A high-rise building steel structure corridor connection locking piece
By designing a steel structure connecting locking member for high-rise buildings with locking mechanisms, the problem of single function and inability to maintain and separate steel structure connection locking equipment in the prior art is solved, and stable locking and convenient maintenance of steel structures are achieved.
Patent Information
- Application Number
- CN202421443255.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-24
- Publication Date
- 2025-04-01
- Estimated Expiration
- 2034-06-24
AI Technical Summary
The existing steel structure connection locking equipment has a relatively single function and is usually installed and locked through welding, resulting in the inability to perform subsequent maintenance and separation operations, which increases the intensity of manual labor and cannot meet the needs of normal use.
A high-rise building steel structure corridor connecting locking member is designed, including a steel structure main body, a first connecting frame beam and a locking mechanism. The locking mechanism consists of a first locking block, a second locking block, a sliding rod, a limiting sleeve and a spring, and the locking and separation switching is achieved through a sliding and limiting mechanism.
The reinforcement and locking treatment of the steel structure main body and the connecting frame beam is realized, which improves the overall stability of use, facilitates subsequent maintenance and disassembly treatment, and reduces the intensity of manual labor.
Smart Images

Figure CN222701220U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of steel structure connection equipment, in particular to a high-rise building steel structure corridor connection locking piece. Background Art
[0002] At present, steel structure is a structure made of steel materials and is one of the main types of building structures. The structure is mainly composed of steel beams, steel columns, steel trusses and other components made of steel and steel plates, and adopts rust removal and rust prevention processes such as silanization, pure manganese phosphating, water washing and drying, and galvanizing. Welds, bolts or rivets are usually used to connect the components or parts. Because of its light weight and simple construction, it is widely used in large factories, venues, super high-rise buildings, bridges and other fields. Steel structures are prone to rust. Generally, steel structures need to be rust-free, galvanized or painted, and maintained regularly.
[0003] The steel structure connection locking equipment in the prior art has a relatively simple function and is generally installed and locked by welding, which makes it impossible to perform subsequent maintenance and separation operations, increases the labor intensity, and cannot meet the requirements of normal use. Therefore, it is necessary to design a high-rise building steel structure corridor connection locking part to solve the above-mentioned problems. Utility Model Content
[0004] The purpose of the utility model is to provide a high-rise building steel structure corridor connection locking device to solve the problem that the steel structure connection locking device mentioned in the above background technology has a relatively single function and is generally installed and locked by welding, which makes it impossible to perform subsequent maintenance and separation operations, increases the labor intensity, and cannot meet the requirements of normal use.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a high-rise building steel structure corridor connection locking piece, comprising a steel structure main body:
[0006] A first connecting frame beam, the first connecting frame beam is installed on both sides of the steel structure body;
[0007] A locking mechanism, the locking mechanism is installed at the connection between the steel structure body and the first connecting frame beam, the locking mechanism includes a first locking block and a second locking block, one side of the steel structure body and located above the first connecting frame beam is slidably connected with the first locking block, the other side of the steel structure body and located above the first connecting frame beam is slidably connected with the second locking block, the interior of the second locking block is slidably connected with the first sliding rod, and the outer side of the first sliding rod is fixedly connected with the first locking plate;
[0008] The second locking plate is installed on one side of the first locking block, and a symmetrically distributed first limit sleeve is fixedly connected inside the first locking block and located on one side of the second locking plate. Two second sliding rods are slidably connected inside the first limit sleeve, and one end of the second sliding rod is connected to the first locking plate. The locking mechanism is used to switch the working state during limit locking and separation maintenance.
[0009] The technical effect of adopting the above further scheme is: the first locking block and the second locking block are respectively placed on both sides of the steel structure main body and are both located above the first connecting frame beam, the disassembly cover plate is removed, the first locking block and the second locking block are gradually slid to one side, and the first sliding rod is manually pushed to move toward the inside of the first locking block until the first sliding rod slides into the inside of the third limiting sleeve for a limiting operation. At this time, the two second sliding rods both penetrate the corresponding second limiting sleeve and slide into the inside of the first limiting sleeve, and the first spring is used to perform buffering when squeezing the inside of the first limiting sleeve. At this time, the second spring is pulled to drive the first connecting block to move, and the limiting card block is driven to move through the limiting sliding groove provided on one side of the first limiting sleeve and gradually snap into the corresponding second sliding rod for limiting installation, so as to facilitate the normal limiting of the first locking block and the second locking block, thereby reinforcing and locking the steel structure main body and the first connecting frame beam, and installing by removing the cover plate. After completing the primary locking, the limiting bolt is used in conjunction with the limiting bolt hole to perform a secondary locking operation with the first connecting frame beam, thereby improving the overall stability of use and facilitating subsequent maintenance and disassembly.
[0010] As a preferred solution of the utility model: one side of the first limit sleeve is fixedly connected to the second connecting block, the first connecting block is installed under the second connecting block, the second spring is installed between the first connecting block and the second connecting block, the outer side of the first connecting block is installed with a limit card block, one end of the limit card block slides into the second sliding rod, the limit card block is used to limit the second sliding rod, the first connecting block and the second spring are used to switch the working state during limit locking and separation maintenance, the second locking plate is fixedly connected to one side close to the second locking block with two second limit sleeves, the second sliding rod passes through the interior of the second limit sleeve, and the second limit sleeve is used to limit the second sliding rod when it slides.
[0011] The technical effect of adopting the above further scheme is: the second limit sleeve is used to limit the second sliding rod when it slides, the limit block is used to limit the second sliding rod, and the first connecting block and the second spring are used to switch the working state during limit locking and separation maintenance.
[0012] As a preferred solution of the utility model: a third limiting sleeve is fixedly connected to one side of the second locking plate and located between the two second limiting sleeves, one end of the first sliding rod slides into the third limiting sleeve, and the third limiting sleeve is used to limit the first sliding rod when it slides.
[0013] The technical effect of adopting the above further solution is: the third limiting sleeve is used to limit the first sliding rod when it slides.
[0014] As a preferred solution of the utility model: a limiting roller is installed inside the first locking block and on one side of the limiting block, and the limiting roller is used to limit the movement trajectory of the limiting block to cooperate with normal limiting and separation.
[0015] The technical effect of adopting the above further solution is: the limiting roller is used to limit the movement trajectory of the limiting block, cooperating with normal limiting and separation.
[0016] As a preferred solution of the utility model: a first spring is installed between the two second sliding rods, and the first spring is used for buffering when one of the two sliding rods slides into the first limiting sleeve and is squeezed.
[0017] The technical effect of adopting the above further solution is: the first spring is used to perform buffering when one of them slides into the first limiting sleeve and is squeezed.
[0018] As a preferred solution of the utility model: a limiting slide groove is provided on one side of the first limiting sleeve, and the limiting slide groove is used to facilitate the limiting block to be normally inserted into the second sliding rod.
[0019] The technical effect of adopting the above further solution is: the limiting sliding groove is used to facilitate the limiting block to be normally inserted into the second sliding rod.
[0020] As a preferred solution of the utility model: a disassembly cover plate is installed on the top of the first locking block and the second locking block, and a limiting bolt hole is provided inside the disassembly cover plate, and the inside of the limiting bolt hole is threadedly connected with a limiting bolt extending to the inside of the first connecting frame beam, and the limiting bolt and the limiting bolt hole are used for connecting the first locking block to the first connecting frame beam and connecting the second locking block to the first connecting frame beam.
[0021] The technical effect of adopting the above further solution is: the limiting bolts and the limiting bolt holes are used to connect the first locking block to the first connecting frame beam and the second locking block to the first connecting frame beam.
[0022] As a preferred solution of the utility model: a second connecting frame beam is installed on the outer side of the steel structure body and on the side adjacent to the two first connecting frame beams. The second connecting frame beam is used to reinforce the connection between the steel structure body and the first connecting frame beams.
[0023] The technical effect of adopting the above further solution is: the second connecting frame beam is used to reinforce the connection between the steel structure main body and the first connecting frame beam.
[0024] Compared with the prior art, the utility model has the following beneficial effects: a steel structure main body, a first connecting frame beam, a second connecting frame beam and a locking mechanism are provided. When in use, the first locking block and the second locking block are respectively placed on both sides of the steel structure main body and both are located above the first connecting frame beam. The disassembly cover is removed, and the first locking block and the second locking block are gradually slid to one side. The first sliding rod is manually pushed to move toward the inside of the first locking block until the first sliding rod slides into the inside of the third limiting sleeve to perform a limiting operation. At this time, the two second sliding rods both penetrate the corresponding second limiting sleeve and slide into the inside of the first limiting sleeve. The first spring is used to perform a buffering process when squeezing the inside of the first limit sleeve. At this time, the second spring is pulled to drive the first connecting block to move, and the limit clamping block is driven to move through a limit sliding groove provided on one side of the first limit sleeve and gradually clamped into the corresponding second sliding rod for limited installation, so as to facilitate the normal limiting of the first locking block and the second locking block, thereby reinforcing and locking the steel structure main body and the first connecting frame beam. The installation is performed by removing the cover plate. After completing the first locking, the limit bolt is used in conjunction with the limit bolt hole to perform a second locking process with the first connecting frame beam, thereby improving the overall stability of use and facilitating subsequent maintenance and disassembly. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0026] Figure 2 This is the internal structure diagram of the locking mechanism of the utility model;
[0027] Figure 3 This is an enlarged view of the structure at point A of the utility model.
[0028] In the figure: 1. Steel structure body; 2. First connecting frame beam; 3. Second connecting frame beam; 4. Locking mechanism; 5. First locking block; 6. Second locking block; 7. First sliding rod; 8. First locking plate; 9. Second locking plate; 10. Second sliding rod; 11. Limit bolt hole; 12. First limiting sleeve; 13. Second limiting sleeve; 14. First spring; 15. Limiting slide groove; 16. Limiting roller; 17. Limiting block; 18. First connecting block; 19. Second connecting block; 20. Second spring; 21. Third limiting sleeve; 22. Disassembly cover. DETAILED DESCRIPTION
[0029] See also Figure 1 , Figure 2 and Figure 3 The utility model provides a technical solution: a high-rise building steel structure corridor connection locking piece, including a steel structure main body 1:
[0030] A first connecting frame beam 2, which is installed on both sides of the steel structure body 1;
[0031] The locking mechanism 4 is installed at the connection between the steel structure body 1 and the first connecting frame beam 2. The locking mechanism 4 includes a first locking block 5 and a second locking block 6. The first locking block 5 is slidably connected to one side of the steel structure body 1 and located above the first connecting frame beam 2. The second locking block 6 is slidably connected to the other side of the steel structure body 1 and located above the first connecting frame beam 2. The first sliding rod 7 is slidably connected to the inside of the second locking block 6, and the first locking plate 8 is fixedly connected to the outside of the first sliding rod 7.
[0032] The second locking plate 9 is installed on one side of the first locking block 5. A symmetrically distributed first limit sleeve 12 is fixedly connected inside the first locking block 5 and located on one side of the second locking plate 9. Two second sliding rods 10 are slidably connected inside the first limit sleeve 12. One end of the second sliding rod 10 is connected to the first locking plate 8. The locking mechanism 4 is used to switch the working state during limit locking and separation maintenance.
[0033] The utility model is provided with a steel structure body 1, a first connecting frame beam 2, a second connecting frame beam 3 and a locking mechanism 4. When in use, the first locking block 5 and the second locking block 6 are respectively placed on both sides of the steel structure body 1 and are both located above the first connecting frame beam 2, the disassembly cover 22 is removed, the first locking block 5 and the second locking block 6 are gradually slid to one side, and the first sliding rod 7 is manually pushed to move toward the inside of the first locking block 5 until the first sliding rod 7 slides into the inside of the third limiting sleeve 21 to perform a limiting operation. At this time, the two second sliding rods 10 both penetrate the corresponding second limiting sleeve 13 and slide into the inside of the first limiting sleeve 12, and are pressed by the first spring 14. When squeezing the inside of the first limit sleeve 12, a buffering treatment is performed. At this time, the second spring 20 is pulled to drive the first connecting block 18 to move, and the limit block 17 is driven to move through the limit slot 15 provided on one side of the first limit sleeve 12 to gradually snap into the corresponding second sliding rod 10 for limited installation, which is convenient for the normal limiting of the first locking block 5 and the second locking block 6, thereby reinforcing and locking the steel structure body 1 and the first connecting frame beam 2. The installation is carried out by removing the cover plate 22. After completing the primary locking, the limiting bolt is used in conjunction with the limiting bolt hole 11 to perform a secondary locking treatment with the first connecting frame beam 2, which improves the overall stability of use and facilitates subsequent maintenance and disassembly.
[0034] See also Figure 1 , Figure 2 and Figure 3 A second connecting block 19 is fixedly connected to one side of the first limiting sleeve 12, a first connecting block 18 is installed below the second connecting block 19, a second spring 20 is installed between the first connecting block 18 and the second connecting block 19, a limiting block 17 is installed on the outer side of the first connecting block 18, one end of the limiting block 17 slides into the second sliding rod 10, and two second limiting sleeves 13 are fixedly connected to one side of the second locking plate 9 close to the second locking block 6, and the second sliding rod 10 passes through the interior of the second limiting sleeve 13.
[0035] In the above scheme, a second limiting sleeve 13 is used to limit the second sliding rod 10 when it slides, a limiting block 17 is used to limit the second sliding rod 10, and a first connecting block 18 and a second spring 20 are used to switch the working state during limiting locking and separation maintenance.
[0036] See also Figure 1 , Figure 2 and Figure 3 A third limiting sleeve 21 is fixedly connected to one side of the second locking plate 9 and is located between the two second limiting sleeves 13 , and one end of the first sliding rod 7 slides into the third limiting sleeve 21 .
[0037] The solution also includes a third limiting sleeve 21 for limiting the first sliding rod 7 when it slides.
[0038] See also Figure 1 , Figure 2 and Figure 3 A limiting roller 16 is installed inside the first locking block 5 and on one side of the limiting block 17 .
[0039] The solution also includes a limiting roller 16 for limiting the movement trajectory of the limiting block 17 to cooperate with normal limiting and separation.
[0040] See also Figure 1 , Figure 2 and Figure 3 A first spring 14 is installed between the two second sliding rods 10.
[0041] In the above solution, the first spring 14 is used to provide buffering when one of the springs slides into the first limiting sleeve 12 and is squeezed.
[0042] See also Figure 1 , Figure 2 and Figure 3 A limiting sliding groove 15 is provided on one side of the first limiting sleeve 12 .
[0043] In the above solution, the limiting sliding groove 15 is used to facilitate the limiting block 17 to be normally inserted into the second sliding rod 10 .
[0044] See also Figure 1 and Figure 2 A disassembly cover plate 22 is installed on the top of the first locking block 5 and the second locking block 6. A limiting bolt hole 11 is provided inside the disassembly cover plate 22. The inside of the limiting bolt hole 11 is threadedly connected with a limiting bolt extending to the inside of the first connecting frame beam 2.
[0045] In the above scheme, there is also a method of connecting the first locking block 5 with the first connecting frame beam 2 and connecting the second locking block 6 with the first connecting frame beam 2 by means of a limiting bolt and a limiting bolt hole 11 .
[0046] See also Figure 1 The second connecting frame beam 3 is installed on the outer side of the steel structure body 1 and on the side adjacent to the two first connecting frame beams 2. In the scheme, the second connecting frame beam 3 is used to reinforce the connection between the steel structure body 1 and the first connecting frame beam 2.
[0047] See also Figure 1 , Figure 2 and Figure 3 The working principle of the utility model is as follows: the first locking block 5 and the second locking block 6 are respectively placed on both sides of the steel structure body 1 and are both located above the first connecting frame beam 2, the disassembly cover 22 is removed, and the first locking block 5 and the second locking block 6 are gradually slid to one side, and the first sliding rod 7 is manually pushed to move inside the first locking block 5 until the first sliding rod 7 slides into the third limiting sleeve 21 for a limiting operation. At this time, the two second sliding rods 10 both penetrate the corresponding second limiting sleeve 13 and slide into the first limiting sleeve 12, and the first spring 14 is used to perform buffering when squeezing the first limiting sleeve 12. At this time, the second spring 20 is pulled to drive the first connecting block 18 to move, and the limiting block 17 is driven to move through the limiting sliding groove 15 provided on one side of the first limiting sleeve 12 and gradually inserted into the corresponding second sliding rod 10 for limiting installation, which is convenient for the normal limiting of the first locking block 5 and the second locking block 6, thereby reinforcing and locking the steel structure body 1 and the first connecting frame beam 2, and installing by removing the cover plate 22. After completing the primary locking, the limiting bolt is used in conjunction with the limiting bolt hole 11 to perform a secondary locking process with the first connecting frame beam 2, thereby improving the overall stability of use and facilitating subsequent maintenance and disassembly.
Claims
1. A high-rise building steel structure corridor connection locking member, comprising a steel structure main body (1), characterized in that: A first connecting frame beam (2), the first connecting frame beam (2) being installed on both sides of the steel structure body (1); A locking mechanism (4), the locking mechanism (4) being installed at the connection between the steel structure main body (1) and the first connecting frame beam (2), the locking mechanism (4) comprising a first locking block (5) and a second locking block (6), the first locking block (5) being slidably connected to one side of the steel structure main body (1) and located above the first connecting frame beam (2), the second locking block (6) being slidably connected to the other side of the steel structure main body (1) and located above the first connecting frame beam (2), the first sliding rod (7) being slidably connected inside the second locking block (6), and the first locking plate (8) being fixedly connected to the outer side of the first sliding rod (7); A second locking plate (9) is installed on one side of the first locking block (5); a symmetrically distributed first limit sleeve (12) is fixedly connected inside the first locking block (5) and located on one side of the second locking plate (9); two second sliding rods (10) are slidably connected inside the first limit sleeve (12); one end of the second sliding rod (10) is connected to the first locking plate (8); and the locking mechanism (4) is used to switch the working state during limit locking and separation maintenance.
2. The high-rise building steel structure corridor connection locking piece according to claim 1, characterized in that: A second connecting block (19) is fixedly connected to one side of the first limiting sleeve (12), a first connecting block (18) is installed below the second connecting block (19), a second spring (20) is installed between the first connecting block (18) and the second connecting block (19), a limiting clamping block (17) is installed on the outer side of the first connecting block (18), one end of the limiting clamping block (17) slides into the second sliding rod (10), the limiting clamping block (17) is used to limit the second sliding rod (10), the first connecting block (18) and the second spring (20) are used to switch the working state during limiting locking and separation maintenance, two second limiting sleeves (13) are fixedly connected to one side of the second locking plate (9) close to the second locking block (6), the second sliding rod (10) passes through the interior of the second limiting sleeve (13), and the second limiting sleeve (13) is used to limit the second sliding rod (10) when it slides.
3. The high-rise building steel structure corridor connection locking piece according to claim 2, characterized in that: A third limiting sleeve (21) is fixedly connected to one side of the second locking plate (9) and is located between the two second limiting sleeves (13); one end of the first sliding rod (7) slides into the third limiting sleeve (21); the third limiting sleeve (21) is used to limit the first sliding rod (7) when it slides.
4. The high-rise building steel structure corridor connection locking member according to claim 2, characterized in that: A limiting roller (16) is installed inside the first locking block (5) and on one side of the limiting block (17). The limiting roller (16) is used to limit the movement trajectory of the limiting block (17) to cooperate with normal limiting and separation.
5. The high-rise building steel structure corridor connection locking piece according to claim 1, characterized in that: A first spring (14) is installed between the two second sliding rods (10), and the first spring (14) is used to provide buffering when one of the two sliding rods slides into the first limiting sleeve (12) and is squeezed.
6. The high-rise building steel structure corridor connection locking piece according to claim 1, characterized in that: A limiting sliding groove (15) is provided on one side of the first limiting sleeve (12), and the limiting sliding groove (15) is used to facilitate the limiting clamping block (17) to be normally clamped into the interior of the second sliding rod (10).
7. The high-rise building steel structure corridor connection locking piece according to claim 1, characterized in that: A disassembly cover plate (22) is installed on the top of the first locking block (5) and the second locking block (6), and a limit bolt hole (11) is provided inside the disassembly cover plate (22). The inside of the limit bolt hole (11) is threadedly connected with a limit bolt extending into the inside of the first connecting frame beam (2), and the limit bolt and the limit bolt hole (11) are used for connecting the first locking block (5) to the first connecting frame beam (2) and for connecting the second locking block (6) to the first connecting frame beam (2).
8. The high-rise building steel structure corridor connection locking piece according to claim 1, characterized in that: A second connecting frame beam (3) is installed on the outer side of the steel structure main body (1) and on a side adjacent to the two first connecting frame beams (2); the second connecting frame beam (3) is used to reinforce the connection between the steel structure main body (1) and the first connecting frame beams (2).
Citation Information
Cited By
Industrial building structure convenient to install and adjust and construction method thereof
CN121451680A