A movable precast concrete component steaming equipment
By designing a steaming and resting equipment for foldable and telescopic precast concrete components, the time-consuming and labor-consuming problem of building a steaming shed in the prior art is solved, the equipment is easily moved and quickly installed, and the construction efficiency is improved.
Patent Information
- Application Number
- CN202421298030.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-07
- Publication Date
- 2025-04-08
- Estimated Expiration
- 2034-06-07
AI Technical Summary
In the prior art, building a steam maintenance shed requires a lot of time and energy to workers, and is not convenient for movement and transportation.
A movable precast concrete member steaming equipment is designed, and a plurality of integral U-shaped fixing frames are connected by an X-shaped folding frame, with a retractable heat shield covered on the outside, and a jet pipe is installed on the fixing frame to spray steam.
The device is foldable and retractable, expanding when used, and folding when not used, making it convenient for movement and transportation, reducing overlap installation time, and flexible and convenient use.
Smart Images

Figure CN222726967U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of concrete curing, in particular to a movable prefabricated concrete component steaming and curing device. Background Art
[0002] For concrete projects with large surface coefficients, short curing time requirements, high early strength requirements, or when the natural temperature is low and there are technical difficulties, it is necessary to use a steam curing shed to cure the newly poured concrete. Steam is a good heat carrier. It releases a lot of heat when condensed and has a high heat release coefficient. It can heat and harden the concrete at a higher temperature, and it can also supply a certain amount of moisture to prevent the concrete from drying out and dehydration due to excessive evaporation of moisture.
[0003] At present, workers directly build steam curing sheds around prefabricated components to maintain them. Workers first select a larger open space, then use several brackets to build the skeleton of the curing shed, and then cover the skeleton with a curing hood to form an enclosed space. Then, steam is passed into the curing shed through steam pipes to maintain the prefabricated components. However, building a steam curing shed requires a certain amount of time and physical strength of workers, which is relatively inconvenient. Utility Model Content
[0004] The utility model provides a movable prefabricated concrete component steaming device to solve the problems in the background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a movable precast concrete component steaming and curing equipment, comprising a plurality of fixed frames that are U-shaped as a whole, adjacent fixed frames are connected by X-shaped folding frames, the outer side of the fixed frame is covered with a heat insulation cover that can be extended and retracted along with the folding frame, one end of the heat insulation cover is open, and two matching shielding curtains are installed at the open end, and the two shielding curtains can close the end opening of the heat insulation cover, and U-shaped frames are fixedly installed on the inner walls of both sides of the fixed frame located at both ends of the heat insulation cover, and an injection pipe with a nozzle evenly arranged on one side is placed on the two U-shaped frames on the fixed frame, and a first threaded joint is provided on the injection pipe.
[0006] Furthermore, casters are installed at the bottom ends of both arms of the fixing frame.
[0007] Furthermore, a connecting rod located at the upper end of the fixing frame is fixedly connected between the inner walls on both sides of the fixing frame, and a reinforcing rod is fixedly connected between the connecting rod and the top inner wall of the fixing frame.
[0008] Furthermore, the folding frame includes a first movable rod, a second movable rod and a movable groove. The inner walls on both sides of the fixed frame are provided with movable grooves. The first movable rod and the second movable rod are hinged in an X shape. One end of the first movable rod and the second movable rod is hinged to the fixed frame, and the other end thereof is hinged to a slider slidably connected to the movable groove.
[0009] Furthermore, a second threaded joint is installed at one end of the top of the air injection pipe.
[0010] Furthermore, grooves cooperating with the U-shaped frame are provided on the inner walls on both sides of the fixing frame.
[0011] Compared with the prior art, the utility model provides a movable precast concrete component steaming and curing equipment, which has the following beneficial effects: the movable precast concrete component steaming and curing equipment can be folded and retracted as a whole, and can be unfolded when in use and folded when not in use, which is convenient for movement and transportation, can reduce the overlapping installation time, and is flexible and convenient to use. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of the structure of the utility model;
[0013] Figure 2 It is a schematic structural diagram of the heat insulation cover of the utility model;
[0014] Figure 3 It is a schematic diagram of the structure of the utility model after removing the shielding curtain;
[0015] Figure 4 It is an enlarged schematic diagram of point A of the present utility model.
[0016] In the figure: 1, fixed frame; 2, first movable rod; 3, second movable rod; 4, movable groove; 5, caster; 6, connecting rod; 7, reinforcing rod; 8, heat insulation cover; 9, shielding curtain; 10, U-shaped frame; 11, jet pipe; 12, nozzle; 13, first threaded joint; 14, second threaded joint; 15, groove. DETAILED DESCRIPTION
[0017] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0018] See also Figure 1-4The utility model discloses a movable precast concrete component steaming and curing equipment, comprising a plurality of fixing frames 1 which are U-shaped as a whole, and adjacent fixing frames 1 are connected by X-shaped folding frames, and the outer side of the fixing frames 1 is covered with a heat insulation cover 8 which can be telescoped along with the folding frame, and one end of the heat insulation cover 8 is open, and two matching shielding curtains 9 are installed at the open end, and the two shielding curtains 9 can close the end openings of the heat insulation cover 8, and U-shaped frames 10 are fixedly installed on the inner walls of both sides of the fixing frames 1 at both ends of the heat insulation cover 8, and an injection pipe 11 with a nozzle 12 evenly arranged on one side is placed on the two U-shaped frames 10 on the fixing frames 1, and a first threaded joint 13 is provided on the injection pipe 11.
[0019] The air injection pipe 11 is in the shape of a square tube as a whole.
[0020] The folding frame includes a first movable rod 2, a second movable rod 3 and a movable groove 4. The inner walls on both sides of the fixed frame 1 are provided with movable grooves 4. The first movable rod 2 and the second movable rod 3 are hinged in an X shape. One end of the first movable rod 2 and the second movable rod 3 is hinged to the fixed frame 1, and the other end thereof is hinged to a slider slidably connected to the movable groove 4.
[0021] The sides of the two shielding curtains 9 that are close to each other are equipped with magnets, so that the sides of the two shielding curtains 9 that are close to each other can be magnetically connected, which facilitates the opening and closing of the two shielding curtains 9.
[0022] The first threaded joint 13 is used for threaded connection with a hose connected to the steam generator, so that the spray pipe 11 with the spray head 12 can spray steam.
[0023] Specifically, casters 5 are installed at the bottom ends of both arms of the fixing frame 1 .
[0024] In this embodiment, the provision of the casters 5 facilitates the movement between the plurality of fixing frames 1 so as to unfold the heat insulation cover 8 .
[0025] Specifically, a connecting rod 6 located at the upper end of the fixing frame 1 is fixedly connected between the inner walls on both sides of the fixing frame 1 , and a reinforcing rod 7 is fixedly connected between the connecting rod 6 and the top inner wall of the fixing frame 1 .
[0026] In this embodiment, the top of the fixing frame 1 is arched upward, and the arrangement of the connecting rod 6 and the reinforcing rod 7 can improve the strength of the fixing frame 1 .
[0027] Specifically, a second threaded joint 14 is installed at one end of the top of the air injection pipe 11 .
[0028] In this embodiment, when the air injection pipes 11 are provided on the fixing frames 1 at both ends of the heat insulation cover 8, the two air injection pipes 11 can be connected together by connecting a hose with nut joints at both ends to the second threaded joint 14.
[0029] Specifically, grooves 15 cooperating with the U-shaped frame 10 are formed on the inner walls of both sides of the fixing frame 1 .
[0030] In this embodiment, the groove 15 is provided so that the gas injection pipe 11 whose end is placed on the U-shaped frame 10 can be inserted therein, so as to limit the gas injection pipe 11 to a certain extent.
[0031] In summary, the movable precast concrete component steaming and curing equipment can be folded and retracted as a whole. It can be unfolded when in use and folded when not in use. It is convenient to move and transport, can reduce the overlapping installation time, and is flexible and convenient to use.
[0032] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A movable precast concrete component steaming device, comprising a plurality of fixing frames (1) which are in a U-shape as a whole, characterized in that: Adjacent fixed frames (1) are connected via an X-shaped folding frame, the outer side of the fixed frame (1) is covered with a heat insulation cover (8) that can be extended and retracted along with the folding frame, one end of the heat insulation cover (8) is open, and two matching shielding curtains (9) are installed at the open end, and the two shielding curtains (9) can close the end opening of the heat insulation cover (8), and U-shaped frames (10) are fixedly installed on the inner walls of both sides of the fixed frame (1) at both ends of the heat insulation cover (8), and an injection pipe (11) with a nozzle (12) evenly arranged on one side is placed on the two U-shaped frames (10) on the fixed frame (1), and a first threaded joint (13) is provided on the injection pipe (11).
2. The movable precast concrete component steaming equipment according to claim 1, characterized in that: Casters (5) are installed at the bottom ends of both arms of the fixing frame (1).
3. The movable precast concrete component steaming equipment according to claim 1, characterized in that: A connecting rod (6) located at the upper end of the fixing frame (1) is fixedly connected between the inner walls on both sides of the fixing frame (1), and a reinforcing rod (7) is fixedly connected between the connecting rod (6) and the top inner wall of the fixing frame (1).
4. The movable precast concrete component steaming equipment according to claim 1, characterized in that: The folding frame comprises a first movable rod (2), a second movable rod (3) and a movable groove (4); movable grooves (4) are provided on the inner walls of both sides of the fixed frame (1); the first movable rod (2) and the second movable rod (3) are hinged in an X shape; one end of the first movable rod (2) and the second movable rod (3) is hinged to the fixed frame (1); and the other end thereof is hinged to a slider slidably connected to the movable groove (4).
5. The movable precast concrete component steaming equipment according to claim 1, characterized in that: A second threaded joint (14) is installed at one end of the top of the air injection pipe (11).
6. The movable precast concrete component steaming equipment according to claim 1, characterized in that: Grooves (15) matching with the U-shaped frame (10) are provided on the inner walls on both sides of the fixing frame (1).