechanism, the mounting plate (1) is fixedly mounted with a connecting plate (12), the connecting plate (12) is fixedly mounted with a first fixing plate (5) and a second fixing plate (6), the second clamping plate (3) is fixedly mounted with a moving plate (7), the connecting plate (12) is provided with a first sliding groove, and the moving plate (7) is slidably connected to the first sliding groove; The movable plate (7) is provided with an adjustment mechanism, which comprises two screw rods (8), the two ends of the two screw rods (8) are rotatably connected to the first fixed plate (5) and the second fixed plate (6) respectively, two threaded holes are provided on the movable plate (7) corresponding to the two screw rods (8), and the two screw rods (8) are screwed to the two threaded holes respectively, a working chamber is provided on the first fixed plate (5), a worm (9) is rotatably installed in the working chamber, a worm wheel (10) is fixedly installed on the two screw rods (8), and the two worm wheels (10) are meshed with the worm (9), and a hand wheel (11) is fixedly installed on one end of the worm (9), and a top plate (14) is fixedly installed on the mounting plate (1), and the top plate (14) is connected to the wall through a plurality of bolts (15); A second limiting mechanism is provided on the mounting plate (1) for limiting the second clamping plate (3).
2. A construction pipeline protection structure according to claim 1, characterized in that: The first limiting mechanism comprises two telescopic rods (4), the two telescopic rods (4) are fixedly mounted on the inner side wall of the bottom end of the mounting plate (1), and one end of the two telescopic rods (4) away from the mounting plate (1) is fixedly connected to the bottom end of the second clamping plate (3).
3. A construction pipeline protection structure according to claim 2, characterized in that: The second limiting mechanism comprises two limiting blocks (17), the two limiting blocks (17) are fixedly mounted on the outer side wall of the second clamping plate (3), limiting grooves (16) are provided on the mounting plate (1) corresponding to the two limiting blocks (17), and the two limiting blocks (17) are respectively slidably connected to the limiting grooves (16).
4. A construction pipeline protection structure according to claim 3, characterized in that: The first fixed plate (5) and the second fixed plate (6) are connected via a protective shell (13); a second slide groove is provided on the protective shell (13); the second slide groove is connected to the first slide groove; the movable plate (7) is slidably connected to the second slide groove; and the two screws (8) and the two worm gears (10) are all located inside the protective shell (13).
5. A construction pipeline protection structure according to claim 4, characterized in that: The inner ends of the first clamping plate (2) and the second clamping plate (3) are both provided with rubber pads (18).