Shaped tower crane wall-attached mounting operation platform
By designing the installation operation platform of the designated tower crane attached wall, the U -shaped operation platform, protective frame and F -shaped buckle components are used to solve the problem of long time and insufficient safety and stability in existing technologies. Effect of stability.
Patent Information
- Application Number
- CN202421083728.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-17
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2034-05-17
AI Technical Summary
The existing tower crane wall-mounted operating platform has been installed for a long time, which affects the construction progress, and the installation of traditional steel pipe fasteners has problems of insufficient safety and stability.
Design a designated tower crane attached wall installation operation platform, adopts a U -shaped operation platform, protective frame and F -shaped buckle components, and fix it with the beams of the tower crane standard section through the buckle component to achieve rapid construction and disassembly.
The rapid construction and disassembly of the operating platform have been realized, and the construction progress has been improved. Due to the use of stylized materials, the safety and stability are higher, which is in line with the concept of safety and civilization.
Smart Images

Figure CN222413964U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of building construction, in particular to a standardized tower crane wall-mounted installation operation platform. Background Art
[0002] At present, the commonly used tower crane wall installation operation platform on site is mainly composed of steel pipes, wooden springboards or steel fence mesh, and the erection process requires professional scaffolding workers to erect. During the erection process, workers usually use steel pipe fasteners to fix the operation platform. This erection method takes a long time to erect, affecting the construction progress, and needs to be improved. Utility Model Content
[0003] In view of the deficiencies in the prior art, the purpose of the utility model is to provide a standardized tower crane wall-mounted installation operating platform, which is easy to build and disassemble.
[0004] The above technical purpose of the utility model is achieved through the following technical solutions: a standardized tower crane wall installation operation platform, comprising:
[0005] A pair of working platforms are arranged in a U shape with openings facing each other and are arranged around the outer wall of the standard section of the tower crane;
[0006] A protective frame is arranged around each of the working platforms;
[0007] The buckle is arranged in an F shape, and the lower end is rotatably connected to the inner side of the working platform and is used to be clamped on the standard section cross beam of the tower crane. A pin shaft is arranged through the opening position of the buckle.
[0008] In a preferred example, the utility model can be further configured as follows: an ear plate for clamping the lower end of the buckle is arranged on the working platform, and a rotating shaft penetrating the buckle is horizontally arranged on the ear plate.
[0009] In a preferred example, the utility model can be further configured as follows: the working platform includes a load-bearing keel, a protective net and a enclosure, the protective net is arranged on the load-bearing keel, and the enclosure is vertically arranged at the outer edge position of the load-bearing keel.
[0010] In a preferred example, the utility model can be further configured as follows: an insert pipe is vertically provided on the outer wall of the enclosure, and an insert rod for inserting the insert pipe is provided on the protection frame.
[0011] In a preferred example, the utility model can be further configured as follows: a locking rod is horizontally slidably connected to the insertion tube, and a locking hole for the locking rod to pass through is provided on the insertion rod.
[0012] In a preferred example, the utility model can be further configured as follows: a pair of end portions of the working platforms close to each other are staggeredly provided with a plurality of connecting rods and connecting holes for the connecting rods to be inserted.
[0013] In a preferred example, the utility model can be further configured as follows: a protective pad is provided on the inner side wall of the working platform.
[0014] In summary, the utility model has the following beneficial effects:
[0015] 1. The operating platform is made of standardized materials. Workers can quickly assemble and disassemble it on site and it is formed in one step. After use, it can be disassembled and assembled again, and the turnover efficiency is high.
[0016] 2. The operating platform is made of standardized materials, which can better ensure safety and stability compared with the traditional steel pipe fastener operating frame;
[0017] 3. The operating platform only requires simple on-site assembly and is integrated with the tower crane through snap-on components. The overall erection is relatively simple and the erection effect is good. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a structural schematic diagram of an embodiment;
[0019] Figure 2 is a schematic diagram of the connection relationship of the embodiment;
[0020] Figure 3 It is a structural schematic diagram of the working platform of the embodiment;
[0021] Figure 4 It is a schematic structural diagram of a protection frame of an embodiment.
[0022] Figure numerals: 1. working platform; 11. protective pad; 12. connecting rod; 13. connecting hole; 14. ear plate; 15. rotating shaft; 16. load-bearing keel; 17. protective net; 18. enclosure; 2. protective frame; 3. buckle; 31. rectangular steel; 32. short square steel; 33. pin; 4. insert pipe; 41. locking rod; 5. insert rod; 51. locking hole. DETAILED DESCRIPTION
[0023] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0024] like Figure 1 , Figure 2 As shown, a standardized tower crane wall-mounted operating platform includes a pair of working platforms 1, a protective frame 2 and a buckle 3.
[0025] like Figure 2As shown, a pair of working platforms 1 are arranged in a U shape, with openings facing each other, and are arranged around the outer wall of the tower crane standard section. The inner wall of the working platform 1 is provided with a protective pad 11 to reduce the noise generated during installation and prevent the working platform 1 from being deformed due to impact during installation.
[0026] like Figure 2 , Figure 3 As shown, the ends of a pair of working platforms 1 close to each other are staggered with multiple connecting rods 12 and connecting holes 13 for the connecting rods 12 to be inserted into. In the process of building the pair of working platforms 1 together, the connecting rods 12 are inserted into the connecting holes 13, which can increase the direct stability of the pair of working platforms 1 and realize the protection of the connecting position to prevent objects from falling along the gap.
[0027] like Figure 2 , Figure 3 As shown, the protective frame 2 is arranged around each working platform 1 to improve the safety of the operating platform. The buckle 3 is arranged in an F shape and is distributed on the inner side of the working platform 1.
[0028] like Figure 2 , Figure 3 As shown, the buckle 3 is welded by a rectangular steel 31 and two short square steels 32, and a plurality of ear plates 14 arranged in pairs are provided on the working platform 1. The ear plates 14 clamp the lower end of the rectangular steel 31, and a rotating shaft 15 penetrating the rectangular steel 31 is horizontally provided on the ear plates 14.
[0029] like Figure 2 , Figure 3 As shown, the lower end of the rectangular steel 31 is rotatably connected to the ear plate 14, and two short square steels 32 are arranged in parallel and used to be clamped on the standard section cross beam of the tower crane. A pin shaft 33 is vertically penetrated through the opening position of the two short square steels 32 to achieve the surrounding fixation of the standard section cross beam of the tower crane.
[0030] When the operating platform needs to be installed, first control the buckle 3 to flip over to the working platform 1, and then hoist the working platform 1 separately. When the working platform 1 is hoisted to the position of the standard section of the tower crane that needs to be installed and fixed, control the buckle 3 to flip upward so that the buckle 3 is connected to the standard section beam of the tower crane, and then install the pin shaft 33 to achieve the fixation of the buckle 3, thereby achieving the installation and fixation of the working platform 1.
[0031] like Figure 3 As shown, the working platform 1 includes a load-bearing keel 16 , a protective net 17 and a panel 18 . The load-bearing keel 16 is welded from square steel pipes arranged horizontally and vertically. The protective net 17 is arranged on the load-bearing keel 16 , and the panel 18 is vertically arranged at the outer edge of the load-bearing keel 16 .
[0032] like Figure 3 , Figure 4As shown, the outer wall of the enclosure 18 is vertically provided with an insertion tube 4, and the protection frame 2 is provided with an insertion rod 5 for inserting the insertion tube 4. The insertion tube 4 is horizontally slidably connected with a locking rod 41, and the insertion rod 5 is provided with a locking hole 51 for the locking rod 41 to pass through.
[0033] Therefore, by providing a plug-in protection frame 2, the protection frame 2 can be quickly installed, fixed and removed, the stability of the protection frame 2 during operation is increased, and the transportation and reinstallation process of the entire operating platform can also be made easier and more convenient.
[0034] In summary, the operating platform is made of standardized materials. Workers can quickly assemble and disassemble it on site and it can be formed in one step. After use, it can be disassembled for a second time, and the turnover efficiency is high. At the same time, compared with the traditional steel pipe fastener erection operating frame, the safety and stability can be better guaranteed, which conforms to the concept of safe and civilized construction. The operating platform only needs simple on-site assembly, and it is integrated with the tower crane through the buckle 3 components. The overall erection is relatively simple, and the erection and molding effect is good.
[0035] The specific embodiments are merely explanations of the present invention and are not limitations of the present invention. After reading this specification, those skilled in the art may make modifications to the embodiments without any creative contribution as needed. However, as long as they are within the scope of the claims of the present invention, they are protected by the patent law.
Claims
1. A standardized tower crane wall-mounted operating platform, characterized in that: include: A pair of working platforms (1) are arranged in a U shape with openings facing each other and are arranged around the outer wall of the tower crane standard section; A protective frame (2) is arranged around each of the working platforms (1); The buckle (3) is arranged in an F shape, and the lower end is rotatably connected to the inner side of the working platform (1), and is used to be clamped on the standard section cross beam of the tower crane. A pin shaft (33) is arranged through the opening position of the buckle (3).
2. According to claim 1, a standardized tower crane wall mounting operation platform is characterized by: The working platform (1) is provided with an ear plate (14) for clamping the lower end of the buckle (3), and a rotating shaft (15) penetrating the buckle (3) is horizontally provided on the ear plate (14).
3. According to claim 1, a standardized tower crane wall mounting operation platform is characterized by: The working platform (1) comprises a load-bearing keel (16), a protective net (17) and a panel (18); the protective net (17) is arranged on the load-bearing keel (16), and the panel (18) is vertically arranged at the outer edge of the load-bearing keel (16).
4. The standardized tower crane wall-mounted installation operation platform according to claim 3 is characterized by: An insert pipe (4) is vertically arranged on the outer wall of the enclosure (18), and an insert rod (5) for inserting the insert pipe (4) is arranged on the protection frame (2).
5. According to claim 4, a standardized tower crane wall-mounted installation operation platform is characterized in that: The insertion tube (4) is horizontally slidably connected with a locking rod (41), and the insertion rod (5) is provided with a locking hole (51) for the locking rod (41) to pass through.
6. The standardized tower crane wall-mounted installation operation platform according to claim 1 is characterized by: A pair of working platforms (1) are staggeredly provided at their mutually adjacent ends with a plurality of connecting rods (12) and connecting holes (13) for the connecting rods (12) to be plugged in.
7. The standardized tower crane wall-mounted installation operation platform according to claim 1 is characterized by: The inner side wall of the working platform (1) is provided with a protective pad (11).