Gallery structure capable of preventing rockfall

By designing the corridor structure of the anti -falling stone, the sand cushion layer and drainage blind material are used for buffering and drainage, and the support pillar and base are improved to improve the structural stability, which solves the problem of high -steep and steep slopes in hydropower engineering. Improvement of security, durability and economy.

CN222390295UActive Publication Date: 2025-01-24CHINA POWER CONSRTUCTION GRP GUIYANG SURVEY & DESIGN INST CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420457036.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-11
Publication Date
2025-01-24
Estimated Expiration
2034-03-11

AI Technical Summary

Technical Problem

In hydropower projects, high steep slope roads are easily threatened by falling rocks. The existing heavy corridor structures are costly, have a long cycle, and have poor economical benefits during the construction process.

Method used

A corridor structure of anti -falling stone is designed, including the arch of the arch, the anti -collision buffer structure, the drainage layer, and the support pillar. The sand cushion and the drainage blind material are used for buffer and drainage, and the support column and the base are improved.

Benefits of technology

Effectively reduce the impact of the destruction of falling stone, ensure the safety and durability of the corridor structure, reduce construction costs and cycles, and improve economy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222390295U_ABST
    Figure CN222390295U_ABST
Patent Text Reader

Abstract

The utility model provides an anti-rockfall gallery structure, which relates to the technical field of hydraulic structures, and comprises a vault, the top of the vault is provided with an anti-collision buffer structure, the anti-collision buffer structure comprises fences arranged on two sides of the vault, and a sand cushion layer and a drainage layer are sequentially arranged in the fences from top to bottom; one side of the bottom of the vault is of a concrete wall structure, a plurality of supporting columns are arranged on the other side and the center line of the bottom of the vault, and a base is arranged at the bottom of each supporting column. According to the utility model, after falling rocks fall to the top of the gallery, the sand cushion layer and the drainage blind material can play a buffering role, so that the damage influence of the falling rocks is effectively reduced, and the safety of the gallery structure is ensured. In the long-term operation period, the problem of accumulated water discharge is considered, the drainage layer is arranged in the middle, accumulated water can be discharged to the outer side through the drainage pipes on the two sides, and the durability of the gallery structure is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of hydraulic structures, in particular to a corridor structure for preventing rockfall. Background Art

[0002] During the implementation of hydropower projects, the particularity of the geographical location and the complexity of the topographic and geological conditions have brought many challenges to road construction. These roads often need to cross canyon areas, and their steep slopes are affected by factors such as the development of bedrock joints, the cutting of unfavorable structural surfaces, and the collapse of slopes due to unloading, resulting in poor rock stability. This situation is very likely to cause a large number of rolling stones and falling rocks, thus posing a serious threat to road safety within the management scope of the hydropower project and a serious threat to the lives of managers.

[0003] Publication No. CN217419675U discloses a heavy-duty corridor structure for protecting a rocky high and steep slope road, including a corridor body arranged along the rocky slope, a corridor is arranged in the corridor body along the direction in which it is arranged, a structural deformation expansion joint is arranged every 10m along the direction in which it is arranged, a corridor internal road surface is arranged at the bottom of the corridor, an anchoring structure connected to the slope is arranged on the inner side of the corridor body close to the slope, several ventilation and lighting openings are arranged at intervals on the outer side of the corridor body away from the slope, and a top backfill body connected to the slope is arranged on the top of the corridor body; after careful evaluation, the heavy-duty corridor structure mentioned in the public document has certain advantages in ensuring road safety, however, in the actual construction process, the structure will significantly increase the construction cost and prolong the construction period. Compared with this technical solution, its economic efficiency is relatively poor. Utility Model Content

[0004] The utility model provides a corridor structure for preventing rockfall, aiming at solving at least one technical problem existing in the prior art mentioned in the background technology.

[0005] The utility model provides the following technical solutions to achieve the above objectives:

[0006] A corridor structure for preventing rockfall comprises an arch, wherein an anti-collision buffer structure is arranged on the top of the arch, the anti-collision buffer structure comprises enclosures arranged on both sides of the arch, and sand cushion layers and drainage layers are arranged in sequence from top to bottom in the enclosures; one side of the bottom of the arch is a concrete wall structure, and a plurality of support columns are arranged on the other side and on the center line, and a base is arranged at the bottom of each support column.

[0007] Furthermore, the drainage layer includes drainage blind materials, which are arranged at intervals in the transverse direction of the length of the arch, and both ends of the drainage blind materials are connected with drainage outlets, which are arranged at the bottom of the enclosure.

[0008] Furthermore, the arch is arranged to be undulating along the length direction, and the drainage blind material is arranged in the concave part of the arch.

[0009] Furthermore, the drainage blind materials are arranged along both sides of the length direction of the arch, and form a complete passage with the drainage blind materials arranged laterally.

[0010] Furthermore, the arch, enclosure, support column and base are made of reinforced concrete.

[0011] Beneficial Effects

[0012] Compared with the prior art, the utility model takes into account that after the falling rocks fall to the top of the corridor, the sand cushion layer and the drainage blind material can play a buffering role, effectively reducing the impact of the falling rocks and ensuring the safety of the corridor structure. During long-term operation, the utility model also considers the problem of water discharge, and sets a drainage layer in the middle. The accumulated water can be discharged to the outside through the drainage pipes on both sides, ensuring the durability of the corridor structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below only relate to some embodiments of the utility model, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor.

[0014] Figure 1 It is a schematic diagram of the structure of the utility model;

[0015] Figure numerals: 1-arch; 2-enclosure; 3-support column; 4-base. DETAILED DESCRIPTION

[0016] In order to enable those skilled in the art to better understand the solution of the present invention, the technical solution in the embodiment of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiment of the present invention.

[0017] It should be noted that in the present invention: the terms "include" and "have" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or apparatus comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units not clearly listed or inherent to these processes, methods, products or apparatuses; the directions or positional relationships indicated by the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inside", "outside", "middle", "vertical", "horizontal", "lateral", "longitudinal" and the like are based on the directions or positional relationships shown in the drawings. These The terms are mainly used to better describe the utility model and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation; the terms "first", "second", etc. are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence; the terms "install", "set", "provided with", "connected", "connected", "sleeved", etc. should be understood in a broad sense; for example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be an internal connection between two devices, elements or components. In addition, some terms can be used to express other meanings in addition to indicating orientation or positional relationships. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For ordinary technicians in this field, the specific meanings of these terms in the utility model can be understood according to specific circumstances.

[0018] Embodiment. A corridor structure for preventing rockfall, the structure of which is referenced Figure 1 , including an arch 1, the top of the arch 1 is provided with an anti-collision buffer structure, the anti-collision buffer structure includes enclosures 2 arranged on both sides of the arch, and the enclosures 2 are provided with sand cushion layers and drainage layers from top to bottom; one side of the bottom of the arch 1 is a concrete wall structure, and a number of support columns 3 are arranged on the other side and the center line, and a base 4 is arranged at the bottom of each support column 3. The sand cushion layer is arranged to form a sandstone skeleton structure to improve the strength while having a certain elastic deformation capacity, which can fully alleviate the impact effect caused by falling rocks.

[0019] The drainage layer includes drainage blind materials, which are arranged at intervals in the horizontal direction of the length of the arch 1, and drainage outlets are connected to both ends of the drainage blind materials, which are arranged at the bottom of the enclosure 2. The use of drainage blind materials can not only complete the drainage work, but also ensure that the drainage layer has a corresponding structural strength and is not easily damaged by falling rocks during actual use.

[0020] The arch 1 is arranged with undulations along the length direction, and the drainage blind material is arranged in the depressions arranged with undulations on the arch 1. The arch 1 is arranged with regular convex and concave shapes along the length direction, and the drainage blind material is arranged in the depressions perpendicular to the length direction of the arch 1, and the water flow is collected in the depressions by utilizing the slope generated by the undulations, and then discharged through the drainage blind material and the drainage outlet.

[0021] The drainage blinds are arranged along both sides of the length direction of the arch 1, and form a complete passage with the drainage blinds arranged transversely. By arranging the drainage blinds on both sides of the length direction of the arch 1, the characteristics of the arch 1 itself, which is high in the middle and low at both ends, are utilized to facilitate the water flow to gather on both sides of the arch 1, and then be guided to the drainage outlet through the drainage blinds.

[0022] The material of the arch 1, enclosure 2, support column 3 and base 4 is reinforced concrete. By uniformly using reinforced concrete material, the rigidity and strength of the whole structure can be improved by integral casting during the construction process. The corridor structure of the rockfall prevention can also be pre-supported by the reinforced concrete structure pre-support technology, and then transported to the required location for installation and construction, thereby reducing the construction period.

[0023] The working principle and use method of the utility model are as follows: the anti-rockfall corridor structure is constructed at the rockfall site of the water conservancy project and implemented according to the above structure, wherein the concrete wall structure on one side of the bottom of the arch 1 is close to the mountain, and the bonding performance of the concrete is utilized to fully combine with the mountain; the strength of the reinforced concrete structure, the structural characteristics of the sand cushion layer and the drainage blind material are fully utilized to ensure that the utility model is not damaged by falling rocks during use, thereby ensuring the safety of personnel.

[0024] Obviously, the above is only a part of the embodiments of the utility model, not all of the embodiments. The above embodiments are not used to limit the utility model. For those skilled in the art, the utility model can have various changes and variations. Any combination, modification, equivalent replacement, improvement and all other embodiments that can be made by ordinary technicians in the field within the spirit and principle of the utility model should be within the protection scope of the utility model.

Claims

1. A corridor structure for preventing rockfall, characterized in that: The invention comprises an arch (1), wherein an anti-collision buffer structure is arranged at the top of the arch (1), and the anti-collision buffer structure comprises enclosures (2) arranged at both sides of the arch, and a sand cushion layer and a drainage layer are arranged in sequence from top to bottom in the enclosures (2); one side of the bottom of the arch (1) is a concrete wall structure, and a plurality of support columns (3) are arranged on the other side and on the center line, and a base (4) is arranged at the bottom of each support column (3).

2. The rockfall prevention corridor structure according to claim 1 is characterized in that: The drainage layer comprises drainage blind materials, which are arranged at intervals in the transverse direction of the length of the arch (1), and drainage outlets are connected to both ends of the drainage blind materials, which are arranged at the bottom of the enclosure (2).

3. The rockfall prevention corridor structure according to claim 2 is characterized in that: The arch (1) is arranged in an undulating manner along the length direction, and the drainage blind material is arranged in the depressions of the undulating arrangement of the arch (1).

4. The rockfall prevention corridor structure according to claim 2, characterized in that: The drainage blind materials are arranged along both sides of the length direction of the arch (1), and together with the drainage blind materials arranged transversely form a complete passage.

5. The rockfall prevention corridor structure according to claim 1, characterized in that: The material of the arch (1), enclosure (2), support column (3) and base (4) is reinforced concrete.