Through the combination of column steel and beam steel frame structures, connecting clips and limit perforations, the existing gas film connection methods are solved, and the stable connection between the gas film and foundation and the improvement of construction efficiency are achieved.
Patent Information
- Application Number
- CN202422078664.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2025-04-08
- Estimated Expiration
- 2034-08-26
AI Technical Summary
The existing gas film connection method has problems such as insufficient friction, cumbersome construction and damage to the membrane material.
The frame structure is formed by an integrated column steel and beam steel. The column steel is fixed by expansion bolts, and the connecting clips and limit perforation are used to achieve stable fixation of the edge of the air membrane rope to avoid holes on the edge of the membrane material.
It realizes a stable connection between the gas film and the foundation, shortens the construction period, reduces labor, avoids membrane damage, and supports the recycling of membrane materials.
Smart Images

Figure CN222730782U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of air film pavilions, and in particular to a connection structure of an air film and a foundation. Background Art
[0002] There are two main ways to connect the air membrane to the foundation in the prior art:
[0003] Solution 1: Use wood to fix the air film in the foundation by friction. In this way, the friction between the wood and the foundation groove is limited and it is easy to fall off. If the wood material moves, it is easy to damage the air film.
[0004] Solution 2: Use angle steel pressing pieces and bolts to press the membrane material onto the foundation surface. This method is cumbersome to construct. The angle steel needs to have holes corresponding to the anchor bolts on site. The construction period is long and the labor is large. In addition, the membrane material edge needs to be punched to insert the anchor bolts, which will cause irreversible damage to the membrane material.
[0005] Therefore, a kind of air film and foundation connection structure is needed. Utility Model Content
[0006] The purpose of the present application is to provide an air membrane and foundation connection structure to solve the problems raised in the above background technology.
[0007] To achieve the above-mentioned purpose, the present application provides the following technical solutions: an air film and foundation connection structure, comprising column steel and beam steel, the column steel and the beam steel are integrally formed into a frame structure, the lower end of the column steel is pre-fixed on the concrete foundation by expansion bolts, and the upper end of the beam steel is detachably fixed with a connection clamp through a connection structure;
[0008] A limiting perforation is provided on the connecting clamp which passes through the connecting clamp horizontally and has an opening at the upper end. The air film rope edge at the lower end of the air film is passed through the limiting perforation from one side of the limiting perforation, and the air film at the upper end of the air film rope edge extends upward along the opening of the limiting perforation to the outside of the connecting clamp.
[0009] Preferably, the connection structure comprises:
[0010] A bolt installation groove is provided at the lower part of the connecting clamp and also passes through the connecting clamp horizontally;
[0011] A bottom opening is provided at the lower end of the bolt installation slot and communicates with the bolt installation slot and the outside of the lower end of the connecting clamp;
[0012] A plurality of connection holes are provided and evenly distributed on the upper end of the beam steel, and the plurality of connection holes vertically penetrate the top wall of the beam steel;
[0013] The connecting piece passes through the connecting hole and the bottom opening in sequence and detachably fixes the lower end of the connecting clamp to the upper end of the beam steel.
[0014] Preferably, the connecting part includes a connecting bolt, which is slidably embedded in the bolt mounting groove from one side of the bottom opening, the nut of the connecting bolt is located in the bolt mounting groove and the nut diameter of the connecting bolt is larger than the width of the bottom opening, the lower end of the stud of the connecting bolt passes through the bottom opening and the connecting hole in sequence and is located on the inner side of the beam steel, the nut of the connecting bolt is screwed on the stud of the connecting bolt and the upper end is tightly pressed against the inner top wall of the beam steel.
[0015] Preferably, an anti-skid gasket is fixed to the inner side wall of the limiting perforation, at least one anti-skid gasket is fixed, and the inner side of the anti-skid gasket is interference fit with the outer side of the air film rope edge.
[0016] Preferably, a waterproof structure is provided at the upper end of the connecting clamp, and the waterproof structure can make excess rainwater automatically overflow from the outside when rainwater enters the limiting perforation from the outside.
[0017] Preferably, the waterproof structure includes a short wall and a tall wall, the upper end of the short wall is lower than the upper end of the tall wall, and a top opening open to the outside is formed between the short wall and the tall wall.
[0018] In summary, the technical effects and advantages of the utility model are:
[0019] 1. In the utility model, by setting the connecting clamp, when the air membrane needs to be fixed, it is only necessary to pass one side of the air membrane rope edge into the limiting perforation, so that the air membrane rope edge can be clamped in the connecting clamp to complete the connection operation between the air membrane and the foundation. The operation is simple and quick. The use of this connection structure can shorten the construction period of installing the air membrane, reduce labor, and there is no need to punch holes on the edge of the membrane material, so that the installed membrane material can be recycled. At the same time, compared with simply using the friction between the wood and the membrane material for fixing, the connection is more stable, and there will be no damage to the air membrane. The actual use effect is excellent.
[0020] 2. In the utility model, a top opening open to the outside is formed by the short wall and the high wall, so that after the external rainwater enters the limiting perforation, when the rainwater fills the limiting perforation, the excess rainwater automatically overflows to the outside from the side of the top opening located on the short wall, which can ensure that rainwater will not flow back into the interior of the air film hall from the limiting perforation, and can also ensure that the interior of the air film will not overflow, thereby playing a good waterproof role. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For those skilled in the art, other drawings can be obtained based on these drawings without paying any creative work.
[0022] Figure 1 Schematic diagram of the overall structure of this embodiment;
[0023] Figure 2 It is a schematic diagram of the enlarged structure of the beam steel and the connecting clamp in this embodiment;
[0024] Figure 3 Schematic diagram of the connecting card structure in this embodiment.
[0025] In the figure: 1. column steel; 2. beam steel; 21. connection hole; 3. connection clamp; 31. limit through hole; 32. bolt installation slot; 33. bottom opening; 34. low wall; 35. high wall; 36. top opening; 4. connection bolt; 5. air film rope edge; 6. air film; 7. anti-slip gasket. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0027] Example: Reference Figure 1-3 The air film and foundation connection structure shown in the figure includes a column steel 1 and a beam steel 2, the column steel 1 and the beam steel 2 are integrally formed into a frame structure, the lower end of the column steel 1 is pre-fixed on the concrete foundation by an expansion bolt, and the upper end of the beam steel 2 is detachably fixed with a connection clamp 3 by a connection structure;
[0028] A limiting perforation 31 is provided on the connecting clamp 3, which passes through the connecting clamp 3 horizontally and has an opening at the upper end. The air film rope edge 5 at the lower end of the air film 6 is passed through the limiting perforation 31 from one side of the limiting perforation 31, and the air film 6 at the upper end of the air film rope edge 5 extends upward along the opening of the limiting perforation 31 to the outside of the connecting clamp 3.
[0029] Based on the above structure, when the air membrane 6 needs to be fixed, it is only necessary to pass one side of the air membrane rope edge 5 into the limiting perforation 31, so that the air membrane rope edge 5 can be clamped in the connecting clamp 3, and the connection operation between the air membrane 6 and the foundation is completed. The operation is simple and quick. The use of this connection structure can shorten the construction period of installing the air membrane 6, reduce labor, and there is no need to punch holes on the edge of the membrane material, so that the installed membrane material can be recycled. At the same time, compared with simply using the friction between the wood and the membrane material for fixing, the connection is more stable, and the air membrane 6 will not be damaged. The actual use effect is excellent.
[0030] Furthermore, the connection structure includes a bolt installation groove 32, a bottom opening 33, a connection hole 21 and a connection member, wherein the bolt installation groove 32 is provided at the lower part of the connection clamp 3 and also passes through the connection clamp 3 transversely;
[0031] The bottom opening 33 is formed at the lower end of the bolt installation groove 32 and connects the bolt installation groove 32 with the outside of the lower end of the connecting clamp 3; a plurality of connecting holes 21 are formed and evenly distributed at the upper end of the beam steel 2, and the plurality of connecting holes 21 vertically penetrate the top wall of the beam steel 2; the connecting member sequentially penetrates the connecting holes 21 and the bottom opening 33 and detachably fixes the lower end of the connecting clamp 3 to the upper end of the beam steel 2;
[0032] The connecting part includes a connecting bolt 4, which is slidably embedded in the bolt mounting groove 32 from one side of the bottom opening 33. The nut of the connecting bolt 4 is located in the bolt mounting groove 32 and the nut diameter of the connecting bolt 4 is larger than the width of the bottom opening 33. The lower end of the stud of the connecting bolt 4 passes through the bottom opening 33 and the connecting hole 21 in sequence and is located on the inner side of the beam steel 2. The nut of the connecting bolt 4 is screwed on the stud of the connecting bolt 4 and the upper end is tightly pressed against the inner top wall of the beam steel 2.
[0033] Through the setting of the connecting structure, when it is necessary to install the connecting clamp 3, the staff only needs to slide the nut of the connecting bolt 4 from one side of the bolt installation groove 32 into the bolt installation groove 32, and at the same time make the stud part of the connecting bolt 4 slide through the bottom opening 33, then insert the lower end of the stud of the connecting bolt 4 into the connecting hole 21 pre-opened on the beam steel 2, and screw the nut of the connecting bolt 4 on the stud of the connecting bolt 4, so that the upper end of the nut of the connecting bolt 4 is tightly against the inner top wall of the beam steel 2, and the installation operation of the connecting clamp 3 can be completed. The installation is convenient, and the holes, grooves and connecting holes 21 on the connecting clamp 3 are all reserved or pre-opened holes and grooves, so there is no need to drill holes on site, and the construction is more convenient and quick; at the same time, the installed connecting clamp 3 can be disassembled by the reverse step operation, so as to facilitate the disassembly and maintenance of the connecting clamp 3, and it is more convenient and quick to use.
[0034] Furthermore, an anti-skid gasket 7 is fixed to the inner wall of the limiting perforation 31. The anti-skid gasket 7 is an arc-shaped gasket made of rubber material, and its surface has great friction. At least one anti-skid gasket 7 is fixed, and the inner side of the anti-skid gasket 7 has an interference fit with the outer side of the air membrane rope edge 5. Through the setting of the anti-skid gasket 7, the friction between the inner wall of the limiting perforation 31 and the outer surface of the air membrane rope edge 5 can be enhanced, thereby ensuring that the air membrane rope edge 5 is more stable after being inserted into the limiting perforation 31, thereby more effectively avoiding the displacement of the air membrane rope edge 5 and causing the displacement of the air membrane 6, thereby avoiding the damage caused by the mutual friction between the air membrane 6 and the connecting clip 3, which can extend the service life of the air membrane 6 to a certain extent and reduce the maintenance cost of the air membrane hall.
[0035] Furthermore, a waterproof structure is provided at the upper end of the connecting clamp 3, and the waterproof structure can make the excess rainwater automatically overflow from the outside when the rainwater enters the limiting perforation 31 from the outside;
[0036] The waterproof structure includes a short wall 34 and a tall wall 35 . The upper end of the short wall 34 is lower than the upper end of the tall wall 35 . A top opening 36 opened to the outside is formed between the short wall 34 and the tall wall 35 .
[0037] A top opening 36 open to the outside is formed by the short wall 34 and the high wall 35, so that after external rainwater enters the limiting perforation 31, when the rainwater fills the limiting perforation 31, the excess rainwater automatically overflows to the outside from the top opening 36 located on the side of the short wall 34, which can ensure that rainwater will not flow back into the air-film pavilion from the limiting perforation 31, and can also ensure that the air membrane 6 will not overflow, thereby playing a good waterproof role.
[0038] It should be noted that in order to prevent rainwater from staying in the limiting perforation 31 and causing corrosion or other damage to the air film 6 and the air film rope edge 5 at the lower end, a downwardly inclined inclined hole (not shown in the figure) can also be opened on the side wall of the connecting clamp 3 on the side of the short wall 34. The upper end of the inclined hole extends to the bottom of the limiting perforation 31 and is connected to the limiting perforation 31, and the lower end of the inclined hole passes through the side wall of the connecting clamp 3 on the side of the short wall 34 to connect to the outside, so that rainwater poured into the limiting perforation 31 can flow out from the inclined hole after the pouring stops, thereby preventing rainwater from remaining in the limiting perforation 31 and causing corrosion or other damage to the air film 6 and the air film rope edge 5 at the lower end. Combined with the arrangement of the short wall 34 and the high wall 35, a better waterproof effect can be achieved.
[0039] Working principle of the utility model: in daily use, when the air film 6 needs to be fixed, firstly, the nut of the connecting bolt 4 is slidably embedded into the bolt installation groove 32 from one side of the bolt installation groove 32, and at the same time, the stud part of the connecting bolt 4 is slid through the bottom opening 33, and then the lower end of the stud of the connecting bolt 4 is inserted into the connecting hole 21 pre-opened on the beam steel 2, and the nut of the connecting bolt 4 is screwed on the stud of the connecting bolt 4, so that the upper end of the nut of the connecting bolt 4 is tightly pressed against the inner top wall of the beam steel 2, and the installation operation of the connecting clamp 3 is completed. The installation is convenient, and the holes, grooves and connecting holes 21 on the connecting clamp 3 are all reserved or pre-opened holes and grooves, so there is no need to drill holes on site, and the construction is simple and convenient. It is more convenient and quicker; at the same time, the installed connecting clip 3 can also be disassembled by the reverse step operation, so as to facilitate the disassembly and maintenance of the connecting clip 3. After that, only one side of the air film rope edge 5 needs to be passed through the limiting perforation 31, so that the air film rope edge 5 can be clamped in the connecting clip 3 to complete the connection operation between the air film 6 and the foundation. The operation is simple and quick. The use of this connection structure can shorten the construction period of installing the air film 6 and reduce labor. There is no need to punch holes on the edge of the membrane material, so that the installed membrane material can be recycled. At the same time, compared with simply using the friction between the wood and the membrane material for fixing, the connection is more stable, and the air film 6 will not be damaged. The actual use effect is excellent.
[0040] Finally, it should be noted that the above is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Although the present utility model has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.
Claims
1. An air film and foundation connection structure, comprising a column steel (1) and a beam steel (2), wherein the column steel (1) and the beam steel (2) are integrally formed into a frame structure, and the lower end of the column steel (1) is pre-fixed on a concrete foundation by expansion bolts, characterized in that: The upper end of the beam steel (2) is detachably fixed with a connecting clamp (3) via a connecting structure; The connecting clamp (3) is provided with a limiting through hole (31) which passes through the connecting clamp (3) transversely and is provided with an opening at the upper end; the air film rope edge (5) at the lower end of the air film (6) is passed through the limiting through hole (31) from one side of the limiting through hole (31); the air film (6) at the upper end of the air film rope edge (5) extends upward along the opening of the limiting through hole (31) to the outside of the connecting clamp (3).
2. The air film and foundation connection structure according to claim 1, characterized in that: The connection structure comprises: A bolt installation groove (32), wherein the bolt installation groove (32) is provided at the lower part of the connecting clamp (3) and also passes through the connecting clamp (3) transversely; A bottom opening (33), the bottom opening (33) being opened at the lower end of the bolt installation slot (32) and communicating with the bolt installation slot (32) and the outside of the lower end of the connecting clamp (3); A connection hole (21), wherein a plurality of the connection holes (21) are provided and evenly distributed on the upper end of the beam steel (2), and the plurality of the connection holes (21) vertically penetrate the top wall of the beam steel (2); A connecting piece, which passes through the connecting hole (21) and the bottom opening (33) in sequence and detachably fixes the lower end of the connecting clamp (3) and the upper end of the beam steel (2).
3. The air film and foundation connection structure according to claim 2, characterized in that: The connecting member comprises a connecting bolt (4), wherein the connecting bolt (4) is slidably embedded in the bolt installation groove (32) from one side of the bottom opening (33), the nut of the connecting bolt (4) is located in the bolt installation groove (32) and the nut diameter of the connecting bolt (4) is larger than the width of the bottom opening (33), the lower end of the stud of the connecting bolt (4) passes through the bottom opening (33) and the connecting hole (21) in sequence and is located on the inner side of the beam steel (2), the nut of the connecting bolt (4) is screwed on the stud of the connecting bolt (4) and the upper end is tightly pressed against the inner top wall of the beam steel (2).
4. The air film and foundation connection structure according to claim 1, characterized in that: An anti-skid pad (7) is fixed to the inner wall of the position-limiting perforation (31), at least one anti-skid pad (7) is fixed, and the inner side of the anti-skid pad (7) is interference-fitted with the outer side of the air film rope edge (5).
5. The air film and foundation connection structure according to claim 1, characterized in that: The upper end of the connecting clamp (3) is provided with a waterproof structure, and the waterproof structure can automatically cause excess rainwater to overflow from the outside when rainwater enters the limiting perforation (31) from the outside.
6. The air film and foundation connection structure according to claim 5, characterized in that: The waterproof structure comprises a short wall (34) and a tall wall (35), wherein the upper end of the short wall (34) is lower than the upper end of the tall wall (35), and a top opening (36) open to the outside is formed between the short wall (34) and the tall wall (35).