By designing a equipment lifting device for high-rise buildings, the problems of traditional human transport efficiency and safety hazards are solved, and the equipment is safe, reliable and efficient lifting is achieved.
Patent Information
- Application Number
- CN202420602478.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-27
- Publication Date
- 2025-03-11
- Estimated Expiration
- 2034-03-27
AI Technical Summary
In buildings with second floors and above without elevators, precision and large equipment transfer is difficult and inefficient, and traditional human transportation is prone to equipment damage and safety accidents.
A high-rise building equipment lifting device is designed, including main beam, installation beam, end lifting lug, middle lifting lug, counterweight block and hoist. Through the combination and adjustment of these components, the safe and reliable lifting of the equipment is achieved.
The device overcomes the problems of low construction efficiency, severe equipment inclination and inability to be placed in the traditional way, achieves smooth lifting of equipment, improves construction efficiency, and avoids equipment damage and safety accidents.
Smart Images

Figure CN222593208U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of hoisting devices, in particular to a high-rise building equipment hoisting device. Background Art
[0002] It is difficult and inefficient to transport precision and large equipment in buildings with two floors or above without elevators, or even impossible to transport, which greatly affects the work efficiency. Traditional equipment transportation methods are mostly carried, lifted, disassembled and transported by manpower, which is time-consuming and labor-intensive. While increasing construction costs, precision equipment may be damaged due to tilting, collision, etc. during the transportation process, and may even cause some safety accidents and the inability to transport heavy equipment. In order to solve the above problems, a high-rise building equipment lifting device is proposed. Summary of the invention
[0003] The purpose of the utility model is to solve the above problems and provide a high-rise building equipment lifting device.
[0004] The specific scheme of the utility model is: a high-rise building equipment lifting device, characterized in that it includes: a main beam, two mounting beams are horizontally arranged side by side at the upper front end of the main beam, and the mounting beams are welded and fixed to the main beam; the mounting beam is used to connect with the equipment to be hoisted; an end lifting lug is provided at one end of the main beam away from the mounting beam, and a middle lifting lug is provided in the middle of the main beam; the end lifting lug is used to connect with the auxiliary lifting hook of the crane; the middle lifting lug is connected to the main lifting hook of the crane through a lifting rope; and a counterweight is connected to the end of the main beam away from the mounting beam.
[0005] Furthermore, a traction rope is connected to the end lifting ear, and the traction rope is used to adjust the direction of the main beam.
[0006] Furthermore, it also includes: a hoist, a hoist is provided between the end lifting ear and the main hook, and the hoist is extended or shortened to adjust the center of gravity of the counterweight block of the main beam.
[0007] Furthermore, the weight of the counterweight block is greater than the weight of the equipment to be hoisted.
[0008] Furthermore, the main beam is made of H-shaped steel, and the mounting beam is made of channel steel.
[0009] The high-rise building equipment lifting device overcomes the limitations of low construction efficiency, serious equipment tilting and inability to move into place that are unavoidable in the traditional method of using manpower; the beneficial effects of the device are mainly in the following aspects: 1. The lifting is stable. Under the control of the traction rope, the equipment to be lifted can be safely and reliably lifted to the high-rise building through the balance of the counterweight block. With the help of a truck crane, equipment at different heights and positions can be lifted without damaging the floor, walls, equipment, etc.; 2. The device can select suitable specifications and models of lifting profiles and hand winches according to the weight of the lifted material. The profiles and hand winches are commonly used materials on the construction site, and there is no restriction on the material collection. The connecting plates are made on site and connected with the profiles and hand winches for use; 3. Unlike fixed construction lifting tools, this device does not need to be installed or fixed in a certain position. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 It is a main schematic diagram of the utility model;
[0011] Figure 2 This is a schematic diagram of the connection between the main beam and the installation beam;
[0012] Figure 3 It is a schematic diagram of the working state of the utility model;
[0013] Figure 4 The load diagram of the main beam;
[0014] Figure 5 The load diagram of the installation beam;
[0015] In the figure: 1. Main beam; 2. Mounting beam; 3. Middle lifting eye; 4. End lifting eye; 5. Towing rope; 6. Hoist; 7. Auxiliary lifting hook; 8. Main lifting hook; 9. Counterweight; 10. Lifting rope; 11. Equipment to be lifted; 12. Truck crane. DETAILED DESCRIPTION
[0016] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0017] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back...), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0018] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the utility model, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or a scheme that satisfies both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the utility model.
[0019] Please refer to Figure 1-Figure 3 , A high-rise building equipment lifting device, characterized in that it comprises: a main beam 1, two mounting beams 2 are arranged side by side horizontally at the upper front end of the main beam 1, and the mounting beams 2 are welded and fixed to the main beam 1; the mounting beam 2 is used to connect with the equipment 11 to be hoisted; the main beam 1 is provided with an end lifting lug 4 at one end away from the mounting beam 2, and a middle lifting lug 3 is provided in the middle of the main beam 1; the end lifting lug 4 is used to connect with the auxiliary lifting hook 7 of the crane; the middle lifting lug 3 is connected with the main lifting hook 8 of the crane through a lifting rope 10; the end of the main beam 1 away from the mounting beam 2 is connected with a counterweight block 9.
[0020] In this embodiment, a traction rope 5 is connected to the end lifting ear 4 , and the traction rope 5 is used to adjust the direction of the main beam 1 .
[0021] In this embodiment, it also includes: a hoist 6, a hoist 6 is provided between the end lifting ear 4 and the main hook 8, and the hoist 6 is extended or shortened to adjust the center of gravity of the counterweight block 9 of the main beam 1.
[0022] In this embodiment, the weight of the counterweight block 9 is greater than the weight of the equipment 11 to be hoisted.
[0023] In this embodiment, the main beam 1 is made of H-shaped steel, and the installation beam 2 is made of channel steel.
[0024] The utility model has the following beneficial effects: the high-rise building equipment lifting device overcomes the limitations of low construction efficiency, serious equipment tilting and inability to put into place that are unavoidable in the traditional method of using manpower; the advantages of the device are mainly in the following aspects: 1. The lifting is stable. Under the control of the traction rope 5, the equipment to be lifted can be safely and reliably lifted to the high-rise building through the balance of the counterweight block 9. With the help of the automobile crane 12, equipment at different heights and different positions can be lifted without damaging the floor, wall, equipment, etc.; 2. The device can select lifting profiles and hand winches of suitable specifications and models according to the weight of the lifted material. The profiles and hand winches are both commonly used materials on the construction site. The material collection is not restricted. They can be cut and manufactured on site and connected with the profiles and hand winches for use. The structure is simple and the manufacturing is convenient; 3. Unlike fixed construction lifting tools, this device does not need to be installed or fixed at a certain position.
[0025] The relevant calculations are as follows:
[0026] Basic parameters: Equipment weight is about 1t, equipment length × width × height = 1.8m × 1m × 1.2m
[0027] See Figure 4 ,Calculation of HW200*200a main beam
[0028] Calculation model basic parameters:
[0029] Length (L) = 5 M
[0030] a=2.8 M
[0031] b=2.2 M
[0032] Concentrated force: standard value Pk=Pg+Pq=30+0=30KN (calculated based on counterweight+equipment=3t)
[0033] Design value Pd=Pg*γG+Pq*γQ=30*1.2+0*1.4=36KN
[0034] Select the loaded section
[0035] Section type: H-beam: 200*200*8*12
[0036] Sectional properties:
[0037] Ix=4610.49 cm4
[0038] Wx=461.04 cm3
[0039] Sx=256.57 cm3
[0040] G=48.73 kg / m
[0041] Flange thickness tf = 12mm Web thickness tw = 8mm
[0042] Related parameters
[0043] Material: Q235B
[0044] X-axis plastic development coefficient γx: 1.05
[0045] Beam deflection control [v]: L / 250
[0046] Internal force calculation results
[0047] Support reaction RA = Pd * b / L = 15.84 KN
[0048] Support reaction force RB = Pd * a / L = 20.16 KN
[0049] Maximum bending moment Mmax = Pd * a * b / L = 44.35 KN.M
[0050] Strength and stiffness verification results
[0051] Bending normal stress σmax = Mmax / (γx * Wx) = 91.62N / mm2
[0052] Shear stress at A τA = RA * Sx / (Ix * tw) = 11.02N / mm2
[0053] Shear stress at B τB = RB * Sx / (Ix * tw) = 14.02N / mm2
[0054] Maximum deflection fmax = Pk * b / (9 * L) * Sqr ((a * a + 2 * a * b) ^ 3 / 3) * 1 / (E * I) = 8.07mm
[0055] Relative deflection v = fmax / L = 1 / 619.6
[0056] Bending normal stress σmax = 91.62N / mm2 < bending design value f: 215 N / mm2
[0057] Maximum shear stress of the support τmax=14.02 N / mm2<shear design value fv: 125 N / mm2
[0058] Relative value of mid-span deflection v = L / 619.6 < deflection control value [v]: L / 250
[0059] Verification passed!
[0060] See Figure 5 , [10 Calculation overview of the installation beam:
[0061] Calculation model basic parameters: length (L) = 1.2 M
[0062] Concentration force: standard value Pk=Pg+Pq=5+0=5KN
[0063] Design value Pd=Pg*γG+Pq*γQ=5*1.2+0*1.4=6KN
[0064] Select the loaded section
[0065] Section type: Channel: [10
[0066] Sectional properties:
[0067] Ix=198cm4
[0068] Wx=39.7cm3
[0069] Sx=23.5cm3
[0070] G=10kg / m
[0071] Flange thickness tf = 8.5mm Web thickness tw = 5.3mm
[0072] Related parameters
[0073] Material: Q235B
[0074] X-axis plastic development coefficient γx: 1.05
[0075] Beam deflection control [v]: L / 250
[0076] Internal force calculation results
[0077] Support reaction RA = RB = 3 KN
[0078] Support reaction RB = Pd / 2 = 3 KN
[0079] Maximum bending moment Mmax = Pd * L / 4 = 1.8 KN.M
[0080] Strength and stiffness verification results
[0081] Bending normal stress σmax = Mmax / (γx * Wx) = 43.18N / mm2
[0082] Shear stress at point A τA = RA * Sx / (Ix * tw) = 6.72N / mm2
[0083] Shear stress at B τB = RB * Sx / (Ix * tw) = 6.72N / mm2
[0084] Maximum deflection fmax = Pk * L ^ 3 / 48 * 1 / ( E * I ) = 0.44mm
[0085] Relative deflection v = fmax / L = 1 / 2719.2
[0086] Bending normal stress σmax = 43.18 N / mm2 < bending design value f: 215 N / mm2
[0087] Maximum shear stress of the support τmax=6.72 N / mm2<shear design value fv: 125 N / mm2
[0088] Relative value of mid-span deflection v = L / 2719.2 < deflection control value [v]: L / 250
[0089] Verification passed.
Claims
1. A high-rise building equipment lifting device, characterized in that: include: A main beam, two mounting beams are arranged side by side transversely at the upper front end of the main beam, and the mounting beams are welded and fixed to the main beam; the mounting beam is used to connect with the equipment to be hoisted; an end lifting lug is provided at one end of the main beam away from the mounting beam, and a middle lifting lug is provided in the middle of the main beam; the end lifting lug is used to connect with the auxiliary lifting hook of the crane; the middle lifting lug is connected to the main lifting hook of the crane through a lifting rope; a counterweight is connected to the end of the main beam away from the mounting beam.
2. A high-rise building equipment lifting device according to claim 1, characterized in that: The end lifting lug is connected with a traction rope, and the traction rope is used to adjust the direction of the main beam.
3. A high-rise building equipment lifting device according to claim 1, characterized in that: Also includes: A hoist is provided between the end lifting lug and the main hook, and the lengthening or shortening of the hoist is used to adjust the center of gravity of the counterweight block of the main beam.
4. A high-rise building equipment lifting device according to claim 1, characterized in that: The weight of the counterweight block is greater than the weight of the equipment to be hoisted.
5. A high-rise building equipment lifting device according to claim 1, characterized in that: The main beam is made of H-shaped steel, and the installation beam is made of channel steel.