Anchoring agent double-color filling device
By designing a device that automatically pushes and fixes the packaging pipe bag, the problem of inconvenient operation of traditional anchor filling equipment is solved, and efficient and convenient operation of two-color filling is achieved.
Patent Information
- Application Number
- CN202420927769.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-30
- Publication Date
- 2024-12-31
- Estimated Expiration
- 2034-04-30
AI Technical Summary
Traditional anchoring agent filling equipment is inconvenient to operate, especially when filling with two-color, it is necessary to frequently replace the packaging pipe bag, which causes time and effort and reduces work efficiency.
A two-color filling device for anchoring agent is designed, including equipment platform, vertical board, connecting board, push structure and bag support structure. The roller shaft and conveyor belt are driven by electric cylinders and servo motors to realize automatic push of the hopper and packaging pipe bags. Fixing, avoiding manual grip and replacement of packaging pipe bags.
It improves operational convenience and work efficiency, reduces labor intensity for operators, and simplifies the two-color filling process.
Smart Images

Figure CN222272409U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of anchoring agent filling equipment, in particular to a two-color anchoring agent filling device. Background Art
[0002] Anchors are mainly used in the construction of underground projects such as railways, highways, hydraulic tunnels, mine shafts and civil air defense using light blasting and anchor spraying support. They can also be used for ground slope reinforcement, gap plugging and water stopping and special construction projects. The same type of anchors are suitable for different building structures. Therefore, the color distinction of anchors is very important for the correct selection and use of anchors. Yellow anchors are usually used to connect structures such as concrete, stone and brick walls. Red anchors are suitable for connecting steel structures, railway tracks, bridges and highways. Green anchors are usually used to connect underground water pumps, water supply and drainage pipes, food processing equipment and other structures. Blue anchors are suitable for connecting high-density boards, plywood, hard plastics and other structures. Some structures require the use of mixed anchors, so the anchors need to be mixed and filled.
[0003] Traditional anchor filling equipment usually consists of a hopper and a feed pipe, and the feed pipe is controlled by a solenoid valve. The operator is required to open the packaging tube belt and put it on the lower end of the feed pipe and hold the packaging tube bag to prevent it from falling off, and open the solenoid valve to discharge the material for filling. It is inconvenient to use. When two-color filling is required, the packaging tube bag must be removed after half of the filling, and then transferred to another color hopper to fill the other color of anchor again, which is time-consuming and labor-intensive, and reduces work efficiency. Utility Model Content
[0004] In order to solve the above technical problems, the utility model provides a two-color filling device for an anchoring agent.
[0005] The utility model provides an anchoring agent two-color filling device comprising: an equipment platform, a vertical plate, a connecting plate, a pushing structure and a bag-supporting structure. A group of vertical plates are respectively arranged on the upper surfaces at both ends of the equipment platform, and the lower end of each group of vertical plates is fixedly connected to the upper surface of the equipment platform. Two groups of connecting plates are arranged between the two groups of vertical plates, and both ends of each group of connecting plates are respectively fixedly connected to the opposite sides of the two groups of vertical plates. A pushing structure is arranged between the two groups of connecting plates. The pushing structure comprises rollers and conveyor belts. Two groups of rollers are arranged, and conveyor belts are sleeved on the outer surfaces of the two groups of rollers. Several groups of bag-supporting structures are respectively arranged on both sides of the pushing structure. The bag-supporting structure comprises an electric cylinder, a first hopper and a second hopper. Two groups of electric cylinders are arranged, and the top outlet end of one group of electric cylinders is fixedly connected to the first hopper, and the top outlet end of the other group of electric cylinders is fixedly connected to the second hopper.
[0006] Preferably, four groups of support columns are provided on the lower surface of the equipment platform, and the upper end of each group of support columns is fixedly connected to the lower surface of the equipment platform; a mounting plate is provided on the upper surface of one side of the equipment platform, and the lower end of the mounting plate is fixedly connected to the upper surface of the equipment platform; two groups of material storage boxes are fixed on the side surface of the upper end of the mounting plate, and a discharge pipe is fixedly connected to the lower end of each group of material storage boxes, and the discharge pipe is communicated with the inside of the material storage box, and a solenoid valve is installed in the middle of the discharge pipe.
[0007] Preferably, two groups of through holes are respectively opened on the upper surfaces of the two groups of connecting plates, and the two groups of through holes on the upper surfaces of the two groups of connecting plates correspond to each other, two ends of one group of roller shafts are respectively rotatably connected to the inside of one group of through holes on the upper surfaces of the two groups of connecting plates, and two ends of the other group of roller shafts are respectively rotatably connected to the inside of the other group of through holes on the upper surfaces of the two groups of connecting plates, and the upper end of one group of roller shafts is fixedly connected to the first bevel gear, and the second bevel gear is meshed above the first bevel gear, one end of the second bevel gear is fixedly connected to the servo motor, and the lower surface of the servo motor is fixedly connected to the upper surfaces of one group of connecting plates.
[0008] Preferably, a group of fixing plates are fixedly connected to the lower surface of each group of electric cylinders, one end of the fixing plates is fixedly connected to the outer surface of the conveyor belt, a plurality of groups of batteries are fixedly connected to the outer surface of the conveyor belt, and the electric cylinders are electrically connected to the batteries.
[0009] Preferably, the second hopper is provided with an expansion joint on the side close to the first hopper, the first hopper is slidably arranged inside the expansion joint on the side of the second hopper on the side close to the second hopper, and the outer surfaces of the lower ends of the first hopper and the second hopper are sleeved with packaging tube bags.
[0010] Preferably, the feed pipe is arranged above the first hopper and the second hopper.
[0011] Compared with the related art, the anchoring agent two-color filling device provided by the utility model has the following beneficial effects:
[0012] By providing a bag supporting structure, an operator starts the electric cylinder and controls the top end of the electric cylinder to contract so that one side of the first hopper slides inside the expansion joint on one side of the second hopper, so that the outer surfaces of the first hopper and the second hopper are tightly fitted to the inner wall of the packaging tube bag, so that the packaging tube bag is connected to the first hopper and the lower end of the second hopper. The operator controls the electric cylinder to push out so that one side of the first hopper slides inside the expansion joint on one side of the second hopper, so that the first hopper and the second hopper are fitted to each other, and the outer surfaces of the first hopper and the second hopper are separated from the inner wall of the packaging tube bag, so that the packaging tube bag is separated from the lower ends of the first hopper and the second hopper, which is convenient for collecting the packaging tube bags, effectively avoiding the need for staff to hold the packaging tube bags to fix them on the outer surface of the feed tube, and effectively increasing the convenience of use.
[0013] By providing a pushing structure, the operator starts the servo motor, and the rotation of the servo motor power output end drives the second bevel gear to rotate. When the second bevel gear rotates, it engages the first bevel gear. When the first bevel gear rotates, it drives the roller to rotate. Under the action of the friction between the outer surface of the roller and the inner wall of the conveyor belt, the conveyor belt moves. When the first hopper and the second hopper move to the bottom of a group of material storage box discharge pipes, the servo motor is controlled to stop rotating. The operator controls the solenoid valve to open, so that the anchoring agent can pass through the first hopper and the second hopper into the packaging tube bag. When filling the second color of the anchoring agent, the first hopper and the second hopper are moved to the bottom of the discharge pipe of another group of material storage boxes, and the servo motor is controlled to stop rotating. Repeating the above steps can fill the second color of the anchoring agent, which effectively improves the work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 A structural schematic diagram of a preferred embodiment of the anchoring agent two-color filling device provided by the utility model;
[0015] Figure 2 It is a structural schematic diagram of another viewing angle of the utility model;
[0016] Figure 3 It is a schematic diagram of the exploded structure of the vertical plate, the connecting plate, the pushing structure and the bag supporting structure of the utility model;
[0017] Figure 4 For the utility model Figure 3 Schematic diagram of the enlarged structure at point A in the middle.
[0018] Numbers in the figure: 1. Equipment platform; 2. Vertical plate; 3. Connecting plate; 4. Pushing structure; 5. Roller; 6. Conveyor belt; 7. Bag-supporting structure; 8. Electric cylinder; 9. First hopper; 10. Second hopper; 11. Support column; 12. Mounting plate; 13. Material storage box; 14. Feeding pipe; 15. Solenoid valve; 16. First bevel gear; 17. Second bevel gear; 18. Servo motor; 19. Fixed plate; 20. Battery; 21. Packaging tube bag. DETAILED DESCRIPTION
[0019] The utility model is further described below in conjunction with the accompanying drawings and implementation modes.
[0020] Please refer to Figure 1 , Figure 2 , Figure 3 and Figure 4 ,in, Figure 1 A structural schematic diagram of a preferred embodiment of the anchoring agent two-color filling device provided by the utility model; Figure 2 It is a structural schematic diagram of another viewing angle of the utility model; Figure 3It is a schematic diagram of the exploded structure of the vertical plate, the connecting plate, the pushing structure and the bag supporting structure of the utility model; Figure 4 For the utility model Figure 3 Schematic diagram of the enlarged structure at point A in the middle. It includes: an equipment platform 1, a vertical plate 2, a connecting plate 3, a pushing structure 4 and a bag-supporting structure 7. A group of vertical plates 2 are respectively arranged on the upper surfaces of both ends of the equipment platform 1, and the lower end of each group of vertical plates 2 is fixedly connected to the upper surface of the equipment platform 1. Two groups of connecting plates 3 are arranged between the two groups of vertical plates 2. Both ends of each group of connecting plates 3 are respectively fixedly connected to the opposite sides of the two groups of vertical plates 2. A pushing structure 4 is arranged between the two groups of connecting plates 3. The connecting plates 3 are convenient for installing the pushing structure 4, and the pushing structure 4 is convenient for pushing the packaging tube bag 21. The pushing structure 4 includes a roller shaft 5 and a conveyor belt 6. Two groups of roller shafts 5 are arranged, and the outer surfaces of the two groups of roller shafts 5 are sleeved with conveyor belts 6. Several groups of bag-supporting structures 7 are respectively arranged on both sides of the pushing structure 4. The bag-supporting structure 7 is convenient for fixing the packaging tube bag 21. The bag-supporting structure 7 includes an electric cylinder 8, a first hopper 9 and a second hopper 10. Two groups of electric cylinders 8 are arranged, one group of electric cylinders 8 is fixedly connected to the first hopper 9 at the ejection end, and the other group of electric cylinders 8 is fixedly connected to the second hopper 10 at the ejection end.
[0021] In the specific implementation process, Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, four groups of support columns 11 are arranged on the lower surface of the equipment platform 1, and the upper end of each group of support columns 11 is fixedly connected to the lower surface of the equipment platform 1, and the support columns 11 provide support force for the equipment platform 1. A mounting plate 12 is arranged on the upper surface of one side of the equipment platform 1, and the lower end of the mounting plate 12 is fixedly connected to the upper surface of the equipment platform 1, and two groups of material storage boxes 13 are fixed on the side surface of the upper end of the mounting plate 12. The mounting plate 12 is convenient for installing the material storage boxes 13, and the two groups of material storage boxes 13 are convenient for placing anchoring agents of different colors. A feeding pipe 14 is fixedly connected to the lower end of each group of material storage boxes 13, and the feeding pipe 14 is interconnected with the inside of the material storage box 13. A solenoid valve 15 is installed in the middle of the feeding pipe 14, and the solenoid valve 15 is electrically connected to an external power supply, and the solenoid valve 15 is convenient for controlling the feeding.
[0022] Among them, two groups of through holes are respectively opened on the upper surfaces of the two groups of connecting plates 3, and the two groups of through holes on the upper surfaces of the two groups of connecting plates 3 correspond to each other, and the two ends of one group of roller shafts 5 are respectively rotatably connected to the inside of one group of through holes on the upper surfaces of the two groups of connecting plates 3, and the two ends of the other group of roller shafts 5 are respectively rotatably connected to the inside of the other group of through holes on the upper surfaces of the two groups of connecting plates 3. The upper end of one group of roller shafts 5 is fixedly connected to the first bevel gear 16, and the second bevel gear 17 is meshed above the first bevel gear 16. One end of the second bevel gear 17 is fixedly connected to a servo motor 18, and the lower surface of the servo motor 18 is fixedly connected to the upper surface of one group of connecting plates 3. The servo motor 18 is electrically connected to an external power supply. The operator starts the servo motor 18, and the power output end of the servo motor 18 rotates to drive the second bevel gear 17 to rotate. When the second bevel gear 17 rotates, it meshes with the first bevel gear 16. When the first bevel gear 16 rotates, it drives the roller shaft 5 to rotate, and under the action of the friction between the outer surface of the roller shaft 5 and the inner wall of the conveyor belt 6, the conveyor belt 6 moves.
[0023] Among them, a group of fixing plates 19 are fixedly connected to the lower surface of each group of electric cylinders 8, one end of the fixing plate 19 is fixedly connected to the outer surface of the conveyor belt 6, and a number of groups of batteries 20 are fixedly connected to the outer surface of the conveyor belt 6. The electric cylinder 8 is electrically connected to the battery 20. The fixing plate 19 facilitates the installation of the electric cylinder 8, and the battery 20 provides electrical energy for the electric cylinder 8.
[0024] Among them, an expansion joint is opened on the side of the second hopper 10 close to the first hopper 9, and the first hopper 9 is slidably arranged inside the expansion joint on the side of the second hopper 10 close to the second hopper 10. The outer surfaces of the lower ends of the first hopper 9 and the second hopper 10 are sleeved with a packaging tube bag 21. The outer surfaces of the first hopper 9 and the second hopper 10 are tightly fitted to the inner wall of the packaging tube bag 21, so that the packaging tube bag 21 is connected to the first hopper 9 and the lower ends of the second hopper 10, the first hopper 9 and the second hopper 10 are fitted to each other, and the outer surfaces of the first hopper 9 and the second hopper 10 are separated from the inner wall of the packaging tube bag 21, so that the packaging tube bag 21 is separated from the lower ends of the first hopper 9 and the second hopper 10.
[0025] The feeding tube 14 is disposed above the first hopper 9 and the second hopper 10 . When the feeding tube 14 discharges materials, the anchoring agent passes through the first hopper 9 and the second hopper 10 and enters the interior of the packaging tube bag 21 .
[0026] The working principle provided by the utility model is as follows: the operator first places two anchoring agents of different colors inside two groups of different storage boxes 13 respectively, and the operator sets the upper end of the packaging tube bag 21 on the outer surface of the lower end of the first hopper 9 and the second hopper 10 at the other end. The operator starts the electric cylinder 8 and controls the ejection end of the electric cylinder 8 to contract so that one side of the first hopper 9 slides inside the expansion joint on one side of the second hopper 10, so that the outer surfaces of the first hopper 9 and the second hopper 10 are tightly fitted to the inner wall of the packaging tube bag 21, so that the packaging tube bag 21 is connected to the first hopper 9 and the lower end of the second hopper 10. The operator starts the servo motor 18, and the power output end of the servo motor 18 rotates to drive the second bevel gear 17 to rotate, and the second bevel gear 17 engages the first bevel gear 16 when rotating. When the first bevel gear 16 rotates, it drives the roller shaft 5 to rotate. Under the action of the friction between the outer surface of the roller shaft 5 and the inner wall of the conveyor belt 6, the conveyor belt 6 moves. When the first hopper 9 and the second hopper 10 move to a group of storage boxes 13 to unload materials, When the anchoring agent of the second color is filled, the first hopper 9 and the second hopper 10 are moved to another group of storage boxes 13. When the material tube 14 is below, the servo motor 18 is controlled to stop rotating. The operator controls the solenoid valve 15 to open, so that the anchoring agent can enter the packaging tube bag 21 through the first hopper 9 and the second hopper 10. When the anchoring agent of the second color is filled, the first hopper 9 and the second hopper 10 are moved to another group of storage boxes 13. When the material tube 14 is below, the servo motor 18 is controlled to stop rotating. Repeat the above steps to fill the second color of the anchoring agent. At the same time, when the conveyor belt 6 stops, the filled bag To load the tube bag 21, the operator controls the electric cylinder 8 to push out, so that one side of the first hopper 9 slides inside the expansion joint on the side of the second hopper 10, so that the first hopper 9 and the second hopper 10 fit each other, and the outer surfaces of the first hopper 9 and the second hopper 10 are separated from the inner wall of the packaging tube bag 21, so that the packaging tube bag 21 is separated from the lower ends of the first hopper 9 and the second hopper 10, which is convenient for collecting the packaging tube bag 21. The installation of the packaging tube bag 21, filling and removing the packaging tube bag 21 are repeated in sequence, and the filling can be repeated.
[0027] The circuits and controls involved in the present invention are all prior art and will not be described in detail here.
[0028] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A two-color anchoring agent filling device, comprising: The equipment platform (1), the vertical plate (2), the connecting plate (3), the pushing structure (4) and the bag supporting structure (7) are characterized in that a group of vertical plates (2) are respectively arranged on the upper surface of both ends of the equipment platform (1), the lower end of each group of vertical plates (2) is fixedly connected to the upper surface of the equipment platform (1), two groups of connecting plates (3) are arranged between the two groups of vertical plates (2), the two ends of each group of connecting plates (3) are respectively fixedly connected to the opposite side of the two groups of vertical plates (2), a pushing structure (4) is arranged between the two groups of connecting plates (3), and the pushing structure (4) comprises a roller shaft (5) and a conveyor belt (6), wherein two groups of roller shafts (5) are provided, and the outer surfaces of the two groups of roller shafts (5) are sleeved with a conveyor belt (6), and a plurality of groups of bag-supporting structures (7) are respectively provided on both sides of the pushing structure (4), and the bag-supporting structures (7) comprise an electric cylinder (8), a first hopper (9) and a second hopper (10), and two groups of electric cylinders (8) are provided, wherein the ejection end of one group of electric cylinders (8) is fixedly connected to the first hopper (9), and the ejection end of the other group of electric cylinders (8) is fixedly connected to the second hopper (10).
2. The anchoring agent two-color filling device according to claim 1 is characterized in that: The lower surface of the equipment platform (1) is provided with four groups of support columns (11), the upper end of each group of support columns (11) is fixedly connected to the lower surface of the equipment platform (1), a mounting plate (12) is provided on one side of the upper surface of the equipment platform (1), the lower end of the mounting plate (12) is fixedly connected to the upper surface of the equipment platform (1), two groups of material storage boxes (13) are fixedly connected to the side surface of the upper end of the mounting plate (12), the lower end of each group of material storage boxes (13) is fixedly connected to a material discharge pipe (14), the material discharge pipe (14) is communicated with the inside of the material storage box (13), and a solenoid valve (15) is installed in the middle of the material discharge pipe (14).
3. The anchoring agent two-color filling device according to claim 1 is characterized in that: Two groups of through holes are respectively opened on the upper surfaces of the two groups of connecting plates (3), and the two groups of through holes on the upper surfaces of the two groups of connecting plates (3) correspond to each other. Two ends of one group of roller shafts (5) are respectively rotatably connected to the inside of one group of through holes on the upper surfaces of the two groups of connecting plates (3), and two ends of the other group of roller shafts (5) are respectively rotatably connected to the inside of the other group of through holes on the upper surfaces of the two groups of connecting plates (3). The upper end of one group of roller shafts (5) is fixedly connected to a first bevel gear (16), a second bevel gear (17) is meshed above the first bevel gear (16), one end of the second bevel gear (17) is fixedly connected to a servo motor (18), and the lower surface of the servo motor (18) is fixedly connected to the upper surface of one group of connecting plates (3).
4. The anchoring agent two-color filling device according to claim 1, characterized in that: A group of fixing plates (19) are fixedly connected to the lower surface of each group of electric cylinders (8), one end of the fixing plates (19) is fixedly connected to the outer surface of the conveyor belt (6), a plurality of groups of batteries (20) are fixedly connected to the outer surface of the conveyor belt (6), and the electric cylinders (8) are electrically connected to the batteries (20).
5. The anchoring agent two-color filling device according to claim 1, characterized in that: The second hopper (10) is provided with an expansion joint on the side close to the first hopper (9); the first hopper (9) is slidably arranged on the side close to the second hopper (10) inside the expansion joint on the side of the second hopper (10); and the outer surfaces of the lower ends of the first hopper (9) and the second hopper (10) are sleeved with a packaging tube bag (21).
6. The anchoring agent two-color filling device according to claim 2, characterized in that: The feed pipe (14) is arranged above the first hopper (9) and the second hopper (10).