Electric power construction pipe cutting device
By using the connection and assembly method of cylinder embedding blocks and cylinder embedding blocks in the power construction pipe cutting device, the problem of difficulty in setting the cutting spacing of power pipelines in the prior art is solved, and a higher cutting accuracy and length adjustment function is achieved, which improves the quality and use effect of the pipeline.
Patent Information
- Application Number
- CN202421239766.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-03
- Publication Date
- 2025-03-14
- Estimated Expiration
- 2034-06-03
AI Technical Summary
The existing power construction pipe cutting devices have difficulties in setting the cutting spacing between power pipelines, resulting in low cutting processing accuracy and difficult to assemble and splice the pipelines after cutting.
The connection method of connecting and assembling the cylinder embedding block into the connection notch of the cylinder embedding block is realized, and the slitting and cutting processing operation of the power pipeline by the cutting blade is improved, and the slitting accuracy and length adjustment functions are improved.
It effectively improves the cutting accuracy and length adjustment function, solves the problem that the pipeline is not easy to assemble and splice after cutting, and improves the quality and use effect of the pipeline.
Smart Images

Figure CN222608167U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of electric power construction pipe cutting, and in particular relates to an electric power construction pipe cutting device. Background Art
[0002] The power construction pipe cutting device is a device used for cutting and processing power pipelines. Its technical background mainly involves the need for cutting and processing pipelines in power pipeline construction. Existing power construction pipe cutting devices have difficulties in setting the distribution of cutting spacing for power pipelines, which leads to low cutting and processing accuracy of power pipelines and difficulty in assembling and splicing pipelines after cutting. Due to the difficulty in setting the distribution of cutting spacing, the cutting position may be inaccurate and the cutting accuracy may be low, affecting the quality and use effect of the pipeline. Inconsistent or inaccurate cutting spacing will cause the pipe sections after cutting to be unable to be accurately spliced, affecting the integrity and stability of the pipeline. Utility Model Content
[0003] In order to overcome the problem that the existing power construction pipe cutting device is difficult to set up due to the difficulty in setting the cutting spacing distribution of the power pipeline, resulting in low power pipeline cutting processing accuracy and difficulty in assembling and splicing after pipeline cutting.
[0004] The technical solution of the utility model is: a power construction pipe cutting device, including a pipe cutting assembly, a clamping assembly, and a workbench assembly; the clamping assembly is arranged in front of the lower end of the pipe cutting assembly; the workbench assembly is arranged at the lower end of the clamping assembly; the pipe cutting assembly includes a first cylinder, a cylinder embedding block, a downward pressure bracket, a second cylinder, a blade bolt locking sleeve, and a cutting blade.
[0005] Preferably, the cutting blade is used to cut the power pipeline by inserting the cylinder embedded block into the connecting groove of the cylinder embedded splicing block for connection and assembly, which effectively improves the cutting accuracy and length adjustment function, and solves the problem of low cutting accuracy of the power pipeline and difficulty in assembly and splicing after the pipeline is cut in the existing power construction pipe cutting device because of the difficulty in setting the cutting spacing distribution of the power pipeline.
[0006] Preferably, a pressing bracket is provided at the lower end of the first cylinder, and the pressing bracket is pneumatically connected to the output end of the first cylinder.
[0007] Preferably, a cylinder embedment block is provided at the rear of the lower end of the first cylinder, and the cylinder embedment block is fixedly connected to the outer shell bolts of the first cylinder. The cutting blade can perform slitting and cutting operations on the power pipeline by inserting the cylinder embedment block into the connecting groove of the cylinder embedment splicing block for connection and assembly, thereby effectively improving the slitting accuracy and length adjustment function.
[0008] Preferably, a second cylinder is provided on one side of the pressing bracket, and the outer shell of the second cylinder is fixedly connected to the pressing bracket; a blade bolt locking sleeve is provided at the lower end of the second cylinder, and the blade bolt locking sleeve is fixedly connected to the output end bolt of the second cylinder; a cutting blade is provided inside the blade bolt locking sleeve, and the cutting blade is connected to the inner bolt locking clamp of the blade bolt locking sleeve, the blade bolt locking sleeve clamps the cutting blade, and the cutting blade can be removed from the inside by loosening the blade bolt locking sleeve, which is convenient for replacement and maintenance of the cutting blade.
[0009] Preferably, the workbench assembly includes a chassis, a cylinder embedded splicing block, and a pipe clamp block; a cylinder embedded splicing block is arranged at the front end of the cylinder embedded splicing block, and the cylinder embedded splicing block is fixedly connected to the cylinder embedded block slot splicing bolts; a chassis is arranged at the lower end of the cylinder embedded splicing block, and the chassis is fixedly connected to the cylinder embedded splicing block; a pipe clamp block is arranged in front of the cylinder embedded splicing block, and the pipe clamp block is slidably connected along the upper end surface slide of the chassis.
[0010] Preferably, the clamping assembly comprises a clamping cylinder and a clamping sleeve; the clamping sleeve is arranged on the outer side of the pipeline clamp block; the clamping cylinder is arranged in front of the clamping sleeve, and the clamping cylinder is fixedly connected to the chassis.
[0011] Preferably, the output end of the clamping cylinder is connected to the pneumatic transmission of the clamping sleeve. The power pipeline is first placed in the groove in which the cylinder is embedded in the splicing block. Then the clamping cylinder drives the clamping sleeve to push the pipeline clamp to clamp and fix the pipeline. After that, the first cylinder drives the downward pressure bracket and the second cylinder to descend and adjust, and then the second cylinder drives the cutting blade to cut the power pipeline.
[0012] Beneficial effects of the utility model:
[0013] 1. The existing power construction pipe cutting device has the problem that the power pipeline cutting spacing distribution is difficult to set, resulting in low power pipeline cutting processing accuracy and difficulty in assembly and splicing after pipeline cutting; the cutting blade is used to cut the power pipeline by inserting the cylinder embedded block into the connecting notch of the cylinder embedded splicing block for connection and assembly, which effectively improves the cutting accuracy and length adjustment function. The power pipeline is first placed in the groove in the cylinder embedded splicing block, and then the clamping cylinder drives the clamping sleeve to push the pipeline clamping block to clamp and fix the pipeline. After that, the first cylinder drives the downward pressure bracket and the second cylinder to adjust the downward movement, and then the second cylinder drives the cutting blade to cut the power pipeline; This solves the problem that the existing power construction pipe cutting device has the problem that the power pipeline cutting spacing distribution is difficult to set, resulting in low power pipeline cutting processing accuracy and difficulty in assembly and splicing after pipeline cutting;
[0014] 2. Through the setting of the blade bolt locking sleeve, the blade bolt locking sleeve clamps and connects the cutting blade. The cutting blade can be removed from the inside by loosening the blade bolt locking sleeve, which is convenient for replacement and maintenance of the cutting blade. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 What is shown is a schematic diagram of the overall three-dimensional structure of a power construction pipe cutting device of the utility model;
[0016] Figure 2 What is shown is a schematic diagram of the overall side view of a power construction pipe cutting device of the utility model;
[0017] Figure 3 The figure shows a schematic diagram of the combined three-dimensional structure of a pipe cutting component and a clamping component of a power construction pipe cutting device of the utility model;
[0018] Figure 4 What is shown is a three-dimensional structural schematic diagram of a pipe cutting component of a power construction pipe cutting device of the utility model.
[0019] The markings in the accompanying drawings are: 1. pipe cutting assembly; 2. clamping assembly; 3. workbench assembly; 101. first cylinder; 102. cylinder embedded block; 103. pressing bracket; 104. second cylinder; 105. blade bolt locking sleeve; 106. cutting blade; 201. clamping cylinder; 202. clamping sleeve; 301. chassis; 302. cylinder embedded splicing block; 303. pipeline clamping block. DETAILED DESCRIPTION
[0020] The utility model is further described below in conjunction with the accompanying drawings and embodiments.
[0021] See also Figure 1-4 The utility model provides an embodiment: a power construction pipe cutting device, including a pipe cutting component 1, a clamping component 2, and a workbench component 3; the clamping component 2 is arranged in front of the lower end of the pipe cutting component 1; the workbench component 3 is arranged at the lower end of the clamping component 2; the pipe cutting component 1 includes a first cylinder 101, a cylinder embedded block 102, a downward pressure bracket 103, a second cylinder 104, a blade bolt locking sleeve 105, and a cutting blade 106.
[0022] See also Figure 1-4In this embodiment, a downward pressure bracket 103 is provided at the lower end of the first cylinder 101, and the downward pressure bracket 103 is pneumatically connected to the output end of the first cylinder 101, and a cylinder embedding block 102 is provided at the rear of the lower end of the first cylinder 101, and the cylinder embedding block 102 is fixedly connected to the outer shell of the first cylinder 101 with bolts; a second cylinder 104 is provided on one side of the downward pressure bracket 103, and the outer shell of the second cylinder 104 is fixedly connected to the downward pressure bracket 103; a blade bolt locking sleeve 105 is provided at the lower end of the second cylinder 104, and the blade bolt locking sleeve 105 is fixedly connected to the output end bolt of the second cylinder 104; a cutting blade 106 is provided inside the blade bolt locking sleeve 105, and the cutting blade 106 is connected to the inner bolt locking clamping arrangement of the blade bolt locking sleeve 105.
[0023] See also Figure 1-4 In this embodiment, the workbench assembly 3 includes a chassis 301, a cylinder embedded splicing block 302, and a pipeline clamp block 303. The front end of the cylinder embedded block 102 is provided with a cylinder embedded splicing block 302, and the cylinder embedded splicing block 302 is fixedly connected with the cylinder embedded block 102 by a slot splicing bolt; the lower end of the cylinder embedded splicing block 302 is provided with a chassis 301, and the chassis 301 is fixedly connected with the cylinder embedded splicing block 302; the cylinder embedded splicing block 30 2 is provided with a pipeline clamp block 303 in front, and the pipeline clamp block 303 is slidably connected along the upper end surface slideway of the chassis 301, and the clamping assembly 2 includes a clamping cylinder 201 and a clamping sleeve 202; the outer side of the pipeline clamp block 303 is provided with a clamping sleeve 202; the front of the clamping sleeve 202 is provided with a clamping cylinder 201, and the clamping cylinder 201 is fixedly connected to the chassis 301, and the output end of the clamping cylinder 201 is connected to the pneumatic transmission of the clamping sleeve 202.
[0024] During operation, the cutting blade 106 is used to cut the power pipeline by inserting the cylinder embedding block 102 into the connecting notch of the cylinder embedding splicing block 302 for connection and assembly, which effectively improves the cutting accuracy and length adjustment function. The power pipeline is first placed in the groove in the cylinder embedding splicing block 302, and then the clamping cylinder 201 drives the clamping sleeve 202 to push the pipeline clamping block 303 to clamp and fix the pipeline. After that, the first cylinder 101 drives the pressing bracket 103 and the second cylinder 104 to lower and adjust, and then the second cylinder 104 drives the cutting blade 106 to cut the power pipeline. This solves the problem that the existing power construction pipe cutting device has low cutting accuracy and is difficult to assemble and splice after the pipeline is cut because the power pipeline cutting spacing distribution is difficult to set.
[0025] Next, the blade bolt locking sleeve 105 clamps and connects the cutting blade 106 , and the cutting blade 106 can be removed from the inside thereof by loosening the blade bolt locking sleeve 105 , so that the cutting blade 106 can be replaced and maintained easily.
[0026] Through the above steps, the cutting blade 106 is used to cut the power pipeline by inserting the cylinder embedded block 102 into the connecting groove of the cylinder embedded splicing block 302 for connection and assembly, which effectively improves the cutting accuracy and length adjustment function, and avoids the problem of low cutting accuracy of the power pipeline and difficult assembly and splicing after the pipeline is cut due to the difficulty in setting the cutting spacing distribution of the power pipeline in the existing power construction pipe cutting device.
[0027] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of those skilled in the art without departing from the purpose of the present invention.
Claims
1. A power construction pipe cutting device, comprising a pipe cutting assembly (1), characterized in that: The invention also comprises a clamping assembly (2) and a workbench assembly (3); the clamping assembly (2) is arranged in front of the lower end of the pipe cutting assembly (1); the workbench assembly (3) is arranged at the lower end of the clamping assembly (2); the pipe cutting assembly (1) comprises a first cylinder (101), a cylinder embedding block (102), a downward pressing bracket (103), a second cylinder (104), a blade bolt locking sleeve (105), and a cutting blade (106).
2. The power construction pipe cutting device according to claim 1, characterized in that: A pressing bracket (103) is provided at the lower end of the first cylinder (101), and the pressing bracket (103) is pneumatically connected to the output end of the first cylinder (101).
3. The power construction pipe cutting device according to claim 1, characterized in that: A cylinder embedding block (102) is arranged at the rear of the lower end of the first cylinder (101), and the cylinder embedding block (102) is fixedly connected to the outer shell of the first cylinder (101) by bolts.
4. The power construction pipe cutting device according to claim 2, characterized in that: A second cylinder (104) is arranged on one side of the pressing bracket (103), and the outer shell of the second cylinder (104) is fixedly connected to the pressing bracket (103); a blade bolt locking sleeve (105) is arranged at the lower end of the second cylinder (104), and the blade bolt locking sleeve (105) is fixedly connected to the output end bolt of the second cylinder (104); a cutting blade (106) is arranged inside the blade bolt locking sleeve (105), and the cutting blade (106) is connected to the inner bolt of the blade bolt locking sleeve (105) by locking and clamping.
5. The power construction pipe cutting device according to claim 3, characterized in that; The workbench assembly (3) comprises a chassis (301), a cylinder embedded splicing block (302), and a pipeline clamping block (303); the front end of the cylinder embedded splicing block (102) is provided with a cylinder embedded splicing block (302), and the cylinder embedded splicing block (302) is fixedly connected to the cylinder embedded splicing block (102) by means of a slot splicing bolt; the lower end of the cylinder embedded splicing block (302) is provided with a chassis (301), and the chassis (301) is fixedly connected to the cylinder embedded splicing block (302); the front of the cylinder embedded splicing block (302) is provided with a pipeline clamping block (303), and the pipeline clamping block (303) is slidably connected along a slideway on the upper end surface of the chassis (301).
6. The power construction pipe cutting device according to claim 5, characterized in that: The clamping assembly (2) comprises a clamping cylinder (201) and a clamping sleeve (202); the clamping sleeve (202) is arranged on the outside of the pipeline clamping block (303); the clamping cylinder (201) is arranged in front of the clamping sleeve (202), and the clamping cylinder (201) is fixedly connected to the chassis (301).
7. The power construction pipe cutting device according to claim 6, characterized in that: The output end of the clamping cylinder (201) is connected to the pneumatic transmission of the clamping sleeve (202).