A concrete settlement observation device
By designing a concrete settlement observation device including embedded parts and mounting components, the problem of vulnerability to traditional devices is solved, effective protection of the observation head is achieved, and the accuracy of the measurement data is ensured.
Patent Information
- Application Number
- CN202421515497.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-29
- Publication Date
- 2025-04-01
- Estimated Expiration
- 2034-06-29
AI Technical Summary
Due to the lack of effective protection, traditional concrete settlement observation devices are prone to displacement, damage, loss or rust, resulting in inaccurate measurement data and affecting the monitoring of concrete project quality.
A concrete settlement observation device is designed, including embedded parts and mounting components. By placing the moving block in the inner side of the docking groove and pushing the protective case so that it is covered on the outside of the observation head, forming a relatively closed space, so as to protect the observation head to avoid damage or rust.
It effectively protects the observation head, avoids surface damage or rust, ensures the accuracy of measurement data, and improves the monitoring effect of concrete engineering quality.
Smart Images

Figure CN222704071U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of concrete settlement observation, in particular to a concrete settlement observation device. Background Art
[0002] With the development of industrial and civil construction, various complex and large-scale engineering buildings are increasing day by day. The construction of engineering buildings has changed the original state of the ground and exerted a certain pressure on the foundation of the building, which will inevitably cause the deformation of the foundation and the surrounding strata. In order to ensure the normal service life and safety of the building, and to provide reliable data and corresponding settlement parameters for the subsequent survey, design and construction, the necessity and importance of building settlement observation are becoming more and more obvious.
[0003] Traditional concrete settlement observation devices have some shortcomings. At present, many construction units often use thin steel bars, short flat irons or galvanized steel bars to simply make settlement points. During construction and use, these settlement points often shift, get damaged, lost or rust due to lack of effective protection, which will lead to inaccurate measurement data and seriously affect the monitoring of concrete project quality. Summary of the invention
[0004] The main purpose of the utility model is to provide a concrete settlement observation device, which can effectively solve the problems in the background technology.
[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0006] A concrete settlement observation device comprises an embedded part, wherein the front end of the embedded part is provided with a mounting assembly, and the mounting assembly comprises a support frame fixedly connected to the front end of the embedded part, a mounting plate is slidably connected to the inner side of the support frame, a docking groove is provided at the front end of the mounting plate, a sliding groove is provided at the side of the front end of the mounting plate close to the docking groove, an observation head is fixedly connected to the lower side of the front end of the mounting plate close to the sliding groove, a moving block is slidably connected to the inner side of the sliding groove, the front end of the moving block is fixedly connected to a protective shell, the front end of the protective shell is provided with a mounting groove, the inner side of the mounting groove is slidably connected to the sliding plate, one end of the protective shell is fixedly connected to a clamping strip, the front end of the clamping strip is provided with a positioning hole, the inner side of the positioning hole is slidably connected to a limiting plate, and the front end of the limiting plate is fixedly connected to a limiting head.
[0007] Preferably, a baffle is fixedly connected to one end of the mounting plate, there are two groups of support frames, and the docking groove and the sliding groove are connected.
[0008] Preferably, the shape of the observation head is hemispherical, the shape of the moving block is T-shaped, and the shape of the protective shell is U-shaped.
[0009] Preferably, the protective shell cover is on the outside of the observation head, the number of the mounting grooves, sliding plates, and clamping strips are two groups, the number of the positioning holes is several groups, the main body material of the limit head is rubber, and the shape of the limit head is trapezoidal.
[0010] Preferably, there are two groups of the limit plates and limit heads, and two groups of the baffles, and the two groups of baffles are distributed at one end and the other end of the mounting plate.
[0011] Preferably, a connecting hole is opened at one end of the embedded part, the shape of the embedded part is L-shaped, there are two groups of embedded parts, and the two groups of support frames are distributed at the front ends of the two groups of embedded parts.
[0012] Compared with the prior art, the utility model has the following beneficial effects:
[0013] By placing the moving block on the inner side of the docking groove and then pushing the protective shell, the moving block will be stuck in the inner side of the sliding groove, so that the protective shell covers the outside of the observation head, and then the sliding plate is inserted into the inner side of the mounting groove, so as to facilitate the protective shell to form a relatively closed space, thereby facilitating the protective shell to protect the observation head and prevent damage or rust on the surface of the observation head.
[0014] By placing the embedded parts on the outside of the steel cage, pouring concrete on the steel cage, and passing the concrete through the connecting holes, the fastness between the embedded parts and the concrete can be increased, so that the embedded parts can be embedded and installed. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the overall structure of a concrete settlement observation device of the utility model;
[0016] Figure 2 This is a schematic diagram of the structure of the installation components of a concrete settlement observation device of the utility model;
[0017] Figure 3 This is a partial structural schematic diagram of an installation component of a concrete settlement observation device of the utility model;
[0018] Figure 4 It is a schematic diagram of the enlarged structure of part A of a concrete settlement observation device of the utility model.
[0019] In the figure: 1. embedded parts; 2. connecting holes; 3. mounting components; 31. support frame; 32. mounting plate; 33. docking groove; 34. sliding groove; 35. observation head; 36. moving block; 37. protective shell; 38. mounting groove; 39. sliding plate; 310. clamping strip; 311. positioning hole; 312. limit plate; 313. limit head; 314. baffle. DETAILED DESCRIPTION
[0020] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.
[0021] like Figure 1-4 As shown, a concrete settlement observation device comprises an embedded part 1, a mounting assembly 3 is arranged at the front end of the embedded part 1, the mounting assembly 3 comprises a support frame 31 fixedly connected to the front end of the embedded part 1, a mounting plate 32 is slidably connected to the inner side of the support frame 31, a docking groove 33 is provided at the front end of the mounting plate 32, a sliding groove 34 is provided at the front end of the mounting plate 32 on the side close to the docking groove 33, an observation head 35 is fixedly connected to the lower side of the front end of the mounting plate 32 close to the sliding groove 34, a moving block 36 is slidably connected to the inner side of the sliding groove 34, a protective shell 37 is fixedly connected to the front end of the moving block 36, a mounting groove 38 is provided at the front end of the protective shell 37, a sliding plate 39 is slidably connected to the inner side of the mounting groove 38, a clamping strip 310 is fixedly connected to one end of the protective shell 37, a positioning hole 311 is provided at the front end of the clamping strip 310, a limiting plate 312 is slidably connected to the inner side of the positioning hole 311, and a limiting head 313 is fixedly connected to the front end of the limiting plate 312.
[0022] In this embodiment, a baffle 314 is fixedly connected to one end of the mounting plate 32, there are two groups of support frames 31, the docking groove 33 and the sliding groove 34 are interconnected, the observation head 35 is hemispherical in shape, the moving block 36 is T-shaped, the protective shell 37 is U-shaped, and the protective shell 37 covers the outer side of the observation head 35. There are two groups of mounting grooves 38, sliding plates 39, and card strips 310, and there are several groups of positioning holes 311. The main body material of the limit head 313 is rubber, and the shape of the limit head 313 is trapezoidal. There are two groups of limit plates 312 and limit heads 313, and there are two groups of baffles 314. The two groups of baffles 314 are distributed at one end and the other end of the mounting plate 32.
[0023] Specifically, the support frame 31 is welded to the embedded part 1, and then the mounting plate 32 is pulled to make the mounting plate 32 slide on the inner side of the support frame 31, and then the moving block 36 is placed on the inner side of the docking groove 33, and then the protective shell 37 is pushed, so that the protective shell 37 drives the moving block 36 from the inner side of the docking groove 33 to the inner side of the sliding groove 34, so that the protective shell 37 covers the outer side of the observation head 35, and at the same time, the sliding plate 39 is inserted into the inner side of the mounting groove 38, so that the protective shell 37 forms a relatively closed space, thereby protecting the observation head 35, and then the card strip 310 is pressed to make the card strip 310 pass through the positioning The hole 311 squeezes the limit head 313, so that the positioning hole 311 is sleeved on the outside of the limit plate 312, thereby limiting the position of the protective shell 37. By placing the moving block 36 on the inner side of the docking groove 33 and then pushing the protective shell 37, the moving block 36 is stuck on the inner side of the sliding groove 34, so that the protective shell 37 covers the outside of the observation head 35, and then the sliding plate 39 is inserted into the inner side of the installation groove 38, so as to facilitate the protective shell 37 to form a relatively closed space, thereby facilitating the protective shell 37 to protect the observation head 35 and prevent the surface of the observation head 35 from being damaged or rusted.
[0024] In this embodiment, a connecting hole 2 is opened at one end of the embedded part 1. The shape of the embedded part 1 is L-shaped. There are two groups of embedded parts 1. Two groups of support frames 31 are distributed at the front ends of the two groups of embedded parts 1.
[0025] Specifically, by placing the embedded part 1 outside the steel cage, then pouring concrete on the steel cage, and passing the concrete through the connecting hole 2, the fastness between the embedded part 1 and the concrete can be increased, so that the embedded part 1 can be embedded and installed.
[0026] Working principle:
[0027] When in use, first place the embedded part 1 on the outside of the steel cage, then pour concrete on the steel cage, and make the concrete pass through the connecting hole 2, so that the tightness between the embedded part 1 and the concrete can be increased, so that the embedded part 1 is pre-embedded and installed. When the concrete pouring is completed, the support frame 31 is welded to the embedded part 1, and then the mounting plate 32 is pulled to make the mounting plate 32 slide on the inner side of the support frame 31, and then the moving block 36 is placed on the inner side of the docking groove 33, and then the protective shell 37 is pushed, so that the protective shell 37 drives the moving block 36 from the inner side of the docking groove 33 to the inner side of the sliding groove 34, so that the protective shell 37 covers the outer side of the observation head 35, and at the same time, the sliding plate 39 is inserted into the inner side of the mounting groove 38, so that the protective shell 37 forms a relatively closed space, thereby protecting the observation head 35, and then press the clamping strip 310, so that the clamping strip 310 passes through the positioning hole 311 to squeeze the limit head 3 13, the positioning hole 311 is sleeved on the outer side of the limiting plate 312, thereby limiting the position of the protective shell 37. When observing the settlement of the concrete, first pull the card strip 310 to make the positioning hole 311 disengage from the limiting plate 312, and pull out the sliding plate 39, and then push the protective shell 37 to expose the observation head 35 to the outside. At this time, the worker uses a rangefinder to measure the observation head 35, so that the settlement of the concrete can be observed. By placing the moving block 36 on the inner side of the docking groove 33 and then pushing the protective shell 37, the moving block 36 is stuck on the inner side of the sliding groove 34, so that the protective shell 37 covers the outer side of the observation head 35, and then the sliding plate 39 is inserted into the inner side of the mounting groove 38, so as to facilitate the protective shell 37 to form a relatively closed space, so that the protective shell 37 can protect the observation head 35 and avoid damage or rust on the surface of the observation head 35.
[0028] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. A concrete settlement observation device, comprising an embedded part (1), characterized in that: The front end of the embedded component (1) is provided with a mounting assembly (3), the mounting assembly (3) comprising a support frame (31) fixedly connected to the front end of the embedded component (1), a mounting plate (32) slidably connected to the inner side of the support frame (31), a docking groove (33) being provided at the front end of the mounting plate (32), a sliding groove (34) being provided at the side of the front end of the mounting plate (32) close to the docking groove (33), an observation head (35) being fixedly connected to the lower side of the front end of the mounting plate (32) close to the sliding groove (34), and a sliding groove (34) being provided at the inner side of the sliding groove (34). A moving block (36) is movably connected to the moving block (36), a front end of the moving block (36) is fixedly connected to a protective shell (37), a front end of the protective shell (37) is provided with a mounting groove (38), the inner side of the mounting groove (38) is slidably connected to a sliding plate (39), one end of the protective shell (37) is fixedly connected to a clamping strip (310), a front end of the clamping strip (310) is provided with a positioning hole (311), the inner side of the positioning hole (311) is slidably connected to a limiting plate (312), and the front end of the limiting plate (312) is fixedly connected to a limiting head (313).
2. A concrete settlement observation device according to claim 1, characterized in that: One end of the mounting plate (32) is fixedly connected to a baffle (314), the supporting frame (31) has two groups, and the docking groove (33) and the sliding groove (34) are interconnected.
3. A concrete settlement observation device according to claim 2, characterized in that: The shape of the observation head (35) is hemispherical, the shape of the moving block (36) is T-shaped, and the shape of the protective shell (37) is U-shaped.
4. A concrete settlement observation device according to claim 2, characterized in that: The protective shell (37) covers the outer side of the observation head (35); the number of the mounting groove (38), the sliding plate (39), and the clamping strip (310) are two groups; the number of the positioning holes (311) are several groups; the main body material of the limit head (313) is rubber; and the shape of the limit head (313) is a trapezoid.
5. A concrete settlement observation device according to claim 2, characterized in that: There are two groups of the limit plates (312) and the limit heads (313), and there are two groups of the baffle plates (314). The two groups of baffle plates (314) are distributed at one end and the other end of the mounting plate (32).
6. A concrete settlement observation device according to claim 1, characterized in that: A connecting hole (2) is provided at one end of the embedded part (1); the embedded part (1) is L-shaped; there are two groups of embedded parts (1); and the two groups of support frames (31) are distributed at the front ends of the two groups of embedded parts (1).