Portable sliding-mode road gutter apron repairing mold

By designing a portable sliding mold road flat stone repair mold, the twist spring is used to drive the flat plate to automatically smooth the concrete, solving the problem of low operating efficiency in the existing technology, and realizing efficient roads for repair.

CN222390208UActive Publication Date: 2025-01-24SHANXI JINDIYUAN GEOLOGICAL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420526650.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-19
Publication Date
2025-01-24
Estimated Expiration
2034-03-19

AI Technical Summary

Technical Problem

The existing shaping molds are inefficient in operating efficiency, require manual smoothing of concrete, and are difficult to use in portable use.

Method used

A portable slip-form road leveling stone repair mold is designed, which includes a fixed frame, a smoothing structure, a torsion spring and a water spray structure. The equipment drives the fixed frame to move, and the torsion spring drives the trowel plate to generate resistance, realizing automatic smoothing of concrete.

Benefits of technology

It improves construction efficiency, reduces manual operations, achieves uniform smoothing of concrete, and improves the efficiency of repairing curbs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222390208U_ABST
    Figure CN222390208U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of sliding-mode road gutter apron repairing, in particular to a portable sliding-mode road gutter apron repairing mold which comprises a fixing frame, a trowelling structure is connected to the fixing frame and comprises a first trowelling plate and a second trowelling plate, the two front fixing frames of the fixing frame are each sleeved with a fixing ring and a torsional spring, and the first trowelling plate and the second trowelling plate are connected with a sliding-mode road gutter apron repairing mold. A first troweling plate is welded to the fixing ring, a protruding block is fixed to the fixing frame, one end of a torsional spring is fixed to the protruding block on the fixing frame, the other end of the torsional spring abuts against the first troweling plate, a shaft sleeve is rotationally arranged at the top end of the fixing frame, and a second troweling plate is fixed to the shaft sleeve. A water spraying structure and a mounting structure are mounted on the fixing frame; the fixing frame is driven by equipment to move in the curb direction, due to the fact that one end of the torsion spring is fixed to the protruding block on the fixing frame, the other end of the torsion spring abuts against the first troweling plate, the first troweling plate generates inward abutting force, the tail of the first troweling plate abuts against concrete, the concrete is troweled, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a display device, in particular to a portable slip-form road leveling stone repair mould, belonging to the technical field of slip-form road leveling stone repair. Background Art

[0002] Curbstones are generally required between the dividing strip and the road surface, and between the sidewalk and the road surface of urban roads. Curbstones are often required at the edge of the central dividing strip of the highway, the right edge of the driving lane or the outer edge of the shoulder. When adjacent curbstones are damaged, they need to be repaired. It is necessary to fix molds on both sides of the damaged curbstone for construction, and then smooth the concrete.

[0003] However, most of the existing shaping molds are formed by splicing templates, and the concrete needs to be manually smoothed after shaping, which has low operating efficiency. Therefore, a portable slipform road leveling stone repair mold is needed. Utility Model Content

[0004] The purpose of the utility model is to provide a portable slip-form road stone repair mold in order to solve the above-mentioned problem. The fixed frame is driven by the equipment to move along the direction of the curb. Since one end of the torsion spring is fixed to the protrusion on the fixed frame, the other end of the torsion spring contacts with the first trowel plate, so that the first trowel plate generates an inward resistance force, so that the tail of the first trowel plate contacts the concrete, the concrete is smoothed, and the construction efficiency is improved.

[0005] The utility model achieves the above-mentioned purpose through the following technical scheme: a portable slipform road stone repair mold, including a fixed frame, a smoothing structure connected to the fixed frame, the smoothing structure including a first smoothing plate and a second smoothing plate, the front two fixed frames of the fixed frame are both sleeved with a fixing ring and a torsion spring, the first smoothing plate is welded on the fixing ring, a protrusion is fixed on the fixed frame, one end of the torsion spring is fixed on the protrusion on the fixed frame, and the other end of the torsion spring is in contact with the first smoothing plate, a shaft sleeve is rotatably provided at the top end of the fixed frame, and the second smoothing plate is fixed on the shaft sleeve; a water spraying structure and a mounting structure are installed on the fixed frame.

[0006] Preferably, a spring is fixed to the top end of the second trowel plate, an end of the spring contacts with a baffle, and the baffle is fixedly connected to the mounting plate.

[0007] Preferably, the tails of the first trowel plate and the second trowel plate are spread outward, and the tail of the first trowel plate is located at the bottom end of the second trowel plate.

[0008] Preferably, the mounting structure comprises a mounting plate, the top end of the fixing frame is fixed with the mounting plate, and the vertical section of the mounting plate is in an inverted U shape.

[0009] Preferably, the mounting structure further comprises a waist-shaped groove, and a plurality of waist-shaped grooves are provided on the mounting plate.

[0010] Preferably, the water spray structure comprises two first spray heads, a second spray head and a third spray head, the two first spray heads are obliquely mounted on the fixing frame, and the second spray head and the third spray head are respectively mounted on the two first trowel plates.

[0011] Preferably, the water spray structure further includes a hose, and the first nozzle, the second nozzle and the third nozzle are all equipped with a hose.

[0012] Preferably, the water spray structure further includes an anti-detachment cover, and the four hoses are all connected to the anti-detachment cover.

[0013] Preferably, a nut is threadedly connected to the bottom end of the fixing frame, and the nut is located at the bottom end of the fixing frame.

[0014] The beneficial effects of the utility model are as follows: the two front fixing frames of the fixing frame are both provided with fixing rings and torsion springs, the fixing rings are welded with a first trowel plate, a convex block is fixed on the fixing frame, a shaft sleeve is rotatably provided at the top end of the fixing frame, a second trowel plate is fixed on the shaft sleeve, the first trowel plate and the second trowel plate can serve as side molds of the curb stone, and when the concrete pouring is completed, the fixing frame is driven by the equipment to move in the direction of the curb stone, because one end of the torsion spring is fixed on the convex block on the fixing frame, and the other end of the torsion spring contacts with the first trowel plate, thereby making the first trowel plate generate an inward contact force, making the tail of the first trowel plate contact with the concrete, smoothing the concrete, and improving the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0016] Figure 2 It is a rear view of the utility model;

[0017] Figure 3 for Figure 2 An enlarged schematic diagram of part A is shown;

[0018] Figure 4 It is a left view of the utility model.

[0019] In the figure: 1. fixing frame; 2. leveling structure; 201. first leveling plate; 202. second leveling plate; 3. torsion spring; 4. fixing ring; 5. water spraying structure; 501. anti-drop cover; 502. first nozzle; 503. hose; 504. second nozzle; 505. third nozzle; 6. bushing; 7. mounting structure; 701. mounting plate; 702. waist-shaped groove; 8. baffle; 9. spring; 10. nut; 11. bump. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] See also Figure 1-Figure 4 As shown, a portable slipform road stone repair mold comprises a fixing frame 1, to which a smoothing structure 2 is connected, and the smoothing structure 2 comprises a first smoothing plate 201 and a second smoothing plate 202. The front two fixing frames 1 of the fixing frame 1 are both provided with a fixing ring 4 and a torsion spring 3, and the first smoothing plate 201 is welded on the fixing ring 4. A protrusion 11 is fixed on the fixing frame 1, and one end of the torsion spring 3 is fixed on the protrusion 11 on the fixing frame 1, and the other end of the torsion spring 3 is in contact with the first smoothing plate 201. A shaft sleeve 6 is rotatably provided at the top end of the fixing frame 1, and the second smoothing plate 202 is fixed on the shaft sleeve 6; a water spraying structure 5 and a mounting structure 7 are installed on the fixing frame 1; the overall height and position are adjusted by moving equipment, and the two first smoothing plates 201 are moved to both sides of the damaged curbstone during construction, and then concrete is poured.

[0022] As a technical optimization scheme of the utility model, a spring 9 is fixed on the top of the second trowel plate 202, and the end of the spring 9 is in conflict with the baffle plate 8, and the baffle plate 8 is fixedly connected to the mounting plate 701; the tails of the first trowel plate 201 and the second trowel plate 202 are opened outward, and the tail of the first trowel plate 201 is at the bottom of the second trowel plate 202; the fixed frame 1 is driven by the equipment to move along the direction of the curbstone, because one end of the torsion spring 3 is fixed on the protrusion 11 on the fixed frame 1, and the other end of the torsion spring 3 is in conflict with the first trowel plate 201, so that the first trowel plate 201 generates an inward resistance force, so that the tail of the first trowel plate 201 is in conflict with the concrete, and the spring 9 is in conflict with the second trowel plate 202, so that the second trowel plate 202 is in conflict with the top surface of the concrete, and the concrete is smoothed, thereby improving the construction efficiency. At the same time, the tails of the first trowel plate 201 and the second trowel plate 202 are opened outward, so that the tails of the first trowel plate 201 and the second trowel plate 202 are in contact with the concrete, so that the smoothing effect is better.

[0023] As a technical optimization solution of the present utility model, the mounting structure 7 includes a mounting plate 701, and the mounting plate 701 is fixed to the top of the fixing frame 1, and the vertical section of the mounting plate 701 is an inverted U shape; the mounting structure 7 also includes a waist-shaped groove 702, and a plurality of waist-shaped grooves 702 are provided on the mounting plate 701; the bolts are passed through the waist-shaped grooves 702, so that the mounting plate 701 is installed on the mobile device by bolts.

[0024] As a technical optimization scheme of the utility model, the water spray structure 5 includes two first nozzles 502, a second nozzle 504 and a third nozzle 505, the two first nozzles 502 are obliquely installed on the fixed frame 1, and the second nozzle 504 and the third nozzle 505 are respectively installed on the two first trowel plates 201; the water spray structure 5 also includes a hose 503, and the first nozzle 502, the second nozzle 504 and the third nozzle 505 are all installed with the hose 503; the water spray structure 5 also includes an anti-detachment cover 501, and the four hoses 503 are all connected to the anti-detachment cover 501; before leveling, the anti-detachment cover 501 is threadedly connected to the water outlet of an external water pump, the water pump injects water into the anti-detachment cover 501, and the water flows from the hose 503 into the first nozzle 502, the second nozzle 504 and the third nozzle 505, and then is evenly sprayed on the concrete surface, thereby improving the smoothness of the leveling.

[0025] As a technical optimization solution of the utility model, the bottom end of the fixing frame 1 is threadedly connected with a nut 10, and the nut 10 is located at the bottom end of the fixing frame 1; when the first wiping plate 201 needs to be removed, the nut 10 is rotated and removed so that the nut 10 does not block the fixing ring 4, thereby making disassembly more convenient.

[0026] When the utility model is in use, the bolts are passed through the waist-shaped grooves 702, so that the mounting plate 701 is installed on the mobile device through the bolts, and the overall height and position are adjusted by the mobile device. During the construction process, the two first trowel plates 201 are moved to the two sides of the damaged curbstone, and then concrete is poured. After the concrete pouring is completed, the fixed frame 1 is driven by the equipment to move along the direction of the curbstone. Since one end of the torsion spring 3 is fixed to the protrusion 11 on the fixed frame 1, the other end of the torsion spring 3 contacts the first trowel plate 201, so that the first trowel plate 201 generates an inward resistance force, so that the tail of the first trowel plate 201 contacts the concrete, and the spring 9 contacts the second trowel plate 202, so that the second trowel plate 202 contacts the top of the concrete The surface of the concrete is smoothed, which improves the construction efficiency. At the same time, the tails of the first and second trowel plates 201 and 202 are opened outward, so that the tails of the first and second trowel plates 201 and 202 are in contact with the concrete, so that the smoothing effect is better; before smoothing, the anti-detachment cover 501 is threadedly connected to the water outlet of the external water pump, and the water pump injects water into the anti-detachment cover 501, and the water flows from the hose 503 into the first nozzle 502, the second nozzle 504 and the third nozzle 505, and then is evenly sprayed on the concrete surface, which improves the smoothness of the smoothing; when it is necessary to disassemble the first trowel plate 201, the nut 10 is turned and the nut 10 is removed so that the nut 10 does not block the fixing ring 4, thereby making the disassembly more convenient.

[0027] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

[0028] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A portable slipform road stone repair mould, comprising a fixing frame (1), characterized in that: The fixing frame (1) is connected to a smoothing structure (2), the smoothing structure (2) comprising a first smoothing plate (201) and a second smoothing plate (202), the two front fixing frames (1) of the fixing frame (1) are sleeved with a fixing ring (4) and a torsion spring (3), the fixing ring (4) is welded with the first smoothing plate (201), a convex block (11) is fixed to the fixing frame (1), one end of the torsion spring (3) is fixed to the convex block (11) on the fixing frame (1), and the other end of the torsion spring (3) is in contact with the first smoothing plate (201), a shaft sleeve (6) is rotatably provided at the top end of the fixing frame (1), and the second smoothing plate (202) is fixed to the shaft sleeve (6); a water spraying structure (5) and a mounting structure (7) are installed on the fixing frame (1).

2. A portable slipform road stone repair mold according to claim 1, characterized in that: The mounting structure (7) comprises a mounting plate (701), the top end of the fixing frame (1) is fixed with the mounting plate (701), and the vertical section of the mounting plate (701) is in an inverted U shape.

3. A portable slipform paving stone repair mold according to claim 1, characterized in that: The tails of the first trowel plate (201) and the second trowel plate (202) are spread outwards, and the tail of the first trowel plate (201) is located at the bottom end of the second trowel plate (202).

4. A portable slipform paving stone repairing mold according to claim 2, characterized in that: A spring (9) is fixed to the top end of the second trowel plate (202), and the end of the spring (9) contacts the baffle plate (8), and the baffle plate (8) is fixedly connected to the mounting plate (701).

5. A portable slipform paving stone repairing mold according to claim 4, characterized in that: The mounting structure (7) further comprises a waist-shaped groove (702), and a plurality of waist-shaped grooves (702) are provided on the mounting plate (701).

6. A portable slipform paving stone repairing mold according to claim 1, characterized in that: The water spray structure (5) comprises two first spray heads (502), a second spray head (504) and a third spray head (505); the two first spray heads (502) are obliquely mounted on the fixed frame (1); and the second spray head (504) and the third spray head (505) are respectively mounted on the two first trowel plates (201).

7. A portable slipform paving stone repairing mold according to claim 6, characterized in that: The water spray structure (5) further comprises a hose (503), and the first spray head (502), the second spray head (504) and the third spray head (505) are all equipped with the hose (503).

8. A portable slipform paving stone repairing mold according to claim 7, characterized in that: The water spray structure (5) further comprises an anti-detachment cover (501), and the four hoses (503) are all connected to the anti-detachment cover (501).

9. The portable slipform paving stone repairing mold according to claim 1, characterized in that: The bottom end of the fixing frame (1) is threadedly connected with a nut (10), and the nut (10) is located at the bottom end of the fixing frame (1).