Bay window installation device
By designing bay window placement and installation equipment, the automatic hook is used to realize the automatic placement of bay windows from the second floor silo to the first floor molding trolley, solving the problems of low manual lifting efficiency and safety hazards, and improving installation efficiency and safety.
Patent Information
- Application Number
- CN202421486708.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-27
- Publication Date
- 2025-04-04
- Estimated Expiration
- 2034-06-27
AI Technical Summary
During the installation of bay windows, manual lifting of bay windows is inefficient and has great safety hazards.
A bay window placement and installation equipment is designed, including a bay window lifting system and a mold trolley. The bay window is taken by automatic hook hooks to realize the automatic placement of the mold trolley from the bay window silo on the second floor to the first floor.
It improves the efficiency and safety of bay window installation, reduces the risk of manual aerial operations, and achieves more efficient and safe bay window placement and installation.
Smart Images

Figure CN222714968U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building engineering, and in particular relates to a bay window placement and installation device. Background Art
[0002] At present, in the installation of bay windows, it is necessary to manually lift the bay windows in the bay window silo on the second floor to the mold trolley on the first floor. However, manual lifting of bay windows is not only inefficient, but also poses a great safety hazard to workers. Utility Model Content
[0003] 1. Technical issues to be resolved
[0004] In view of the existing technical problems, the utility model provides a bay window installation device.
[0005] (II) Technical solution
[0006] In order to achieve the above-mentioned purpose, the main technical solutions adopted by the utility model include:
[0007] A bay window installation device comprises: a bay window lifting system and a mold trolley;
[0008] The bay window lifting system is arranged on the ground of the second floor;
[0009] There is a feeding port and a bay window silo on the second floor leading to the first floor;
[0010] The mold trolley is arranged on the ground floor;
[0011] The bay window lifting system can deliver the bay windows in the bay window silo on the second floor to the mold trolley on the first floor through the feeding port, so as to prepare for the installation of the bay windows on the first floor.
[0012] Preferably, the bay window lifting system comprises: a ceiling frame, a traveling trolley device, a moving trolley device and a hanger;
[0013] The ceiling frame is arranged on the ground of the second floor;
[0014] The walking trolley device is arranged on the ceiling frame and can move on the ceiling frame;
[0015] The mobile trolley device is mounted on the traveling trolley device and can move on the traveling trolley device;
[0016] The hanger is located below the moving trolley device and is connected to the moving trolley device.
[0017] Preferably, the ceiling frame comprises: a rack and column assembly;
[0018] The frame is arranged on the column assembly;
[0019] The column assembly is fixedly arranged on the second floor to support the rack.
[0020] Preferably, the ceiling frame further comprises a first guide rail;
[0021] The first guide rail is arranged on the frame in the longitudinal direction,
[0022] The traveling trolley device is arranged on the first guide rail and can move in the longitudinal direction along the first guide rail.
[0023] Preferably, the traveling trolley device further has a second guide rail;
[0024] The second guide rail is arranged on the traveling trolley device in the transverse direction;
[0025] The moving trolley device is arranged on the second guide rail and can move in a lateral direction along the second guide rail.
[0026] Preferably, the mobile trolley device comprises: a trolley body and a winch assembly;
[0027] The trolley body is arranged on the second guide rail and can move on the second guide rail;
[0028] The hoisting assembly is arranged on the trolley body for raising and lowering the bay window.
[0029] Preferably, the hanger is connected to the winch assembly;
[0030] The hanger is provided with a third guide rail and an automatic hook;
[0031] The automatic hook is capable of moving along the third guide rail;
[0032] The automatic hook can be adapted to the hanging rings of various types of bay window products.
[0033] Preferably, a fourth guide rail is provided on the first floor for the mold trolley to move thereon;
[0034] The mold trolley is equipped with a mold for installing the bay window.
[0035] Preferably, the second floor is set 15m away from the first floor;
[0036] A fixed material rack is arranged on the second floor for placing the bay window material bin.
[0037] (III) Beneficial effects
[0038] The bay window placement and installation equipment provided by this application realizes the lifting and transportation of bay window products from the material collection position to the installation position in a human-machine combination manner, and the production personnel on the first and second floors control the placement of bay window products in sections. This equipment uses an automatic hook to hook the bay window products, avoiding the manual hook operation of production personnel at high altitude, which is more efficient and safer. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 A schematic diagram of the structure of a bay window installation device provided by the utility model;
[0040] Figure 2 A schematic structural diagram of a bay window lifting system of a bay window placement and installation device provided by the utility model.
[0041] [Description of Reference Numerals]
[0042] 100: Bay window lifting system; 110: Ceiling frame; 120: Traveling trolley device; 130: Moving trolley device; 140: Hanging bracket;
[0043] 200: First floor; 300: Moulding trolley; 400: Second floor. DETAILED DESCRIPTION
[0044] In order to better explain the present invention and facilitate understanding, the present invention is described in detail below through specific implementation modes in conjunction with the accompanying drawings.
[0045] like Figure 1 and Figure 2 As shown: This embodiment discloses a bay window installation device, including: a bay window lifting system 100 and a mold trolley 300; the bay window lifting system 100 is set on the second floor 400.
[0046] A feeding port and a bay window silo leading to the first floor are provided on the second floor 400; the mold trolley 300 is arranged on the first floor 200; the bay window lifting system 100 can deliver the bay windows in the bay window silo on the second floor 400 to the mold trolley 300 on the first floor through the feeding port, so as to prepare for the installation of the bay windows on the first floor.
[0047] The bay window lifting system 100 in this embodiment includes: a ceiling frame 110, a traveling trolley device 120, a moving trolley device 130 and a hanger 140. The ceiling frame 110 is arranged on the second floor 400; the traveling trolley device 120 is arranged on the ceiling frame 110 and can move on the ceiling frame 110; the moving trolley device 130 is mounted on the traveling trolley device 120 and can move on the traveling trolley device 120; the hanger 140 is located below the moving trolley device 130 and is connected to the moving trolley device 130.
[0048] The ceiling frame 110 includes: a frame and a column assembly; the frame is arranged on the column assembly; the column assembly is fixedly arranged on the second floor 400 to support the frame.
[0049] In detail, the ceiling frame 110 also includes a first guide rail; the first guide rail is arranged on the frame in the longitudinal direction, and the traveling trolley device 120 is arranged on the first guide rail and can move in the longitudinal direction along the first guide rail.
[0050] In this embodiment, the traveling trolley device 120 also has a second guide rail; the second guide rail is arranged on the traveling trolley device 120 in the transverse direction; the moving trolley device 130 is arranged on the second guide rail and can move in the transverse direction along the second guide rail.
[0051] The mobile trolley device 130 comprises: a trolley body and a winch assembly; the trolley body is arranged on the second guide rail and can move on the second guide rail; the winch assembly is arranged on the trolley body for lifting and lowering the bay window.
[0052] The hanger described in this embodiment is connected to the winch assembly; a third guide rail and an automatic hook are provided on the hanger; the automatic hook can move along the third guide rail; the automatic hook can adapt to the lifting rings of various models of bay window products.
[0053] In this embodiment, the first floor 200 is provided with a fourth guide rail for the mold trolley 300 to move on; the mold trolley 300 carries a mold for installing a bay window. The second floor 400 is set 15 meters away from the first floor; a fixed material rack is set on the second floor 100 for placing the bay window material bin.
[0054] Specific workflow:
[0055] The production staff on the second floor use a wireless terminal to control the device to move horizontally from the origin to the top of the bay window silo, and lower the sling so that the automatic hook reaches the bay window product lifting ring position. After hooking the bay window, lift the sling, and then control the device to move above the feeding port. After lowering the sling to the preset height, the production staff on the first floor take over the control and control the device to lower the bay window and place it on the mold of the mold trolley 300 on the first floor. After the installation is completed, the sling is controlled to unhook and return to the origin.
[0056] According to the above operation, lift the other bay window and install it on the corresponding mold. After the operation is completed, control the lifting device to unhook and return to the original position.
[0057] The technical principle of the present invention is described above in combination with specific embodiments. These descriptions are only for explaining the principle of the present invention and cannot be interpreted as limiting the protection scope of the present invention in any way. Based on the explanation here, technicians in this field can think of other specific implementation methods of the present invention without creative work, and these methods will fall within the protection scope of the present invention.
Claims
1. A bay window installation device, characterized in that: include: Bay window lifting system and mold trolley; The bay window lifting system is arranged on the ground of the second floor; There is a feeding port and a bay window silo on the second floor leading to the first floor; The mold trolley is arranged on the ground floor; The bay window lifting system can deliver the bay windows in the bay window silo on the second floor to the mold trolley on the first floor through the feeding port, so as to prepare for the installation of the bay windows on the first floor.
2. The device according to claim 1, characterized in that The bay window lifting system comprises: a ceiling frame, a walking trolley device, a moving trolley device and a hanger; The ceiling frame is arranged on the ground of the second floor; The walking trolley device is arranged on the ceiling frame and can move on the ceiling frame; The mobile trolley device is mounted on the traveling trolley device and can move on the traveling trolley device; The hanger is located below the moving trolley device and is connected to the moving trolley device.
3. The device according to claim 2, characterized in that The ceiling frame comprises: a rack and a column assembly; The frame is arranged on the column assembly; The column assembly is fixedly arranged on the second floor to support the rack.
4. The device according to claim 3, characterized in that The ceiling frame also includes a first guide rail; The first guide rail is arranged on the frame in the longitudinal direction, The traveling trolley device is arranged on the first guide rail and can move in the longitudinal direction along the first guide rail.
5. The device according to claim 4, characterized in that The traveling trolley device also has a second guide rail; The second guide rail is arranged on the traveling trolley device in the transverse direction; The moving trolley device is arranged on the second guide rail and can move in a lateral direction along the second guide rail.
6. The device according to claim 5, characterized in that The mobile trolley device comprises: a trolley body and a winch assembly; The trolley body is arranged on the second guide rail and can move on the second guide rail; The hoisting assembly is arranged on the trolley body for raising and lowering the bay window.
7. The device according to claim 6, characterized in that The hanger is connected to the winch assembly; The hanger is provided with a third guide rail and an automatic hook; The automatic hook is capable of moving along the third guide rail; The automatic hook can be adapted to the hanging rings of various types of bay window products.
8. The device according to claim 7, characterized in that A fourth guide rail is provided on the first floor for the mold trolley to move thereon; The mold trolley is equipped with a mold for installing the bay window.
9. The device according to claim 8, characterized in that The second floor is set 15m away from the first floor; A fixed material rack is arranged on the second floor for placing the bay window material bin.