Movable construction site sewage treatment device

By using a combination of telescopic air pressure cylinder, motion plate and filter in the mobile construction site sewage treatment device, combined with the cooperation of pressure sensors and controllers, the uninterrupted treatment of sewage and the diversion and discharge of sludge are achieved, solving the problems of discontinuous sewage treatment and slow treatment speed.

CN222585780UActive Publication Date: 2025-03-11QINGDAO FUYING CONSTR GRP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420560533.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-22
Publication Date
2025-03-11
Estimated Expiration
2034-03-22

AI Technical Summary

Technical Problem

After the existing mobile construction site sewage treatment device stores a certain amount of water inside the body, it needs to suspend the inlet water for water purification, resulting in discontinuous sewage treatment and slow treatment speed.

Method used

A mobile construction site sewage treatment device is designed, using a combination of telescopic air pressure cylinder, a sports plate and a filter net. Through the cooperation of pressure sensors and controllers, uninterrupted sewage treatment and sludge diversion and discharge.

Benefits of technology

The uninterrupted treatment of sewage is achieved, the continuity and speed of sewage treatment is ensured, and the problem of slow treatment speed in the prior art is effectively solved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222585780U_ABST
    Figure CN222585780U_ABST
Patent Text Reader

Abstract

The utility model provides a movable construction site sewage treatment device and relates to the field of sewage treatment. The movable construction site sewage treatment device comprises a sewage treatment vehicle and a sludge pump, a three-way valve is arranged at the water outlet end of the sludge pump, a flow guide pipe and a short pipe are fixedly connected between the three-way valve and the sewage treatment vehicle, filter screens are fixedly connected to the two sides of the interior of the sewage treatment vehicle, and a moving plate is arranged between the two filter screens. A pressure sensor is fixedly connected to the interior of the moving plate, sewage draining holes are formed in the sides, close to the moving plate, of the two filter screens, and water draining holes are formed in the sides, away from the moving plate, of the two filter screens. According to the movable construction site sewage treatment device, pressurized filtration of sewage by the telescopic pneumatic cylinder, the moving plate and the right filter screen does not affect the suction work of the sludge pump on the sewage, continuous treatment of the sewage is ensured, sludge and purified water in the sewage are discharged in a split-flow manner, and the sewage treatment speed of the iron pipe is increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a sewage treatment device, in particular to a mobile construction site sewage treatment device, belonging to the technical field of sewage treatment. Background Art

[0002] Construction site sewage is an inevitable product of current economic development. Construction site sewage is scattered and large in volume, and many infrastructure construction sites do not have urban sewage pipe collection systems, so it is difficult to centralize them to urban sewage treatment plants for unified treatment. Mobile treatment equipment will be used to purify them.

[0003] For example, the utility model with existing patent application number: 202121802794.5 discloses a mobile integrated sewage treatment machine on construction sites, including an outer cylinder body, a cylinder cover, an injection cylinder and a sewage pump, the injection cylinder is inserted into the outer cylinder body, a piston body is arranged in the injection cylinder, a sewage pipe and a mounting port are arranged at one end of the injection cylinder, an electric push rod for driving the piston body is arranged on the cylinder cover, a filter plate is arranged in the mounting port, a feed port and a feed pipe are arranged in the middle of the piston body, a one-way valve is arranged in the feed port, the feed pipe is fixedly connected to the piston body, a movable hole matching the feed pipe is arranged on the cylinder cover, the feed pipe is movably connected to the cylinder cover through the movable hole, and the discharge port of the sewage pump is connected to the feed pipe.

[0004] During the use of the above-mentioned integrated sewage treatment machine, when a certain amount of water is stored inside the machine body, it is necessary to stop the water intake and perform water purification, resulting in discontinuous sewage treatment and slow sewage treatment speed. Utility Model Content

[0005] 1. Technical issues to be solved

[0006] The purpose of the utility model is to provide a mobile construction site sewage treatment device in order to solve the above-mentioned problems, so as to solve the problem in the prior art that after a certain amount of water is stored in the body, it is necessary to stop the water intake and perform water purification work, resulting in discontinuous sewage treatment and slow sewage treatment speed.

[0007] (II) Technical solution

[0008] The utility model is implemented through the following technical scheme: a mobile construction site sewage treatment device, including a sewage treatment vehicle and a sludge pump, a three-way valve is arranged at the water outlet of the sludge pump, a guide pipe and a short pipe are fixedly connected between the three-way valve and the sewage treatment vehicle, filters are fixedly connected on both sides of the interior of the sewage treatment vehicle, a moving plate is arranged between the two filters, a pressure sensor is fixedly connected inside the moving plate, when the water pressure detected by the pressure sensor exceeds a preset pressure value, a controller electrically connected to the pressure sensor works, at this time the controller works to control the sludge pump and the telescopic pneumatic cylinder to stop working, so as to protect the sludge pump and the telescopic pneumatic cylinder, a sewage discharge hole is arranged on the side of the two filters close to the moving plate, and a drainage hole is arranged on the side of the two filters away from the moving plate.

[0009] Preferably, the sludge pump is fixedly connected to one side of the sewage treatment vehicle, the water inlet end of the sludge pump is fixedly connected to a water inlet pipe, and one side of the sludge pump is fixedly connected to a controller.

[0010] Preferably, the water outlet end of the sludge pump is fixedly connected with a diversion elbow, one end of the diversion elbow is fixedly connected to the three-way valve, and one end of the diversion pipe fixed on one side of the top of the sewage treatment vehicle is arranged on the side of the normally closed end of the three-way valve and fixedly connected to the three-way valve, so the three-way valve and the diversion pipe cooperate to guide the sewage to the right side of the interior of the sewage treatment vehicle.

[0011] Preferably, one end of the guide tube is arranged at a normally closed end side of the three-way valve and fixedly connected to the three-way valve, and the short tube is arranged at a normally open end side of the three-way valve and fixedly connected to the three-way valve.

[0012] Preferably, a telescopic pneumatic cylinder is fixedly connected to one side of the moving plate, one end of the telescopic pneumatic cylinder sequentially passes through the filter screen and the sewage treatment vehicle and extends to the outside of the sewage treatment vehicle, and the telescopic pneumatic cylinder is fixedly connected to the sewage treatment vehicle.

[0013] Preferably, a water pipe is provided between the two drainage holes, the water pipe is fixedly connected to the sewage treatment vehicle, and one side of the water pipe is fixedly connected to a water outlet pipe.

[0014] Preferably, a sewage valve is provided at the bottom of the two sewage holes, and the sewage valve is fixedly connected to the sewage treatment vehicle. A sewage pipe is fixedly connected between the two sewage valves, and a mud discharge pipe is fixedly connected to one side of the sewage pipe. The sewage pipe drains and collects the sludge discharged through the two sewage valves, and finally the sludge is discharged through the mud discharge pipe fixedly connected to one side of the sewage pipe.

[0015] The utility model provides a mobile construction site sewage treatment device, which has the following beneficial effects:

[0016] 1. The mobile construction site sewage treatment device, the telescopic pneumatic cylinder, the moving plate and the right filter screen will not affect the sludge pump's suction work on the sewage, ensuring uninterrupted treatment of the sewage, and diverting the sludge and clean water in the sewage to discharge, and the speed of iron pipe sewage treatment.

[0017] 2. The mobile construction site sewage treatment device, the moving plate squeezes the sewage through the guide pipe into the sewage treatment vehicle, the sewage is pressurized and accelerated to contact with the filter on the right, the filter intercepts impurities in the sewage, and the clean water passes through the filter and falls to the top of the drainage hole on the right, a water guide pipe is arranged between the left and right drainage holes, the water guide pipe fixedly connected to the sewage treatment vehicle guides the clean water, and the filtered clean water finally flows out through the outlet pipe fixedly connected to one side of the water guide pipe, after the moving plate moves for a period of time, the sludge in the sewage between the moving plate and the filter is discharged through the drainage hole and the working open drainage valve. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0019] Figure 2 This is a schematic diagram of the structure of the flow guide pipe of the utility model;

[0020] Figure 3 It is a structural schematic diagram of the sports board of the utility model;

[0021] Figure 4 It is a structural schematic diagram of the sewage discharge pipe of the utility model.

[0022]

Main component symbol description

[0023] 1. Sewage treatment vehicle; 2. Sludge pump; 3. Water inlet pipe; 4. Controller; 5. Diversion elbow; 6. Three-way valve; 7. Diversion pipe; 8. Short pipe; 9. Moving plate; 10. Pressure sensor; 11. Filter; 12. Drain hole; 13. Drain valve; 14. Drain pipe; 15. Mud outlet pipe; 16. Drain hole; 17. Water guide pipe; 18. Water outlet pipe; 19. Telescopic pneumatic cylinder. DETAILED DESCRIPTION

[0024] The embodiment of the utility model provides a mobile construction site sewage treatment device.

[0025] See also Figure 1 , Figure 2 , Figure 3 and Figure 4, including a sewage treatment vehicle 1 and a sludge pump 2, a three-way valve 6 is provided at the water outlet of the sludge pump 2, a guide pipe 7 and a short pipe 8 are fixedly connected between the three-way valve 6 and the sewage treatment vehicle 1, filter screens 11 are fixedly connected on both sides of the sewage treatment vehicle 1, a moving plate 9 is provided between the two filter screens 11, a pressure sensor 10 is fixedly connected inside the moving plate 9, a sewage discharge hole 12 is provided on the side of the two filter screens 11 close to the moving plate 9, and a drainage hole 16 is provided on the side of the two filter screens 11 away from the moving plate 9.

[0026] When the utility model is in use: a sludge pump 2 is fixedly connected to one side of a sewage treatment vehicle 1, and a water inlet end of the sludge pump 2 is fixedly connected to a water inlet pipe 3 for connecting to a sewage pipe on a construction site. After the working sludge pump 2 extracts sewage through the water inlet pipe 3, the sludge pump 2 discharges the sewage through a diversion elbow 5 fixedly connected to the water outlet end, and one end of the diversion elbow 5 is fixedly connected to a three-way valve 6.

[0027] At this time, the normally closed end of the three-way valve 6 is open, and the normally open end is closed, and one end of the guide pipe 7 fixed on the top side of the sewage treatment vehicle 1 is arranged on the side of the normally closed end of the three-way valve 6 and is fixedly connected to the three-way valve 6, such as Figure 2 and Figure 3 As shown, the three-way valve 6 and the guide pipe 7 cooperate to guide the sewage to the right side inside the sewage treatment vehicle 1.

[0028] After the sludge pump 2 has been working for a period of time, a controller 4 is fixedly connected to one side of the sludge pump 2 to work, and the controller 4 is electrically connected to the telescopic pneumatic cylinder 19 and the three-way valve 6. At this time, the controller 4 controls the telescopic pneumatic cylinder 19 to work, and the working telescopic pneumatic cylinder 19 extends and pushes the moving plate 9 to move, so that the moving plate 9 moves to the right (left and right in this application are represented by left and right). Figure 2 As shown in the figure for reference), the moving plate 9 squeezes the sewage through the guide pipe 7 and enters the sewage treatment vehicle 1. After the sewage is pressurized, it is accelerated to contact with the filter screen 11 on the right. The filter screen 11 intercepts impurities in the sewage. The clean water passes through the filter screen 11 and falls to the top of the drainage hole 16 on the right. A water guide pipe 17 is arranged between the left and right drainage holes 16. The water guide pipe 17 fixedly connected to the sewage treatment vehicle 1 guides the clean water. The filtered clean water finally flows out through the outlet pipe 18 fixedly connected to one side of the water guide pipe 17.

[0029] After the telescopic pneumatic cylinder 19 works for a period of time, the controller 4 controls the electrically connected drain valve 13 on the right side to open. At this time, the drain hole 12 on the top of the right drain valve 13 is located between the moving plate 9 and the filter screen 11. After the moving plate 9 moves for a period of time, the sludge in the sewage between the moving plate 9 and the filter screen 11 is discharged through the drain hole 12 and the open drain valve 13. Then the telescopic pneumatic cylinder 19 stops working, and the moving plate 9 temporarily stays on the right side of the sewage treatment vehicle 1.

[0030] While the controller 4 controls the telescopic pneumatic cylinder 19 to work and push the moving plate 9 to move right, the controller 4 controls the electrically connected three-way valve 6 to work, the normally closed end of the three-way valve 6 is closed, the normally open end is opened, and the short pipe 8 set at the normally open end of the three-way valve 6 is fixedly connected to the sewage treatment vehicle 1. At this time, the sewage enters the left side of the interior of the sewage treatment vehicle 1 through the three-way valve 6 and the short pipe 8 set on the top side of the sewage treatment vehicle 1. The pressurized filtration of the sewage by the telescopic pneumatic cylinder 19, the moving plate 9 and the right filter screen 11 will not affect the suction work of the sludge pump 2 on the sewage, thereby ensuring uninterrupted treatment of the sewage, and diverting and discharging the sludge and clean water in the sewage, thereby increasing the speed of iron pipe sewage treatment.

[0031] When the telescopic pneumatic cylinder 19 stops working for a period of time, the controller 4 controls the telescopic pneumatic cylinder 19 to drive the moving plate 9 to move left and reset. At this time, the moving plate 9 and the filter screen 11 set on the left side of the sewage treatment vehicle 1 filter the sewage. At the same time, when the three-way valve 6 works, the sewage enters from the right side of the sewage treatment vehicle 1, and the drainage hole 16 and the water pipe 17 cooperate to discharge the clean water, and the drainage hole 12 and the drainage valve 13 cooperate to discharge the sludge.

[0032] The above work is repeated repeatedly until the sewage treatment is completed.

[0033] One end of the telescopic pneumatic cylinder 19 passes through the filter 11 and the sewage treatment vehicle 1 in sequence and extends to the outside of the sewage treatment vehicle 1 . The telescopic pneumatic cylinder 19 fixedly connected to the sewage treatment vehicle 1 can be simply electrically connected to the controller 4 .

[0034] A sewage valve 13 is provided at the bottom of the two sewage holes 12, and a sewage pipe 14 is fixedly connected between the two sewage valves 13 fixedly connected to the sewage treatment vehicle 1. The sewage pipe 14 collects and drains the sludge discharged through the two sewage valves 13, and finally the sludge is discharged through a mud discharge pipe 15 fixedly connected to one side of the sewage pipe 14.

[0035] A pressure sensor 10 is fixedly connected inside the moving plate 9. The pressure sensor 10 can detect the water pressure inside the sewage treatment vehicle 1. When the sewage treatment vehicle 1 is blocked and cannot discharge sludge or water, and the water pressure detected by the pressure sensor 10 exceeds a preset pressure value, the controller 4 electrically connected to the pressure sensor 10 starts working. At this time, the controller 4 controls the sludge pump 2 and the telescopic pneumatic cylinder 19 to stop working, thereby protecting the sludge pump 2 and the telescopic pneumatic cylinder 19.

[0036] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.

Claims

1. A mobile construction site sewage treatment device, comprising a sewage treatment vehicle (1) and a sludge pump (2), characterized in that: A three-way valve (6) is provided at the water outlet of the sludge pump (2); a guide pipe (7) and a short pipe (8) are fixedly connected between the three-way valve (6) and the sewage treatment vehicle (1); filter screens (11) are fixedly connected to both sides of the sewage treatment vehicle (1); a moving plate (9) is provided between the two filter screens (11); a pressure sensor (10) is fixedly connected inside the moving plate (9); a sewage discharge hole (12) is provided on the side of the two filter screens (11) close to the moving plate (9); and a drainage hole (16) is provided on the side of the two filter screens (11) away from the moving plate (9).

2. The mobile construction site sewage treatment device according to claim 1 is characterized in that: The sludge pump (2) is fixedly connected to one side of the sewage treatment vehicle (1); the water inlet end of the sludge pump (2) is fixedly connected to a water inlet pipe (3); and one side of the sludge pump (2) is fixedly connected to a controller (4).

3. The mobile construction site sewage treatment device according to claim 1 is characterized in that: The water outlet end of the sludge pump (2) is fixedly connected to a diversion elbow (5), and one end of the diversion elbow (5) is fixedly connected to a three-way valve (6).

4. The mobile construction site sewage treatment device according to claim 1 is characterized in that: One end of the flow guide tube (7) is arranged on the normally closed end side of the three-way valve (6) and is fixedly connected to the three-way valve (6), and the short tube (8) is arranged on the normally open end side of the three-way valve (6) and is fixedly connected to the three-way valve (6).

5. The mobile construction site sewage treatment device according to claim 1 is characterized in that: A telescopic pneumatic cylinder (19) is fixedly connected to one side of the moving plate (9); one end of the telescopic pneumatic cylinder (19) sequentially passes through the filter screen (11) and the sewage treatment vehicle (1) and extends to the outside of the sewage treatment vehicle (1); the telescopic pneumatic cylinder (19) is fixedly connected to the sewage treatment vehicle (1).

6. The mobile construction site sewage treatment device according to claim 1 is characterized in that: A water pipe (17) is provided between the two drainage holes (16); the water pipe (17) is fixedly connected to the sewage treatment vehicle (1); and a water outlet pipe (18) is fixedly connected to one side of the water pipe (17).

7. The mobile construction site sewage treatment device according to claim 1, characterized in that: A sewage valve (13) is provided at the bottom of each of the two sewage holes (12); the sewage valve (13) is fixedly connected to the sewage treatment vehicle (1); a sewage pipe (14) is fixedly connected between the two sewage valves (13); and a mud discharge pipe (15) is fixedly connected to one side of the sewage pipe (14).

Citation Information

Patent Citations

  • Movable comprehensive sewage treatment all-in-one machine for construction site

    CN215962342U