Novel building ground pile
By designing new building ground piles with fixed plates, fixed rods, connecting rods, plug-in plates and reinforcing nails, the problem of insufficient anchoring force of existing ground piles is solved and a more efficient and economical anchoring effect is achieved.
Patent Information
- Application Number
- CN202420706695.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-08
- Publication Date
- 2025-01-21
- Estimated Expiration
- 2034-04-08
AI Technical Summary
When existing ground piles are anchored, the anchoring force provided by a single ground pile is small, and a larger number of ground piles need to be drilled to meet the requirements, which is time-consuming and labor-intensive and not economical.
A new type of building ground pile is designed. The ground pile body is equipped with fixed plates, fixed rods, connecting rods, plug-in plates and reinforcing nails. The fixed rod is pressed by a tool to drive the connecting rods and plug-in plates to move, thereby causing the reinforcing nails to move. Insert into the ground to enhance the anchoring force of ground piles.
Through the set of reinforcement nails, the anchoring force of the ground piles is significantly improved, the number of ground piles that need to be driven is reduced, time and cost are saved, and the problem of insufficient anchoring force of a single ground pile is solved.
Smart Images

Figure CN222375374U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building ground piles, in particular to a novel building ground pile. Background Art
[0002] Ground piles can be divided into precast piles and cast-in-place piles according to the construction method. Precast piles are mostly made of reinforced concrete and driven into the ground by a pile driver. They have the advantages of less material and high strength, and are suitable for buildings with higher requirements. However, when using ground piles for anchoring, the anchoring force provided by a single ground pile is relatively small, and it is often necessary to drive more ground piles to meet the requirements, which is time-consuming, labor-intensive, and not economical.
[0003] In this regard, the utility model proposes a novel building ground pile to solve this problem. Utility Model Content
[0004] The purpose of the present invention is to solve at least one of the above technical deficiencies.
[0005] Therefore, one purpose of the present invention is to provide a new type of building ground pile to solve the problems mentioned in the background technology and overcome the shortcomings of the prior art.
[0006] In order to achieve the above-mentioned purpose, an embodiment of one aspect of the utility model provides a new type of building ground pile, including a ground pile body, the outer surface of the ground pile body is provided with two positioning holes, the inside of the ground pile body is fixedly connected with a fixing plate, the inside of the fixing plate is plugged with two fixing rods, the bottoms of the two fixing rods are rotatably connected to two connecting rods, one side of several of the connecting rods is rotatably connected to two plug-in plates, one side of the two plug-in plates is fixedly connected with a reinforcement nail, and the outer surfaces of the two reinforcement nails are respectively plugged into the inside of the corresponding positioning holes.
[0007] By adopting the above technical solution, the utility model has a strong anchoring force, avoiding the problem that when using ground piles for anchoring at present, the anchoring force provided by a single ground pile is small, and it is often necessary to drive a larger number of ground piles to meet the requirements, which is time-consuming, labor-intensive and uneconomical.
[0008] Preferably, any of the above solutions has two first fixing holes on the top of the fixing plate, and the insides of the two first fixing holes are plugged into the outer surfaces of the corresponding fixing rods.
[0009] Preferably, any of the above schemes is that the plurality of connecting rods are grouped in pairs, and the two groups of connecting rods are symmetrically arranged.
[0010] Preferably, any of the above schemes has two fixing frames fixedly connected inside the ground pile body, one side of each of the two fixing frames is provided with a plug slot, and the insides of the two plug slots are respectively slidably connected to the outer surface of the corresponding plug board.
[0011] Preferably, one side of each of the two fixing frames is provided with a second fixing hole, the interiors of the two second fixing holes are respectively inserted into the outer surfaces of the corresponding reinforcement nails, and the interiors of the two second fixing holes are respectively connected to the interiors of the corresponding insertion slots.
[0012] Preferably, in any of the above schemes, the two plug-in boards are symmetrically arranged, and one side of the two plug-in boards is overlapped with one side of the corresponding connecting rod respectively.
[0013] Preferably, in any of the above schemes, the two reinforcing nails are symmetrically arranged.
[0014] Compared with the prior art, the advantages and beneficial effects of the utility model are:
[0015] When the novel building ground pile is in use, the ground pile body is first hammered into the ground stratum by a pile driver, and then the two fixing rods are pressed downward by a tool or other tool that can be inserted into the ground pile body. The movement of the two fixing rods drives the movement of a plurality of connecting rods, and the movement of the plurality of connecting rods drives the movement of the two plug-in plates. The movement of the plug-in plates drives the two reinforcing nails to move inside the positioning holes respectively, and then when the reinforcing nails extend out of the positioning holes, the two reinforcing nails are inserted into the ground stratum around the ground pile body, thereby completing the installation of the ground pile body. The two reinforcing nails not only enhance the strength of the ground pile body itself, but also greatly enhance the anchoring force of the ground pile body, thereby solving the problem that when ground piles are currently used for anchoring, the anchoring force provided by a single ground pile is small, and it is often necessary to drive a larger number of ground piles to meet the requirements, which is time-consuming, labor-intensive, and uneconomical.
[0016] Additional aspects and advantages of the present invention will be given in part in the following description and in part will become apparent from the following description or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0018] Figure 1 It is a schematic diagram of the overall structure according to an embodiment of the utility model;
[0019] Figure 2 It is a schematic diagram of the cross-sectional structure according to an embodiment of the utility model;
[0020] Figure 3 It is a schematic diagram of the explosion structure according to an embodiment of the utility model.
[0021] In the figure: 1-ground pile body, 101-positioning hole, 2-fixing plate, 3-fixing rod, 4-connecting rod, 5-plug-in plate, 6-reinforcement rod. DETAILED DESCRIPTION
[0022] like Figures 1 to 3 As shown, a new type of building ground pile comprises a ground pile body 1, which is a stainless steel buried pile body. A pile driver is first used to hammer the ground pile body 1 into the ground. How the pile driver works specifically belongs to common knowledge, so it is not described in detail here. Two positioning holes 101 are provided on the outer surface of the ground pile body 1, and a fixing plate 2 is fixedly connected to the inside of the ground pile body 1. Two fixing rods 3 are inserted into the inside of the fixing plate 2. Then, the two fixing rods 3 are pressed downward by a tool or other tool that can be inserted into the inside of the ground pile body 1. The movement of the two fixing rods 3 drives a plurality of connecting rods 4 to move, and a plurality of connecting rods 4 move. The movement of the connecting rod 4 drives the two plug-in plates 5 to move. The bottoms of the two fixing rods 3 are rotatably connected to the two connecting rods 4. One side of several connecting rods 4 is rotatably connected to the two plug-in plates 5. One side of the two plug-in plates 5 is fixedly connected to a reinforcing nail 6. The outer surfaces of the two reinforcing nails 6 are respectively inserted into the corresponding positioning holes 101. The movement of the plug-in plate 5 drives the two reinforcing nails 6 to move respectively inside the positioning holes 101. When the reinforcing nails 6 extend out of the positioning holes 101, the two reinforcing nails 6 are inserted into the stratum around the ground pile body 1, thereby completing the installation of the ground pile body 1.
[0023] Two first fixing holes are provided on the top of the fixing plate 2, and the interiors of the two first fixing holes are plugged into the outer surfaces of the corresponding fixing rods 3. By inserting the setting fixing rods 3 into the interiors of the first fixing holes, the fixing rods 3 have a certain supporting force and also play a role of limiting.
[0024] The connecting rods 4 are arranged in groups of two, and the two groups of connecting rods 4 are symmetrically arranged.
[0025] Two fixing frames are fixedly connected inside the ground pile body 1, and a plug-in slot is provided on one side of each fixing frame. The insides of the two plug-in slots are respectively slidably connected to the outer surfaces of the corresponding plug-in boards 5. The plug-in boards 5 are slidably connected to the insides of the plug-in slots, which makes the movement of the plug-in boards 5 more stable, thereby increasing the stability of the ground pile during installation.
[0026] One side of the two fixing frames is provided with a second fixing hole, the insides of the two second fixing holes are respectively plugged into the outer surfaces of the corresponding reinforcing nails 6, and the insides of the two second fixing holes are respectively connected to the insides of the corresponding insertion slots.
[0027] The two plug-in boards 5 are symmetrically arranged, and one side of the two plug-in boards 5 overlaps with one side of the corresponding connecting rod 4 respectively.
[0028] The two reinforcement nails 6 are symmetrically arranged. Figure 3 It can be seen that the protruding end of the reinforcement nail 6 is a pointed tip, which is set to a pointed shape, making it easier for the reinforcement nail 6 to be inserted into the stratum around the ground pile body 1, thereby increasing the overall structural strength of the ground pile body 1.
[0029] A new type of building pile, the working principle is as follows:
[0030] When the new type of building ground pile is in use, the ground pile body 1 is first hammered into the ground stratum using a pile driver, and then the two fixing rods 3 are pressed downward by a tool or other tool that can be inserted into the ground pile body 1. The movement of the two fixing rods 3 drives the movement of a plurality of connecting rods 4, and the movement of the plurality of connecting rods 4 drives the movement of the two plug-in plates 5. The movement of the plug-in plates 5 drives the two reinforcing nails 6 to move inside the positioning holes 101 respectively. Then, when the reinforcing nails 6 extend out of the positioning holes 101, the two reinforcing nails 6 are inserted into the ground stratum around the ground pile body 1, thereby completing the installation of the ground pile body 1.
[0031] Compared with the prior art, the present invention has the following beneficial effects:
[0032] When the novel building ground pile is in use, the ground pile body 1 is first hammered into the ground stratum with a pile driver, and then the two fixing rods 3 are pressed downward by a tool or other tool that can be inserted into the ground pile body 1. The movement of the two fixing rods 3 drives the movement of the plurality of connecting rods 4, and the movement of the plurality of connecting rods 4 drives the movement of the two plug-in plates 5. The movement of the plug-in plates 5 drives the two reinforcing nails 6 to move inside the positioning holes 101 respectively. Then, when the reinforcing nails 6 extend out of the positioning holes 101, the two reinforcing nails 6 are inserted into the ground stratum around the ground pile body 1, thereby completing the installation of the ground pile body 1. The two reinforcing nails 6 are provided, not only the strength of the ground pile body 1 itself is enhanced, but also the anchoring force of the ground pile body 1 is greatly improved, thereby solving the problem that when ground piles are currently used for anchoring, the anchoring force provided by a single ground pile is small, and it is often necessary to drive more ground piles to meet the requirements, which is time-consuming, labor-intensive, and not economical.
Claims
1. A new type of building pile, characterized by: The invention comprises a ground pile body (1), wherein the outer surface of the ground pile body (1) is provided with two positioning holes (101), the interior of the ground pile body (1) is fixedly connected with a fixing plate (2), the interior of the fixing plate (2) is plugged with two fixing rods (3), the bottoms of the two fixing rods (3) are rotatably connected with two connecting rods (4), one side of a plurality of the connecting rods (4) is rotatably connected with two plug-in plates (5), one side of the two plug-in plates (5) is fixedly connected with a reinforcing nail (6), and the outer surfaces of the two reinforcing nails (6) are respectively plugged into the interiors of the corresponding positioning holes (101).
2. A new type of construction pile according to claim 1, characterized in that: Two first fixing holes are provided on the top of the fixing plate (2), and the insides of the two first fixing holes are plugged into the outer surfaces of the corresponding fixing rods (3).
3. A new type of construction pile according to claim 1, characterized in that: A plurality of connecting rods (4) are arranged in groups of two, and the two groups of connecting rods (4) are symmetrically arranged.
4. A new type of construction pile according to claim 1, characterized in that: Two fixing frames are fixedly connected inside the ground pile body (1), one side of each of the two fixing frames is provided with a plug-in slot, and the insides of the two plug-in slots are respectively slidably connected to the outer surfaces of corresponding plug-in boards (5).
5. A new type of construction pile according to claim 4, characterized in that: A second fixing hole is provided on one side of each of the two fixing frames, the interiors of the two second fixing holes are respectively plugged into the outer surfaces of the corresponding reinforcing nails (6), and the interiors of the two second fixing holes are respectively connected to the interiors of the corresponding plug-in slots.
6. A new type of construction pile according to claim 1, characterized in that: The two plug-in plates (5) are symmetrically arranged, and one side of the two plug-in plates (5) is overlapped with one side of the corresponding connecting rod (4) respectively.
7. The novel construction pile according to claim 1 is characterized by: The two reinforcing nails (6) are symmetrically arranged.