Novel cooling equipment

By adopting support beams and pullable baffle structures in the cooling equipment, the water flow is improved, and the secondary utilization of cooling water is realized through the conveying mechanism and the second spray assembly, the problems of prone to scale, deposit accumulation and water flow dead zones in the existing cooling tower equipment are solved, and the equipment is efficiently cleaned and the cooling water is effectively utilized.

CN222670477UActive Publication Date: 2025-03-25TIANFU GREEN CARBON (DALIAN) TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421199499.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-29
Publication Date
2025-03-25
Estimated Expiration
2034-05-29

AI Technical Summary

Technical Problem

The heat exchange filler of the existing open cross-flow cooling tower is in direct contact with the water tray at the bottom of the equipment, which is prone to scale and difficult to clean, resulting in sediment accumulation, water flow dead zones and microorganisms growing, and the cooling water has not been reused.

Method used

A new cooling device is designed, adopting support beams and pullable baffle structures to improve the water flow of the ventilation and heat exchange dehydration assembly, prevent sediment accumulation and microbial growth, and realize the secondary utilization of cooling water through the conveying mechanism and the second spray assembly.

Benefits of technology

It effectively prevents the dead zone of water flow and the accumulation of sediment, reduces the scaling degree at the bottom of the filler, facilitates equipment cleaning and maintenance, and realizes the secondary utilization of cooling water.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222670477U_ABST
    Figure CN222670477U_ABST
Patent Text Reader

Abstract

The utility model discloses novel cooling equipment, which relates to the technical field of cooling equipment and comprises a tower body, a water tray is fixed at the bottom of the tower body, a water collecting bin is fixed at the bottom of the water tray, a fan component is mounted at the top of the tower body, and ventilation heat exchange dehydration components are arranged on the left side and the right side in the tower body. Two supporting beams are arranged at the bottom of the ventilation heat exchange dehydration assembly. According to the novel cooling equipment, the supporting beams and the drawable baffles are arranged, and the supporting beams can lift the ventilation heat exchange dehydration assembly, so that the flowability of water in the water tray can be guaranteed, a water flow dead zone cannot be formed, sediment accumulation and microorganism breeding are prevented, the scaling degree of the bottom of filler can be reduced, and cleaning and maintenance of the equipment are facilitated; the drawable baffle can meet the requirement of the cross flow tower for the air inlet channel, and when the equipment is cleaned and maintained, the drawable baffle is taken off, and the equipment can be kept clean by washing the water disc with water.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of cooling equipment, in particular to a novel cooling equipment. Background Art

[0002] A cooling tower is a device that dissipates waste heat generated during industrial production or refrigeration processes into the atmosphere. It can exchange heat between the medium to be cooled (usually water) carrying waste heat and the air inside the tower, transfer the heat of the medium to the air and dissipate it into the atmosphere, thereby cooling the medium.

[0003] The heat exchange filler of the existing open cross-flow cooling tower is in direct contact with the water pan plane at the bottom of the equipment. The filler part in direct contact with the water pan at the bottom of the equipment is prone to scaling and is inconvenient to clean. Long-term use will cause sediment accumulation, dead zones in water flow, and the growth of microorganisms. In addition, the cooled water flows out without secondary use. Utility Model Content

[0004] In view of the deficiencies of the prior art, the utility model provides a novel cooling device to solve the problems raised by the above background technology.

[0005] To achieve the above objectives, the utility model is implemented through the following technical solutions: a new cooling device, including a tower body, a water tray is fixed at the bottom of the tower body, a water collecting bin is fixed at the bottom of the water tray, a fan assembly is installed on the top of the tower body, ventilation, heat exchange and dehydration assemblies are provided on the left and right sides of the interior of the tower body, two support beams are provided at the bottom of the ventilation, heat exchange and dehydration assembly, the bottom of the support beam is fixedly connected to the inner lower surface of the water tray, and the inner lower surface of the water tray is provided with two pull-out baffles.

[0006] Preferably, two first spray assemblies are fixed on the inner upper surface of the tower body, a first water pipe is fixed between the two first spray assemblies, a water inlet pipe is fixed inside the water collecting bin, a conveying mechanism is fixed to the right end of the water inlet pipe, a second water pipe is fixed to the right side of the conveying mechanism, and the other end of the second water pipe is fixedly connected to the outer wall of the first water pipe.

[0007] Preferably, a manual water filling port is opened on the left side of the water collecting bin behind the water inlet pipe, an automatic water filling port is opened on the left side of the water collecting bin behind the manual water filling port, an overflow port is opened on the left side of the water collecting bin in front of the water inlet pipe, and a sewage outlet is opened on the left side of the water collecting bin below the overflow port.

[0008] Preferably, a second spray assembly is sleeved on the outer side of the first spray assembly, a third water pipe is fixed to the outer wall of the second spray assembly, the bottom end of the third water pipe on the left side is fixedly connected to the outer wall of the third water pipe on the right side, and the bottom end of the third water pipe on the right side is fixedly connected to the top of the conveying mechanism.

[0009] Preferably, the conveying mechanism includes a fixed cylinder, which is slidably connected to a piston ring inside the fixed cylinder, a moving rod is provided inside the piston ring, baffle rods are fixed to the top and bottom of the moving rod, the other end of the baffle rod is slidably connected to the inner wall of the fixed cylinder, a piston plate is fixed to the outer wall of the moving rod located on the left side of the piston ring, a cylinder is fixed to the top of the fixed cylinder, a fixing ring is fixed inside the cylinder, a first spring is fixed to the bottom of the fixing ring, a blocking plate is fixed to the other end of the first spring, and a blocking ring is fixed to the inside of the cylinder below the blocking plate.

[0010] Preferably, a fixed shell is fixed to the right end of the water inlet pipe, the right side of the fixed shell is fixedly connected to the bottom end of the second water pipe, the fixed shell is rotatably connected to an impeller inside, the fixed shell is rotatably connected to a rotating rod inside, the rear end of the rotating rod is fixedly connected to the front end of the impeller, a disc is fixed to the front end of the rotating rod, a round rod is fixed to the front end of the disc, a connecting rod is rotatably connected to the front end of the round rod, and the right end of the connecting rod is rotatably connected to the left end of the moving rod. Beneficial Effects

[0011] The utility model provides a new cooling device. Compared with the prior art, it has the following beneficial effects:

[0012] 1. This new cooling equipment is equipped with support beams and retractable baffles. The support beams can lift the ventilation, heat exchange and dehydration components, which can ensure the fluidity of water in the water tray, prevent the formation of dead zones, prevent sediment accumulation and the growth of microorganisms, and reduce the degree of scaling at the bottom of the filler, making it easier to clean and maintain the equipment. The retractable baffles can meet the requirements of the cross-flow tower for the air inlet channel, and when cleaning and maintaining the equipment, they can be removed and the water tray can be rinsed with water to keep the equipment clean.

[0013] 2. The new cooling equipment is provided with a conveying mechanism and a second spray assembly. Water enters the water inlet pipe, and the water flow impacts the impeller. The impeller rotates with the rotating rod and the disc, and the disc rotates with the round rod. The round rod pulls the connecting rod to move, and the connecting rod pulls the moving rod to move. The moving rod moves with the piston plate, and the piston plate moves and contacts with the piston ring, and then moves with the piston ring to squeeze the cooling water inside the fixed cylinder into the inside of the cylinder. In this way, the cooling water enters the inside of the third water pipe and is finally sprayed out from the second spray assembly. In this way, the cooling water can be reused for a second time. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the structure of the utility model;

[0015] Figure 2 It is a schematic diagram of the internal structure of the utility model;

[0016] Figure 3 It is a side view structural schematic diagram of the utility model;

[0017] Figure 4 It is a schematic diagram of the internal structure of the conveying mechanism in the utility model;

[0018] Figure 5 It is a structural schematic diagram of the tower body and the water tray in the utility model;

[0019] Figure 6 It is a structural schematic diagram of the support beam in the utility model;

[0020] Figure 7 This is a schematic diagram of the structure of the drawable baffle in the utility model;

[0021] Figure 8 It is a structural schematic diagram of the second spray assembly in the utility model.

[0022] In the figure: 1. water collecting bin; 2. water inlet pipe; 3. water tray; 4. tower body; 5. fan assembly; 6. first spray assembly; 7. second spray assembly; 8. third water pipe; 9. second water pipe; 10. conveying mechanism; 11. round rod; 12. connecting rod; 13. supporting beam; 14. retractable baffle; 15. first water pipe; 16. ventilation, heat exchange and dehydration assembly; 17. manual water filling port; 18. automatic water filling port; 19. sewage outlet; 20. overflow port; 21. fixed shell; 22. impeller; 23. rotating rod; 24. disc; 25. cylinder; 26. fixed ring; 27. spring; 28. blocking plate; 29. ​​blocking ring; 30. fixed cylinder; 31. baffle rod; 32. piston ring; 33. piston plate; 34. moving rod. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] See also Figure 1-8The utility model provides a technical solution: a new cooling device, including a tower body 4, a water pan 3 is fixed at the bottom of the tower body 4, a water collecting bin 1 is fixed at the bottom of the water pan 3, a fan assembly 5 is installed on the top of the tower body 4, ventilation, heat exchange and dehydration assemblies 16 are arranged on the left and right sides of the interior of the tower body 4, two support beams 13 are arranged at the bottom of the ventilation, heat exchange and dehydration assembly 16, the bottom of the ventilation, heat exchange and dehydration assembly 16 is fixedly connected with the bottom of the support beam 13 and the inner lower surface of the water pan 3, two retractable baffles 14 are arranged on the inner lower surface of the water pan 3, two first spray assemblies 6 are fixed on the inner upper surface of the tower body 4, a first water pipe 15 is fixed between the two first spray assemblies 6, a water inlet pipe 2 is fixed inside the water collecting bin 1, a conveying mechanism 10 is fixed at the right end of the water inlet pipe 2, a second water pipe 9 is fixed on the right side of the conveying mechanism 10, and the other end of the second water pipe 9 is fixedly connected to the outer side wall of the first water pipe 15, a manual water replenishment port 17 is opened on the left side of the water collecting bin 1 behind the water inlet pipe 2, and a water collecting An automatic water filling port 18 is provided on the left side of the bin 1 behind the manual water filling port 17, an overflow port 20 is provided on the left side of the water collecting bin 1 in front of the water inlet pipe 2, and a sewage outlet 19 is provided on the left side of the water collecting bin 1 below the overflow port 20. A second spray component 7 is sleeved on the outer side of the first spray component 6, and a third water pipe 8 is fixed to the outer wall of the second spray component 7. The bottom end of the third water pipe 8 on the left is fixedly connected to the outer wall of the third water pipe 8 on the right, and the bottom end of the third water pipe 8 on the right is fixedly connected to the top of the conveying mechanism 10. The support beam 13 can lift the ventilation, heat exchange and dehydration component 16, so as to ensure the fluidity of water in the water tray 3, and will not form a dead zone of water flow, prevent sediment accumulation and the growth of microorganisms, and can also reduce the degree of scaling at the bottom of the filler, so as to facilitate the cleaning and maintenance of the equipment; the retractable baffle 14 can meet the requirements of the cross-flow tower for the air inlet channel, and when the equipment is cleaned and maintained, it can be removed and the water tray 3 can be rinsed with water to keep the equipment clean.

[0025] Furthermore, the conveying mechanism 10 includes a fixed cylinder 30, which is slidably connected to a piston ring 32 inside the fixed cylinder 30, a moving rod 34 is provided inside the piston ring 32, a blocking rod 31 is fixed to the top and bottom of the moving rod 34, the other end of the blocking rod 31 is slidably connected to the inner wall of the fixed cylinder 30, and a piston plate 33 is fixed to the outer wall of the moving rod 34 located on the left side of the piston ring 32, a cylinder 25 is fixed to the top of the fixed cylinder 30, a fixed ring 26 is fixed inside the cylinder 25, a first spring 27 is fixed to the bottom of the fixed ring 26, a blocking plate 28 is fixed to the other end of the first spring 27, a blocking ring 29 is fixed to the inside of the cylinder 25 below the blocking plate 28, a fixed shell 21 is fixed to the right end of the water inlet pipe 2, the right side of the fixed shell 21 is fixedly connected to the bottom end of the second water pipe 9, the fixed shell 21 is rotatably connected to the inside of the fixed shell 21, and the fixed shell 21 is rotatably connected to the inside of the fixed shell 21. The impeller 22 is rotatably connected with a rotating rod 23, the rear end of the rotating rod 23 is fixedly connected to the front end of the impeller 22, the front end of the rotating rod 23 is fixed with a disc 24, the front end of the disc 24 is fixed with a round rod 11, the front end of the round rod 11 is rotatably connected with a connecting rod 12, the right end of the connecting rod 12 is rotatably connected to the left end of the moving rod 34, water enters the water inlet pipe 2, the water flow will impact the impeller 22, the impeller 22 drives the rotating rod 23 and the disc 24 to rotate, the disc 24 drives the round rod 11 to rotate, the round rod 11 pulls the connecting rod 12 to move, the connecting rod 12 pulls the moving rod 34 to move, the moving rod 34 drives the piston plate 33 to move, the piston plate 33 moves and contacts with the piston ring 32, and then moves with the piston ring 32, squeezing the cooling water inside the fixed cylinder 30 into the inside of the cylinder 25, so that the cooling water enters the inside of the third water pipe 8 and is finally sprayed out from the second spray assembly 7, so that the cooling water can be reused for a second time.

[0026] During operation, the support beam 13 can lift the ventilation, heat exchange and dehydration assembly 16, so as to ensure the fluidity of water in the water pan 3, prevent the formation of dead zones of water flow, prevent the accumulation of sediments and the breeding of microorganisms, and reduce the degree of scaling at the bottom of the filler, so as to facilitate the cleaning and maintenance of the equipment; the retractable baffle 14 can meet the requirements of the cross-flow tower for the air inlet channel, and when the equipment is cleaned and maintained, it can be removed and the water pan 3 can be rinsed with water to keep the equipment clean; water enters the water inlet pipe 2, and the water flow will impact the impeller 22, the impeller 22 rotates with the rotating rod 23 and the disc 24, the disc 24 rotates with the round rod 11, the round rod 11 pulls the connecting rod 12 to move, the connecting rod 12 pulls the moving rod 34 to move, the moving rod 34 moves with the piston plate 33, the piston plate 33 moves and contacts with the piston ring 32, and then moves with the piston ring 32, squeezing the cooling water inside the fixed cylinder 30 into the inside of the cylinder 25, so that the cooling water enters the inside of the third water pipe 8 and is finally sprayed out from the second spray assembly 7, so that the cooling water can be reused for a second time.

[0027] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.

[0028] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions. The sentence "includes an element defined by ... does not exclude the existence of other identical elements in the process, method, article or device including the element".

[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A novel cooling device, comprising a tower body (4), characterized in that: A water tray (3) is fixed at the bottom of the tower body (4), a water collection bin (1) is fixed at the bottom of the water tray (3), a fan assembly (5) is installed at the top of the tower body (4), ventilation, heat exchange and dehydration assemblies (16) are provided on both left and right sides of the interior of the tower body (4), two support beams (13) are provided at the bottom of the ventilation, heat exchange and dehydration assemblies (16), the bottom of the support beams (13) is fixedly connected to the inner lower surface of the water tray (3), and the inner lower surface of the water tray (3) is provided with two retractable baffles (14).

2. A novel cooling device according to claim 1, characterized in that: Two first spray assemblies (6) are fixed on the inner upper surface of the tower body (4), a first water pipe (15) is fixed between the two first spray assemblies (6), a water inlet pipe (2) is fixed inside the water collecting bin (1), a conveying mechanism (10) is fixed at the right end of the water inlet pipe (2), a second water pipe (9) is fixed on the right side of the conveying mechanism (10), and the other end of the second water pipe (9) is fixedly connected to the outer side wall of the first water pipe (15).

3. A novel cooling device according to claim 2, characterized in that: A manual water filling port (17) is provided on the left side of the water collecting bin (1) and is located behind the water inlet pipe (2); an automatic water filling port (18) is provided on the left side of the water collecting bin (1) and is located behind the manual water filling port (17); an overflow port (20) is provided on the left side of the water collecting bin (1) and is located in front of the water inlet pipe (2); and a sewage outlet (19) is provided on the left side of the water collecting bin (1) and is located below the overflow port (20).

4. A novel cooling device according to claim 3, characterized in that: A second spray assembly (7) is sleeved on the outer side of the first spray assembly (6); a third water pipe (8) is fixed to the outer side wall of the second spray assembly (7); the bottom end of the third water pipe (8) on the left side is fixedly connected to the outer side wall of the third water pipe (8) on the right side; and the bottom end of the third water pipe (8) on the right side is fixedly connected to the top of the conveying mechanism (10).

5. A novel cooling device according to claim 4, characterized in that: The conveying mechanism (10) comprises a fixed cylinder (30), the bottom of the fixed cylinder (30) is fixedly connected to the inner lower surface of the water collecting bin (1), the inner part of the fixed cylinder (30) is slidably connected to a piston ring (32), the inner part of the piston ring (32) is provided with a moving rod (34), the top and bottom of the moving rod (34) are fixed with a blocking rod (31), the other end of the blocking rod (31) is slidably connected to the inner side wall of the fixed cylinder (30), the outer side wall of the moving rod (34) is located on the left side of the piston ring (32) and is fixed with a piston plate (33), the top of the fixed cylinder (30) is fixed with a cylinder (25), the inner part of the cylinder (25) is fixed with a fixing ring (26), the bottom of the fixing ring (26) is fixed with a first spring (27), the other end of the first spring (27) is fixed with a blocking plate (28), and the inner part of the cylinder (25) is fixed with a blocking ring (29) below the blocking plate (28).

6. A novel cooling device according to claim 5, characterized in that: A fixed shell (21) is fixed to the right end of the water inlet pipe (2), the right side of the fixed shell (21) is fixedly connected to the bottom end of the second water pipe (9), the fixed shell (21) is rotatably connected to an impeller (22) inside, the fixed shell (21) is rotatably connected to a rotating rod (23) inside, the rear end of the rotating rod (23) is fixedly connected to the front end of the impeller (22), a disc (24) is fixed to the front end of the rotating rod (23), a round rod (11) is fixed to the front end of the disc (24), the front end of the round rod (11) is rotatably connected to a connecting rod (12), and the right end of the connecting rod (12) is rotatably connected to the left end of the moving rod (34).