A double tank interconnection device for battery cell slurry
By designing a dual-tank interoperability device for battery cell slurry, the system paralysis caused by single tank failure in the existing technology is solved, the continuity and stability of production are achieved, and the capacity output during the production process is ensured.
Patent Information
- Application Number
- CN202421512702.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2025-04-04
- Estimated Expiration
- 2034-06-28
AI Technical Summary
The existing battery cell slurry tank device has single tank operation, the system is paralyzed during failure, the material precipitation and scrapping risk is high, the material supply speed is slow, the production efficiency is low, and it is difficult to quickly switch the supplied raw materials, and the production plan is insufficient.
A dual-tank intercommunication device for battery cell slurry is designed. By connecting two raw material circulation systems, when an abnormality or failure occurs in a certain tank, it can quickly switch to the intercommunication tank to ensure the continuity and stability of the system production and realize the uninterrupted operation of the system.
Through the dual-tank intercom device, the scrap risk of material precipitation is reduced, the production continuity and stability is ensured, the device is allowed to be continuously maintained and maintained, and the capacity output during the production process is ensured.
Smart Images

Figure CN222715100U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of battery production process, in particular to a double-tank intercommunication device for battery core slurry. Background Art
[0002] The battery cell slurry needs to go through a series of processing steps before it can be used in battery manufacturing. The battery cell slurry is generally placed in a slurry tank. The battery cell slurry tank has important functions such as raw material mixing, slurry storage, slurry transportation and slurry quality control.
[0003] After searching, a slurry tank device with an existing announcement number of CN114160523A is found, which includes a slurry tank and a plurality of high-frequency ultrasonic vibrators, which are installed on the outer wall of the slurry tank. The high-frequency ultrasonic vibrators are used to generate high-frequency vibrations to the slurry tank. The slurry attached to the slurry tank falls off under the high-frequency vibration, thereby achieving the effect of quickly cleaning the slurry tank.
[0004] The tank body of the existing slurry tank device is generally a single tank. The raw materials enter the single tank and form a single operating system through pipeline components. Once the slurry tank and pipeline components are abnormal or fail, it will directly lead to system paralysis, and there is a risk of material precipitation and scrap. At the same time, there are problems such as slow feeding speed, low production efficiency, difficulty in quickly switching the supplied raw materials, and insufficient adaptability of the production plan. Utility Model Content
[0005] 1. Purpose of the utility model
[0006] In view of the problems existing in the prior art, the purpose of the utility model is to provide a dual-tank interconnection device for battery cell slurry. By connecting two raw material circulation systems, when an abnormality or failure occurs in one tank, it can quickly switch to the interconnected tank to ensure the continuity and stability of the system production, while facilitating uninterrupted maintenance and servicing of the tank, and realizing uninterrupted operation of the system, thereby ensuring the production capacity output of the production process.
[0007] (II) Technical solution
[0008] In order to solve the above technical problems, the utility model provides a battery cell slurry dual-tank interconnection device, including a ton barrel, a first raw material tank, a second raw material tank, a first raw material circulation system, a second raw material circulation system, a connecting pipe assembly, a first controller, a second controller, a first discharge pipe and a second discharge pipe, the ton barrel is used to supply battery cell slurry, and the ton barrel is provided with a first feed pipe and a second feed pipe;
[0009] The first raw material tank is provided with a first feed port and a first discharge port, and the first feed port is connected to the first feed pipe;
[0010] The second raw material tank is provided with a second feed port and a second discharge port, and the second feed port is connected to the second feed pipe;
[0011] The first raw material circulation system is connected to the first raw material tank, and the first raw material circulation system includes a first diaphragm pump, and the first diaphragm pump is used to drive the battery core slurry to circulate in the first circulation system;
[0012] The second raw material circulation system is connected to the second raw material tank, and the second raw material circulation system includes a second diaphragm pump, and the second diaphragm pump is used to drive the battery cell slurry to circulate in the second raw material circulation system;
[0013] The connecting pipe assembly is used to connect the first raw material circulation system and the second raw material circulation system;
[0014] The first controller is used to control the discharge of the first discharge port;
[0015] The second controller is used to control the discharge of the second discharge port;
[0016] The first discharge pipe is connected to the first discharge port; and
[0017] The second discharge pipe is connected to the second discharge port.
[0018] Preferably, the first raw material circulation system also includes a first raw material circulation guide pipe, the first diaphragm pump is located on the first raw material circulation guide pipe, the input end of the first raw material circulation guide pipe is connected to the bottom of the first raw material tank, and the output end of the first raw material circulation guide pipe is connected to the top of the first raw material tank.
[0019] Preferably, the second raw material circulation system also includes a second raw material circulation guide pipe, the second diaphragm pump is located on the second raw material circulation guide pipe, the input end of the second raw material circulation guide pipe is connected to the bottom of the second raw material tank, and the output end of the second raw material circulation guide pipe is connected to the top of the second raw material tank.
[0020] Preferably, the first raw material circulation guide pipe is provided with a first concentration detector, and the first concentration detector is used to detect the concentration of battery cell slurry in the first raw material circulation guide pipe. The second raw material circulation guide pipe is provided with a second concentration detector, and the second concentration detector is used to detect the concentration of battery cell slurry in the second raw material circulation guide pipe.
[0021] Preferably, the connecting pipe assembly includes a first connecting pipe, a first pneumatic ball valve is provided on the first connecting pipe, the first connecting pipe is located below the first raw material circulation system and the second raw material circulation system, a first pipe tee is provided on the first raw material circulation guide pipe, a second pipe tee is provided on the second raw material circulation guide pipe, one end of the first connecting pipe is connected to the first pipe tee, and the other end of the first connecting pipe is connected to the second pipe tee.
[0022] Preferably, a second pneumatic ball valve is provided at one end of the first pipe tee, a third pneumatic ball valve is provided at the other end of the first pipe tee, a fourth pneumatic ball valve is provided at one end of the second pipe tee, and a fifth pneumatic ball valve is provided at the other end of the second pipe tee.
[0023] Preferably, the first raw material circulation guide pipe is also provided with a sixth pneumatic ball valve, and the first diaphragm pump is located between the third pneumatic ball valve and the sixth pneumatic ball valve; the second raw material circulation guide pipe is also provided with a seventh pneumatic ball valve, and the second diaphragm pump is located between the fourth pneumatic ball valve and the seventh pneumatic ball valve.
[0024] Preferably, the connecting pipe assembly also includes a second connecting pipe, which is located on the side of the first raw material circulation system and the second raw material circulation system, one end of the second connecting pipe is connected to the first raw material circulation guide pipe, and the other end of the second connecting pipe is connected to the second raw material circulation guide pipe, and an eighth pneumatic ball valve is provided on the second connecting pipe.
[0025] Preferably, the connecting pipe assembly also includes a third connecting pipe, one end of the third connecting pipe is connected to the top of the first raw material tank, the other end of the third connecting pipe is connected to the top of the second raw material tank, and a ninth pneumatic ball valve is provided on the third connecting pipe.
[0026] Preferably, the first feed pipe is provided with a tenth pneumatic ball valve, the second feed pipe is provided with an eleventh pneumatic ball valve, the second discharge pipe is provided with a twelfth pneumatic ball valve, and the second discharge pipe is provided with a thirteenth pneumatic ball valve.
[0027] 3. Beneficial effects
[0028] Compared with the prior art, the advantages of the present invention are:
[0029] The utility model sets two raw material tanks and configures corresponding feed pipes, discharge pipes, diaphragm pumps, raw material circulation systems, controllers and pneumatic ball valves. The two raw material circulation systems are connected through the first connecting pipe, the second connecting pipe and the third connecting pipe. The three connecting pipes are all provided with pneumatic ball valves. The battery cell slurry only passes through the raw material circulation system. When the solid content of the slurry is qualified, the controller controls the discharge. When one of the raw material tanks or the raw material circulation system fails, the pneumatic ball valve related to the slurry supply at the faulty position is closed to facilitate the repair or replacement of the faulty parts. At the same time, the pneumatic ball valves on the first connecting pipe and the second connecting pipe are opened to quickly switch to the interconnected tank body. The battery cell slurry in one of the raw material circulation systems can enter the other raw material circulation system through the first connecting pipe, reducing the risk of scrapping of material precipitation, ensuring the continuity and stability of production, and at the same time, the device can be uninterruptedly maintained and maintained to ensure the production capacity output during the production process.
[0030] The above-mentioned records related to the content of the utility model are only an overview of the technical solution of the present application. In order to enable ordinary technicians in the field to more clearly understand the technical solution of the present application, and then implement it according to the text of the specification and the contents recorded in the drawings, and in order to make the above-mentioned purpose and other purposes, features and advantages of the present application easier to understand, the following is an explanation in combination with the specific implementation method and drawings of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] The drawings are only used to illustrate the principles, implementation methods, applications, characteristics and effects of the specific embodiments of the present application and other related contents, and shall not be considered as limitations of the present application.
[0032] In the drawings of the specification:
[0033] Figure 1 It is a schematic diagram of the structure of a single tank device for battery slurry in the prior art;
[0034] Figure 2 A schematic diagram of the structure of a dual-tank interconnection device for battery cell slurry Figure 1 ;
[0035] Figure 3 A schematic diagram of the structure of a dual-tank interconnection device for battery cell slurry Figure 2 ;
[0036] Figure 4 It is a structural schematic diagram of a connecting component of a dual-tank interconnection device for battery cell slurry;
[0037] Figure 5 This is a schematic diagram of the structure of the first raw material circulation system of a dual-tank interconnected device for battery cell slurry.
[0038] The reference numerals in the above drawings are described as follows:
[0039] 1. Ton barrel,
[0040] 2. First feed pipe, 21. Tenth pneumatic ball valve,
[0041] 3. Second feed pipe, 31. Eleventh pneumatic ball valve,
[0042] 4. First raw material tank, 41. First feed port, 42. First discharge port,
[0043] 5. Second raw material tank, 51. Second feed port, 52. Second discharge port,
[0044] 6. First raw material circulation system, 61. First diaphragm pump, 62. First raw material circulation guide pipe, 621. First pipe fitting tee, 63. Second pneumatic ball valve, 64. First concentration detector, 65. Third pneumatic ball valve, 66. Sixth pneumatic ball valve,
[0045] 7. Second raw material circulation system, 71. Second diaphragm pump, 72. Second raw material circulation guide pipe, 721. Second pipe fitting tee, 73. Fourth pneumatic ball valve, 74. Second concentration detector, 75. Fifth pneumatic ball valve, 76. Seventh pneumatic ball valve,
[0046] 8. Connecting pipe assembly, 81. First connecting pipe, 811. First pneumatic ball valve, 82. Second connecting pipe, 821. Eighth pneumatic ball valve, 83. Third connecting pipe, 831. Ninth pneumatic ball valve,
[0047] 9. The first controller,
[0048] 10. Second controller,
[0049] 11. The first discharge pipe, 111. The twelfth pneumatic ball valve,
[0050] 12. The second discharge pipe. 121. The thirteenth pneumatic ball valve. DETAILED DESCRIPTION
[0051] In order to explain in detail the possible application scenarios, technical principles, specific schemes that can be implemented, and the purposes and effects that can be achieved, the following is a detailed description of the specific embodiments listed in conjunction with the accompanying drawings. The embodiments described herein are only used to more clearly illustrate the technical solutions of the present application, and are therefore only used as examples, and cannot be used to limit the scope of protection of the present application.
[0052] Reference to "embodiment" herein means that the specific features, structures or characteristics described in conjunction with the embodiment may be included in at least one embodiment of the present application. The term "embodiment" appearing in various places in the specification does not necessarily refer to the same embodiment, nor does it particularly limit its independence or association with other embodiments. In principle, in the present application, as long as there is no technical contradiction or conflict, the various technical features mentioned in the embodiments can be combined in any way to form a corresponding implementable technical solution.
[0053] Unless otherwise defined, the technical terms used in this document have the same meanings as those generally understood by those skilled in the art to which this application belongs; the use of relevant terms in this document is only for describing specific embodiments and is not intended to limit this application.
[0054] In the description of this application, the term "and / or" is an expression used to describe the logical relationship between objects, indicating that three relationships may exist, for example, X and / or Y, which means: X exists, Y exists, and X and Y exist at the same time. In addition, the character " / " in this article generally indicates that the objects before and after are in a logical relationship of "or".
[0055] In the present application, terms such as “first” and “second” are merely used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship of quantity, priority or sequence between these entities or operations.
[0056] Without further limitations, in this application, the words "include", "comprises", "has" or other similar expressions used in the sentences are intended to cover non-exclusive inclusion. These expressions do not exclude the presence of additional elements in the process, method or product including the elements, so that the process, method or product including a series of elements may include not only those limited elements, but also other elements not explicitly listed, or also include elements inherent to such process, method or product.
[0057] Similar to the understanding in the Examination Guidelines, in this application, expressions such as "greater than", "less than", "exceed" and the like are understood to exclude the number itself; expressions such as "above", "below", "within" and the like are understood to include the number itself. In addition, in the description of the embodiments of this application, "multiple" means more than two (including two), and similar expressions related to "multiple" are also understood in this way, such as "multiple groups", "multiple times", etc., unless otherwise clearly and specifically limited.
[0058] In the description of the embodiments of the present application, space-related expressions used, such as "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "vertical", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc., indicate the orientation or position relationship based on the orientation or position relationship shown in the specific embodiments or drawings, and are only for the convenience of describing the specific embodiments of the present application or facilitating the reader's understanding, and do not indicate or imply that the referred device or component must have a specific position, a specific orientation, or be constructed or operated in a specific orientation, and therefore cannot be understood as a limitation on the embodiments of the present application.
[0059] Unless otherwise expressly specified or limited, in the description of the embodiments of the present application, the terms such as "install", "connect", "connect", "fix", "set", etc. used should be understood in a broad sense. For example, the "connection" can be a fixed connection, a detachable connection, or an integrated setting; it can be a mechanical connection, an electrical connection, or a communication connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. For technicians in the technical field to which the present application belongs, the specific meanings of the above terms in the embodiments of the present application can be understood according to the specific circumstances.
[0060] like Figure 1 As shown, the prior art is a single tank device for battery cell raw materials. The raw materials in the ton barrel 1 enter the first raw material tank 4 through the first feed pipe 2. The battery cell slurry in the first raw material tank 4 circulates through the first raw material circulation system 6. After repeated circulation, it is detected by the first concentration detector 64. When the solid content of the slurry is qualified, the twelfth pneumatic ball valve 111 is opened to discharge the material under the action of the diaphragm pump.
[0061] Based on the existing technology, this embodiment adds a raw material tank and a raw material circulation system, and realizes the intercommunication of raw materials in the two raw material circulation systems.
[0062] See also Figure 2-5 A dual-tank interconnection device for battery cell slurry includes a ton barrel 1, a first raw material tank 4, a second raw material tank 5, a first raw material circulation system 6, a second raw material circulation system 7, a connecting pipe assembly 8, a first controller 9, a second controller 10, a first discharge pipe 11 and a second discharge pipe 12. The ton barrel 1 is used to supply battery cell slurry, and the ton barrel 1 is provided with a first feed pipe 2 and a second feed pipe 3;
[0063] The first raw material tank 4 is provided with a first feed port 41 and a first discharge port 42, and the first feed port 41 is connected to the first feed pipe 2;
[0064] The second raw material tank 5 is provided with a second feed port 51 and a second discharge port 52, and the second feed port 51 is connected to the second feed pipe 3;
[0065] The first raw material circulation system 6 is connected to the first raw material tank 4, and the first raw material circulation system 6 includes a first diaphragm pump 61, and the first diaphragm pump 61 is used to drive the battery core slurry to circulate in the first raw material circulation system 6;
[0066] The second raw material circulation system 7 is connected to the second raw material tank 5, and the second raw material circulation system 7 includes a second diaphragm pump 71, and the second diaphragm pump 71 is used to drive the battery cell slurry to circulate in the second raw material circulation system 7;
[0067] The connecting pipe assembly 8 is used to connect the first raw material circulation system 6 and the second raw material circulation system 7;
[0068] The first controller 9 is used to control the discharge of the first discharge port 42;
[0069] The second controller 10 is used to control the discharge of the second discharge port 52;
[0070] The first discharge pipe 11 is connected to the first discharge port 42; and
[0071] The second discharge pipe 12 is connected to the second discharge port 52 .
[0072] The first raw material circulation system 6 also includes a first raw material circulation guide pipe 62, a first diaphragm pump 61 is located on the first raw material circulation guide pipe 62, an input end of the first raw material circulation guide pipe 62 is connected to the bottom of the first raw material tank 4, and an output end of the first raw material circulation guide pipe 62 is connected to the top of the first raw material tank 4.
[0073] The second raw material circulation system 7 also includes a second raw material circulation guide pipe 72, and the second diaphragm pump 71 is located on the second raw material circulation guide pipe 72. The input end of the second raw material circulation guide pipe 72 is connected to the bottom of the second raw material tank 5, and the output end of the second raw material circulation guide pipe 72 is connected to the top of the second raw material tank 5.
[0074] The first raw material circulation guide pipe 62 is provided with a first concentration detector 64, which is used to detect the concentration of battery cell slurry in the first raw material circulation guide pipe 62, and the second raw material circulation guide pipe 72 is provided with a second concentration detector 74, which is used to detect the concentration of battery cell slurry in the second raw material circulation guide pipe 72.
[0075] The connecting pipe assembly 8 includes a first connecting pipe 81, on which a first pneumatic ball valve 811 is provided. The first connecting pipe 81 is located below the first raw material circulation system 6 and the second raw material circulation system 7. The first raw material circulation guide pipe 62 is provided with a first pipe fitting tee 621, and the second raw material circulation guide pipe 72 is provided with a second pipe fitting tee 721. One end of the first connecting pipe 81 is connected to the first pipe fitting tee 621, and the other end of the first connecting pipe 81 is connected to the second pipe fitting tee 721.
[0076] A second pneumatic ball valve 63 is provided at one end of the first pipe tee 621 , a third pneumatic ball valve 65 is provided at the other end of the first pipe tee 621 , a fourth pneumatic ball valve 73 is provided at one end of the second pipe tee 721 , and a fifth pneumatic ball valve 75 is provided at the other end of the second pipe tee 721 .
[0077] A sixth pneumatic ball valve 66 is also provided on the first raw material circulation guide pipe 62, and the first diaphragm pump 61 is located between the third pneumatic ball valve 65 and the sixth pneumatic ball valve 66. A seventh pneumatic ball valve 76 is also provided on the second raw material circulation guide pipe 72, and the second diaphragm pump 71 is located between the fourth pneumatic ball valve 73 and the seventh pneumatic ball valve 76.
[0078] The connecting pipe assembly 8 also includes a second connecting pipe 82, which is located on the side of the first raw material circulation system 6 and the second raw material circulation system 7. One end of the second connecting pipe 82 is connected to the first raw material circulation guide pipe 62, and the other end of the second connecting pipe 82 is connected to the second raw material circulation guide pipe 72. The second connecting pipe 82 is provided with an eighth pneumatic ball valve 821.
[0079] The connecting pipe assembly 8 also includes a third connecting pipe 83 , one end of which is connected to the top of the first raw material tank 4 , and the other end of the third connecting pipe 83 is connected to the top of the second raw material tank 5 . A ninth pneumatic ball valve 831 is provided on the third connecting pipe 83 .
[0080] The first feed pipe 2 is provided with a tenth pneumatic ball valve 21 , the second feed pipe 3 is provided with an eleventh pneumatic ball valve 31 , the second discharge pipe 12 is provided with a twelfth pneumatic ball valve 111 , and the second discharge pipe 12 is provided with a thirteenth pneumatic ball valve 121 .
[0081] It should be noted that the first pneumatic ball valve 811, the eighth pneumatic ball valve 821, the twelfth pneumatic ball valve 111, and the thirteenth pneumatic ball valve 121 are closed, and the remaining pneumatic ball valves are in a normally open state.
[0082] Circulation process of the first raw material tank: the tenth pneumatic ball valve 21 is opened, the slurry in the ton barrel 1 is transported to the first raw material tank 4, and the slurry in the first raw material tank 4 forms a self-circulating loop through the second pneumatic ball valve 63, the third pneumatic ball valve 65, the sixth pneumatic ball valve 66 and the first concentration detector 64 under the action of the first diaphragm pump 61. After repeated circulation, the slurry is tested by the first concentration detector 64. When the solid content of the slurry is qualified, the twelfth pneumatic ball valve 111 is opened to discharge the material.
[0083] The circulation process of the second raw material tank: the eleventh pneumatic ball valve 31 is opened, and the slurry in the ton barrel 1 is transported to the second raw material tank 5. Under the action of the second diaphragm pump 71, the slurry in the second raw material tank 5 passes through the fourth pneumatic ball valve 73, the fifth pneumatic ball valve 75, the seventh pneumatic ball valve 76 and the second concentration detector 74 to form a self-circulating loop. After repeated circulation, the slurry is detected by the second concentration detector 74. When the solid content of the slurry is qualified, the thirteenth pneumatic ball valve 121 is opened to discharge the material. When the second raw material tank 5 has an abnormal fault and needs maintenance, the fourth pneumatic ball valve 73 is closed, and the second raw material tank 5 is in a temporary storage state. After the first raw material tank 4 is discharged, the twelfth pneumatic ball valve 111 is closed, and the fourth pneumatic ball valve 73 and the first pneumatic ball valve 811 are opened. Under the action of the first diaphragm pump 61, the slurry in the second raw material tank 5 passes through the fourth pneumatic ball valve 73, the first pneumatic ball valve 811 and the third pneumatic ball valve 65 and enters the circulation of the first raw material tank 4. After repeated cycles, the slurry is tested by the first concentration detector 64. When the solid content of the slurry is qualified, the twelfth pneumatic ball valve 111 is opened to discharge the material.
[0084] When the second diaphragm pump 71 fails, the fifth pneumatic ball valve 75 and the seventh pneumatic ball valve 76 are closed, and the second diaphragm pump 71 can be repaired or replaced. The second raw material tank 5 cannot circulate by itself, and the first pneumatic ball valve 811 and the eighth pneumatic ball valve 821 are opened. Under the action of the first diaphragm pump 61, the slurry in the second raw material tank 5 passes through the fourth pneumatic ball valve 73, the first pneumatic ball valve 811 and the third pneumatic ball valve 65 to enter the circulation of the first raw material tank 4. Two circulation loops are formed by the first diaphragm pump 61. Loop 1 is the circulation process of returning to the first raw material tank 4 mentioned above; part of the slurry in loop 2 passes through the eighth pneumatic ball valve 821 and the second concentration detector 74 and returns to the second raw material tank 5. After repeated circulation, it is detected by the second concentration detector 74. When the solid content of the slurry is qualified, the thirteenth pneumatic ball valve 121 is opened to discharge the material.
[0085] When the second concentration detector 74 fails, the eighth pneumatic ball valve 821 is closed, the second diaphragm pump 71 is closed, and the second concentration detector 74 can be repaired or replaced. The first pneumatic ball valve 811 is opened, and the cell slurry in the second raw material tank 5 enters the circulation of the first raw material tank 4 through the fourth pneumatic ball valve 73, the first pneumatic ball valve 811 and the third pneumatic ball valve 65 under the action of the first diaphragm pump 61. After the liquid level of the first raw material tank 4 increases, because the outlet of the first raw material tank 4 and the outlet of the second raw material tank 5 are at the same height of the horizontal pipe through the third connecting pipe 83 where the ninth pneumatic ball valve 831 is located, the ninth pneumatic ball valve 831 is opened, and the slurry flows from the first raw material tank 4 with a high liquid level through the ninth pneumatic ball valve 831 to the second raw material tank 5 with a low liquid level, forming a new cycle. After repeated cycles, it is detected by the first concentration detector 64. When the solid content of the slurry is qualified, the twelfth pneumatic ball valve 111 is opened to discharge the material.
[0086] It should be noted that if Figure 3 As shown, a diaphragm pump can be installed on one side of the ton barrel 1, and the diaphragm pump transports the raw materials in the ton barrel to the first feed pipe 2 and the second feed pipe 3. The discharge ends of the first discharge pipe 11 and the second discharge pipe 12 can be provided with pneumatic ball valves and diaphragm pumps. When the pneumatic ball valve is opened, the battery cell slurry in the first discharge pipe 11 and the second discharge pipe 12 is discharged under the action of the diaphragm pump.
[0087] Those skilled in the art will appreciate that, although some embodiments herein include certain features included in other embodiments but not other features, the combination of features of different embodiments is meant to be within the scope of the present application and form different embodiments. For example, in the claims, any one of the claimed embodiments may be used in any combination.
[0088] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them; although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present application, and they should all be included in the scope of the claims and specification of the present application. In particular, as long as there is no structural conflict, the various technical features mentioned in the various embodiments can be combined in any way. The present application is not limited to the specific embodiments disclosed herein, but includes all technical solutions that fall within the scope of the claims.
Claims
1. A dual-tank interconnection device for battery cell slurry, characterized in that: include: A ton barrel (1), the ton barrel (1) is used to supply battery core slurry, and the ton barrel (1) is provided with a first feed pipe (2) and a second feed pipe (3); A first raw material tank (4), wherein the first raw material tank (4) is provided with a first feed port (41) and a first discharge port (42), and the first feed port (41) is connected to the first feed pipe (2); A second raw material tank (5), wherein the second raw material tank (5) is provided with a second feed port (51) and a second discharge port (52), and the second feed port (51) is connected to the second feed pipe (3); A first raw material circulation system (6), the first raw material circulation system (6) being connected to the first raw material tank (4), the first raw material circulation system (6) comprising a first diaphragm pump (61), the first diaphragm pump (61) being used to drive the cell slurry to circulate in the first raw material circulation system; A second raw material circulation system (7), wherein the second raw material circulation system (7) is connected to the second raw material tank (5), and the second raw material circulation system (7) comprises a second diaphragm pump (71), and the second diaphragm pump (71) is used to drive the battery cell slurry to circulate in the second raw material circulation system; A connecting pipe assembly (8), the connecting pipe assembly (8) being used to connect the first raw material circulation system (6) and the second raw material circulation system (7); A first controller (9), the first controller (9) being used to control the discharge of the first discharge port (42); A second controller (10), the second controller (10) being used to control the discharge of the second discharge port (52); A first discharge pipe (11), the first discharge pipe (11) being connected to the first discharge port (42); and A second discharge pipe (12), the second discharge pipe (12) is connected to the second discharge port (52).
2. A battery core slurry dual tank interconnection device according to claim 1, characterized in that: The first raw material circulation system (6) also includes a first raw material circulation guide pipe (62), the first diaphragm pump (61) is located on the first raw material circulation guide pipe (62), the input end of the first raw material circulation guide pipe (62) is connected to the bottom of the first raw material tank (4), and the output end of the first raw material circulation guide pipe (62) is connected to the top of the first raw material tank (4).
3. A battery core slurry dual tank interconnection device according to claim 2, characterized in that: The second raw material circulation system (7) also includes a second raw material circulation guide pipe (72), the second diaphragm pump (71) is located on the second raw material circulation guide pipe (72), the input end of the second raw material circulation guide pipe (72) is connected to the bottom of the second raw material tank (5), and the output end of the second raw material circulation guide pipe (72) is connected to the top of the second raw material tank (5).
4. A battery core slurry dual tank interconnection device according to claim 3, characterized in that: The first raw material circulation flow guide pipe (62) is provided with a first concentration detector (64), and the first concentration detector (64) is used to detect the concentration of the battery cell slurry in the first raw material circulation flow guide pipe (62). The second raw material circulation flow guide pipe (72) is provided with a second concentration detector (74), and the second concentration detector (74) is used to detect the concentration of the battery cell slurry in the second raw material circulation flow guide pipe (72).
5. A battery core slurry dual tank interconnection device according to claim 4, characterized in that: The connecting pipe assembly (8) comprises a first connecting pipe (81), the first connecting pipe (81) is provided with a first pneumatic ball valve (811), the first connecting pipe (81) is located below the first raw material circulation system (6) and the second raw material circulation system (7), the first raw material circulation guide pipe (62) is provided with a first pipe fitting tee (621), the second raw material circulation guide pipe (72) is provided with a second pipe fitting tee (721), one end of the first connecting pipe (81) is connected to the first pipe fitting tee (621), and the other end of the first connecting pipe (81) is connected to the second pipe fitting tee (721).
6. A battery core slurry dual tank interconnection device according to claim 5, characterized in that: A second pneumatic ball valve (63) is provided at one end of the first pipe fitting tee (621), a third pneumatic ball valve (65) is provided at the other end of the first pipe fitting tee (621), a fourth pneumatic ball valve (73) is provided at one end of the second pipe fitting tee (721), and a fifth pneumatic ball valve (75) is provided at the other end of the second pipe fitting tee (721).
7. A battery core slurry dual tank interconnection device according to claim 6, characterized in that: The first raw material circulation guide pipe (62) is also provided with a sixth pneumatic ball valve (66), and the first diaphragm pump (61) is located between the third pneumatic ball valve (65) and the sixth pneumatic ball valve (66). The second raw material circulation guide pipe (72) is also provided with a seventh pneumatic ball valve (76), and the second diaphragm pump (71) is located between the fourth pneumatic ball valve (73) and the seventh pneumatic ball valve (76).
8. A battery core slurry dual tank interconnection device according to claim 7, characterized in that: The connecting pipe assembly (8) further comprises a second connecting pipe (82), wherein the second connecting pipe (82) is located on the side of the first raw material circulation system (6) and the second raw material circulation system (7), one end of the second connecting pipe (82) is connected to the first raw material circulation flow guide pipe (62), and the other end of the second connecting pipe (82) is connected to the second raw material circulation flow guide pipe (72), and an eighth pneumatic ball valve (821) is provided on the second connecting pipe (82).
9. A battery core slurry dual tank interconnection device according to claim 8, characterized in that: The connecting pipe assembly (8) further comprises a third connecting pipe (83), one end of the third connecting pipe (83) being connected to the top of the first raw material tank (4), and the other end of the third connecting pipe (83) being connected to the top of the second raw material tank (5), and a ninth pneumatic ball valve (831) being provided on the third connecting pipe (83).
10. The battery core slurry dual tank interconnection device according to claim 1, characterized in that: The first feed pipe (2) is provided with a tenth pneumatic ball valve (21), the second feed pipe (3) is provided with an eleventh pneumatic ball valve (31), the second discharge pipe (12) is provided with a twelfth pneumatic ball valve (111), and the second discharge pipe (12) is provided with a thirteenth pneumatic ball valve (121).
Citation Information
Patent Citations
Slurry tank device
CN114160523A