Reinforcing device for bridge guardrail
By designing a bridge guardrail reinforcement device including support plate, telescopic rod and threaded hole, the problem that the reinforcement device in the prior art cannot combine firmness and installation convenience is solved, and more efficient installation and firmer reinforcement effects are achieved.
Patent Information
- Application Number
- CN202421390730.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-18
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2034-06-18
AI Technical Summary
The existing bridge guardrail reinforcement devices cannot effectively combine firmness and installation convenience, resulting in inefficient use.
A reinforcement device including a first support plate, a second support plate, a telescopic rod, a connecting rod and a supporting rod is designed. Through the combination of the telescopic rod and a connecting rod, a stable right-angle triangle structure is formed, and the flexible adjustment and fixation of the supporting rod is achieved through the design of threaded holes and bolts.
This reinforcement device not only effectively reinforces the bridge guardrail, but also makes the installation and disassembly process more convenient and quick, avoiding the complexity of welding and improving the efficiency of use.
Smart Images

Figure CN222685316U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of reinforcement devices, in particular to a reinforcement device for bridge guardrails. Background Art
[0002] After long-term use, the bridge guardrail may tilt or even fall due to rainwater seeping into the soil, loosening the soil, or external impact. In order to increase the service life of the guardrail, a reinforcement device can be added to the guardrail to prevent it from falling. Existing reinforcement devices use ropes welded on both sides of the metal guardrail for reinforcement. This reinforcement method is very strong and not easy to loosen, but it is inconvenient to install, requires a lot of working time, and is more difficult to disassemble; or use several inclined columns to fix with bolts for reinforcement. Since this reinforcement method only has a few columns for support, although it is easy to install, the reinforcement of the guardrail is not strong and the effect is not strong. It can be seen that the existing reinforcement device of the bridge guardrail cannot effectively combine firmness and installation convenience, which reduces the use efficiency of the reinforcement device. Utility Model Content
[0003] In view of the shortcomings of the prior art, the utility model provides a reinforcement device for bridge guardrails, which has the advantages of effectively reinforcing the bridge guardrails and being convenient for installation and disassembly. It solves the problem that the existing reinforcement devices for bridge guardrails cannot effectively combine firmness and installation convenience, thereby reducing the use efficiency of the reinforcement devices.
[0004] The utility model provides the following technical solution: a reinforcement device for a bridge guardrail, comprising a first support plate and a second support plate, wherein the first support plate is located on the left side of the second support plate, two telescopic rods are fixedly installed between the first support plate and the second support plate, the two telescopic rods are respectively located on the front and back sides between the first support plate and the second support plate, the first support plate is divided into an upper half and a lower half, the width of the upper half of the first support plate is smaller than the width of the lower half, the telescopic rod is fixedly connected to the lower half of the first support plate, a plurality of threaded holes are symmetrically arranged on the front and back sides of the upper half of the first support plate, the heights of the plurality of threaded holes are all greater than the top height of the telescopic rods, and the A first bolt is threadedly inserted into one of the threaded holes on the front and back sides of the upper half of the first support plate, and a connecting rod is movably sleeved on the outer surfaces of the two first bolts, and the other ends of the two connecting rods are threadedly inserted with a second bolt, and the two second bolts are respectively threadedly connected to the right sides of the two telescopic rods, and two support rods are fixedly installed on the bottom of the first support plate and the second support plate, and a fixing guard plate is fixedly installed on the top of the left side of the first support plate, and fixing ears are fixedly installed on the front and back sides of the fixing guard plate, and a plurality of through holes are penetrated on the fixing ears, and a fixing groove is provided on the surface of the fixing guard plate away from the first support plate, and the fixing groove penetrates the top and bottom of the fixing guard plate.
[0005] Preferably, a spike block is fixedly mounted on the bottom of the support rod, and the spike block is in the shape of a cone.
[0006] Preferably, the outer surface of the support rod is threaded.
[0007] Preferably, the fixed guard plate is in the shape of a cuboid.
[0008] Preferably, the fixing groove is arc-shaped.
[0009] Preferably, a first buffer pad is fixedly installed on the top of the first support plate, and a second buffer pad is fixedly installed on the top of the second support plate.
[0010] Preferably, the telescopic rod is a square telescopic rod, and the insertion rod on the left side of the telescopic rod is a solid rod.
[0011] Preferably, the connecting rod is in the shape of a cuboid.
[0012] Compared with the prior art, the utility model has the following beneficial effects:
[0013] 1. The reinforcement device for bridge guardrails requires two to be used together. The two reinforcement devices are placed facing each other, and the fixing grooves on the two fixed guard plates are close to the support columns of the guardrail. Then, each support rod is buried in a hole dug in advance. After filling and compacting, a tool can be used to knock the first buffer pad and the second buffer pad to continue to move the support rod downward to fix it firmly. Finally, bolts are used to pass through the through holes of the fixing ears fixed on the fixed guard plates, fix the two fixed guard plates, and clamp the support columns of the guardrail. When it needs to be dismantled, the bolts are removed and the support rod is pulled out of the soil. This method does not require welding with the guardrail, and is more convenient for installation and disassembly, saving time and effort.
[0014] 2. The reinforcement device for bridge guardrails can form two corresponding right-angled triangles through the first support plate, two connecting rods and two telescopic rods. According to the stability of the triangle, the reinforcement device can be made more secure, and under the action of the four support rods, the penetration depth of the reinforcement device can be increased, so that its firmness is further enhanced.
[0015] 3. The reinforcement device for bridge guardrail can effectively fix the support rod in the soil through the threaded design on the outer surface of the support rod, and is not prone to sliding and loosening.
[0016] 4. The reinforcement device for bridge guardrails is provided with a plurality of threaded holes on the front and back sides of the first support plate, and cooperates with two telescopic rods to freely adjust the distance between the first support plate and the second support plate. When installing, if the installation space is narrow, the distance between the first support plate and the second support plate can be reduced to facilitate installation, thereby increasing the flexibility of the fixing device and making it more practical.
[0017] 5. The reinforcement device for bridge guardrails has a spike block fixedly installed at the bottom of the support rod. When the first buffer pad and the second buffer pad are struck, the cone design of the spike block can make the support rod move downward more smoothly. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a schematic diagram of the front view structure of the utility model;
[0019] Figure 2 This is a left-side structural schematic diagram of the utility model;
[0020] Figure 3 It is a left-side structural schematic diagram of the utility model without the fixed guard plate;
[0021] Figure 4 It is a right side structural schematic diagram of the utility model;
[0022] Figure 5 It is a schematic diagram of the top view of the fixed guard plate of the utility model.
[0023] In the figure: 1. first support plate; 2. telescopic rod; 3. support rod; 4. spike block; 5. fixing ear; 6. fixing guard plate; 7. first buffer pad; 8. threaded hole; 9. first bolt; 10. connecting rod; 11. second buffer pad; 12. second support plate; 13. second bolt; 14. fixing groove. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0025] See also Figure 1-5, a reinforcement device for a bridge guardrail, comprising a first support plate 1 and a second support plate 12, the first support plate 1 is located on the left side of the second support plate 12, two telescopic rods 2 are fixedly installed between the first support plate 1 and the second support plate 12, the two telescopic rods 2 are respectively located on the front and rear sides between the first support plate 1 and the second support plate 12, the telescopic rod 2 is a square telescopic rod, and the insertion rod on the left side of the telescopic rod 2 is a solid rod, the solid rod can increase the depth of the second bolt 13 screwed in, so that it is fixed more firmly, the first support plate 1 is divided into an upper half and a lower half, the width of the upper half of the first support plate 1 is smaller than the width of the lower half, the telescopic rod 2 is fixedly connected to the lower half of the first support plate 1, and the front and back sides of the upper half of the first support plate 1 are symmetrically arranged A plurality of threaded holes 8 are provided, and the heights of the plurality of threaded holes 8 are all greater than the top height of the telescopic rod 2. By providing a plurality of threaded holes 8 on the front and back of the first support plate 1 and cooperating with the two telescopic rods 2, the distance between the first support plate 1 and the second support plate 12 can be freely adjusted. When installing, if the installation position space is narrow, the distance between the first support plate 1 and the second support plate 12 can be reduced to facilitate installation, thereby increasing the flexibility of the fixing device and making it more practical. The second bolt 13 can be loosened by screwing it, and the first bolt 9 can be removed by screwing it. Then, the distance between the first support plate 1 and the second support plate 12 can be adjusted by pushing and pulling the second support plate 12. After the distance is adjusted, the first bolt 9 can be screwed on again. , and tighten the second bolt 13. A first bolt 9 is threadedly inserted into one of the threaded holes 8 on the front and back of the upper half of the first support plate 1. The outer surfaces of the two first bolts 9 are movably sleeved with connecting rods 10. The connecting rods 10 are rectangular. The rectangular design of the connecting rods 10 can make the contact surfaces of the two ends of the connecting rods 10 with the first support plate 1 and the telescopic rod 2 larger and more fit, making the connection more stable. The other ends of the two connecting rods 10 are threadedly inserted with second bolts 13. The two second bolts 13 are respectively threadedly connected to the right sides of the two telescopic rods 2. A first buffer pad 7 is fixedly installed on the top of the first support plate 1, and a second buffer pad 11 is fixedly installed on the top of the second support plate 12. When the reinforcement device is knocked, the first The buffer pad 7 and the second buffer pad 11 can provide buffering protection for the reinforcement device to prevent deformation due to knocking. Two support rods 3 are fixedly installed at the bottom of the first support plate 1 and the second support plate 12. The reinforcement device requires two to be used in conjunction. The two reinforcement devices are placed facing each other, and the fixing grooves 14 on the two fixed guard plates 6 are close to the support columns of the guardrail. Then, each support rod 3 is buried in a hole dug in advance. After filling and compacting, the first buffer pad 7 and the second buffer pad 11 can be knocked with a tool to move the support rod 3 downward to fix it firmly. Finally, bolts are used to pass through the through holes of the fixing ears 5 fixedly installed on the fixed guard plates 6, respectively, to fix the two fixed guard plates 6 and clamp the support columns of the guardrail. When it needs to be dismantled, the bolts are removed.The support rod 3 can be pulled out of the soil. This method does not require welding with the guardrail, which is more convenient for installation and disassembly, saving time and effort. A spike block 4 is fixedly installed at the bottom of the support rod 3. The spike block 4 is in a cone shape. When the first buffer pad 7 and the second buffer pad 11 are hit, the cone design of the spike block 4 can make the support rod 3 move down more smoothly. The outer surface of the support rod 3 is threaded. The threaded design can effectively fix the support rod 3 in the soil and is not easy to slide and relax. A fixed guard plate 6 is fixedly installed on the top of the left side of the first support plate 1. The first support plate 1 and the fixed guard plate 6 can be fixedly connected by welding. The fixed guard plate 6 is in a rectangular parallelepiped, which can make the area of the connection surface of the fixed guard plate 6 and the first support plate 1 The fixing ears 5 are fixedly installed on the front and back of the fixing guard plate 6, and a plurality of through holes are penetrated on the fixing ears 5. The surface of the fixing guard plate 6 away from the first support plate 1 is provided with a fixing groove 14. The fixing groove 14 is arc-shaped, which increases the contact area with the guardrail support column and can better fix the guardrail support column. The fixing groove 14 runs through the top and bottom of the fixing guard plate 6. Through the first support plate 1, two connecting rods 10 and two telescopic rods 2, two corresponding right triangles can be formed. According to the stability of the triangle, the reinforcement device can be made more secure, and under the action of the four support rods 3, the penetration depth of the reinforcement device can be increased, so that its secureness is further enhanced.
[0026] Working principle: When in use, first loosen the second bolt 13 according to the size of the space at the installation location, and remove the first bolt 9 by screwing it. Then, by pushing and pulling the second support plate 12, the distance between the first support plate 1 and the second support plate 12 can be adjusted. After the distance is adjusted, screw the first bolt 9 again, and tighten the second bolt 13. Then, dig a hole at the installation location, wait for the four support rods 3 to be inserted, place the two reinforcement devices facing each other, and place the fixing grooves 14 on the two fixed guard plates 6 close to the support column of the guardrail, and then Each support rod 3 is buried in a hole dug in advance, and then after filling and compacting, a tool can be used to knock on the first buffer pad 7 and the second buffer pad 11 to continue moving the support rod 3 downward to fix it firmly. Finally, bolts are used to pass through the through holes of the fixing ears 5 fixed on the fixed guard plate 6, fix the two fixed guard plates 6, and clamp the support columns of the guardrail to complete the installation. When it needs to be dismantled, the bolts are removed and the support rod 3 can be pulled out of the soil. This method does not require welding to the guardrail, and is more convenient for installation and disassembly, saving time and effort.
[0027] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0028] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A reinforcement device for a bridge guardrail, comprising a first support plate (1) and a second support plate (12), characterized in that: The first support plate (1) is located on the left side of the second support plate (12); two telescopic rods (2) are fixedly installed between the first support plate (1) and the second support plate (12); the two telescopic rods (2) are respectively located at the front and rear sides between the first support plate (1) and the second support plate (12); the first support plate (1) is divided into an upper half and a lower half; the width of the upper half of the first support plate (1) is smaller than the width of the lower half; the telescopic rods (2) are fixedly connected to the lower half of the first support plate (1); a plurality of threaded holes (8) are symmetrically arranged on the front and back sides of the upper half of the first support plate (1); the heights of the plurality of threaded holes (8) are all greater than the top height of the telescopic rods (2); and one of the threaded holes (8) on the front and back sides of the upper half of the first support plate (1) is threaded. A first bolt (9) is inserted, and the outer surfaces of the two first bolts (9) are movably sleeved with a connecting rod (10), and the other ends of the two connecting rods (10) are threadedly inserted with a second bolt (13), and the two second bolts (13) are respectively threadedly connected to the right sides of the two telescopic rods (2), and the bottoms of the first support plate (1) and the second support plate (12) are fixedly installed with two support rods (3), and the top of the left side of the first support plate (1) is fixedly installed with a fixed guard plate (6), and the front and back sides of the fixed guard plate (6) are fixedly installed with fixed ears (5), and a plurality of through holes are penetrated on the fixed ears (5), and the surface of the fixed guard plate (6) away from the first support plate (1) is provided with a fixing groove (14), and the fixing groove (14) penetrates the top and bottom of the fixed guard plate (6).
2. A reinforcement device for bridge guardrail according to claim 1, characterized in that: A spike block (4) is fixedly mounted on the bottom of the support rod (3), and the spike block (4) is in the shape of a cone.
3. A reinforcement device for bridge guardrail according to claim 2, characterized in that: The outer surface of the support rod (3) is threaded.
4. A reinforcement device for bridge guardrail according to claim 1, characterized in that: The fixed guard plate (6) is in the shape of a rectangular parallelepiped.
5. A reinforcement device for bridge guardrail according to claim 1, characterized in that: The fixing groove (14) is arc-shaped.
6. A reinforcement device for bridge guardrail according to claim 1, characterized in that: A first buffer pad (7) is fixedly mounted on the top of the first support plate (1), and a second buffer pad (11) is fixedly mounted on the top of the second support plate (12).
7. A reinforcement device for bridge guardrail according to claim 1, characterized in that: The telescopic rod (2) is a square telescopic rod, and the insertion rod on the left side of the telescopic rod (2) is a solid rod.
8. A reinforcement device for bridge guardrail according to claim 7, characterized in that: The connecting rod (10) is in the shape of a rectangular parallelepiped.