Building engineering guardrail

By designing construction engineering guardrails with adjustable length, combined with the structure of sliding rods, tie rods and connecting rods, the problem of fixed length of existing guardrails is solved, construction efficiency is improved and safety warning effects are improved.

CN222376178UActive Publication Date: 2025-01-21HUNAN ZHENGLING CONSTRUCTION ENGINEERING CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420747975.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-11
Publication Date
2025-01-21
Estimated Expiration
2034-04-11

AI Technical Summary

Technical Problem

The length of the existing construction project guardrail is fixed and cannot be adjusted, resulting in the need to continuously connect the guardrails when the project scope is large, which increases labor costs and reduces work efficiency. At the same time, the safety warning effect is poor.

Method used

A construction engineering guardrail is designed that includes a first railing and a second railing, which are connected to the crossbar through bolts. The crossbar is equipped with sliding rods, tie rods and connecting rods, and the sliding rod and tie rod are fixed on the second railing. Blocks are set on the pull rods and blocks are set on the connecting rods. Through the cooperation of these structures, the length of the guardrail can be adjusted, and warning signs can be installed on the railings to improve the safety warning effect.

Benefits of technology

The adjustability of guardrail length is achieved, construction efficiency is improved, labor costs are reduced, and the safety warning effect on the construction site is improved through the setting of warning signs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222376178U_ABST
    Figure CN222376178U_ABST
Patent Text Reader

Abstract

The utility model belongs to the field of building guardrails, and particularly relates to a building engineering guardrail which solves the problems that in the prior art, the length of a guardrail cannot be adjusted, and the safety warning effect is poor, the building engineering guardrail comprises a first guardrail column and a second guardrail column, and one side of the first guardrail column is fixedly connected with two symmetrically-arranged transverse rods through bolts. Wherein a sliding rod is assembled in one cross rod in a sliding mode, a pull rod and a connecting rod are assembled in the other cross rod in a sliding mode, the sliding rod and the pull rod are both fixedly arranged on the second fence column, through arrangement of the structures such as the first fence column and the second fence column, the length of the engineering fence can be adjusted, and when the fence needs to be lengthened, the first fence column and the second fence column can be adjusted. When the guardrail is used, the first guardrail column is fixed to one place, then an operator pulls the second guardrail column, the sliding rod, the pull rod and the metal protective net which are fixedly arranged on the second guardrail column are all pulled out, and therefore the effect of extending the length of the guardrail is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of engineering guardrails, in particular to a construction engineering guardrail. Background Art

[0002] At present, construction project guardrail is an important safety protection facility at construction sites, and is widely used in places where high-altitude operations occur, such as construction sites, bridges, and highways. Its main function is to prevent people and objects from falling from heights, thereby ensuring construction safety.

[0003] The utility model in the prior art has an authorization announcement number of CN206337896U, and its name is: A construction project guardrail, which achieves the effects of efficient construction, convenient use, durability, uniform quality and high mechanization through its structural optimization. Its design includes elements such as vertical bars, grooves, square holes, step grooves, bolts, guardrails and anti-rotation pads. The combination of these elements enables the guardrail to have the flexibility to adapt to different construction environments and needs. Through a simple description, it can be concluded that the product has advantages in improving construction efficiency, enhancing safety and ensuring quality. However, the length of the patented guardrail is fixed. If the scope of the project is large, it can only be achieved by continuously connecting the guardrails, which increases labor costs and reduces work efficiency. Utility Model Content

[0004] The utility model aims to provide a construction engineering guardrail, which solves the problems that the guardrail length cannot be adjusted and the safety warning effect is poor.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction engineering guardrail, comprising a first guardrail post and a second guardrail post, one side of the first guardrail post is fixedly connected with two symmetrically arranged cross bars by bolts, one of the cross bars is slidably equipped with a sliding rod, and the other cross bar is slidably equipped with a pull rod and a connecting rod, the sliding rod and the pull rod are fixedly arranged on the second guardrail post, and a plurality of array-equidistantly distributed card blocks are fixedly arranged on the pull rod,

[0006] The connecting rod is fixedly provided with a plurality of blocks which are evenly distributed in an array, and one end of the block and the block are both inclined. The bottom of the connecting rod is fixedly connected to a pillar by screws, and the pillar is slidably assembled inside one of the cross bars, and the bottom end of the pillar is fixedly connected to the pedal by screws.

[0007] Preferably, the bottoms of the first and second fence posts are both fixedly connected with cushion blocks by bolts, and warning signs are rotatably mounted on the first and second fence posts.

[0008] Preferably, a slide groove is provided inside one of the cross bars, the pull rod is slidably connected inside the slide groove, and a plurality of the blocks are located inside the slide groove, thereby enhancing the stability of the pull rod.

[0009] Preferably, a movable groove is opened inside one of the cross bars, and the connecting rod is slidably connected inside the movable groove. Two symmetrically arranged springs are connected to the connecting rod, and the other ends of the two springs are welded to the bottom wall of the movable groove, thereby realizing the automatic resetting effect of the connecting rod.

[0010] Preferably, a linear groove is opened inside one of the cross bars, and the slide bar is slidably connected inside the linear groove; a pull groove is opened inside the other cross bar, and the support is slidably connected inside the pull groove, thereby improving the stability of the slide bar.

[0011] Preferably, a metal protective net is fixedly provided on both the first fence post and the second fence post, and the two metal protective nets are staggered. When the first fence post and the second fence post are spread out to both sides, the metal protective nets are also spread out.

[0012] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0013] 1. The utility model can adjust the length of the engineering guardrail through the arrangement of the first guardrail post and the second guardrail post. When the guardrail needs to be lengthened, the first guardrail post is first fixed in one place, and then the operator pulls the second guardrail post, and the sliding rod, the pulling rod and the metal protective net fixed on the second guardrail post are all pulled outward, thereby achieving the effect of extending the length of the guardrail.

[0014] 2. The utility model arranges warning signs and first railings and other structures, wherein warning signs are rotatably installed on the first railing and the second railing. Warning signs are provided with construction warning slogans to remind passers-by to pay attention to safety, thereby achieving the effect of enhancing safety warnings. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a front cross-sectional view of the utility model;

[0016] Figure 2 It is a schematic diagram of the overall structure of the utility model;

[0017] Figure 3 It is an enlarged view of point A of the present utility model.

[0018] In the figure: 1. first railing; 2. second railing; 3. cross bar; 4. metal protective net; 5. sliding bar; 6. warning sign; 7. pull rod; 8. pedal; 9. support; 10. block; 11. spring; 12. movable groove; 13. connecting rod; 14. block; 15. slide groove; 16. pad. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] See also Figure 1-3 A construction engineering guardrail comprises a first hurdle 1 and a second hurdle 2. One side of the first hurdle 1 is fixedly connected with two symmetrically arranged cross bars 3 by bolts. A sliding rod 5 is slidably mounted inside one of the cross bars 3. A pull rod 7 and a connecting rod 13 are slidably mounted inside the other cross bar 3. The sliding rod 5 and the pull rod 7 are both fixedly mounted on the second hurdle 2. A plurality of blocks 10 equidistantly distributed in an array are fixedly mounted on the pull rod 7. A plurality of blocks 14 equidistantly distributed in an array are fixedly mounted on the connecting rod 13. One end of each of the blocks 10 and the blocks 14 is The bottom of the connecting rod 13 is inclined, and is fixedly connected to the pillar 9 by screws. The pillar 9 is slidably assembled inside one of the cross bars 3. The bottom end of the pillar 9 is fixedly connected to the pedal 8 by screws. Through the arrangement of the first column 1 and the second column 2 and other structures, the length of the engineering guardrail can be adjusted. When the guardrail needs to be lengthened, the first column 1 is first fixed in one place, and then the operator pulls the second column 2, and the sliding rod 5, the pulling rod 7 and the metal protective net 4 fixed on the second column 2 are all pulled outward, thereby achieving the effect of extending the length of the guardrail.

[0021] See also Figure 1-3 The bottoms of the first column 1 and the second column 2 are fixedly connected with pads 16 by bolts, and warning signs 6 are rotatably installed on the first column 1 and the second column 2. Through the arrangement of the warning sign 6 and the first column 1 and other structures, the warning sign 6 is rotatably installed on the first column 1 and the second column 2, and the warning sign 6 is provided with a construction warning slogan to remind passers-by to pay attention to safety, thereby achieving the effect of enhancing safety warnings.

[0022] See also Figure 1-3A slide groove 15 is opened inside one of the cross bars 3, and the pull rod 7 is slidably connected inside the slide groove 15. Several blocks 10 are located inside the slide groove 15. A movable groove 12 is opened inside one of the cross bars 3, and a connecting rod 13 is slidably connected inside the movable groove 12. Two symmetrically arranged springs 11 are connected to the connecting rod 13, and the other ends of the two springs 11 are welded to the bottom wall of the movable groove 12. A straight groove is opened inside one of the cross bars 3, and the slide rod 5 is slidably connected inside the straight groove. A pull groove is opened inside the other cross bar 3, and the pillar 9 is slidably connected inside the pull groove. Metal protective nets 4 are fixedly provided on the first column 1 and the second column 2, and the two metal protective nets 4 are staggered.

[0023] The specific implementation process of the utility model is as follows: During construction, it is necessary to place a guardrail outside the construction site. The patent sets a guardrail with adjustable length. When the guardrail is used, if the guardrail protection length needs to be adjusted, first fix the first fence post 1 at the specified position, and then the operator pulls the second fence post 2, and pulls the second fence post 2 to the side away from the first fence post 1, and drives the sliding rod 5 and the pull rod 7 to move together with the second fence post 2. The block 10 set on the pull rod 7 squeezes the inclined surface on the stopper 14 through the inclined surface, and the stopper 14 drives the connecting rod 13 to retract downward at the same time. After the degree adjustment is completed, the second fence post 2 is no longer pulled. At this time, the two springs 11 set on the connecting rod 13 push the connecting rod 13 and the plurality of blocks 14 to reset. At this time, the block 14 is inserted into the middle of the plurality of blocks 10 to form a limit to prevent the second fence post 2 from sliding and shrinking. When it needs to be retracted and reset after use, an operator needs to step on the pedal 8 with his foot, and at the same time drive the connecting rod 13 and the block 14 to move downward together through the support 9. At this time, the block 14 no longer forms a limiting effect on the block 10, and then another staff member pushes the second fence post 2 towards the first fence post 1.

[0024] In addition, warning signs 6 are rotated on the first and second fence posts 1 and 2, and batteries are arranged inside the warning signs 6. The function of the batteries is to ensure that a good warning effect can be achieved during nighttime construction. At the same time, the warning signs 6 can be rotated to adjust the angle.

[0025] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A construction engineering guardrail, comprising a first guardrail post (1) and a second guardrail post (2), characterized in that: One side of the first fence post (1) is fixedly connected to two symmetrically arranged cross bars (3) by bolts, wherein a sliding rod (5) is slidably mounted inside one of the cross bars (3), and a pull rod (7) and a connecting rod (13) are slidably mounted inside the other cross bar (3), respectively; the sliding rod (5) and the pull rod (7) are both fixedly mounted on the second fence post (2), and a plurality of equidistantly distributed card blocks (10) are fixedly mounted on the pull rod (7). A plurality of array-equidistantly distributed stoppers (14) are fixedly arranged on the connecting rod (13); one end of the block (10) and the stopper (14) are both inclined; the bottom of the connecting rod (13) is fixedly connected to a support (9) by screws; the support (9) is slidably assembled inside one of the cross bars (3); and the bottom end of the support (9) is fixedly connected to a pedal (8) by screws.

2. A construction engineering guardrail according to claim 1, characterized in that: The bottoms of the first fence post (1) and the second fence post (2) are both fixedly connected with cushion blocks (16) by means of bolts, and warning signs (6) are rotatably mounted on the first fence post (1) and the second fence post (2).

3. A construction engineering guardrail according to claim 1, characterized in that: A slide groove (15) is provided inside one of the cross bars (3), the pull rod (7) is slidably connected inside the slide groove (15), and a plurality of the clamping blocks (10) are located inside the slide groove (15).

4. A construction engineering guardrail according to claim 1, characterized in that: A movable groove (12) is provided inside one of the cross bars (3), and the connecting rod (13) is slidably connected inside the movable groove (12). Two symmetrically arranged springs (11) are connected to the connecting rod (13), and the other ends of the two springs (11) are welded to the bottom wall of the movable groove (12).

5. A construction engineering guardrail according to claim 1, characterized in that: A linear groove is provided inside one of the cross bars (3), and the slide bar (5) is slidably connected inside the linear groove; a pull groove is provided inside the other cross bar (3), and the support (9) is slidably connected inside the pull groove.

6. A construction engineering guardrail according to claim 1, characterized in that: The first fence post (1) and the second fence post (2) are both fixedly provided with metal protection nets (4), and the two metal protection nets (4) are staggered.

Citation Information

Patent Citations

  • Building engineering guardrail

    CN206337896U