Engineering video acceptance device
By designing an engineering camera acceptance device that includes lifting, clamping and rotational direction adjustment devices, the problem of inconvenience of acceptance of artificial handheld devices at high places is solved, convenient image acquisition and acceptance of high-altitude buildings is achieved, and acceptance efficiency and flexibility are improved.
Patent Information
- Application Number
- CN202421382293.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-18
- Publication Date
- 2025-04-01
- Estimated Expiration
- 2034-06-18
AI Technical Summary
In the prior art, manual handheld data acquisition devices are laborious when conducting engineering acceptance, and are not convenient for camera acceptance of high-altitude buildings.
An engineering camera acceptance device is designed, including a chassis, columns, lifting columns, clamping devices and rotational direction adjustment devices. The height adjustment device is adjusted, the clamping device is quickly installed and disassembled, and the rotational direction adjustment device is realized in image acquisition at different angles.
It realizes convenient image acquisition and acceptance of high-altitude buildings, solves the problem of labor and inconvenience of traditional handheld devices, and improves acceptance efficiency and flexibility.
Smart Images

Figure CN222702997U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of engineering acceptance, and specifically refers to an engineering video acceptance device. Background Art
[0002] When a construction project is completed, staff are required to conduct an acceptance inspection. It is common for manual handheld data collection devices to collect building video and acceptance inspections.
[0003] There are many inconveniences when manual inspection is performed with a handheld data collection device: manual inspection with a handheld data collection device is laborious, and it is very inconvenient when inspecting high buildings. Therefore, improvements are needed. Utility Model Content
[0004] The technical problem to be solved by the utility model is that in the prior art, when accepting a project, it is laborious to manually hold a data acquisition device, which is inconvenient to perform video acceptance of a construction project at a height.
[0005] The cam is provided with a plurality of lifting poles, and the lifting pole is provided with a plurality of lifting poles, and a plurality of lifting poles are provided on the plurality of lifting poles.
[0006] Furthermore, the rotation and direction adjustment device includes a second motor, which is fixedly connected to the outer end surface of the slide plate. A rotating shaft is provided at the output end of the second motor, and a driving bar is provided on the rotating shaft. Slots are provided in the two side walls of the engineering acceptance image collector and can be inserted into the driving bar. When the driving bar is inserted into the slot, the rotation of the engineering acceptance image collector can be realized through the drive of the second motor, so that images of the engineering acceptance can be collected at different angles.
[0007] Furthermore, the lifting device includes a motor 1, which is arranged at the inner bottom end of the column. A screw rod is provided at the output end of the motor 1, and the screw rod is connected to the internal thread of the lifting column. By rotating the screw rod, the screw rod drives the lifting column to slide in the column, so that the height of the project acceptance image collector can be adjusted to facilitate the acceptance work at high places of the construction project.
[0008] Preferably, a limiting groove is provided in the lifting column, and a limiting strip is provided in the column, and the limiting strip is inserted in the limiting groove. When the lifting column slides up and down in the column, due to the existence of the limiting strip and the limiting groove, it will not rotate in the column, and the lifting is relatively stable.
[0009] Preferably, an end plate is provided at the lower end of the lifting column, and the end plate can prevent the lifting column from detaching from the column.
[0010] Preferably, a handle is provided on the side wall of the column, and the column can be pushed by the handle, and the column can also be rotated in the chassis, which is very convenient.
[0011] Preferably, the bottom of the chassis is provided with running wheels.
[0012] The utility model adopts the above structure to achieve the following beneficial effects:
[0013] 1. The utility model can adjust the height of the project acceptance image collector by setting a lifting device, so as to facilitate image collection and acceptance of high-rise buildings during project acceptance, thus solving the defect that the traditional manual handheld project acceptance image collector is not convenient for acceptance at high places.
[0014] 2. The utility model can realize the rapid clamping and fixing of the project acceptance image collector by setting a clamping device. Under the action of the rotating direction adjustment device, the rotation orientation of the project acceptance image collector can be realized to facilitate the image collection and acceptance work at different angles of the project. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is an overall stereogram of an engineering video acceptance device of the utility model;
[0016] Figure 2 It is a connection diagram between the lifting device inside the column and the lifting column;
[0017] Figure 3 Exploded diagram of the image collector and the rotation and steering device for project acceptance;
[0018] Figure 4 for Figure 1 A partial enlarged view of point A in the middle.
[0019] Among them, 1. chassis, 2. column, 3. operation panel, 4. lifting column, 5. beam, 6. fixed block, 7. fixed plate, 8. lifting device, 9. clamping device, 10. rotation and adjustment device, 11. project acceptance image collector, 12. slide, 13. slide plate, 14. electric push rod, 15. baffle, 16. motor 2, 17. rotating shaft, 18. driving bar, 19. slot, 20. motor 1, 21. screw, 22. limit slot, 23. limit bar, 24. end plate, 25. handle, 26. walking wheel. DETAILED DESCRIPTION
[0020] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0021] In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, they cannot be understood as limitations on the present invention.
[0022] like Figure 1-4 The utility model is an engineering video acceptance device, comprising a chassis 1, a walking wheel 26 is arranged at the bottom of the chassis 1, a column 2 is rotatably arranged at the upper end of the chassis 1, an operation panel 3 is arranged on the column 2, a handle 25 is arranged on the side wall of the column 2, the column 2 can be pushed by the handle 25, and the column 2 can be rotated in the chassis 1 at the same time, which is very convenient, a lifting column 4 is slidably arranged in the column 2, a limiting groove 22 is arranged in the lifting column 4, a limiting strip 23 is arranged in the column 2, and the limiting strip 23 is inserted in the limiting groove 22. When the lifting column 4 slides up and down in the column 2, due to The existence of the limit strip 23 and the limit groove 22 prevents the column 2 from rotating, and the lifting is relatively stable. The top of the lifting column 4 is fixedly connected with a crossbeam 5, and the lower end of the lifting column 4 is provided with an end plate 24, which can prevent the lifting column 4 from detaching from the column 2. The upper end surface of the crossbeam 5 is provided with a fixing block 6, and the lower end of the crossbeam 5 is fixedly connected with a fixing plate 7. A lifting device 8 is provided inside the column 2, and a clamping device 9 is provided for sliding inside the crossbeam 5. A rotating direction adjustment device is provided on the clamping device 9, and an engineering acceptance image collector 11 is provided between the rotating direction adjustment device 10 and the fixing plate 7;
[0023] like Figure 1 and 4The clamping device 9 includes a slide groove 12, which is located in the beam 5. A slide plate 13 is slidably provided in the slide groove 12. Baffles 15 are provided on both sides of the slide plate 13. The baffles 15 slide closely on the end surface of the beam 5. An electric push rod 14 is fixedly provided on the fixed block 6. The output end of the electric push rod 14 is connected to the slide plate 13. The engineering acceptance image collector 11 can be quickly installed and disassembled through the clamping device 9.
[0024] like Figure 1 and 3 The rotating direction adjustment device 10 includes a second motor 16, which is fixedly connected to the outer end surface of the slide plate 13. A rotating shaft 17 is provided at the output end of the second motor 16, and a driving bar 18 is provided on the rotating shaft 17. Slots 19 are provided in the two side walls of the engineering acceptance image collector 11 and can be inserted by the driving bar 18. When the driving bar 18 is inserted into the slot 19, the rotation of the engineering acceptance image collector 11 can be realized through the drive of the second motor 16, so that images of the engineering acceptance can be collected at different angles.
[0025] like Figure 2 The lifting device 8 includes a motor 20, which is arranged at the inner bottom end of the column 2. A screw rod 21 is arranged at the output end of the motor 20. The screw rod 21 is connected to the internal thread of the lifting column 4. The screw rod 21 rotates and drives the lifting column 4 to slide in the column 2, so that the height of the project acceptance image collector 11 can be adjusted to facilitate the acceptance work at high places of the construction project.
[0026] During specific use, first install the project acceptance image collector 11, align the slots 19 on both sides of the project acceptance image collector 11 with the drive bar 18, then start the electric push rod 14, the slide plate 13 will slide in the slide groove 12, and the drive bar 18 will be inserted into the project acceptance image collector 11, and push the project acceptance image collector 11 into the rotating shaft 17 on the fixed plate 7, so that the project acceptance image collector 11 will not fall off, and quick installation can be achieved.
[0027] When collecting images for project acceptance, the motor 20 is controlled by the operation panel 3, the screw 21 rotates, and the screw 21 drives the lifting rod to rise and fall in the column 2. At the same time, the limit bar 23 slides in the limit groove 22 to ensure that the lifting column 4 will not rotate in the column 2, thereby achieving the purpose of adjusting the height of the project acceptance image collector 11, so as to facilitate image collection and acceptance work for high-altitude projects.
[0028] When it is necessary to adjust the shooting angle of the project acceptance image collector 11, the shaft 17 is rotated by controlling the motor 2 16. Since the drive bar 18 is plugged into the project acceptance image collector 11, the project acceptance image collector 11 will be driven to rotate on the fixed plate 7, thereby realizing the project acceptance image collection work in different directions. By pulling the handle 25, the column 2 can be flexibly rotated, and the column 2 can also be pushed at the same time, and the walking wheel 26 can walk on the ground.
[0029] The above description of the utility model and its implementation methods is not restrictive. The drawings show only one implementation method of the utility model, and the actual structure is not limited thereto. In short, if ordinary technicians in this field are inspired by it and design structural methods and embodiments similar to the technical solution without creativity without departing from the purpose of the invention of the utility model, they should all fall within the protection scope of the utility model.
Claims
1. An engineering video acceptance device, comprising a chassis, wherein a column is rotatably provided at the upper end of the chassis, characterized in that: An operation panel is provided on the column, a lifting column is slidably provided in the column, a crossbeam is fixedly connected to the top of the lifting column, a fixing block is provided on the upper end surface of the crossbeam, a fixing plate is fixedly connected to the lower end of the crossbeam, a lifting device is provided inside the column, a clamping device is slidably provided in the crossbeam, a rotating direction adjustment device is provided on the clamping device, and a project acceptance image collector is provided between the rotating direction adjustment device and the fixed plate.
2. The engineering video acceptance device according to claim 1, characterized in that: The clamping device includes a slide groove, which is located in the beam. A slide plate is slidably provided in the slide groove. Baffles are provided on both sides of the slide plate. The baffles slide tightly on the end surface of the beam. An electric push rod is fixedly connected to the fixed block, and the output end of the electric push rod is connected to the slide plate.
3. The engineering video acceptance device according to claim 2, characterized in that: The rotation and direction adjustment device includes a second motor, which is fixedly connected to the outer end surface of the slide plate. A rotating shaft is provided at the output end of the second motor, and a driving bar is provided on the rotating shaft. Slots are provided in the two side walls of the engineering acceptance image collector and can be inserted by the driving bar.
4. The engineering video acceptance device according to claim 3, characterized in that: The lifting device comprises a motor 1, which is arranged at the inner bottom end of the column. A screw rod is arranged at the output end of the motor 1, and the screw rod is connected with the inner thread of the lifting column.
5. The engineering video acceptance device according to claim 4, characterized in that: A limiting groove is arranged in the lifting column, and a limiting strip is arranged in the upright column, and the limiting strip is inserted in the limiting groove.
6. The engineering video acceptance device according to claim 5, characterized in that: An end plate is provided at the lower end of the lifting column.
7. The engineering video acceptance device according to claim 6, characterized in that: A handle is provided on the side wall of the column.
8. The engineering video acceptance device according to claim 7, characterized in that: The bottom of the chassis is provided with running wheels.