Ground disaster investigation monitor support
By designing the fixing mechanism of the annular mount, locking assembly and fastening assembly in the geological disaster survey monitor bracket, the combination of hinged legs and fixing bolts combined with the extrusion mechanism of the lifting block and spring, the bracket installation stability is solved The problem of insufficient achieves higher stability and convenient transportation.
Patent Information
- Application Number
- CN202421163228.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-27
- Publication Date
- 2024-12-24
- Estimated Expiration
- 2034-05-27
AI Technical Summary
The installation stability of the existing geological disaster detection monitor bracket is insufficient, especially when the holes are inserted into advance, the stability is still not ideal.
A fixing mechanism including an annular mount, a locking assembly and a fastening assembly is designed. Through the combination of hinged legs and fixing bolts, the sliding card is pressed to the inner wall of the hole by using the elastic extrusion mechanism of the lifting block and the spring. , realize the firm fixation of the bracket.
It improves the installation stability of the geological disaster survey monitor bracket, enhances the monitoring effect, and can be separated when carried and transported, occupying a small space and convenient transportation.
Smart Images

Figure CN222230053U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of geological disaster investigation, in particular to a geological disaster investigation monitoring device bracket. Background Art
[0002] A geological disaster survey monitor is a special device used to monitor and warn of geological disasters (such as earthquakes, landslides, mud-rock flows, etc.), and is usually fixedly installed on a geological disaster survey monitor bracket.
[0003] Currently, most of the geological disaster investigation and monitoring device brackets on the market are tripod structures with three legs at the bottom. There are usually two supporting methods. One is that the supporting legs are directly supported on the ground, and the other is that the supporting legs are directly inserted into pre-drilled holes. The latter is more stable than the former, but the stability is still insufficient. Utility Model Content
[0004] The utility model provides a geological disaster investigation monitoring device bracket, which has the advantage of stable installation and solves the problems raised in the background technology.
[0005] In order to solve the defect of poor stability of the existing geological disaster survey monitor bracket after installation, the utility model provides the following technical solutions: a geological disaster survey monitor bracket, comprising a geological disaster survey monitor mounting base and a fixing mechanism, wherein the bottom end of the geological disaster survey monitor mounting base is hinged with three legs, and the bottom end of each leg is installed with a fixing bolt;
[0006] The fixing mechanism comprises an annular mounting seat, a locking assembly and three fastening assemblies;
[0007] The locking bolt has a first end fixedly mounted on the locking bolt and a second end fixedly mounted on the locking bolt.
[0008] As a preferred technical solution of the utility model, the second slide member is made of magnet material, the protruding rod is an iron rod structure, the upper part of the second slide member is an oblique bar structure, and the lower part of the second slide member is a straight bar structure.
[0009] As a preferred technical solution of the utility model, the protruding rod is a square long rod structure, the lifting block is a square sheet structure, and the first slot is a rectangular structure.
[0010] As a preferred technical solution of the utility model, the annular mounting seat includes a circular ring, the top surface of the circular ring is provided with three third slots matching the card block, the bottom end of the third slot is provided with a circular hole, the hollow insertion rod passes through the circular hole, an annular groove is provided inside the circular ring, each of the third slots is connected to the annular groove, the top surface of the circular ring is provided with an arc opening connected to the annular groove, and the top surface of the circular ring is provided with a locking hole.
[0011] As a preferred technical solution of the utility model, the locking assembly includes a swivel ring rotatably connected to the ring groove, the swivel ring is simultaneously clamped on the three second clamping grooves, the outer wall of the swivel ring is provided with three triangular grooves, and the top surface of the swivel ring is welded with a push block that penetrates to the top of the arc mouth, and the top surface of the push block is threadedly connected with a fastening bolt inserted into the locking hole.
[0012] As a preferred technical solution of the utility model, the third slot is a regular hexagonal structure, and the triangular slot matches the third slot.
[0013] Compared with the prior art, the utility model provides a geological disaster survey monitor bracket, which has the following beneficial effects:
[0014] 1. This kind of geological disaster investigation and monitoring device bracket is provided with a fixing mechanism consisting of an annular mounting seat, a locking assembly and a fastening assembly. When in use, the three circular holes in the annular mounting seat can determine the drilling position and quickly and accurately realize the drilling. The fastening assembly can be clamped on the annular mounting seat and inserted into the holes drilled in advance. The three fastening assemblies can be firmly installed on the annular mounting seat at the same time in conjunction with the locking assembly. The legs are clamped on the fixing assembly. When fixed and installed by fixing bolts, not only can the legs be fixedly installed above the fixing assembly, but also a plurality of sliding clips can be driven to slide outward and squeezed on the inner wall of the hole. At this time, the entire fixing mechanism is firmly fixed to the ground, thereby effectively improving the firmness of the entire geological disaster investigation and monitoring device bracket after installation, and the monitoring effect of the geological disaster investigation and monitoring device is greatly improved accordingly.
[0015] 2. When the geological disaster investigation and monitoring device bracket is carried and transported, the fixing mechanism in the geological disaster investigation and monitoring device bracket can be disassembled into three parts: an annular mounting seat, a locking assembly, and a fastening assembly. It occupies little space and is easy to carry and transport. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a structural schematic diagram of the utility model;
[0017] Figure 2 It is a front cross-sectional view of the fastening assembly of the utility model;
[0018] Figure 3 For this utility model Figure 2 A magnified view of middle;
[0019] Figure 4 This is a schematic diagram of the structure of the annular mounting seat of the utility model;
[0020] Figure 5 It is a structural schematic diagram of the locking assembly of the utility model.
[0021] In the figure:
[0022] 10. Mounting seat for geological disaster investigation and monitoring device; 20. Fixing mechanism; 21. Annular mounting seat; 210. Circular ring; 211. Third slot; 212. Circular hole; 213. Annular groove; 214. Arc opening; 215. Locking hole; 22. Locking assembly; 220. Rotating ring; 221. Triangular groove; 222. Push block; 223. Fastening bolt; 23. Fastening assembly; 230. Block; 231. First slot; 232. Threaded hole; 233. Cavity; 234. Lifting block; 235. Spring; 236. Hollow plug rod; 236. Hollow plug rod; 237. Protruding rod; 238. First slide; 239. Opening; 240. Sliding card; 241. Second slide; 30. Leg; 40. Fixing bolt. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] See also Figure 1-Figure 5 The utility model discloses a geological disaster survey monitor bracket, including a geological disaster survey monitor mounting seat 10 and a fixing mechanism 20. The geological disaster survey monitor can be fixedly mounted on the geological disaster survey monitor mounting seat 10. The bottom end of the geological disaster survey monitor mounting seat 10 is hinged with three legs 30, and the bottom end of each leg 30 is installed with a fixing bolt 40;
[0025] The fixing mechanism 20 includes an annular mounting seat 21, a locking assembly 22 and three fastening assemblies 23;
[0026] The fastening assembly 23 includes a block 230, a first slot 231 is formed on the top surface of the block 230, the bottom end of the leg 30 is clamped on the first slot 231, a threaded hole 232 is formed on the bottom end of the first slot 231, a fixing bolt 40 is threadedly connected to the threaded hole 232, a cavity 233 is formed on the bottom end of the threaded hole 232, a lifting block 234 is provided in the cavity 233 and is connected to the lifting block 234 for sliding up and down, a plurality of springs 235 are welded to the bottom end of the lifting block 234, a hollow plug rod 236 is welded to the bottom end of the block 230, and the hollow plug rod 236 is welded to the bottom end of the block 230. 36 is connected to the cavity 233, and a protruding rod 237 extending into the hollow plug rod 236 is welded to the bottom end of the lifting block 234, and a plurality of first slides 238 are welded to the outer wall of the protruding rod 237. A plurality of openings 239 are provided on the outer wall of the hollow plug rod 236, and each opening 239 is horizontally slidably connected to a sliding card 240. The sliding card 240 is fixedly connected to a second slide 241 on one side close to the protruding rod 237, and the bottom end of the first slide 238 is attached to the top surface of the second slide 241. A second slot is provided on the outer wall of the card block 230.
[0027] In this embodiment, when the fixing bolt 40 is fixedly installed, the lifting block 234 will be squeezed, the spring 235 will elastically contract, and the lifting block 234 will drive the protruding rod 237 to move downward together. Each first slide 238 will move downward accordingly and squeeze the second slide 241 below. At this time, the sliding card 240 will slide horizontally, and the sliding card 240 will protrude from the opening 239 and press against the inner wall of the hole on the ground, so that the connection is more firm and stable.
[0028] Not only can the support leg 30 be fixedly installed above the fixing component, but also the multiple sliding clamps 240 can be driven to slide outward and squeezed on the inner wall of the hole. At this time, the entire fixing mechanism 20 is firmly fixed to the ground, thereby effectively improving the firmness of the entire geological disaster survey monitor bracket after installation, and the monitoring effect of the geological disaster survey monitor is greatly improved.
[0029] Specifically, the second slide member 241 is made of a magnet, the protruding rod 237 is an iron rod structure, the upper portion of the second slide member 241 is an oblique bar structure, and the lower portion of the second slide member 241 is a straight bar structure.
[0030] In this embodiment, it has a magnetic attraction effect, and has a large area and a strong magnetic force, which facilitates the subsequent storage and reset of the sliding card 240, thereby facilitating the subsequent removal and reuse.
[0031] Specifically, the protruding rod 237 is a square long rod structure, the lifting block 234 is a square sheet structure, and the first slot 231 is a rectangular structure.
[0032] In this embodiment, no rotation occurs, and the protruding rod 237 and the lifting block 234 move up and down stably.
[0033] Specifically, the annular mounting seat 21 includes a circular ring 210, the top surface of the circular ring 210 is provided with three third slots 211 matching the block 230, the bottom end of the third slot 211 is provided with a circular hole 212, a hollow insert rod 236 passes through the circular hole 212, an annular groove 213 is provided in the circular ring 210, each third slot 211 is connected to the annular groove 213, an arc opening 214 connected to the annular groove 213 is provided on the top surface of the circular ring 210, a locking hole 215 is provided on the top surface of the circular ring 210, the third slot 211 is a regular hexagonal structure, and the triangular groove 221 matches the third slot 211.
[0034] In this embodiment, the ring 210 is placed on the ground, and the drill rod of the drilling machine can penetrate the circular hole 212 to achieve drilling without causing deviation in the drilling position and affecting subsequent insertion.
[0035] Specifically, the locking assembly 22 includes a swivel ring 220 rotatably connected to the annular groove 213, and the swivel ring 220 is simultaneously clamped on the three second clamping grooves. The outer wall of the swivel ring 220 is provided with three triangular grooves 221. The top surface of the swivel ring 220 is welded with a push block 222 that penetrates to the top of the arc opening 214, and the top surface of the push block 222 is threadedly connected with a fastening bolt 223 inserted into the locking hole 215.
[0036] In this embodiment, when the installation is not locked, the triangular groove 221 is flush with the inner wall of the third slot 211, and will not affect the clamping of the clamping block 230 on the third slot 211. When the fastening assembly 23 needs to be fixedly installed, the push block 222 can be pushed to drive the swivel 220 to rotate until the swivel 220 cannot rotate. At this time, the triangular groove 221 is separated from the third slot 211, and the swivel 220 is clamped on the second slot on the outer wall of the clamping block 230. The fastening bolt 223 is rotated forward to be inserted into the locking hole 215, so as to achieve fixed installation of the fastening assembly 23.
[0037] The working principle and use process of this utility model:
[0038] Select a suitable ground and place the circular ring 210 on the ground. At this time, the triangular groove 221 is flush with the inner wall of the third slot 211, which will not affect the clamping block 230 being clamped on the third slot 211. Pass the drill rod of the drilling machine through the circular hole 212 to drill holes in the ground. A total of three holes are drilled. Then, the hollow plug rod 236 passes through the circular hole 212 and is inserted into the hole on the ground, and the clamping block 230 is clamped on the third slot 211. Push the push block 222 to drive the swivel 220 to rotate until the swivel 220 cannot rotate. At this time, the triangular groove 221 is separated from the third slot 211, and the swivel 220 is clamped on the second slot on the outer wall of the clamping block 230. Turn the fastening bolt 236 forward. 23 is inserted into the locking hole 215 to achieve the fixed installation of the fastening component 23. Finally, the bottom of the leg 30 is clamped on the first clamping groove 231, and the fixing bolt 40 is installed. The fixing bolt 40 is threadedly connected with the threaded hole 232 and pushes the lifting block 234 directly below. The spring 235 elastically contracts, and the lifting block 234 drives the protruding rod 237 to move downward together. Each first sliding member 238 moves downward accordingly and squeezes the second sliding member 241 below. At this time, the sliding clamp 240 slides horizontally, and the sliding clamp 240 protrudes from the opening 239 and presses on the inner wall of the hole on the ground. Finally, the geological disaster investigation monitor is fixedly installed on the geological disaster investigation monitor mounting base 10.
[0039] It should be noted that, in this article, terms such as "comprises", "includes" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of more restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element.
[0040] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A geological disaster survey monitoring device bracket, characterized in that: It comprises a geological disaster survey monitoring device mounting base (10) and a fixing mechanism (20), wherein the bottom end of the geological disaster survey monitoring device mounting base (10) is hinged with three legs (30), and the bottom end of each leg (30) is installed with a fixing bolt (40); The fixing mechanism (20) comprises an annular mounting seat (21), a locking assembly (22) and three fastening assemblies (23); The fastening assembly (23) comprises a clamping block (230), a top surface of the clamping block (230) is provided with a first clamping groove (231), the bottom end of the supporting leg (30) is clamped on the first clamping groove (231), a threaded hole (232) is provided at the bottom end of the first clamping groove (231), the fixing bolt (40) is threadedly connected to the threaded hole (232), a cavity (233) is provided at the bottom end of the threaded hole (232), a lifting block (234) connected to the cavity (233) and slidingly connected thereto is provided in the cavity (233), a plurality of springs (235) are welded at the bottom end of the lifting block (234), a hollow plug rod (236) is welded at the bottom end of the clamping block (230), and the hollow plug rod (236) is welded at the bottom end of the clamping block (230), and the hollow plug rod (236) is welded at the bottom end of the clamping block (230). The rod (236) is connected to the cavity (233), and a protruding rod (237) extending into the hollow plug rod (236) is welded at the bottom end of the lifting block (234), and a plurality of first slides (238) are welded to the outer wall of the protruding rod (237). A plurality of openings (239) are provided on the outer wall of the hollow plug rod (236), and each of the openings (239) is horizontally slidably connected to a sliding card (240). A second slide (241) is fixedly connected to the side of the sliding card (240) close to the protruding rod (237), and the bottom end of the first slide (238) is attached to the top surface of the second slide (241), and a second slot is provided on the outer wall of the card block (230).
2. The geological disaster survey monitoring device support according to claim 1, characterized in that: The second sliding member (241) is made of a magnet material, the protruding rod (237) is an iron rod structure, the upper portion of the second sliding member (241) is an oblique bar structure, and the lower portion of the second sliding member (241) is a straight bar structure.
3. The geological disaster survey monitoring device support according to claim 1, characterized in that: The protruding rod (237) is a square long rod structure, the lifting block (234) is a square sheet structure, and the first clamping slot (231) is a rectangular structure.
4. The geological disaster survey monitoring device support according to claim 1, characterized in that: The annular mounting seat (21) comprises a circular ring (210), the top surface of the circular ring (210) is provided with three third clamping grooves (211) matching the clamping block (230), the bottom ends of the third clamping grooves (211) are provided with round holes (212), the hollow insertion rod (236) passes through the round holes (212), an annular groove (213) is provided inside the circular ring (210), each of the third clamping grooves (211) is connected to the annular groove (213), the top surface of the circular ring (210) is provided with an arc opening (214) connected to the annular groove (213), and the top surface of the circular ring (210) is provided with a locking hole (215).
5. The geological disaster survey monitoring device support according to claim 4, characterized in that: The locking assembly (22) comprises a rotating ring (220) rotatably connected to the annular groove (213), the rotating ring (220) being simultaneously clamped on the three second clamping grooves, the outer wall of the rotating ring (220) being provided with three triangular grooves (221), the top surface of the rotating ring (220) being welded with a push block (222) penetrating to the top of the arc opening (214), the top surface of the push block (222) being threadedly connected with a fastening bolt (223) inserted into the locking hole (215).
6. The geological disaster survey monitoring device support according to claim 5, characterized in that: The third clamping slot (211) is a regular hexagonal structure, and the triangular slot (221) matches the third clamping slot (211).
Citation Information
Cited By
Ground disaster investigation monitoring instrument support
CN223909138U
