Truss type arm support carrier roller auxiliary installation tool

By designing the truss-type boom roller assisted installation tool, using the roller to drag the wire rope and lay scaffolding channels between the rollers, the problems of swaying the variable-wire rope and safety hazards in the installation of the floating crane are solved, and the structure protection and construction safety are improved.

CN222644435UActive Publication Date: 2025-03-21NANTONG ZHENHUA HEAVY EQUIP MFG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420720873.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-09
Publication Date
2025-03-21
Estimated Expiration
2034-04-09

AI Technical Summary

Technical Problem

During the installation of the floating crane sieve winding system, the distance between the head of the arm frame and the head of the herringbone is too long, causing the wire rope to hang and wear the arm frame structure. Moreover, when removing the scaffolding after the rope is threaded, it involves a large number of high-altitude operations, which poses major safety hazards.

Method used

A truss type boom roller auxiliary installation tool is designed, including a support frame, a support roller and a clamp. The support frame is composed of multiple seamless steel pipes. The support roller is installed on both sides of the top of the support frame. The clamp is installed on the arm frame and connected to the clamp. The wire rope is dragged by the clamp to prevent it from sagging, and a scaffolding passage is laid between the clamps to facilitate inspection by construction personnel.

Benefits of technology

Effectively prevent the swathe of the wire rope from hanging, avoid wear of the boom structure, greatly reduce the setting of scaffolding and high-altitude operations, improve construction safety, and the structure is simple and easy to make, suitable for boom structures in different projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222644435U_ABST
    Figure CN222644435U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of floating crane mounting structures, in particular to a truss type boom carrier roller auxiliary mounting tool which comprises a supporting frame, a carrier roller and a hoop. The whole structure is simple, manufacturing is easy, when the variable-amplitude steel wire rope is installed, the steel wire rope is dragged through the carrier rollers, heaving of the variable-amplitude steel wire rope can be effectively prevented, abrasion of the arm support structure is avoided, erecting of scaffolds is greatly reduced, and the project period is shortened; the supporting frame is installed on the arm frame in a hoop mode, installation is firm, disassembly is convenient, and meanwhile laying of a large number of scaffolds and aloft work can be reduced; according to boom structures of different projects, the boom can be continuously used on all subsequent crane projects after being simply modified, and the practicability is high; the scaffold channel with the width of about 500mm is laid between the carrier rollers, so that constructors can conveniently check the problems of interference, deflection and the like during rope threading.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of floating crane installation structures, in particular to a truss type boom roller auxiliary installation tool. Background Art

[0002] During the installation of the luffing winding system of the floating crane, the luffing pulley block at the head of the boom and the luffing pulley block at the head of the A-frame were too long, causing the luffing wire rope to hang on the boom, wearing out the boom structure. At the same time, in order to facilitate construction workers to walk back and forth on the top of the boom to check for interference, deflection and other problems during rope threading, it is necessary to lay a full scaffold on the top of the boom. After the rope threading is completed, the removal of the scaffolding involves a lot of high-altitude operations, which poses a major safety hazard. Utility Model Content

[0003] The technical problem to be solved by the utility model is to provide a truss-type boom roller auxiliary installation tooling to solve the problems in the prior art that the variable-length wire rope is easily caused to swing on the boom, which wears the boom structure and involves a large amount of high-altitude operations when dismantling the scaffolding after the rope is threaded, posing a major safety hazard.

[0004] In order to solve the above technical problems, the technical solution of the utility model is: a truss-type boom roller auxiliary installation tool, the innovation of which is: comprising a support frame, a roller and a hoop;

[0005] The arm is arranged transversely;

[0006] The clamp is installed on the arm;

[0007] The support frame is longitudinally arranged on the top of the arm frame and connected to the hoop, and the support frame is composed of a plurality of seamless steel pipes;

[0008] The rollers are installed at both longitudinal sides of the top of the support frame.

[0009] Furthermore, a rubber pad is laid between the clamp and the arm to avoid wearing the paint of the arm.

[0010] Furthermore, the support frame includes a transverse tube, a first vertical tube and a second vertical tube, and the first vertical tube and the second vertical tube are arranged on both sides of the bottom end of the transverse tube, and a clamp is fixed to the bottom end of each of the first vertical tube and the second vertical tube, and is detachably connected to the arm through the clamp.

[0011] Furthermore, the support frame also includes an inclined straight pipe arranged close to the second vertical pipe, and the top of the inclined straight pipe is connected to the horizontal pipe, and the bottom of the inclined straight pipe is also connected to the arm through a clamp.

[0012] Furthermore, the distance between the adjacent closer ends of the second vertical pipe and the horizontal pipe is 500 mm, and the space is a scaffolding channel, and the width of the scaffolding channel is greater than the distance between the adjacent closer ends of the first vertical pipe and the horizontal pipe. By laying a scaffolding channel with a width of about 500 mm between the rollers, it is convenient for construction workers to check interference, deflection and other problems when threading the rope.

[0013] The advantages of the utility model are:

[0014] 1) The utility model has a simple overall structure and is easy to manufacture. When installing the luffing wire rope, the wire rope is dragged by the roller, which can effectively prevent the luffing wire rope from swaying, avoid wearing the boom structure, greatly reduce the erection of scaffolding, and shorten the project cycle;

[0015] 2) The support frame of the utility model is installed on the arm frame in the form of a hoop, which is firmly installed and easy to disassemble, and can also reduce the laying of a large number of scaffolds and high-altitude operations;

[0016] 3) The utility model can be used continuously in all subsequent crane projects after simple modification according to the boom structure of different projects, and has strong practicality;

[0017] 4) By laying a scaffolding channel with a width of about 500mm between the rollers, it is convenient for construction workers to check interference, deflection and other problems when threading the rope. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The utility model is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0019] Figure 1 It is the front view of the utility model.

[0020] Figure 2 Part of the structure of the utility model Figure 1 .

[0021] Figure 3 Part of the structure of the utility model Figure 2 .

[0022] Figure 4 For the utility model Figure 2 Schematic diagram of direction A. DETAILED DESCRIPTION

[0023] like Figures 1 to 4 A truss-type boom roller auxiliary installation tool shown includes a support frame 1, a roller 2 and a hoop 3;

[0024] The arm 4 is arranged transversely, and includes a thicker first connecting rod 41 and a thinner second connecting rod 42;

[0025] The clamp 3 is detachably mounted on the arm 4 by bolts, and includes a large clamp 31 mounted on the first connecting rod 41 and a small clamp 32 mounted on the second connecting rod 42 .

[0026] A rubber pad 5 is laid between the hoop 3 and the arm 4 to avoid wearing the paint of the arm 4.

[0027] The support frame 1 is longitudinally arranged on the top of the arm frame 4 and connected to the hoop 3, and the support frame 1 is composed of a plurality of seamless steel pipes;

[0028] The support frame 1 includes a transverse tube 11, a first vertical tube 12 and a second vertical tube 13, and the first vertical tube 12 and the second vertical tube 13 are arranged at both sides of the bottom end of the transverse tube 11. The first vertical tube 12 is longer and is connected to the second connecting rod 42 of the arm 4 through a small clamp 32. The second vertical tube 13 is shorter and is connected to the second connecting rod 42 of the arm 4 through a large clamp 31, so that the transverse tube 11 remains in a horizontal state.

[0029] The support frame 1 further includes an inclined straight pipe 14 disposed near the second vertical pipe 13 , and the top of the inclined straight pipe 14 is connected to the horizontal pipe 11 , and the bottom of the inclined straight pipe 14 is also connected to the arm frame 4 via a clamp 3 .

[0030] Sealing plates 15 are also fixed at both ends of the transverse pipe 11 .

[0031] The distance between the adjacent closer end of the second vertical pipe 13 and the horizontal pipe 11 is 500 mm, and the space is a scaffolding channel, the width of which is greater than the 200 mm distance between the adjacent closer end of the first vertical pipe 12 and the horizontal pipe 11. By laying a scaffolding channel with a width of about 500 mm between the rollers 2, it is convenient for construction workers to check interference, deflection and other problems when threading the rope.

[0032] The rollers 2 are installed at both longitudinal sides of the top of the support frame 1 .

[0033] Working principle of this patent:

[0034] According to the length of the boom 4 and the height of the herringbone in the project, simulate the sway of the wire rope, select the appropriate installation position of the roller 2 on the boom 4, and confirm the number of rollers 2 that need to be installed; according to the winding form of the variable-length wire rope and the spacing between each strand of the wire rope, clarify the specifications of the roller 2; install the support frame 1 on the boom 4 using the clamp 3 and the rubber pad 5, and install the roller 2 on both sides of the top of the support frame 1, and then perform subsequent operations. The overall structure of the utility model is simple and easy to make. When installing the variable-length wire rope, the wire rope is dragged by the roller 2, which can effectively prevent the sway of the variable-length wire rope, avoid wearing the boom 4 structure, greatly reduce the erection of scaffolding, and shorten the project cycle.

[0035] Those skilled in the art should understand that the present invention is not limited by the above embodiments. The above embodiments and the description are only for explaining the principle of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which are within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A truss boom roller auxiliary installation tool, which is arranged on the boom, characterized in that: Including support frame, roller and hoop; The arm is arranged transversely; The clamp is installed on the arm; The support frame is longitudinally arranged on the top of the arm frame and connected to the hoop, and the support frame is composed of a plurality of seamless steel pipes; The rollers are installed at both longitudinal sides of the top of the support frame.

2. The truss boom roller auxiliary installation tool according to claim 1, characterized in that: A rubber pad is laid between the clamp and the arm.

3. The truss boom roller auxiliary installation tool according to claim 1, characterized in that: The support frame includes a transverse tube, a first vertical tube and a second vertical tube, and the first vertical tube and the second vertical tube are arranged at both sides of the bottom end of the transverse tube. A clamp is fixed to the bottom end of each of the first vertical tube and the second vertical tube, and is detachably connected to the arm frame through the clamp.

4. The truss boom roller auxiliary installation tool according to claim 3 is characterized by: The support frame also includes an inclined straight pipe arranged close to the second vertical pipe, and the top of the inclined straight pipe is connected to the horizontal pipe, and the bottom of the inclined straight pipe is also connected to the arm through a clamp.

5. The truss boom roller auxiliary installation tool according to claim 3, characterized in that: The space between the adjacent closer ends of the second vertical pipe and the horizontal pipe is a scaffolding channel, and the width of the scaffolding channel is greater than the distance between the adjacent closer ends of the first vertical pipe and the horizontal pipe.