Multifunctional lifting appliance suitable for lifting arch building
By designing multi-functional spreaders and using various types of lower lifting lugs and steel wire ropes, the problem of frequent replacement of spreaders during the installation of the arch bridge superstructure was solved, achieving the effect of saving materials and construction period.
Patent Information
- Application Number
- CN202420604948.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-27
- Publication Date
- 2025-01-24
- Estimated Expiration
- 2034-03-27
AI Technical Summary
During the installation of the superstructure of the arch bridge, the spreader needs to be replaced frequently, resulting in increased material costs and increased construction periods.
A multi -function sink includes a pourage beam, a variety of types of downhill and wire rope. By setting up columns, hats, hoods, steel beams, and bridge panel hanging ears on the skeleton beams. The same poured beam can have a variety of hanging functions.
It enables the same spreader to hoist different types of arch buildings, reduces the number of welding beams of the spreader, avoids the problem of frequent replacement of spreaders, and saves materials and construction period.
Smart Images

Figure CN222389369U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of bridge construction, and in particular relates to a multifunctional hoist suitable for hoisting buildings on arches. Background Art
[0002] Arch structures are structures that transmit force or fill between the deck and the arch ring of a top-supported arch bridge, so that the bridge deck road meets driving requirements and ensures that vehicles can drive smoothly on the bridge deck. Due to the variety of arch structures, the hoisting equipment needs to be replaced frequently during the installation of the arch bridge superstructure, resulting in increased material costs and longer construction periods. Utility Model Content
[0003] The utility model aims to provide a multifunctional hoist suitable for hoisting buildings on arches, so as to overcome the above technical defects.
[0004] In order to solve the above technical problems, the utility model provides a multifunctional hoist suitable for hoisting buildings on arches, comprising:
[0005] Spreader beam;
[0006] Lower lifting lugs, wherein a plurality of lower lifting lugs are arranged on the lower surface of the sling beam, and the spacing between two adjacent lower lifting lugs is the same or different;
[0007] Steel wire rope is hung on the lower lifting lug to lift the arch onto the building.
[0008] The plurality of lower lifting eyes include at least:
[0009] Column lifting lugs;
[0010] Cap beam lugs;
[0011] Steel beam lifting lugs;
[0012] Bridge deck lifting lugs.
[0013] A lower lifting eye is installed at the midpoint of the hanger beam along the length direction of the hanger beam, and the lower lifting eye serves as a bridge deck lifting eye or a cap beam lifting eye;
[0014] A median perpendicular line is drawn through the midpoint of the hanger beam, and two bridge deck lifting ears are installed on the lower surface of the hanger beam. The two bridge deck lifting ears are symmetrically arranged about the median perpendicular line.
[0015] Four column lifting ears are mounted on the lower surface of the spreader beam;
[0016] The four column lifting ears are arranged symmetrically about the perpendicular midline of the sling beam.
[0017] Four steel beam lifting lugs are mounted on the lower surface of the spreader beam;
[0018] The four steel beam lifting eyes are arranged symmetrically about the perpendicular midline of the hanger beam.
[0019] Between the two steel beam lifting ears on the same side of the mid-perpendicular line is a bridge deck lifting ear and two column lifting ears;
[0020] The two column hanging ears are adjacent;
[0021] One of the beam lifting lugs is located near the end of the spreader beam.
[0022] Two upper lifting lugs are mounted on the upper surface of the spreader beam;
[0023] The upper lifting lug is welded with a stiffening plate.
[0024] A shackle is installed on the lower lifting lug;
[0025] The wire rope is hooked to the lower lifting eye through a shackle.
[0026] The utility model provides a multifunctional hoist suitable for hoisting buildings on arches. By arranging a variety of lifting ears on the hoist beam, the same hoist beam can have the functions of hoisting columns, cap beams, steel beams and bridge decks. Compared with the prior art, the utility model can realize the hoisting of buildings on different arches only by replacing the lifting ears, reducing the number of welding of hoist beams when hoisting buildings on arches in the prior art, avoiding the problem of frequent replacement of hoists when hoisting buildings on arches, and saving materials and construction time.
[0027] In order to make the above contents of the present invention more clearly understood, preferred embodiments are given below and described in detail in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 This is a front view of a multifunctional lifting device suitable for lifting buildings on arches (rotated 90 degrees to the left).
[0029] Figure 2 It is a side view of a multifunctional lifting device suitable for lifting buildings on arches.
[0030] Figure 3 This is an application diagram of a multifunctional hoist for lifting steel beams.
[0031] Figure 4 This is an application diagram of a multifunctional hoisting device for lifting bridge decks.
[0032] Figure 5 This is an application diagram of a multifunctional sling for lifting cap beams.
[0033] Description of reference numerals:
[0034] 10. Upper lifting lug;
[0035] 20. Spreader beam;
[0036] 30. Lower lifting lug; 31. Column lifting lug; 32. Cap beam lifting lug; 33. Steel beam lifting lug; 34. Bridge deck lifting lug;
[0037] 40. Shackle;
[0038] 50. Wire rope. DETAILED DESCRIPTION
[0039] The following is an explanation of the implementation of the present invention by means of specific embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification.
[0040] It should be noted that, in the present utility model, the up, down, left and right in the figure are regarded as the up, down, left and right of the multifunctional hoist suitable for hoisting buildings on arches described in this specification.
[0041] The exemplary embodiments of the present invention are now introduced with reference to the accompanying drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. These embodiments are provided to disclose the present invention in detail and completely and to fully convey the scope of the present invention to those skilled in the art. The terms in the exemplary embodiments shown in the accompanying drawings are not intended to limit the present invention. In the accompanying drawings, the same units / elements are marked with the same reference numerals.
[0042] Unless otherwise specified, the terms (including technical terms) used herein have the commonly understood meanings to those skilled in the art. In addition, it is understood that the terms defined in commonly used dictionaries should be understood to have the same meanings as those in the context of the relevant fields, and should not be understood as idealized or overly formal meanings.
[0043] This embodiment relates to a multifunctional lifting device suitable for hoisting buildings on arches. Figure 1 and Figure 2 The multifunctional sling includes a sling beam 20, a lower sling lug 30 and a steel wire rope 50. Specifically, a plurality of lower sling lugs 30 are arranged on the lower surface of the sling beam 20, and the intervals between two adjacent lower sling lugs 30 are the same or different.
[0044] like Figure 1 As shown, the sling beam 20 is arranged along its entire length, the cable hoist is connected to the sling beam 20 through a rope, and a plurality of lower lifting ears 30 are welded to the bottom surface of the sling beam 20 at intervals. In some embodiments, the arrangement of the plurality of lower lifting ears 30 can be referred to Figure 1 .
[0045] The hanger beam 20 is a three-web box-type structure made of welded steel plates, and its length is the same as the width of a single bridge deck.
[0046] Two upper lifting ears 10 are installed on the upper surface of the hanger beam 20 . The distance between the two upper lifting ears 10 is half of the total length of the hanger beam 20 . The two upper lifting ears 10 are welded to the hanger beam 20 symmetrically about the perpendicular midline of the hanger beam 20 .
[0047] In order to enhance rigidity and ensure stability, the upper lifting lug 10 and the lower lifting lug 30 are both welded with stiffening plates.
[0048] The steel wire rope 50 is suspended on the lower lifting lug 30 to hoist the arch structure. Specifically, a shackle 40 is installed on each lower lifting lug 30, and the steel wire rope 50 is hung on the lower lifting lug 30 through the shackle 40. The length of each steel wire rope 50 is different. The final length of the steel wire rope 50 is determined by calculating the cross slope of the bridge deck to ensure that the component always remains horizontal during the hoisting process.
[0049] In addition, the arch structure includes arch columns, cap beams, steel beams, bridge decks, etc.
[0050] Depending on the type of arch structure to be hoisted, in some embodiments, refer to Figure 1 The multiple lower lifting ears 30 include at least the following four types, namely, column lifting ears 31, cap beam lifting ears 32, steel beam lifting ears 33, and bridge deck lifting ears 34.
[0051] like Figure 1 As shown, along the length direction of the hanger beam 20, a lower lifting ear 30 is installed at the midpoint thereof, and the lower lifting ear 30 is used as a bridge deck lifting ear 34 for lifting the bridge deck or a cap beam lifting ear 32 for lifting the cap beam. That is to say, the lower lifting ear 30 located at the midpoint of the hanger beam 20 can be used for lifting the bridge deck and also for lifting the cap beam. Specifically, Figure 4 The following is an application diagram for lifting bridge deck. Figure 5 The figure shows the application when hoisting the cap beam.
[0052] Please continue reading Figure 1 Along the midpoint to the end of the hanger beam 20, a steel beam lifting lug 33 for lifting the steel beam, a column lifting lug 31 for lifting the column, and a bridge deck lifting lug 34 for lifting the bridge deck are also installed on the hanger beam 20.
[0053] Please continue reading Figure 1 In some implementations, specifically, 11 lower lifting ears 30 are provided in total. According to the arch building components lifted by the lower lifting ears 30, the 11 lower lifting ears 30 are divided into column lifting ears 31 for lifting columns, cap beam lifting ears 32 for lifting cap beams, steel beam lifting ears 33 for lifting steel beams, and bridge deck lifting ears 34 for lifting bridge decks.
[0054] exist Figure 1 In the figure, the arch building to be hoisted is marked with words above each lower lifting ear 30.
[0055] The specific distribution and lifting process of the 11 lower lifting ears 30 will be described in detail below.
[0056] It should be noted that since the left and right sides of the cap beam are hoisted at the same time, Figure 5 As shown, one cap beam requires two multifunctional slings to lift it simultaneously, and at this time, the lower lifting ear 30 at the midpoint of the sling beam 20 is called the cap beam lifting ear 32.
[0057] A midpoint perpendicular line is drawn through the midpoint of the hanger beam 20. Two bridge deck lifting ears 34 are also installed on the lower surface of the hanger beam 20. The two bridge deck lifting ears 34 are arranged symmetrically about the midpoint perpendicular line. That is, a total of three bridge deck lifting ears 34 are arranged on the hanger beam 20. Figure 4 The multifunctional hoist can lift three bridge decks at the same time. In order to avoid mutual influence, Figure 4 As shown, there is a height difference between the three bridge decks, which can be achieved by adjusting the length of the steel wire rope 50 under the bridge deck lifting eye 34.
[0058] Please continue reading Figure 1 Four column ears 31 are installed on the lower surface of the hanger beam 20. The four column ears 31 are symmetrically arranged about the midpoint of the hanger beam 20. The upper ear 10 is directly above the two column ears 31 on the same side of the midpoint.
[0059] Please continue reading Figure 1 Four steel beam lifting lugs 33 are installed on the lower surface of the hanger beam 20, and the four steel beam lifting lugs 33 are symmetrically arranged about the mid-vertical line of the hanger beam 20. Figure 1 The four steel beam lifting ears 33 are numbered sequentially from left to right in the direction shown. It can be seen that the first steel beam lifting ear 33 and the fourth steel beam lifting ear 33 are located at the left and right ends of the hanger beam 20, respectively, while the second steel beam lifting ear 33 and the third steel beam lifting ear 33 are close to the midpoint of the hanger beam 20. In this way, the multifunctional hanger can ensure that the steel beam remains horizontal in the air when the steel beam is lifted. The lifting state is shown in FIG. Figure 3 .
[0060] For the distribution of the 11 lower lifting lugs 30, please continue to refer to Figure 1 Between the two steel beam hanging ears 33 on the same side of the mid-perpendicular line is a bridge deck hanging ear 34 and two column hanging ears 31, and the two column hanging ears 31 are adjacent to each other; one of the steel beam hanging ears 33 is close to the end of the hanger beam 20.
[0061] like Figure 1 As shown, the 11 lower lifting ears 30 are, from left to right, a steel beam lifting ear 33, a bridge deck lifting ear 34, two column lifting ears 31, a steel beam lifting ear 33, a bridge deck lifting ear 34 / cap beam lifting ear 32, a steel beam lifting ear 33, two column lifting ears 31, a bridge deck lifting ear 34, and a steel beam lifting ear 33.
[0062] It is worth mentioning that, in some embodiments, the length of the steel wire rope 50 corresponding to each lower hanging lug 30 is calculated by the transverse slope of the bridge deck, and the length of the steel wire rope 50 is controlled to ensure that the building component on the arch maintains a horizontal posture in the air.
[0063] The multifunctional lifting device provided in this embodiment can realize lifting various types of arch buildings with the same lifting device. Only the lower lifting ear connected to the arch building needs to be replaced, and the lifting device itself does not need to be replaced. Therefore, this embodiment solves the problem of frequent replacement of lifting devices when lifting arch buildings.
[0064] Those skilled in the art will appreciate that the above-mentioned embodiments are specific examples for implementing the present invention, and in actual applications, various changes may be made thereto in form and detail without departing from the spirit and scope of the present invention.
Claims
1. A multifunctional lifting device suitable for hoisting buildings on arches, characterized in that: include: Spreader beam (20); A lower lifting lug (30), wherein a plurality of the lower lifting lugs (30) are arranged on the lower surface of the hanger beam (20), and the spacing between two adjacent lower lifting lugs (30) is the same or different; A steel wire rope (50) is suspended from the lower lifting lug (30) to lift the building on the arch; The multifunctional lifting device can realize the lifting of various types of arch structures by the same lifting device, and only the lower lifting lug (30) connected to the arch structure needs to be replaced. The arch structure includes an arch column, a cap beam, a steel beam, and a bridge deck. According to the type of the arch structure to be lifted, the plurality of lower lifting lugs (30) include at least the following four types: a column lifting lug (31), a cap beam lifting lug (32), a steel beam lifting lug (33), and a bridge deck lifting lug (34); A lower lifting lug (30) is installed at the midpoint of the hanger beam (20) along the length direction thereof, and the lower lifting lug (30) serves as a bridge deck lifting lug (34) for lifting a bridge deck or a cap beam lifting lug (32) for lifting a cap beam; A steel beam lifting lug (33) for lifting a steel beam, a column lifting lug (31) for lifting a column, and a bridge deck lifting lug (34) for lifting a bridge deck are also installed on the hanger beam (20) from the midpoint to the end of the hanger beam (20).
2. The multifunctional lifting device suitable for hoisting buildings on arches as claimed in claim 1, characterized in that: The midpoint of the hanger beam (20) is taken as a perpendicular midline, and two bridge deck lifting ears (34) are also installed on the lower surface of the hanger beam (20), and the two bridge deck lifting ears (34) are symmetrically arranged about the perpendicular midline.
3. The multifunctional lifting device suitable for hoisting buildings on arches as claimed in claim 2, characterized in that: Four column lifting ears (31) are installed on the lower surface of the hanger beam (20); The four column lifting ears (31) are arranged symmetrically about the perpendicular midline of the hanger beam (20).
4. The multifunctional lifting device suitable for hoisting buildings on arches as claimed in claim 2 or 3, characterized in that: Four steel beam lifting ears (33) are installed on the lower surface of the hanger beam (20); The four steel beam lifting ears (33) are arranged symmetrically about the perpendicular midline of the hanger beam (20).
5. The multifunctional lifting device suitable for hoisting buildings on arches as claimed in claim 4, characterized in that: Between the two steel beam lifting ears (33) located on the same side of the mid-perpendicular line is a bridge deck lifting ear (34) and two column lifting ears (31); The two column hanging ears (31) are adjacent to each other; One of the steel beam lifting ears (33) is close to the end of the spreader beam (20).
6. The multifunctional lifting device suitable for hoisting buildings on arches as claimed in claim 1, characterized in that: Two upper lifting ears (10) are installed on the upper surface of the hanger beam (20); The upper lifting lug (10) is welded with a stiffening plate.