Bridge construction protection hanging basket

By designing a bridge construction protective hanging basket made of hollow steel pipes, combined with the pulley design, the hanging basket can move along the length of the bridge, which solves the existing problems of difficulty in moving the hanging basket and the narrow construction working surface, and achieves greater protection of the outside of the bridge. Convenience of scope construction.

CN222390244UActive Publication Date: 2025-01-24GUANGZHOU EXPRESSWAY CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420935929.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-29
Publication Date
2025-01-24
Estimated Expiration
2034-04-29

AI Technical Summary

Technical Problem

The existing bridge construction hanging baskets are difficult to move due to the counterweight mechanism and the construction surface is small, making it difficult to achieve a large-scale construction on the outside of the bridge.

Method used

Design a bridge construction protective hanging basket, using the protective column, protective beams and connecting rods of hollow steel pipe materials, combined with the design of the horizontal pulley, top pulley and bottom pulley, so that the hanging basket can move along the length of the bridge and expand the operating space Essence

Benefits of technology

Through the design of the mobile hanging basket, the construction work surface is expanded to facilitate the construction personnel to carry out a large range of construction on the outside of the bridge. At the same time, due to the selection of materials and structural design, the hanging basket is easier to move, reducing the difficulty of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222390244U_ABST
    Figure CN222390244U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of construction tools, in particular to a bridge construction protection hanging basket which comprises a hanging basket bottom plate, a protection stand column, a protection cross beam and a connecting hanging rod, the protection stand column is installed on the hanging basket bottom plate in the vertical direction, and the protection cross beam is installed on the protection stand column; the hanging basket bottom plate, the protection stand columns and the protection cross beams define an operation space. The connecting hanging rod is installed at the top of the protective stand column in the horizontal direction, the connecting hanging rod is rotationally matched with a transverse pulley and a top pulley, the rotating axis of the transverse pulley is arranged in the vertical direction, and the rotating axis of the top pulley is arranged in the horizontal direction; bottom pulleys are arranged at the bottoms of the protection stand columns in a running fit mode, and the rotating axes of the bottom pulleys are arranged in the vertical direction. The protective stand columns, the protective cross beams and the connecting hanging rods are all made of hollow steel pipes. The construction method has the effect that the construction working face is enlarged, so that constructors can conveniently construct the outer side of the bridge.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of construction tools, and in particular to a protective hanging basket for bridge construction. Background Art

[0002] After the main structure of the bridge is completed, it is usually necessary to carry out construction on the outside of the bridge, such as steel bar formwork construction, construction joint repair, and bridge electromechanical installation. When carrying out construction on the outside of the bridge, a hanging basket is needed to provide a safe construction platform for the construction workers.

[0003] In the existing related technologies, a hanging basket is usually recorded as described in the utility model announcement number CN 219260750 U, which is named "A bridge side construction hanging basket", including a counterweight mechanism, a connecting rod, a ladder and a hanging basket. The counterweight mechanism is arranged on the inner side of the bridge deck guardrail and connecting rods extending to the outer side of the bridge deck guardrail are installed on both sides of the top of the counterweight mechanism. The extended end of the connecting rod is installed with a ladder and the hanging basket is installed on the ladder.

[0004] The utility model is provided with a connecting rod installed on the top of the counterweight mechanism, a ladder installed on the connecting rod, and a hanging basket installed on the ladder. When in use, the installation position of the device needs to be determined according to the specific conditions of the bridge construction, and then the counterweight mechanism is assembled and placed inside the bridge deck guardrail. The ladder and the hanging basket are located outside the bridge deck guardrail, and the staff can enter the hanging basket through the ladder to carry out construction. Compared with traditional hanging basket equipment, this device occupies less space, is convenient to construct, and is easy to install.

[0005] With regard to the above-mentioned related technologies, the counterweight mechanism makes the weight of the hanging basket heavy and difficult to move, and the construction work surface is narrow, making it difficult for construction workers to carry out large-scale construction on the outside of the bridge. Summary of the invention

[0006] In order to expand the construction working area and thus facilitate construction workers to construct the outer side of the bridge, the present application provides a bridge construction protective hanging basket.

[0007] The present application provides a bridge construction protection hanging basket adopts the following technical solution:

[0008] A bridge construction protection hanging basket, comprising a hanging basket bottom plate, a protection column, a protection beam and a connecting hanging rod, wherein the protection column is installed on the hanging basket bottom plate in a vertical direction, the protection beam is installed on the protection column, and the hanging basket bottom plate, the protection column and the protection beam are surrounded to form a working space, and the working space is used to accommodate construction personnel;

[0009] The connecting rod is installed on the top of the protective column in the horizontal direction, and the connecting rod is rotatably matched with a transverse pulley and a top pulley, the rotation axis of the transverse pulley is arranged in the vertical direction, and the rotation axis of the top pulley is arranged in the horizontal direction; the bottom of the protective column is rotatably matched with a bottom pulley, and the rotation axis of the bottom pulley is arranged in the vertical direction;

[0010] The materials of the protective columns, protective beams and connecting hanging rods are all hollow steel pipes.

[0011] By adopting the above technical solution, when the bridge construction protection basket is hung on the bridge guardrail and needs to be moved, the bridge construction protection basket is pushed to make the transverse pulley, the top pulley and the bottom pulley roll along the length direction of the bridge, thereby making the working cavity accommodating the construction personnel move along the length direction of the bridge, thereby expanding the construction working surface and facilitating the construction personnel to carry out a larger range of construction on the outside of the bridge.

[0012] In addition, the materials selected for the protective columns, protective beams and connecting hanging rods are hollow steel pipes, which not only ensure the strength but also reduce the dead weight of the structure, making the bridge construction protective hanging basket easier for construction workers to push, thereby further facilitating the movement of the bridge construction protective hanging basket.

[0013] Optionally, a guardrail is also included, and the guardrail is installed on the top of the connecting hanging rod.

[0014] By adopting the above technical solution, after the bridge construction protective hanging basket is hung on the bridge guardrail, the construction workers enter the working space by holding the protective railing located at the top of the connecting hanging rod, which is conducive to ensuring the safety of the construction workers when entering the working space.

[0015] Optionally, the bottom plate of the hanging basket is provided with a plurality of bottom plate mesh holes, and the plurality of bottom plate mesh holes are all arranged through.

[0016] By adopting the above technical solution, on the one hand, the bottom plate mesh reduces the weight of the bottom plate of the hanging basket, and on the other hand, the bottom plate mesh facilitates airflow to pass through, thereby reducing the occurrence of shaking of the bridge construction protection hanging basket under the action of wind.

[0017] Optionally, a wire mesh is arranged around the bottom of the protective column, and the bottom plate of the hanging basket is located in the area surrounded by the wire mesh.

[0018] By adopting the above technical solution, on the one hand, the wire mesh makes it difficult for construction workers to step out of the bottom plate of the hanging basket during construction, and on the other hand, it is also convenient for construction workers to temporarily place construction tools on the bottom plate of the hanging basket.

[0019] Optionally, the height of the wire mesh is greater than or equal to 500 mm.

[0020] By adopting the above technical solution, construction workers need to lift their calves to cross the wire mesh with a height greater than or equal to 500 mm, which makes it more difficult for construction workers to step out of the bottom plate of the hanging basket during construction, which is conducive to further ensuring the safety of construction workers.

[0021] Optionally, a plurality of the protective beams are distributed in the vertical direction, and a vertical distance between two adjacent protective beams is greater than 200 mm and less than 300 mm.

[0022] By adopting the above technical solution, the protective beam with a distance size greater than 200mm and less than 300mm, on the one hand, makes it convenient for construction workers to extend their hands out of the working space, thereby facilitating construction workers to carry out construction on the outside of the bridge; on the other hand, it is also convenient for construction workers to use the protective beam as a ladder to enter or leave the working space.

[0023] Optionally, the bottom pulley is arranged in a spindle shape.

[0024] By adopting the above technical solution, the outer bottom of the bridge is usually provided with an inclined surface, and the spindle-shaped bottom pulley is easier to effectively contact the inclined surface on the outer side of the bridge, thereby ensuring that the bottom pulley rolls stably along the bridge.

[0025] Optionally, the length of the connecting rod is greater than or equal to 500 mm.

[0026] By adopting the above technical solution, the connecting hanging rod with a length greater than or equal to 500 mm allows the construction workers to maintain a distance from the outer side of the bridge, thereby facilitating the construction workers to operate construction tools.

[0027] In summary, the present application includes at least one of the following beneficial technical effects:

[0028] 1. When the bridge construction protection hanging basket is hung on the bridge guardrail and needs to be moved, the bridge construction protection hanging basket is pushed to make the transverse pulley, the top pulley and the bottom pulley roll along the length direction of the bridge, thereby making the working cavity accommodating the construction personnel move along the length direction of the bridge, thereby expanding the construction working surface and facilitating the construction personnel to carry out a larger range of construction on the outside of the bridge.

[0029] In addition, the materials selected for the protective columns, protective beams and connecting hanging rods are hollow steel pipes, which not only ensure the strength but also reduce the dead weight of the structure, making the bridge construction protective hanging basket easier for construction workers to push, thereby further facilitating the movement of the bridge construction protective hanging basket.

[0030] 2. After the bridge construction protection hanging basket is hung on the bridge guardrail, the construction workers enter the working space by holding the guardrail located at the top of the connecting hanging rod, which is conducive to ensuring the safety of the construction workers when entering the working space.

[0031] 3. On the one hand, the wire mesh makes it difficult for construction workers to step out of the bottom plate of the hanging basket during the construction process. On the other hand, it is also convenient for construction workers to temporarily place construction tools on the bottom plate of the hanging basket. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is an overall schematic diagram of the overall structure of the embodiment of the present application.

[0033] Figure 2 It is a partial schematic diagram of the overall structure of the embodiment of the present application.

[0034] Figure 3 It is a cross-sectional schematic diagram of the protective column according to the embodiment of the present application.

[0035] Explanation of the accompanying reference numerals: 1. bottom plate of the hanging basket; 101. mesh of the bottom plate; 102. working window; 103. working space; 11. bending part of the bottom plate; 2. protective column; 21. wire mesh; 22. bottom pulley; 3. protective beam; 4. connecting hanging rod; 41. horizontal pulley; 42. top pulley; 5. protective railing. DETAILED DESCRIPTION

[0036] The following is combined with Figure 1-3 This application is described in further detail.

[0037] The present application embodiment discloses a bridge construction protection hanging basket. Figure 1 and Figure 2 The bridge construction protection hanging basket includes a hanging basket bottom plate 1, a protection column 2, a protection beam 3, a connecting hanging rod 4 and a protection railing 5.

[0038] Reference Figure 2 A plurality of bottom plate mesh holes 101 are arranged through the bottom plate 1 of the hanging basket, and the plurality of bottom plate mesh holes 101 are distributed in a grid shape, and the plurality of bottom plate mesh holes 101 are arranged through the thickness direction of the hanging basket bottom plate 1, so as to reduce the weight of the hanging basket bottom plate 1 and reduce the occurrence of shaking of the hanging basket bottom plate 1 under the action of wind force, especially wind force from bottom to top.

[0039] Reference Figure 2 The bottom plate 1 of the hanging basket is provided with a bottom plate bending portion 11, and in the embodiment of the present application, two bottom plate bending portions 11 are provided, and the two bottom plate bending portions 11 are arranged far away from each other. The height of the bottom plate bending portion 11 is greater than or equal to 150 mm, so as to block the feet of the construction workers so that the construction workers are not likely to step on empty space.

[0040] Reference Figure 2In the embodiment of the present application, the number of protective columns 2 is set to four, and the four protective columns 2 are distributed in a rectangular shape. The protective columns 2 are arranged in the vertical direction, and the bottom of the protective columns 2 is fixedly connected to the bottom plate 1 of the hanging basket, and the height of the protective columns 2 is greater than or equal to 2000 mm. In addition, an operation window 102 is opened between the two protective columns 2, and the operation window 102 is arranged near the bending portion 11 of the bottom plate. When the bridge construction protective hanging basket is hung on the bridge guardrail, the operation window 102 is set toward the bridge. The height of the operation window 102 is greater than 500 mm and less than 1500 mm, so as to ensure that the operation window 102 provides sufficient space for construction personnel to move around and makes it difficult for construction personnel to slip and fall from the operation window 102.

[0041] Reference Figure 2 , there are several protective beams 3, and several protective beams 3 are arranged in the vertical direction. The protective beams 3 are fixedly installed on the protective columns 2 in the horizontal direction, and the bottom plate 1 of the hanging basket, the protective columns 2 and the protective beams 3 are surrounded to form a working space 103 for accommodating construction personnel. The working space 103 is connected to the working window 102, so that construction personnel are not likely to fall from the working space 103. The vertical distance between two adjacent protective beams 3 is 200mm and less than 300mm, so that construction personnel can stretch their hands out of the working space 103, and it is convenient for construction personnel to use the protective beams 3 as ladders.

[0042] Reference Figure 1 and Figure 2 A wire mesh 21 is fixed around the bottom of the protective column 2, the basket bottom plate 1 is located in the area enclosed by the wire mesh 21, and the height of the wire mesh 21 is greater than or equal to 500 mm, so that it is not easy for construction workers to step out of the basket bottom plate 1 during the construction process, and it is also convenient for construction workers to temporarily place construction tools on the basket bottom plate 1.

[0043] Reference Figure 2 In the embodiment of the present application, the number of the connecting rod 4 and the guardrail 5 is set to two, and the two connecting rods 4 and the two guardrails 5 are set one by one. The connecting rod 4 is set in the horizontal direction, and one end of the connecting rod 4 is integrally connected to the top of the guard column 2, and the length of the connecting rod 4 is greater than or equal to 500mm. In addition, referring to Figure 2 and Figure 3 , the materials of the protective column 2, the protective beam 3 and the connecting hanging rod 4 are all hollow steel pipes. Specifically, in the embodiment of the present application, the materials of the protective column 2, the protective beam 3 and the connecting hanging rod 4 are hollow round galvanized steel pipes, so as to reduce the weight of the bridge construction protective hanging basket while ensuring the strength.

[0044] The guardrail 5 is located at the top of the connecting rod 4 and the guard column 2, and the two ends of the guardrail 5 are respectively installed on the connecting rod 4 and the guardrail 5, so that construction workers can enter the working space 103 by holding the guardrail 5, thereby ensuring the safety of the construction workers when entering the working space 103.

[0045] Reference Figure 2 The end of the connecting rod 4 away from the protective column 2 is rotatably matched with a transverse pulley 41 and a top pulley 42. The rotation axis of the transverse pulley 41 is set in the vertical direction, and the rotation axis of the top pulley 42 is set in the horizontal direction. The transverse pulley 41 and the top pulley 42 are both set in a cylindrical shape to fit the flat surface of the bridge guardrail. The bottom of the protective column 2 is rotatably matched with a bottom pulley 22. The rotation axis of the bottom pulley 22 is set in the vertical direction, and the bottom pulley 22 is set in a spindle shape to fit the inclined surface outside the bridge.

[0046] The implementation principle of a bridge construction protection hanging basket in the embodiment of the present application is:

[0047] S1. Hang the bridge construction protection hanging basket on the bridge guardrail to ensure that the transverse pulley 41, the top pulley 42 and the bottom pulley 22 are tightly fitted on the outside of the bridge.

[0048] S2. The construction worker hangs the safety rope on the guardrail 5 and climbs into the working space 103 along the guard beam 3.

[0049] S3. According to construction needs, push the bridge construction protection hanging basket so that the bridge construction protection hanging basket slides along the length direction of the bridge guardrail to the required construction position.

[0050] Therefore, the present application reduces the resistance during the movement of the bridge construction protection basket through the transverse pulley 41, the top pulley 42 and the bottom pulley 22, and also reduces the weight of the bridge construction protection basket by selecting the protection column 2, the protection beam 3 and the connecting hanging rod 4 as hollow steel pipes, making the bridge construction protection basket easier to move, expanding the construction work surface, and facilitating construction personnel to construct the outside of the bridge.

[0051] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A bridge construction protection hanging basket, characterized by: The invention comprises a hanging basket bottom plate (1), a protective column (2), a protective crossbeam (3) and a connecting hanging rod (4), wherein the protective column (2) is mounted on the hanging basket bottom plate (1) in a vertical direction, and the protective crossbeam (3) is mounted on the protective column (2), and the hanging basket bottom plate (1), the protective column (2) and the protective crossbeam (3) are arranged to form a working space (103), and the working space (103) is used to accommodate construction personnel; The connecting rod (4) is installed on the top of the protective column (2) in the horizontal direction, and the connecting rod (4) is rotatably matched with a transverse pulley (41) and a top pulley (42), the rotation axis of the transverse pulley (41) is arranged in the vertical direction, and the rotation axis of the top pulley (42) is arranged in the horizontal direction; the bottom of the protective column (2) is rotatably matched with a bottom pulley (22), and the rotation axis of the bottom pulley (22) is arranged in the vertical direction; The materials of the protective columns (2), protective beams (3) and connecting hanging rods (4) are all hollow steel pipes.

2. A bridge construction protection hanging basket according to claim 1, characterized in that: It also comprises a guardrail (5), wherein the guardrail (5) is installed on the top of the connecting hanging rod (4).

3. The bridge construction protection hanging basket according to claim 1 is characterized by: The hanging basket bottom plate (1) is provided with a plurality of bottom plate mesh holes (101), and the plurality of bottom plate mesh holes (101) are all arranged through.

4. A bridge construction protection hanging basket according to claim 3, characterized in that: A steel wire mesh (21) is wound around the bottom of the protective column (2), and the hanging basket bottom plate (1) is located in the area surrounded by the steel wire mesh (21).

5. A bridge construction protection hanging basket according to claim 4, characterized in that: The height of the steel wire mesh (21) is greater than or equal to 500 mm.

6. The bridge construction protection hanging basket according to claim 1 is characterized by: A plurality of the protective cross beams (3) are distributed in the vertical direction, and the vertical distance between two adjacent protective cross beams (3) is greater than 200 mm and less than 300 mm.

7. The bridge construction protection hanging basket according to claim 1 is characterized by: The bottom pulley (22) is arranged in a spindle shape.

8. The bridge construction protection hanging basket according to claim 1 is characterized by: The length of the connecting hanging rod (4) is greater than or equal to 500 mm.

Citation Information

Patent Citations

  • Bridge side face construction hanging basket

    CN219260750U