Photovoltaic power generation shed
By setting up water guide tanks and installation components on the inclined beams of the photovoltaic power plant, the problems of high cost and low assembly efficiency of the photovoltaic power plant are solved, and a more efficient drainage and safe assembly process is achieved.
Patent Information
- Application Number
- CN202420789973.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-16
- Publication Date
- 2024-12-24
- Estimated Expiration
- 2034-04-16
AI Technical Summary
The existing photovoltaic power plantation has high cost, low assembly efficiency, and poor drainage efficiency in rainy and snowy weather.
A water guide groove with an upper end opening is provided on the inclined beam, and a first mounting part is provided on both sides of its width direction, and the first mounting assembly is fixedly connected to the water guide groove. The mounting edge of the photovoltaic panel bracket is held in the clamping groove. , reduces the need to set up a separate sink and improves assembly efficiency and drainage efficiency.
It reduces the production cost of photovoltaic power plantations, improves assembly efficiency and drainage efficiency, enhances the safety of the assembly process, reduces fire operation, and improves the reliability of the system.
Smart Images

Figure CN222227769U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of photovoltaics, in particular to a photovoltaic power generation shed. Background Art
[0002] The photovoltaic power generation industry has developed rapidly in recent years. In a photovoltaic power generation shed, the gap between two adjacent photovoltaic panels is generally supported by an inclined beam. At the same time, in order to ensure the drainage efficiency of the photovoltaic power generation shed, a water guide trough is also set in the gap between the two photovoltaic panels. In related technologies, the water guide trough and the inclined beam are independent components, which makes the cost of the photovoltaic power generation shed relatively high. Utility Model Content
[0003] The utility model aims to solve at least one of the technical problems existing in the prior art. To this end, the utility model proposes a photovoltaic power generation shed, which has higher assembly efficiency and lower cost.
[0004] According to the utility model, the photovoltaic power generation shed includes: an inclined beam, a water guide groove with an upper end opening is formed on the inclined beam, the water guide groove extends along the length direction of the inclined beam, and the water guide groove is provided with a first mounting portion on both sides in the width direction; a first mounting component, the first mounting component is fixedly connected to the first mounting portion, and the first mounting component is provided with a clamping groove; a plurality of photovoltaic panel assemblies, the photovoltaic panel assemblies include photovoltaic panels and photovoltaic panel brackets, the photovoltaic panel brackets are connected to the outer peripheral side of the photovoltaic panels, the photovoltaic panel brackets have installation flanges, the installation flanges are clamped in the clamping grooves, and a slit is provided between two adjacent photovoltaic panel brackets in the width direction of the water guide groove, and the opening of the water guide groove is opposite to the slit up and down.
[0005] According to the photovoltaic power generation shed of the utility model, by arranging a water guide trough on the inclined beam, on the one hand, the drainage efficiency of the photovoltaic power generation shed can be improved, and on the other hand, the separate water guide trough is omitted, which can improve the assembly efficiency of the photovoltaic power generation shed and reduce the cost of the photovoltaic power generation shed. By clamping the installation flange of the photovoltaic panel bracket in the clamping groove, the fire in the assembly process of the photovoltaic panel power generation shed can be reduced, thereby improving the safety of the assembly process of the photovoltaic power generation shed.
[0006] According to some embodiments of the utility model, a first fixing hole is formed on the first mounting component, and a second fixing hole is formed on the inclined beam, and the second fixing hole forms the first mounting portion; the photovoltaic power generation shed also includes: a first fastener, and the first fastener connects the first mounting component to the inclined beam through the first fixing hole and the second fixing hole.
[0007] According to some embodiments of the utility model, on either side of the width direction of the water guide groove, there are multiple second fixing holes and multiple first mounting components, the multiple second fixing holes are arranged at intervals along the length direction of the water guide groove, and the multiple first mounting components are arranged in sequence along the length direction of the water guide groove.
[0008] According to some embodiments of the utility model, the water guide groove is formed with fixed flanges extending outward on both side edges in the width direction, the second fixing hole is formed on the fixed flange, and the second fixing hole penetrates the fixed flange in the up and down direction.
[0009] According to some embodiments of the utility model, the first mounting assembly includes: a fixing plate and a clamping plate, the fixing plate and the clamping plate are stacked up and down, the first fixing hole penetrates the fixing plate and the clamping plate in the up and down directions, and the fixing plate and the clamping plate cooperate to define the clamping groove.
[0010] According to some embodiments of the present invention, on a horizontal projection plane, a projection of the first mounting assembly partially overlaps with a projection of the water channel.
[0011] According to some embodiments of the utility model, the inner wall of the water guide groove includes a bottom wall and two side walls, the two side walls are connected to both sides of the bottom wall in the width direction, the side walls are perpendicular to the bottom wall, or, in the direction from top to bottom, the two side walls extend obliquely toward each other.
[0012] According to some embodiments of the utility model, the photovoltaic power generation shed also includes: a main beam, the inclined beam is supported on the main beam; a second mounting component, the second mounting component is connected to the main beam, the second mounting component cooperates with the main beam to define a fixing hole, and the inclined beam is passed through the fixing hole.
[0013] According to some embodiments of the utility model, the second mounting assembly includes: a mounting bracket, the mounting bracket includes a U-shaped fixing plate portion and a mounting folded edge, the fixing plate portion and the main beam cooperate to define the fixing hole, the mounting folded edge is connected to the fixing plate portion on both sides of the water guide groove width direction; a pad, the pad is connected to the main beam, and the mounting folded edge is arranged between the pad and the main beam.
[0014] According to some embodiments of the utility model, the fixing plate portion and the oblique beam are connected by bolts; and / or the pad is connected by bolts to the main beam.
[0015] Additional aspects and advantages of the present invention will be given in part in the following description, and in part will become apparent from the following description, or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 is a cross-sectional view of a photovoltaic panel support, a first mounting assembly and an inclined beam according to an embodiment of the utility model;
[0017] Figure 2 yes Figure 1 A schematic diagram of a first mounting assembly shown in ;
[0018] Figure 3 is a cross-sectional view of a main beam, an inclined beam and a second mounting assembly according to an embodiment of the utility model;
[0019] Figure 4 yes Figure 3 A schematic diagram of another angle of the inclined beam shown in ;
[0020] Figure 5 yes Figure 3 A schematic diagram of a second mounting assembly shown in ;
[0021] Figure 6 is a cross-sectional view of a photovoltaic panel support, a first mounting assembly and an inclined beam according to another embodiment of the utility model;
[0022] Figure 7 is a cross-sectional view of a main beam, an inclined beam and a second mounting assembly according to another embodiment of the utility model;
[0023] Figure 8 yes Figure 7 Schematic diagram of another angle of the inclined beam shown in .
[0024] Reference numerals:
[0025] 10. inclined beam; 11. water guide groove; 12. second fixing hole; 13. fixed flange; 131. reinforced folded edge; 132. fourth fixing hole;
[0026] 20. First mounting assembly; 21. Clamping groove; 22. First fixing hole; 23. Fixing plate; 231. First plate section; 232. Second plate section; 233. Third plate section; 24. Clamping plate; 241. Clamping flange;
[0027] 30. Photovoltaic panel bracket; 31. Installation flange; 32. Support flange;
[0028] 40. Main beam;
[0029] 50. Second mounting assembly; 51. Fixing hole; 52. Mounting bracket; 521. Fixing plate portion; 5211. Third fixing hole; 522. Mounting folded edge; 5221. First flange; 53. Pad; 531. Pad fixing plate portion; 532. Second flange; 533. Fifth fixing hole. DETAILED DESCRIPTION
[0030] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0031] Reference below Figure 1-Figure 8 A photovoltaic power generation shed according to an embodiment of the utility model is described.
[0032] like Figure 1 , Figure 2 , Figure 4 , Figure 6 and Figure 8 As shown, the photovoltaic power generation shed according to the embodiment of the utility model includes: an inclined beam 10, a first installation component 20 and a plurality of photovoltaic panel components. For example, the number of the photovoltaic panel components may be two, three or twenty.
[0033] Specifically, a water guide groove 11 with an upper end opening is formed on the inclined beam 10. The water guide groove 11 extends along the length direction of the inclined beam 10 (for example, Figure 4 The water channel 11 extends in the width direction (for example, in the front-to-back direction shown in FIG. 1 ). Figure 4 A first mounting portion is provided on both sides (left and right directions shown in the figure), a first mounting component 20 is fixedly connected to the first mounting portion, the first mounting component 20 is provided with a clamping groove 21, the photovoltaic panel assembly includes a photovoltaic panel (not shown in the drawings) and a photovoltaic panel bracket 30, the photovoltaic panel bracket 30 is connected to the outer peripheral side of the photovoltaic panel, the photovoltaic panel bracket 30 has a mounting flange 31, the mounting flange 31 is clamped in the clamping groove 21, and a slit is provided between two adjacent photovoltaic panel brackets 30 in the width direction of the water guide groove 11, and the opening of the water guide groove 11 is opposite to the slit up and down.
[0034] The inclined beam 10 can provide support for the photovoltaic panel assembly. A water guide trough 11 is provided on the inclined beam 10. During the assembly process, the water guide trough 11 is a non-independent component. In this way, the number of assembled components can be reduced, thereby improving the efficiency of the photovoltaic power shed assembly process, saving material usage of the photovoltaic power shed, and reducing the production cost of the photovoltaic power shed.
[0035] In rainy and snowy weather, water will flow over the photovoltaic panel assembly. When the water flows to the narrow gap between the two photovoltaic panel brackets 30, the water can enter the water guide groove 11 under the action of gravity. It can be understood that there is less obstruction when the water flows in the water guide groove 11, so that the drainage efficiency of the photovoltaic power shed can be improved.
[0036] The first mounting assembly 20 is fixedly connected to the first mounting portion on the inclined beam 10, and the mounting flange 31 of the photovoltaic panel bracket 30 is clamped in the clamping groove 21, so that the photovoltaic panel assembly can be installed on the inclined beam 10. At the photovoltaic power generation shed operation site, the risk factor of hot work is relatively high. The mounting flange 31 is clamped in the clamping groove 21, and no hot work is required during the process of connecting the photovoltaic panel bracket 30 with the first mounting assembly 20, thereby improving the safety during the photovoltaic power generation shed operation.
[0037] The first installation component 20 is connected to both sides of the water channel 11 in the width direction. Water can flow into the water channel 11 from between the first installation components 20, and the first installation component 20 will not cause obstruction in the water channel 11, thereby ensuring the drainage efficiency of the photovoltaic power shed.
[0038] The photovoltaic panel assembly is installed on the inclined beam 10 through the first installation component 20. When the specification parameters of the photovoltaic panel assembly change, the specification parameters of the first installation component 20 can be adjusted to adapt to the photovoltaic panel assembly, thereby reducing the changes to the inclined beam 10 and reducing the difficulty of product design and the cost of product development.
[0039] It is understandable to those skilled in the art that the supporting force at the connection between the photovoltaic panel assembly and the first mounting assembly 20 is relatively large, and when the photovoltaic power generation shed is in an outdoor environment and is impacted by wind or rain and snow, the impact force at the connection between the photovoltaic panel assembly and the first mounting assembly 20 is relatively large. By connecting the photovoltaic panel and the first mounting assembly 20 through the photovoltaic panel bracket 30, the force applied to the photovoltaic panel during use can be reduced, thereby reducing the probability of damage to the photovoltaic panel and improving the reliability of the photovoltaic power generation shed during use.
[0040] During the product design process, the specification parameters of the photovoltaic panel bracket 30 can be adjusted so that the photovoltaic panel assembly can adapt to more assembly environments, thereby reducing the difficulty of product design.
[0041] The photovoltaic power shed according to the embodiment of the utility model can improve the drainage efficiency of the photovoltaic power shed on the one hand, and on the other hand, it eliminates the need for a separate water guide trough 11, thereby improving the assembly efficiency of the photovoltaic power shed and reducing the cost of the photovoltaic power shed. By clamping the installation flange 31 of the photovoltaic panel bracket 30 in the clamping groove 21, the fire in the assembly process of the photovoltaic panel power shed can be reduced, thereby improving the safety of the photovoltaic power shed assembly process.
[0042] In some embodiments of the present invention, Figure 1 and Figure 6As shown, the photovoltaic panel bracket 30 also includes a supporting flange 32, and the outer peripheral side of the photovoltaic panel is supported on the supporting flange 32. In this way, the connection area between the photovoltaic panel and the photovoltaic panel bracket 30 can be increased. On the one hand, the concentration of the force exerted by the photovoltaic panel bracket 30 on the photovoltaic panel can be reduced, thereby reducing the probability of damage to the photovoltaic panel during use. On the other hand, the connection strength between the photovoltaic panel and the photovoltaic panel bracket 30 can be improved.
[0043] In some embodiments of the present invention, Figure 1 , Figure 2 and Figure 6 As shown, a first fixing hole 22 is formed on the first mounting component 20, and a second fixing hole 12 is formed on the inclined beam 10. The second fixing hole 12 forms a first mounting portion. The photovoltaic power generation shed also includes: a first fastener, which connects the first mounting component 20 to the inclined beam 10 through the first fixing hole 22 and the second fixing hole 12.
[0044] It can be understood that the first fixing hole 22 is easier to process on the first mounting assembly 20, and the second fixing hole 12 is easier to process on the inclined beam 10. In this way, the production difficulty of the first mounting assembly 20 and the inclined beam 10 can be reduced, thereby further reducing the production cost. During the assembly process, the first fastener is matched with the first fixing hole 22 and the second fixing hole 12, and the operation is simple, which can further improve the production efficiency. Preferably, the first fastener is a first fastening bolt, the bolt connection strength is high, and the production cost of the bolt is low. Therefore, the connection strength of the first mounting assembly 20 and the inclined beam 10 can meet the use requirements and further reduce the production cost.
[0045] In some embodiments of the present invention, Figure 4 and Figure 8 As shown, on either side of the water guide groove 11 in the width direction, there are multiple second fixing holes 12, for example, the second fixing holes 12 can be two, three, nine or thirty, and there are multiple first mounting components 20, for example, the first mounting components 20 can be two, three or twenty. The multiple second fixing holes 12 are arranged at intervals along the length direction of the water guide groove 11, and the multiple first mounting components 20 are arranged in sequence along the length direction of the water guide groove 11.
[0046] Among them, the first mounting component 20 can be provided with a first fixing hole 22, and the first mounting component 20 can also be provided with multiple first fixing holes 22. In this way, the size of a single first mounting component 20 is smaller, the production difficulty is lower during the production process, the production cost can be reduced, it is easier to place and carry during transportation, the transportation difficulty can be reduced, and it is easier for the operator to hold during the assembly process, which can reduce the assembly difficulty.
[0047] In addition, during the assembly process, the installation sequence of the first installation components 20 at various positions of the oblique beam 10 can be adjusted according to the requirements of the assembly environment, thereby further reducing the difficulty of assembly.
[0048] During the product design process, parameters such as the number of first mounting components 20, the size of the first mounting components 20, the number of first fixing holes 22 on the first mounting components 20, the size of the first fixing holes 22, the number of second fixing holes 12 or the size of the second fixing holes 12 can be adjusted to meet more product design needs.
[0049] In some embodiments of the present invention, Figure 1 , Figure 4 , Figure 6 and Figure 8 As shown, the water channel 11 is formed with outwardly extending fixed flanges 13 on both side edges in the width direction, and the second fixing holes 12 are formed on the fixed flanges 13, and the second fixing holes 12 penetrate the fixed flanges 13 in the up-down direction.
[0050] In this way, the structure of the inclined beam 10 is relatively simple, which can further reduce the production difficulty and production cost of the inclined beam 10. The fixed flange 13 provides less obstruction to the operator, and during the assembly process, the operator can have more operating space, thereby reducing the assembly difficulty and improving the assembly efficiency. In addition, it can be understood that the fixed flange 13 can increase the contact area between the first mounting assembly 20 and the inclined beam 10, thereby reducing the concentration of stress on the inclined beam 10 and improving the reliability of the connection between the first mounting assembly 20 and the inclined beam 10.
[0051] In some embodiments of the present invention, Figure 1 and Figure 6 As shown, a reinforcing fold 131 is formed at one end of the fixed flange 13 away from the water guide groove 11 . By providing the reinforcing fold 131 , the structural strength of the fixed flange 13 can be enhanced.
[0052] In some embodiments of the present invention, Figure 1 , Figure 2 and Figure 6 As shown, the first mounting assembly 20 includes: a fixing plate 23 and a clamping plate 24, the fixing plate 23 and the clamping plate 24 are stacked up and down, the first fixing hole 22 penetrates the fixing plate 23 and the clamping plate 24 along the up and down direction, and the fixing plate 23 and the clamping plate 24 cooperate to define a clamping groove 21.
[0053] During the assembly process, the first mounting component 20 is placed on the fixed flange 13 and the first fixing hole 22 is aligned with the second fixing hole 12, and then the first fastener is passed through the first fixing hole 22 and the second fixing hole 12 to fix the first mounting component 20 on the fixed flange 13, wherein, preferably, the first fastener is a first fastening bolt.
[0054] The fixing plate 23 and the clamping plate 24 of the first mounting component 20 are both plate-shaped. During the assembly process, the first mounting component 20 and the fixed flange 13 are in surface contact. On the one hand, the first mounting component 20 is easier to place on the fixed flange 13, thereby reducing the difficulty of positioning the first mounting component 20 on the inclined beam 10. On the other hand, the sealing between the first mounting component 20 and the fixed flange 13 is better. When water flows into the water guide groove 11, less water penetrates between the first mounting component 20 and the fixed flange 13, thereby improving the drainage efficiency. When the rain and snow stop, the water on the photovoltaic shed is easier to evaporate.
[0055] The first fixing hole 22 and the second fixing hole 12 are both through holes, so the operator can more easily know whether the first fastener is in place in the first fixing hole 22 and the second fixing hole 12, thereby further reducing the difficulty of assembly and improving the efficiency of assembly.
[0056] The fixing plate 23 and the clamping plate 24 cooperate to define the clamping groove 21, which can make the production difficulty of the first installation component 20 lower, thereby further reducing the production cost.
[0057] In some embodiments of the present invention, Figure 1 and Figure 2 As shown, the fixing plate 23 includes a first plate segment 231, a second plate segment 232 and a third plate segment 233, the second plate segment 232 is connected between the first plate segment 231 and the third plate segment 233, the first plate segment 231 and the third plate segment 233 are arranged at intervals up and down, the clamping plate 24 and the first plate segment 231 are stacked up and down, and the clamping plate 24 is arranged on the side of the first plate segment 231 away from the third plate segment 233, the first fixing hole 22 passes through the first plate segment 231 and the clamping plate 24 in the up and down direction, and the end of the clamping plate 24 away from the first plate segment 231 is formed with a clamping flange 241 folded toward the third plate segment 233, and the third plate segment 233 and the clamping plate 24 cooperate to define a clamping groove 21.
[0058] During the assembly process, first place the fixing plate 23 and the clamping plate 24 on the fixing flange 13 in sequence, and align the first fixing hole 22 with the second fixing hole 12, then pass the first fastening bolt through the first fixing hole 22 and the second fixing hole 12 but do not tighten the nut, so that the fixing plate 23 and the clamping plate 24 will not fall off the fixing flange 13, then extend the installation flange 31 of the photovoltaic panel bracket 30 between the third plate segment 233 and the clamping plate 24, and then tighten the first fastening bolt with the nut, so that the clamping flange 241 and the third plate segment 233 can clamp the installation flange 31 in the clamping groove 21, thereby realizing the assembly of the photovoltaic panel bracket 30 on the inclined beam 10.
[0059] Among them, the fixing plate 23 and the clamping plate 24 are connected by the first fastening bolts, which can simplify the operation steps and improve the assembly efficiency. In addition, no fire is required during the connection between the fixing plate 23 and the clamping plate 24, which can further improve the safety during the operation of the photovoltaic power shed.
[0060] Preferably, the third plate segment 233 extends above the opening of the water guide groove 11, so that the clamping groove 21 is located above the opening of the water guide groove 11, which can reduce the torque of the photovoltaic panel bracket 30 on the inclined beam 10, thereby improving the reliability of the connection between the first mounting assembly 20 and the inclined beam 10.
[0061] During product design, parameters such as the size of the first plate segment 231, the second plate segment 232 and the third plate segment 233, the size of the clamping flange 241 or the folding angle of the clamping flange 241 relative to the clamping plate 24 can be adjusted to meet more product design needs.
[0062] In some embodiments of the present invention, Figure 1 and Figure 6 As shown, on the horizontal projection plane, the projection of the first installation assembly 20 partially overlaps with the projection of the water channel 11. In other words, part of the space above the opening of the water channel 11 is the arrangement space of the first installation assembly 20.
[0063] It is understandable that in order to ensure that the structural strength of the first mounting component 20 meets the requirements of use, the size of the first mounting component 20 needs to be larger than the set size. By extending the first mounting component 20 to the space above the opening of the water guide groove 11, the size of the first mounting component 20 on both sides of the inclined beam 10 can be reduced, and the edge of the water guide groove 11 can also provide support for the first mounting component 20. Thereby, the torque of the first mounting component 20 on the first mounting portion can be reduced, thereby improving the reliability of the connection between the first mounting component 20 and the inclined beam 10.
[0064] In some embodiments of the present invention, Figure 1 , Figure 3 and Figure 4As shown, the inner wall of the water guide trough includes a bottom wall and two side walls. The two side walls are connected to both sides of the bottom wall in the width direction, and the side walls and the bottom wall are perpendicular. In this way, the capacity of the water guide trough 11 can be larger. When the precipitation is large, the drainage efficiency of the photovoltaic power shed can be guaranteed.
[0065] In some embodiments of the present invention, Figure 6-Figure 8 As shown, the inner wall of the water guide trough includes a bottom wall and two side walls. The two side walls are connected to both sides of the bottom wall in the width direction. From top to bottom, the two side walls extend obliquely toward each other. In this way, the speed of water level rise can be increased during the accumulation of water in the water guide trough 11. It can be understood that the higher the water level, the faster the water flow speed. Therefore, the drainage efficiency of the photovoltaic power shed can be further improved.
[0066] In some embodiments of the utility model, the oblique beam 10 is an integrally formed part. The integrally formed part has high production efficiency and high structural strength. By setting the oblique beam 10 as an integrally formed part, the production efficiency of the oblique beam 10 can be improved, and it is easier to make the structural strength of the oblique beam 10 meet the use requirements.
[0067] In some embodiments of the present invention, Figure 3 , Figure 5 and Figure 7 As shown, the photovoltaic power generation shed also includes: a main beam 40 and a second mounting assembly 50. Specifically, the inclined beam 10 is supported on the main beam 40, the second mounting assembly 50 is connected to the main beam 40, and the second mounting assembly 50 cooperates with the main beam 40 to define a fixing hole 51, and the inclined beam 10 is inserted into the fixing hole 51.
[0068] Among them, the inclined beam 10 cooperates with the fixing hole 51, and the structure is relatively simple. During the assembly process, it is relatively easy for the operator to insert the inclined beam 10 into the fixing hole 51, and the inclined beam 10 cooperates with the fixing hole 51 to achieve positioning, thereby improving the assembly accuracy of the inclined beam 10 on the main beam 40.
[0069] The oblique beam 10 is installed on the main beam 40 through the second installation component 50. During the product design process, when the specification parameters of the oblique beam 10 are adjusted, the specification parameters of the second installation component can be adjusted to make it compatible with the oblique beam 10, thereby reducing the adjustment of the main beam 40, reducing the difficulty of product design and the development cost.
[0070] In some embodiments of the present invention, Figure 3 , Figure 5 and Figure 7 As shown, the second mounting assembly 50 includes: a mounting bracket 52 and a backing plate 53 .
[0071] Specifically, the mounting bracket 52 includes a U-shaped fixing plate portion 521 and a mounting folded edge 522. The fixing plate portion 521 and the main beam 40 cooperate to define a fixing hole 51. The mounting folded edge 522 is connected to both sides of the fixing plate portion 521 in the width direction of the water guide groove 11. The pad 53 is connected to the main beam 40, and the mounting folded edge 522 is arranged between the pad 53 and the main beam 40.
[0072] During the assembly process, the inclined beam 10 is first supported on the main beam 40, and then the mounting bracket 52 is placed on the inclined beam 10 so that the inclined beam 10 is located between the fixed plate portion 521 and the main beam 40. Subsequently, the pad 53 is placed on the mounting fold 522 and the pad 53 is connected to the main beam 40. In this way, the pad 53 can fix the mounting fold 522 to the main beam 40, thereby fixing the inclined beam 10 on the main beam 40.
[0073] Among them, the U-shaped fixed plate portion 521 and the inclined beam 10 can be positioned together, so that the mounting bracket 52 can be quickly installed on the inclined beam 10, and the contact area between the pad 53 and the mounting folded edge 522 is large, which can reduce the difficulty of the assembly process and make the connection strength between the pad 53 and the mounting folded edge 522 meet the use requirements.
[0074] During the product design process, the size and shape of the fixing plate portion 521 , the size of the mounting flange 522 or the size of the pad 53 may be adjusted to meet more product design requirements.
[0075] In some embodiments of the utility model, the fixed plate portion 521 is connected to the inclined beam 10 by bolts. That is to say, the fixed plate portion 521 is fixedly connected to the inclined beam 10, so that the movement of the inclined beam 10 relative to the fixed plate portion 521 can be prevented, thereby improving the structural stability of the photovoltaic power generation shed, wherein the bolt connection operation is convenient, which can further improve the assembly efficiency, and the bolt connection strength is high, so that the connection strength between the fixed plate portion 521 and the inclined beam 10 can meet the use requirements, in addition, the bolt connection does not require fire, which can further improve the safety during the operation.
[0076] Preferably, if Figure 3 and Figure 7 As shown, two third fixing holes 5211 are formed on the fixing plate portion 521 and penetrate the fixing plate portion 521 along the up-down direction, and fourth fixing holes 132 are formed on the two fixing flanges 13 of the inclined beam 10 and penetrate the fixing flanges 13 along the up-down direction. The fastening bolts pass through the third fixing holes 5211 and the fourth fixing holes 132 in turn to connect the fixing plate portion 521 with the inclined beam 10.
[0077] In some embodiments of the present invention, the pad 53 is bolted to the main beam 40. Bolting is easy to operate and has a high connection strength, which can further improve assembly efficiency and make the connection strength between the pad 53 and the main beam 40 meet the use requirements. In addition, bolting does not require hot work, which can further improve safety during the operation.
[0078] Preferably, if Figure 3 and Figure 7 As shown, a fifth fixing hole 533 is formed on the pad 53 and passes through the pad 53 in the up-down direction, and a sixth fixing hole is formed on the main beam 40 and passes through the main beam 40 in the up-down direction. The fastening bolts pass through the fifth fixing hole 533 and the sixth fixing hole in sequence to connect the pad 53 to the main beam 40.
[0079] In some embodiments of the present invention, Figure 5 As shown, the end of the mounting folded edge 522 has a first flange 5221 folded upward, the pad 53 includes a U-shaped pad fixing plate portion 531 and a second flange 532, the second flange 532 is connected to the end of the side plate of the pad 53 fixing portion and extends outward, the opening of the pad fixing plate portion 531 faces the main beam 40, and a fifth fixing hole 533 is formed on the bottom plate of the pad fixing plate portion 531, and the second flange 532 is arranged on the upper side of the mounting folded edge 522 and between the first flange 5221 and the fixing plate portion 521.
[0080] In this way, during the assembly process, the second flange 532 cooperates with the first flange 5221 and the fixed plate portion 521 to achieve rapid positioning, thereby further improving the assembly efficiency. When the assembly is completed, the first flange 5221 and the second flange 532 cooperate to prevent the installation folded edge 522 from escaping from between the pad 53 and the main beam 40, and the second flange 532 and the installation folded edge 522 can increase the contact area between the pad 53 and the installation folded edge 522. As a result, the reliability of the pad 53 fixing the installation folded edge 522 on the main beam 40 can be improved, thereby improving the reliability of the installation of the oblique beam 10 on the main beam 40.
[0081] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0082] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0083] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or a communication; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0084] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0085] Although the embodiments of the present invention have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.
Claims
1. A photovoltaic power generation shed, characterized in that: include: An inclined beam, wherein a water guide groove with an upper end opening is formed on the inclined beam, the water guide groove extends along the length direction of the inclined beam, and first mounting parts are provided on both sides of the water guide groove in the width direction; A first mounting component, wherein the first mounting component is fixedly connected to the first mounting portion, and the first mounting component is provided with a clamping groove; A plurality of photovoltaic panel assemblies, wherein the photovoltaic panel assemblies include photovoltaic panels and photovoltaic panel brackets, wherein the photovoltaic panel brackets are connected to the outer peripheral side of the photovoltaic panels, the photovoltaic panel brackets have mounting flanges, the mounting flanges are clamped in the clamping grooves, and a slit is provided between two adjacent photovoltaic panel brackets in the width direction of the water guide groove, and the opening of the water guide groove is opposite to the slit in the upper and lower directions.
2. The photovoltaic power generation shed according to claim 1, characterized in that: A first fixing hole is formed on the first mounting assembly, a second fixing hole is formed on the inclined beam, and the second fixing hole is formed as the first mounting portion; The photovoltaic power generation shed further includes: a first fastener, which connects the first mounting assembly to the inclined beam through the first fixing hole and the second fixing hole.
3. The photovoltaic power generation shed according to claim 2, characterized in that: On either side of the width direction of the water guide groove, there are multiple second fixing holes and multiple first mounting components, the multiple second fixing holes are arranged at intervals along the length direction of the water guide groove, and the multiple first mounting components are arranged in sequence along the length direction of the water guide groove.
4. The photovoltaic power generation shed according to claim 2, characterized in that: The water guide groove is formed with fixed flanges extending outward on both side edges in the width direction, the second fixing hole is formed on the fixed flange, and the second fixing hole penetrates the fixed flange in the up-down direction.
5. The photovoltaic power generation shed according to claim 4, characterized in that: The first mounting assembly includes: a fixing plate and a clamping plate, the fixing plate and the clamping plate are stacked up and down, the first fixing hole penetrates the fixing plate and the clamping plate in the up and down direction, and the fixing plate and the clamping plate cooperate to define the clamping groove.
6. The photovoltaic power generation shed according to claim 1, characterized in that: On a horizontal projection plane, the projection of the first mounting assembly partially overlaps with the projection of the water channel.
7. The photovoltaic power generation shed according to claim 1, characterized in that: The inner wall of the water guide groove includes a bottom wall and two side walls, and the two side walls are connected to both sides of the bottom wall in the width direction. The side wall and the bottom wall are perpendicular, or, from top to bottom, the two side walls extend obliquely toward each other.
8. The photovoltaic power generation shed according to any one of claims 1 to 7, characterized in that: Also includes: A main beam, on which the oblique beam is supported; The second installation component is connected to the main beam, and the second installation component cooperates with the main beam to define a fixing hole, and the oblique beam is inserted into the fixing hole.
9. The photovoltaic power generation shed according to claim 8, characterized in that: The second installation component includes: A mounting bracket, the mounting bracket comprising a U-shaped fixing plate portion and a mounting fold, the fixing plate portion and the main beam cooperate to define the fixing hole, and the mounting fold is connected to both sides of the fixing plate portion in the width direction of the water guide groove; A pad is connected to the main beam, and the mounting fold is arranged between the pad and the main beam.
10. The photovoltaic power generation shed according to claim 9, characterized in that: The fixing plate portion is connected to the oblique beam by bolts; and / or the pad is connected to the main beam by bolts.