A rigid-flexible composite honeycomb long-life pavement structure capable of melting snow and ice

By introducing geothermal and thermal conduits into the rigid-flexible composite honeycomb long-lived pavement structure, the shallow ground temperature can melt the snow and ice on the road area, solving the traffic safety problems of traditional pavement when snow is frozen in winter, achieving efficient snow melting effect and good load-bearing capacity.

CN222744719UActive Publication Date: 2025-04-11LUOYANG CITY CONSTR RECONNAISSANCE DESIGN RES INST
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202421561633.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2025-04-11
Estimated Expiration
2034-07-04

AI Technical Summary

Technical Problem

When snow accumulates in winter, traditional hard-and-flexible composite pavement is severely affected by road smoothness and driving safety. The existing technology mainly relies on external snow melting and de-icing technology on the road surface, and the effect is limited.

Method used

A rigid-flexible composite honeycomb-shaped long-lived pavement structure that can melt snow and ice is designed. By placing geothermal thermal conductors between honeycomb-shaped prefabricated blocks of the rigid layer and in the concave surface of the flexible layer, heat conduction is carried out using shallow ground temperature energy to melt snow and ice on the road surface.

Benefits of technology

It effectively improves the snow melting ability of the road surface in winter, ensures smooth roads and driving safety, while taking into account the load-bearing capacity and service life of the road surface, meeting the conditions of heavy and overload traffic loads.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222744719U_ABST
    Figure CN222744719U_ABST
Patent Text Reader

Abstract

The utility model discloses a rigid-flexible composite honeycomb long-life pavement structure capable of melting snow and ice, which comprises a roadbed layer, a cushion layer, a base layer, a rigid layer and a flexible layer from bottom to top; the rigid layer is composed of honeycomb prefabricated blocks; geothermal heat pipes are placed in the gaps and concave surfaces between the honeycomb prefabricated blocks of the rigid layer itself, the geothermal heat pipes are placed in the width direction of the road surface, the geothermal heat pipes themselves are located at both ends in the width direction of the road surface and are aligned with the positions on both sides of the width of the road surface itself, the geothermal pad pipes themselves are located at both ends in the width direction of the road surface and extend downward to the ground to be connected to the pipe mouth of an air power pump; the flexible layer comprises the concave surfaces in which the geothermal heat pipes are placed between the honeycomb prefabricated blocks of the rigid layer, a flexible filling layer in the gap and a flexible surface layer arranged on the rigid layer; the geothermal heat pipes are made of metal; the utility model ensures that the rigid asphalt pavement can be used for a long time while taking into account the ability to melt snow and ice.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of pavement structures, in particular to a rigid-flexible composite honeycomb long-life pavement structure capable of melting snow and ice. Background Art

[0002] Traditional rigid-flexible composite pavement refers to a pavement whose surface layer is composed of two structural layers with different material types and mechanical properties. It generally refers to a composite pavement mainly composed of honeycomb prefabricated blocks and asphalt concrete. Asphalt concrete composite pavement gives full play to the advantages of different pavement materials. The high-strength rigid blocks are used as the rigid foundation to improve the bearing capacity of the asphalt pavement, which can meet the requirements of heavy load, overload and other traffic load conditions. The asphalt concrete surface layer is used to improve and enhance the use quality of the concrete pavement surface, which can meet the requirements of high-speed driving performance of automobiles and is easy to repair and maintain. This rigid-flexible composite pavement can meet the requirements of the durability and longevity of the pavement structure under heavy load traffic conditions to a certain extent.

[0003] However, in winter, snow and ice on this traditional rigid-flexible composite pavement will have a serious impact on the smooth flow of traffic and driving safety. Snow and ice greatly reduce the adhesion coefficient of the road surface, causing the car to slip, significantly extend the braking distance, and even brake failure and loss of control, thus causing serious traffic accidents. Therefore, in order to ensure smooth roads and driving safety, avoid or reduce traffic accidents, and improve road capacity and operational efficiency, measures must be taken to remove ice and snow on the road surface. The technology of removing ice and snow or using ice and snow melting on this traditional rigid-flexible composite pavement mainly relies on external snow melting and ice removal technology on the road surface, which includes manual method, mechanical method and snow removal agent method; geothermal heat conduction pavement automatic snow melting and ice removal technology came into being, and the layout method of geothermal heat conduction pipes on asphalt pavement is crucial in this technology. Utility Model Content

[0004] The utility model aims to provide a rigid-flexible composite honeycomb long-life pavement structure capable of melting snow and ice, so as to solve the problems raised in the above-mentioned background technology.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A rigid-flexible composite honeycomb long-life pavement structure capable of melting snow and ice, comprising, from bottom to top, a roadbed layer, a cushion layer, a base layer, a rigid layer, and a flexible layer; the rigid layer is a honeycomb prefabricated block regularly arranged and mutually installed with gaps; the honeycomb prefabricated block is a block with a thickness greater than 15 cm and composed of an upper end of a main body located below and a lower end of a cone overlapping and combining, and the main body is a column or a cone; the horizontal cross-section of the honeycomb prefabricated block is a regular polygon; it is characterized in that: geothermal heat pipes are placed in the gaps and concave surfaces between the honeycomb prefabricated blocks of the rigid layer itself, and the geothermal heat pipes are placed in the width direction of the road surface The geothermal heat pipe itself is located at two ends in the width direction of the road surface and is aligned with the positions on both sides of the width of the road surface itself, and the geothermal pad pipe itself is located at two ends in the width direction of the road surface and extends downward to the underground; the flexible layer includes a concave surface filled with geothermal heat pipes placed between the honeycomb prefabricated blocks of the rigid layer, a flexible filling layer in the gap and a flexible surface layer arranged on the rigid layer; the geothermal heat pipe is made of metal; one end of the geothermal heat pipe itself is fixedly connected to the air pump pipe; the air pump is connected to the solar photovoltaic power generation device arranged on the road edge at both ends in the width direction of the road surface through electric wires.

[0007] The honeycomb prefabricated block includes a hexagonal column arranged at the bottom of the honeycomb prefabricated block and a hexagonal pyramid arranged at the top of the honeycomb prefabricated block, the bottom surface of the hexagonal pyramid coincides with the top surface of the hexagonal column; the top surface of the hexagonal pyramid is a regular hexagon and is smaller than the bottom surface of the hexagonal pyramid; arc chamfers are arranged at the intersection of two adjacent side surfaces of the six side surfaces of the hexagonal column, and arc chamfers are also arranged at the intersection of two adjacent side surfaces of the six side surfaces of the hexagonal pyramid; geothermal heat pipes are placed in the concave surfaces and gaps between the hexagonal pyramids on the upper part of the honeycomb prefabricated block of the rigid layer itself; the geothermal heat pipes are made of aluminum; the geothermal pad pipes themselves are located at both ends in the width direction of the road surface and extend downward to forty centimeters underground; the sides of the hexagonal columns at the bottom of the honeycomb prefabricated blocks of the rigid layer itself are regularly arranged and installed in a close relationship with each other, and the center of the honeycomb prefabricated block in the front is aligned with the middle position of the distance between the centers of the two honeycomb prefabricated blocks at the rear; the honeycomb prefabricated blocks are made of cement.

[0008] A group of geothermal heat pipes are placed in the concave surfaces and gaps between the hexagonal pyramids on the upper part of the honeycomb prefabricated block of the rigid layer itself, and the group of geothermal heat pipes includes geothermal heat pipe 1 and geothermal heat pipe 2. Geothermal heat pipe 1 is located above or below geothermal heat pipe 2, and the left end of geothermal heat pipe 1 is located at an opening on the end head forty centimeters underground, the right end of geothermal heat pipe 2 is located at an opening on the end head forty centimeters underground, or the right end of geothermal heat pipe 1 is located at an opening on the end head forty centimeters underground, and the left end of geothermal heat pipe 2 is located at an opening on the end head forty centimeters underground, all of which are fixedly connected to an air pump pipe mouth.

[0009] The geothermal heat pipe is 40 centimeters underground at one end of the width of the road surface itself.

[0010] After extending upward to the height of the rigid layer, it changes to extend horizontally along the width of the road. At this time, one side of the geothermal heat pipe is closely attached to the rear side of the upper hexagonal pyramid of a honeycomb prefabricated block in a linear array along the width of the road and extends. After passing the rear side of the hexagonal pyramid and the side of the hexagonal pyramid perpendicular to the width of the road, one side of the geothermal heat pipe is closely attached to the front side of the upper hexagonal pyramid of another honeycomb prefabricated block located in a linear array along the width of the road surface and extends along the side. After passing the front side of the upper hexagonal pyramid of the honeycomb prefabricated block and the side of the hexagonal pyramid perpendicular to the width of the road, one side of the geothermal heat pipe is closely attached to the rear side of the upper hexagonal pyramid of another honeycomb prefabricated block located in a linear array along the width of the road surface and extends along the side. This is repeated until it extends to the other end of the width of the road surface itself and extends into the ground forty centimeters.

[0011] The geothermal heat pipe 2 extends upward to the rigid layer height through forty centimeters underground at one end of the width of the road surface itself, and then changes to extend horizontally along the width of the road. At this time, one side of the geothermal heat pipe 2 is tightly attached to the front side of the upper hexagonal pyramid of a honeycomb prefabricated block in a linear array along the width of the road and extends. After passing the front side of the hexagonal pyramid and the side perpendicular to the width of the road, the other side of the geothermal heat pipe 2 is changed to be tightly attached to the rear side of the upper hexagonal pyramid of another honeycomb prefabricated block in a linear array along the width of the road and extends along the side. After passing the rear side of the upper hexagonal pyramid of the honeycomb prefabricated block and the side perpendicular to the width of the road, one side of the geothermal heat pipe 2 is changed to be tightly attached to the front side of the upper hexagonal pyramid of another honeycomb prefabricated block in a linear array along the width of the road and extends along the side. This is repeated until it extends to the other end of the width of the road surface itself and extends into forty centimeters underground.

[0012] The roadbed layer is the original soil roadbed compacted by a roller; the cushion layer is composed of lime soil or graded gravel and is arranged on the roadbed layer; the base layer is composed of cement-stabilized crushed stone base layer or fly ash base layer and is arranged on the cushion layer; the flexible filling layer is made of asphalt crushed stone, and the flexible surface layer is made of asphalt concrete.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] The utility model is used for the geothermal heat conduction pipe arrangement structure of the rigid asphalt pavement, which is simple to operate and has good use effect. Through experiments, the most suitable pipe diameter of the geothermal heat conduction pipe, the lateral arrangement spacing between the heat conduction pipes, the buried depth of the geothermal heat conduction pipes in the heat absorption sections on both sides of the road width, the buried geothermal heat conduction pipes in the middle of the road pavement to the position between the rigid layer and the flexible layer, and the backfilling to the flexible layer material around and above the geothermal heat conduction pipes are determined, thereby ensuring the rationality of the arrangement of the geothermal heat conduction pipes and the simplicity of construction, improving the snow melting effect of the geothermal snow melting system of the rigid asphalt pavement, and ensuring that the rigid asphalt pavement can melt snow and ice while ensuring the durability of use. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of a top view cross-sectional structure of a rigid-flexible composite honeycomb long-life pavement structure capable of melting snow and ice according to the utility model;

[0016] Figure 2 It is a schematic diagram of the cross-sectional structure along the up and down direction of a rigid-flexible composite honeycomb long-life pavement structure capable of melting snow and ice according to the utility model;

[0017] In the figure: 1 geothermal heat pipe; 101 geothermal heat pipe one; 102 geothermal heat pipe two; 2 road bed layer; 3 cushion layer; 4 road pavement width direction; 5 base layer; 6 rigid layer; 601 honeycomb prefabricated block; 7 flexible layer; 701 flexible filling layer; 702 flexible surface layer; 8 air power pump; 9 solar photovoltaic power generation device. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model; in the description of the utility model, it should be understood that the terms "upper", "lower", "front", "back" and the like indicate the orientation or position relationship based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model.

[0019] Please refer to the legend. In the embodiment of the utility model, a rigid-flexible composite honeycomb long-life pavement structure capable of melting snow and ice comprises, from bottom to top, a roadbed layer 2, a cushion layer 3, a base layer 5, a rigid layer 6, and a flexible layer 7; the rigid layer 6 is a honeycomb prefabricated block 601 which is regularly arranged and installed with gaps between each other; the honeycomb prefabricated block 601 is a block body with a thickness greater than fifteen centimeters and is composed of the upper end of a main body located below and the lower end of a cone overlapping and combining, and the main body is a column or a cone; the horizontal cross-section of the honeycomb prefabricated block 601 is a regular polygon; it is characterized in that: a geothermal heat pipe 1 is placed in the gaps and concave surfaces between the honeycomb prefabricated blocks 601 of the rigid layer 6 itself, and the geothermal heat pipe 1 is connected to the road surface The width direction 4 is the placement direction, the geothermal heat pipe 1 itself is located at both ends of the road surface width direction 4 and is aligned with the positions on both sides of the road surface width, and the geothermal pad pipe itself is located at both ends of the road surface width direction 4 and extends downward to the underground; the flexible layer 7 includes a flexible filling layer 701 filled in the concave surface and gap between the honeycomb prefabricated blocks 601 of the rigid layer 6 where the geothermal heat pipe 1 is placed, and a flexible surface layer 702 arranged on the rigid layer 6; the geothermal heat pipe 1 is made of metal; one end of the geothermal heat pipe 1 itself is fixedly connected to the end of the air pump 8; the air pump 8 is connected to the solar photovoltaic power generation device 9 arranged on the road edge at both ends in the width direction of the road surface through electric wires.

[0020] The honeycomb prefabricated block 601 includes a hexagonal column arranged at the bottom of the honeycomb prefabricated block 601, and a hexagonal pyramid arranged at the top of the honeycomb prefabricated block 601, wherein the bottom surface of the hexagonal pyramid coincides with the top surface of the hexagonal column; the top surface of the hexagonal pyramid is a regular hexagon and is smaller than the bottom surface of the hexagonal pyramid; the intersection of two adjacent side surfaces of the six side surfaces of the hexagonal column is provided with an arc chamfer, and the intersection of two adjacent side surfaces of the six side surfaces of the hexagonal pyramid is also provided with an arc chamfer; the concave surface, the seam between the hexagonal pyramids on the upper part of the honeycomb prefabricated block 601 of the rigid layer 6 itself A geothermal heat pipe is placed in the gap; the geothermal heat pipe is made of aluminum; the geothermal pad pipe itself is located at both ends of the road surface width direction 4 and extends downward to forty centimeters underground; the rigid layer 6 itself has regularly arranged and coordinated honeycomb prefabricated blocks 601 installed, and the sides of the hexagonal prisms at the bottom of the honeycomb prefabricated blocks 601 are tightly attached to each other, and the center of the honeycomb prefabricated block 601 in the front is aligned with the middle position of the distance between the centers of the two honeycomb prefabricated blocks 601 at the back; the honeycomb prefabricated blocks 601 are made of cement.

[0021] Among them, a group of geothermal heat pipes 1 are placed in the concave surfaces and gaps between the hexagonal pyramids on the upper part of the honeycomb prefabricated block 601 of the rigid layer 6 itself, and the group of geothermal heat pipes 1 includes geothermal heat pipe 1 101 and geothermal heat pipe 2 102; wherein, geothermal heat pipe 1 101 is located above or below geothermal heat pipe 2 102, the left end of geothermal heat pipe 1 101 is located at the opening on the end forty centimeters underground, the right end of geothermal heat pipe 2 102 is located at the opening on the end forty centimeters underground, or the right end of geothermal heat pipe 1 101 is located at the opening on the end forty centimeters underground, and the left end of geothermal heat pipe 2 102 is located at the opening on the end forty centimeters underground, all of which are fixedly connected to an air pump pipe mouth.

[0022] The geothermal heat pipe 101 extends upward from 40 centimeters underground at one end of the width of the road surface to the height of the rigid layer 6, and then changes to extend horizontally along the width direction of the road. At this time, one side of the geothermal heat pipe 101 is closely attached to the rear side of the upper hexagonal pyramid of a honeycomb prefabricated block 601 in a linear array along the width direction of the road and extends. After passing through the rear side of the hexagonal pyramid and the side of the hexagonal pyramid perpendicular to the width direction of the road, one side of the geothermal heat pipe 101 is connected to the other side of the hexagonal pyramid 601 in the width direction of the road surface 4. The front side of the upper hexagonal pyramid of the linear array honeycomb prefabricated block 601 is closely attached to and extends along the side, and after passing the front side of the upper hexagonal pyramid of the honeycomb prefabricated block 601 and the side perpendicular to the road width direction of the hexagonal pyramid, one side of the geothermal heat pipe 101 is closely attached to and extends along the side of the rear side of the upper hexagonal pyramid of another linear array honeycomb prefabricated block 601 located along the road surface width direction 4, and this is repeated until it extends to the other end of the width of the road surface itself and then extends into the ground forty centimeters; and the geothermal heat pipe 101 is connected to the upper hexagonal pyramid of the linear array honeycomb prefabricated block 601 and extends along the road surface width direction 4. The heat pipe 102 extends upward from 40 centimeters underground at one end of the width of the road surface to the height of the rigid layer 6, and then changes to extend horizontally along the width direction of the road. At this time, one side of the geothermal heat pipe 102 is closely attached to the front side of the upper hexagonal pyramid of a honeycomb prefabricated block 601 in a linear array along the width direction of the road and extends. After passing through the front side of the hexagonal pyramid and the side of the hexagonal pyramid perpendicular to the width direction of the road, the other side of the geothermal heat pipe 102 changes to another one located 4 along the width direction of the road surface. The rear side of the upper hexagonal pyramid of the upper linear array of honeycomb prefabricated block 601 is closely attached to and extends along the side. After passing the rear side of the upper hexagonal pyramid of the honeycomb prefabricated block 601 and the side of the hexagonal pyramid perpendicular to the road width direction, one side of the geothermal heat pipe 102 is changed to be closely attached to and extend along the front side of the upper hexagonal pyramid of another honeycomb prefabricated block 601 located in the linear array along the road pavement width direction 4, and this process is repeated until it extends to the other end of the width of the road pavement itself and then extends forty centimeters underground.

[0023] Among them, the roadbed layer is the original soil roadbed compacted by a roller; the cushion layer 3 is composed of lime soil or graded gravel, and is arranged on the roadbed layer 2; the base layer 5 is composed of a cement-stabilized crushed stone base layer 5 or a fly ash base layer 5, and is arranged on the cushion layer 3; the flexible filling layer 701 is made of asphalt crushed stone, and the flexible surface layer 702 is made of asphalt concrete.

[0024] The working principle of the utility model is:

[0025] Shallow geothermal energy is an invisible natural resource accumulated underground (0 to 200 meters). It is the product of the combined action of heat conduction and heat convection in the deep earth and solar radiation. It is low-temperature heat energy stored in soil, sand and groundwater, with a temperature below 25 degrees. It is the energy formed by the perennial temperature difference between the temperature within the depth of 0 to 200 meters below the surface and the temperature at a distance of 1.5 meters from the surface without direct sunlight (louvered box). It is the potential energy between two temperature fields in different states. It is also called shallow geothermal energy and is part of geothermal resources. It is a thermal energy resource in the earth's interior that is fully capable of development and utilization under current technical and economic conditions. Shallow geothermal energy is part of geothermal resources. Compared with traditional geothermal energy, it has low investment and operation risks, is easy to recharge, has strong renewability, and has little impact on groundwater. It is a national mineral resource and does not require resource fees.

[0026] The utility model discloses a rigid-flexible composite honeycomb long-life pavement structure capable of melting snow and ice. In the severe winter season, especially after a snowy day in a severe cold climate, the road surface is often covered with snow and ice. In the rigid-flexible composite honeycomb long-life pavement structure, the two ends of the geothermal heat pipe are respectively located at the two ends of the width of the road surface and inserted downward forty centimeters underground to fully absorb shallow geothermal energy. The geothermal heat pipe itself is made of aluminum metal, and the shallow heat of the ground surface can be conducted to between the rigid layer 6 and the flexible layer 7 in the road pavement structure through the geothermal heat pipe; thereby actually improving the rigid layer 6 and the flexible layer 7 in the road pavement structure. 6 (the surface layer of the road pavement structure), thereby not only isolating the low temperature of the deep pavement layer of the snow deposited on the road surface from being conducted, but also conducting heat to the snow on the road surface, forcing it to melt, and avoiding the snow on the road surface from freezing after melting; at the same time, the utility model still takes into account the advantages of the rigid-flexible composite structure road, ensures the bearing capacity of the road surface, and can meet the requirements of heavy load, overload and other traffic load conditions, while the rigid blocks and asphalt concrete surface layers in the rigid layer 7 are all used to improve and enhance the use quality of the concrete pavement surface, fully meeting the high-speed driving performance requirements of heavy-duty trucks.

[0027] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A rigid-flexible composite honeycomb long-life pavement structure capable of melting snow and ice, comprising a roadbed layer, a cushion layer, a base layer, a rigid layer, and a flexible layer from bottom to top; the rigid layer is composed of honeycomb prefabricated blocks arranged regularly and installed with gaps between each other; the honeycomb prefabricated block is a block body with a thickness greater than 15 cm and including a main body located below, the upper end of the main body itself overlaps with the lower end of a cone; the characteristics are: Geothermal heat pipes are placed in the gaps and concave surfaces between the honeycomb prefabricated blocks of the rigid layer itself. The geothermal heat pipes are placed in the width direction of the road surface. The two ends of the geothermal heat pipes located in the width direction of the road surface are aligned with the positions on both sides of the width of the road surface itself. The two ends of the geothermal heat pipes located in the width direction of the road surface extend downward to the underground; the flexible layer includes a flexible filling layer in the concave surface and gaps filled with geothermal heat pipes placed between the honeycomb prefabricated blocks of the rigid layer, and a flexible surface layer arranged on the rigid layer; the geothermal heat pipe is made of metal; one end of the geothermal heat pipe itself is fixedly connected to the air pump; the air pump is connected to the solar photovoltaic power generation device arranged on the road edge at both ends in the width direction of the road surface through electric wires.

2. According to claim 1, a rigid-flexible composite honeycomb long-life pavement structure capable of melting snow and ice, characterized in that: The main body of the honeycomb prefabricated block is a hexagonal column, and the cone is a hexagonal pyramid. The upper end of the hexagonal column overlaps with the lower end of a hexagonal pyramid to form a block, and the bottom surface of the hexagonal pyramid overlaps with the top surface of the hexagonal column; the top surface of the hexagonal pyramid is a regular hexagon and is smaller than the bottom surface of the hexagonal pyramid; the intersection of two adjacent side surfaces of the six side surfaces of the hexagonal column is provided with an arc chamfer, and the intersection of two adjacent side surfaces of the six side surfaces of the hexagonal pyramid is also provided with an arc chamfer; geothermal heat pipes are placed in the concave surfaces and gaps between the hexagonal pyramids on the upper part of the honeycomb prefabricated block of the rigid layer itself; the geothermal heat pipes are made of aluminum; the geothermal pad pipes themselves are located at both ends in the width direction of the road surface and extend downward to forty centimeters underground; the rigid layer includes regularly arranged and matched honeycomb prefabricated blocks, the sides of the lower hexagonal columns are close to each other, and the center of the honeycomb prefabricated block in the front is aligned with the middle position of the distance between the centers of the two honeycomb prefabricated blocks in the back; the honeycomb prefabricated blocks are made of cement.

3. According to claim 2, a rigid-flexible composite honeycomb long-life pavement structure capable of melting snow and ice, characterized in that: A group of geothermal heat pipes are placed in the concave surfaces and gaps between the hexagonal pyramids on the upper part of the honeycomb prefabricated block of the rigid layer itself. The group of geothermal heat pipes includes geothermal heat pipe 1 and geothermal heat pipe 2. Geothermal heat pipe 1 is located above or below geothermal heat pipe 2. The left end of geothermal heat pipe 1 is located at an opening on the end forty centimeters underground, the right end of geothermal heat pipe 2 is located at an opening on the end forty centimeters underground, or the right end of geothermal heat pipe 1 is located at an opening on the end forty centimeters underground, and the left end of geothermal heat pipe 2 is located at an opening on the end forty centimeters underground, all of which are fixedly connected to an air pump pipe mouth.

4. According to claim 3, a rigid-flexible composite honeycomb long-life pavement structure capable of melting snow and ice, characterized in that: After the geothermal heat pipe one extends upward to the height of the rigid layer through forty centimeters underground at one end of the width of the road surface itself, it changes to extend horizontally along the width direction of the road. At this time, one side of the geothermal heat pipe one is closely attached to the rear side of the upper hexagonal pyramid of a honeycomb prefabricated block in a linear array along the width direction of the road and extends. After passing the rear side of the hexagonal pyramid and the side perpendicular to the width direction of the road, one side of the geothermal heat pipe one is closely attached to the front side of the upper hexagonal pyramid of another honeycomb prefabricated block in a linear array along the width direction of the road surface and extends along the side. After passing the front side of the upper hexagonal pyramid of the honeycomb prefabricated block and the side perpendicular to the width direction of the road, one side of the geothermal heat pipe one is closely attached to the rear side of the upper hexagonal pyramid of another honeycomb prefabricated block in a linear array along the width direction of the road surface and extends along the side. This is repeated until it extends to the other end of the width of the road surface itself and extends into forty centimeters underground.

5. According to claim 3, a rigid-flexible composite honeycomb long-life pavement structure capable of melting snow and ice, characterized in that: After the geothermal heat pipe 2 extends upward to the height of the rigid layer through forty centimeters underground at one end of the width of the road surface itself, it changes to extend horizontally along the width of the road. At this time, one side of the geothermal heat pipe 2 is closely attached to the front side of the upper hexagonal pyramid of a honeycomb prefabricated block in a linear array along the width of the road and extends. After passing the front side of the hexagonal pyramid and the side perpendicular to the width of the road, the other side of the geothermal heat pipe 2 is changed to closely attach to the rear side of the upper hexagonal pyramid of another honeycomb prefabricated block in a linear array along the width of the road and extend along the side. After passing the rear side of the upper hexagonal pyramid of the honeycomb prefabricated block and the side perpendicular to the width of the road, one side of the geothermal heat pipe 2 is changed to closely attach to the front side of the upper hexagonal pyramid of another honeycomb prefabricated block in a linear array along the width of the road and extend along the side. This is repeated until it extends to the other end of the width of the road surface itself and extends into forty centimeters underground.

6. According to claim 1, a rigid-flexible composite honeycomb long-life pavement structure capable of melting snow and ice, characterized in that: The roadbed layer is the original soil roadbed compacted by a roller; the cushion layer is composed of lime soil or graded gravel, and is arranged on the roadbed layer; the base layer is composed of cement-stabilized crushed stone base layer or fly ash base layer, and is arranged on the cushion layer; the flexible filling layer is made of asphalt crushed stone, and the flexible surface layer is made of asphalt concrete.

Citation Information

Cited By

  • Honeycomb-shaped fabricated pavement structure and construction equipment and method thereof

    CN120830274A

  • Honeycomb assembly type pavement structure and construction equipment and method thereof

    CN120830274B