Composite corrugated drainage mat

By using three-dimensional polypropylene mesh pads and non-woven geotextiles, combined with the assembly components of 7-shaped card holders, conical head blocks and elastic jacks, the problem of easy deviation of the composite corrugated drainage pads during the paving process is solved, achieving a more stable connection and a firmer splicing.

CN222730512UActive Publication Date: 2025-04-08JINAN JINLIYUAN ENVIRONMENTAL PROTECTION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420848135.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-23
Publication Date
2025-04-08
Estimated Expiration
2034-04-23

AI Technical Summary

Technical Problem

During the paving process, composite corrugated drainage pads are prone to shift or lift due to uneven force at the splicing, resulting in gaps at the splicing.

Method used

A composite corrugated drainage pad consisting of a three-dimensional polypropylene mesh pad and a non-woven geotextile is used, and a stable connection to the composite corrugated drainage pad is achieved through assembled components, including a 7-shaped locker, a conical head block and an elastic jack.

Benefits of technology

It effectively avoids the deviation at the splicing of composite wave-shaped drainage pads, enhances the connection force at the splicing, and ensures the stability of the drainage pads and the splicing firmness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222730512U_ABST
    Figure CN222730512U_ABST
Patent Text Reader

Abstract

The utility model discloses a composite corrugated drainage mat, which relates to the technical field of composite corrugated drainage mats, including a composite corrugated drainage mat composed of a three-dimensional polypropylene mesh mat and a non-woven geotextile, and an assembly component; the assembly component includes a splicing unit and a reinforcement unit, the splicing unit is used to realize the splicing and clamping of two composite corrugated drainage mats, and the reinforcement unit is used to further increase the connection force between the splicing unit and the composite corrugated drainage mat. The utility model sets an assembly component, realizes the connection between the top sheet and the bottom sheet by the clamping of the 7-shaped clamping seat and the cone head clamping block, clamps the two sections of the composite corrugated drainage mat in the middle by the top sheet and the bottom sheet, and then realizes the splicing and fixing of the two sections of the composite corrugated drainage mat, and pierces the non-woven geotextile through the elastic barb, so that the connection force between the non-woven geotextile and the top sheet and the bottom sheet is further increased, and compared with the structure of the traditional composite corrugated drainage mat directly overlapped, it can effectively avoid the offset phenomenon at the splicing of the composite corrugated drainage mat.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of composite corrugated drainage mats, in particular to a composite corrugated drainage mat. Background Art

[0002] The composite corrugated drainage mat is made of three layers combined and heat-sealed at one time. The upper layer is the water filtration part, the middle layer is an effective drainage part formed by fine filaments with "W"-shaped longitudinal drainage cavities and filament-shaped transverse transparent structures, and the lower layer is the water filtration layer (sometimes a water-blocking layer depending on the project needs).

[0003] When the composite corrugated drainage mat is being laid, the joints of the composite corrugated drainage mat at both ends are simply overlapped. As a result, during the subsequent filling operation, the composite corrugated drainage mat is easily offset or the ends are lifted due to force, resulting in gaps at the joints of the composite corrugated drainage mat. Based on this, a composite corrugated drainage mat is provided. Utility Model Content

[0004] The purpose of the utility model is to provide a composite corrugated drainage mat in order to solve the above-mentioned problems.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a composite corrugated drainage mat, comprising a composite corrugated drainage mat composed of a three-dimensional polypropylene mesh mat and a non-woven geotextile, wherein the non-woven geotextile is symmetrically heat-sealed and fixed to the upper and lower ends of the three-dimensional polypropylene mesh mat, and the two composite corrugated drainage mats are connected and fixed by assembling components;

[0006] The assembly assembly includes a splicing unit and a reinforcement unit;

[0007] The splicing unit is used to realize the splicing and clamping of two composite corrugated drainage mats;

[0008] The reinforcement unit is used to further increase the connection force between the splicing unit and the composite corrugated drainage mat.

[0009] As a further solution of the utility model: the splicing unit includes a bottom sheet, a 7-shaped card seat, a top sheet, and a cone head card block;

[0010] The 7-shaped holder is symmetrically fixed at the top center of the bottom sheet, and when the two composite corrugated drainage pads are butt-jointed, they are symmetrically placed on the top of the bottom sheet with the 7-shaped holder as the center;

[0011] The cone head block is fixed at the bottom center of the top sheet, the top sheet is pressed onto the upper surfaces of the two composite corrugated drainage pads, and the cone head block is clamped onto the inner sides of the two 7-shaped clamps to connect the bottom sheet and the top sheet, thereby clamping and fixing the two composite corrugated drainage pads through the bottom sheet and the top sheet.

[0012] As a further solution of the utility model: the reinforcement unit includes an elastic barbed hook, and the elastic barbed hook is symmetrically fixed to the top of the bottom sheet and the bottom of the top sheet with the 7-shaped clamping seat and the cone head clamping block as the center;

[0013] The elastic barbed hooks on the top of the bottom sheet pierce the nonwoven geotextile at the bottom, and the elastic barbed hooks on the bottom of the top sheet pierce the nonwoven geotextile at the top. The elastic barbed hooks piercing the nonwoven geotextile can further increase the connection force between the nonwoven geotextile and the bottom sheet and the top sheet.

[0014] As a further solution of the utility model: there are multiple 7-shaped card seats and cone head blocks evenly distributed along the tracks of the bottom plate and the top plate, the length of the 7-shaped card seats along the distribution direction is greater than the length of the cone head blocks, and the number of the cone head blocks is greater than the number of the 7-shaped card seats.

[0015] As a further solution of the utility model: a bending portion is formed on the top of the elastic barbed hook, and the bending portion faces the 7-shaped holder and the cone head block, and the height of the bottom of the elastic barbed hook from the bottom of the bending portion is greater than the thickness of the non-woven geotextile.

[0016] Compared with the prior art, the beneficial effects of the utility model are:

[0017] By setting up an assembly component, the connection between the top sheet and the bottom sheet is achieved through the clamping of the 7-shaped clamping seat and the cone head clamping block, and the two sections of the composite corrugated drainage mat are clamped in the middle by the top sheet and the bottom sheet, and then the two sections of the composite corrugated drainage mat are spliced ​​and fixed, and the non-woven geotextile is pierced by elastic barbed hooks, so that the connection force between the non-woven geotextile and the top sheet and the bottom sheet is further increased. Compared with the traditional structure of directly overlapping the composite corrugated drainage mat, the offset phenomenon at the splicing of the composite corrugated drainage mat can be effectively avoided. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a structural schematic diagram of the utility model;

[0019] Figure 2 It is a structural schematic diagram of the assembly components of the utility model;

[0020] Figure 3 The utility model is a schematic diagram of the distribution state of the 7-shaped clamping seat and the cone head clamping block.

[0021] In the figure: 1. composite corrugated drainage mat; 101. three-dimensional polypropylene mesh mat; 102. non-woven geotextile; 2. assembly components; 201. bottom sheet; 202. 7-shaped holder; 203. top sheet; 204. cone head block; 205. elastic barb hook. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figures 1 to 3 In the embodiment of the utility model, a composite corrugated drainage mat includes a composite corrugated drainage mat 1 composed of a three-dimensional polypropylene mesh mat 101 and a non-woven geotextile 102. The non-woven geotextile 102 is symmetrically heat-sealed and fixed to the upper and lower ends of the three-dimensional polypropylene mesh mat 101. The two composite corrugated drainage mats 1 are connected and fixed by an assembly component 2.

[0024] The assembly component 2 includes a splicing unit and a reinforcement unit;

[0025] The splicing unit is used to realize the splicing and clamping of two composite corrugated drainage mats 1;

[0026] The reinforcement unit is used to further increase the connection force between the splicing unit and the composite corrugated drainage mat 1;

[0027] The splicing unit includes a bottom sheet 201, a 7-shaped card seat 202, a top sheet 203, and a cone head card block 204;

[0028] The 7-shaped holder 202 is symmetrically fixed at the top center of the bottom film 201. When two composite corrugated drainage pads 1 are connected, they are symmetrically placed on the top of the bottom film 201 with the 7-shaped holder 202 as the center.

[0029] The cone head block 204 is fixed at the bottom center of the top sheet 203, the top sheet 203 is pressed on the upper surface of the two composite corrugated drainage pads 1, and the cone head block 204 is clamped on the inner side of the two 7-shaped clamping seats 202 to realize the connection between the bottom sheet 201 and the top sheet 203, and the two composite corrugated drainage pads 1 are clamped and fixed by the bottom sheet 201 and the top sheet 203;

[0030] The reinforcement unit includes an elastic barbed hook 205, which is symmetrically fixed to the top of the bottom sheet 201 and the bottom of the top sheet 203 with the 7-shaped clamping seat 202 and the cone head clamping block 204 as the center;

[0031] The elastic barbed hooks 205 on the top of the bottom sheet 201 pierce the nonwoven geotextile 102 at the bottom, and the elastic barbed hooks 205 on the bottom of the top sheet 203 pierce the nonwoven geotextile 102 at the top. The elastic barbed hooks 205 piercing the nonwoven geotextile 102 can further increase the connection force between the nonwoven geotextile 102 and the bottom sheet 201 and the top sheet 203.

[0032] In this embodiment: when the composite corrugated drainage mat 1 is being paved, when the first section of the composite corrugated drainage mat 1 is almost paved, the bottom film 201 can be firstly laid horizontally on the ground (the paving direction of the composite corrugated drainage mat 1 is longitudinal), and then the end of the first section of the composite corrugated drainage mat 1 is overlapped on the top of the bottom film 201, and then the initial end of the second section of the composite corrugated drainage mat 1 is overlapped on the top of the other end of the bottom film 201, and the ends of the composite corrugated drainage mats 1 at both ends are symmetrically distributed with the 7-shaped holder 202 as the center. At this time, the composite corrugated drainage mat 1 can be stepped on, so that the elastic barbed hooks 205 on the top of the bottom film 201 pierce the geotextile 102 at the bottom;

[0033] Then, the top sheet 203 is laid on the top of the joint of the two sections of the composite corrugated drainage mat 1, with the cone head block 204 facing downward and located in the middle of the two 7-shaped holders 202. Then, the top of the top sheet 203 is stepped on, and the elastic barbed hooks 205 at the bottom of the top sheet 203 pierce the non-woven geotextile 102 at the top. At the same time, the cone head block 204 presses the two 7-shaped holders 202 downward, and the two 7-shaped holders 202 are deformed by force, so that the cone head block 204 is smoothly inserted into the two In the middle of the 7-shaped holder 202, the 7-shaped holder 202 will be reset under the action of its own elastic force, and then the 7-shaped holder 202 and the cone head block 204 will be clamped together. At this time, the top sheet 203 is connected to the bottom sheet 201, and the two sections of the composite corrugated drainage mat 1 are clamped in the middle, and then the two sections of the composite corrugated drainage mat 1 are spliced ​​and fixed. Compared with the traditional structure of directly overlapping the composite corrugated drainage mat 1, it can effectively avoid the offset phenomenon at the splicing point of the composite corrugated drainage mat 1.

[0034] Please refer to Figures 1 to 3 There are multiple 7-shaped card seats 202 and cone head blocks 204 evenly distributed along the tracks of the bottom film 201 and the top film 203. The length of the 7-shaped card seat 202 along the distribution direction is greater than the length of the cone head block 204, and the number of the cone head block 204 is greater than the number of the 7-shaped card seat 202.

[0035] In this embodiment: this structure allows the cone head block 204 and the 7-shaped socket 202 to be connected without precise alignment. During the splicing process, even if there is misalignment along the distribution direction, stable connection can be achieved, thus reducing the difficulty of construction.

[0036] Please refer to Figures 1 to 3 A bending portion is formed at the top of the elastic barbed hook 205, and the bending portion faces the 7-shaped holder 202 and the cone head block 204. The height of the bottom of the elastic barbed hook 205 from the bottom of the bending portion is greater than the thickness of the non-woven geotextile 102.

[0037] In this embodiment: after the elastic barb 205 pierces the non-woven geotextile 102, its bent portion also passes through the non-woven geotextile 102 simultaneously, so that the non-woven geotextile 102 is not easily separated from the elastic barb 205, thereby ensuring the connection stability of the composite corrugated drainage mat 1.

[0038] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A composite corrugated drainage mat, comprising a composite corrugated drainage mat (1) composed of a three-dimensional polypropylene mesh mat (101) and a non-woven geotextile (102), wherein the non-woven geotextile (102) is symmetrically heat-sealed and fixed to the upper and lower ends of the three-dimensional polypropylene mesh mat (101), characterized in that: The two composite corrugated drainage mats (1) are connected and fixed via an assembling component (2); The assembling component (2) comprises a splicing unit and a reinforcement unit; The splicing unit is used to realize the splicing and clamping of two composite corrugated drainage mats (1); The reinforcement unit is used to further increase the connection force between the splicing unit and the composite corrugated drainage mat (1).

2. A composite corrugated drainage mat according to claim 1, characterized in that: The splicing unit comprises a bottom sheet (201), a 7-shaped clamping seat (202), a top sheet (203), and a cone head clamping block (204); The 7-shaped holder (202) is symmetrically fixed at the top center of the bottom sheet (201); when the two composite corrugated drainage pads (1) are butt-jointed, they are symmetrically placed on the top of the bottom sheet (201) with the 7-shaped holder (202) as the center; The cone-head clamping block (204) is fixed at the bottom center position of the top sheet (203); the top sheet (203) is pressed onto the upper surfaces of the two composite corrugated drainage pads (1); the cone-head clamping block (204) is clamped onto the inner sides of the two 7-shaped clamping seats (202) to achieve the connection between the bottom sheet (201) and the top sheet (203); and the two composite corrugated drainage pads (1) are clamped and fixed by the bottom sheet (201) and the top sheet (203).

3. A composite corrugated drainage mat according to claim 2, characterized in that: The reinforcing unit comprises an elastic barbed hook (205), and the elastic barbed hook (205) is symmetrically fixed to the top of the bottom sheet (201) and the bottom of the top sheet (203) with the 7-shaped clamping seat (202) and the cone head clamping block (204) as the center; The elastic barbed hooks (205) at the top of the bottom sheet (201) pierce the non-woven geotextile (102) at the bottom, and the elastic barbed hooks (205) at the bottom of the top sheet (203) pierce the non-woven geotextile (102) at the top. The elastic barbed hooks (205) piercing the non-woven geotextile (102) can further increase the connection force between the non-woven geotextile (102) and the bottom sheet (201) and the top sheet (203).

4. A composite corrugated drainage mat according to claim 2, characterized in that: A plurality of the 7-shaped card seats (202) and the cone head blocks (204) are evenly distributed along the tracks of the bottom film (201) and the top film (203); the length of the 7-shaped card seats (202) along the distribution direction is greater than the length of the cone head blocks (204); and the number of the cone head blocks (204) is greater than the number of the 7-shaped card seats (202).

5. The composite corrugated drainage mat according to claim 3, characterized in that: The top of the elastic barbed hook (205) is formed with a bending portion, and the bending portion faces the 7-shaped clamping seat (202) and the cone head clamping block (204), and the height of the bottom of the elastic barbed hook (205) from the bottom of the bending portion is greater than the thickness of the non-woven geotextile (102).