Continuous water gushing treatment device and treatment system
By installing a continuous water inrush treatment device in the mine shaft and using organic matter layers and limestone to treat water inrush, the problems of low efficiency, high cost, maintenance difficulties and safety hazards in the existing technology are solved, and efficient, economical and environmentally friendly water inrush treatment effect is achieved.
Patent Information
- Application Number
- CN202421497151.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-27
- Publication Date
- 2025-04-15
- Estimated Expiration
- 2034-06-27
AI Technical Summary
The existing mine water inrush treatment methods have problems such as low efficiency, high cost, difficulty in maintenance and safety hazards.
A continuous water influx treatment device is designed, including a drug delivery unit, a drainage unit, a water quality detection unit and a gas collection system. By installing the device in the shaft, the water influx is directly treated on-site, and the water quality is treated using organic matter layers and limestone to reduce pollution.
It improves processing efficiency, reduces processing costs, is efficient and economical, effectively reduces the pollution of waste mines to the surrounding environment, and is environmentally friendly and sustainable.
Smart Images

Figure CN222758046U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of mine restoration technology, and more specifically, to a treatment device and system for continuous water inrush. Background Art
[0002] During the mining process, vertical shaft drilling is required in complex strata with developed groundwater and fissures. These abandoned mines often have the hidden danger of continuous water inrush. These water inrushes come from the groundwater bodies in the abandoned mine areas. The changes in their flow and water quality have caused serious impacts on the environment, such as soil subsidence, ground collapse, soil erosion, etc.
[0003] If there is a sudden water gushing on the working face, the traditional method of dealing with water gushing in abandoned mines often uses an underground drainage system, but there are problems such as low efficiency, high cost, and difficult maintenance. The construction plan for treating large water gushing on the working face is usually to use concrete to construct a grouting pad on the working face. When constructing the grouting pad, it is necessary to drain the gushing water on the working face and the water dripping on the well wall in time, dig a pump nest at the bottom of the well, and use the height difference of the pump nest to allow the gushing water on the working face and the water dripping on the well wall to flow into the pump nest and be discharged by the submersible pump. This drainage method often causes sand and gravel in the concrete to flow into the pump nest along with the gushing water on the working face and the water dripping on the well wall, increasing the failure rate of the submersible pump, reducing the concrete strength of the grouting pad, and posing a safety hazard to the treatment of water gushing in the wellbore.
[0004] In summary, the existing spring water treatment process has technical problems such as low efficiency, high cost, difficult maintenance and potential safety hazards. Utility Model Content
[0005] In view of the shortcomings of the existing methods, the present application proposes a continuous water gushing treatment device and treatment system to solve the technical problems of low efficiency, high cost, difficult maintenance and potential safety hazards in the existing technology.
[0006] In a first aspect, an embodiment of the present application provides a device for treating continuous water inflow, which is used to treat a vertical shaft, and includes a dosing unit, a drainage unit, a water quality detection unit, and a gas collection system:
[0007] A dosing unit, comprising a plurality of dosing devices and dosing pipelines, wherein the dosing devices are filled with limestone and an organic layer, and one end of the dosing pipeline is connected to the dosing device, and the other end extends into the vertical shaft;
[0008] A drainage unit, comprising a water collection enclosure and a drainage pipe, wherein the water collection enclosure surrounds and covers the shaft opening, and the drainage pipe is connected to the water collection enclosure;
[0009] A water quality detection unit connected to the drainage pipe;
[0010] A gas collection system is connected to the water collection enclosure.
[0011] In some embodiments of the present application, the plurality of dosing devices include a first dosing device and a second dosing device connected in sequence, the first dosing device is connected to the second dosing device through the dosing pipe, and the second dosing device extends into the vertical shaft through the dosing pipe.
[0012] In some embodiments of the present application, the medication unit further includes a first medication valve and a second medication valve, the first medication valve is connected to the medication pipe between the first medication device and the second medication device, and the second medication valve is connected to the medication pipe between the second medication device and the vertical shaft.
[0013] In some embodiments of the present application, the dosing unit further comprises an air-permeable package, wherein the air-permeable package wraps the limestone and the organic layer, and the limestone and the organic layer are mixed in layers.
[0014] In some embodiments of the present application, the drainage unit further includes a flow monitoring device, and a detection end of the flow monitoring device extends into the vertical shaft.
[0015] In some embodiments of the present application, the drainage unit further includes a drainage stop valve, which is connected to the drainage pipe.
[0016] In some embodiments of the present application, the gas collection system includes a gas collection device and a gas collection pipe, the gas collection pipe includes an air inlet pipe and an air outlet pipe, the two ends of the gas collection device are respectively connected to the vertical shaft through the air inlet pipe and the air outlet pipe, and the pipe mouth height of the air inlet pipe is greater than the pipe mouth height of the air outlet pipe.
[0017] In some embodiments of the present application, the gas collection system further includes a gas control valve, which is connected to the air intake pipe.
[0018] In some embodiments of the present application, a grouting and sealing unit is further included, wherein the grouting and sealing unit includes a grouting machine filled with slurry, and the grouting machine is directed toward the water seepage point on the side wall of the shaft.
[0019] In a second aspect, an embodiment of the present application further provides a system for processing a continuous water gushing, comprising a vertical shaft and a device for processing a continuous water gushing as described in any one of the embodiments in the first aspect, wherein the device for processing a continuous water gushing is installed on the vertical shaft.
[0020] The beneficial technical effects brought about by the technical solution provided in the embodiment of the present application include: the embodiment of the present application relies on the vertical shaft to install a treatment device for continuous water gushing, and directly treats the gushing water on-site through the vertical shaft, avoiding the cumbersome construction of reaction facilities and drainage processes in traditional methods, improving the treatment efficiency, reducing the treatment cost, and being highly efficient and economical; through the dosing unit treatment measures, the organic matter layer is used to reduce the sulfate in the wastewater, and the limestone is used to adsorb suspended matter, which can effectively reduce the pollution of the surrounding environment by abandoned mines; the treatment device can continuously deal with the gushing water problem, effectively control the scale and harm of the gushing water in the abandoned mine, and provide a good foundation for subsequent mine restoration work, which is environmentally friendly and sustainable.
[0021] Additional aspects and advantages of the present application will be partially given in the following description, which will become apparent from the following description, or will be understood through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:
[0023] Figure 1 It is a structural schematic diagram of a device for treating continuous water inflow in an embodiment of the present application.
[0024] Reference numerals:
[0025] 1-vertical shaft, 2-organic layer, 3-limestone, 4-flow monitoring equipment, 5-first dosing device, 6-second dosing device, 7-water collection enclosure, 8-drainage pipe, 9-drainage stop valve, 10-gas collection system. DETAILED DESCRIPTION
[0026] The embodiments of the present application are described below in conjunction with the drawings in the present application. It should be understood that the implementation methods described below in conjunction with the drawings are exemplary descriptions for explaining the technical solutions of the embodiments of the present application and do not constitute a limitation on the technical solutions of the embodiments of the present application.
[0027] Those skilled in the art will appreciate that, unless otherwise stated, the singular forms "a", "an", "above", and "the" used herein may also include plural forms. It should be further understood that the term "comprising" used in the specification of the present application means the presence of the features, integers, steps, operations, elements, and / or components, but does not exclude the implementation of other features, information, data, steps, operations, elements, components, and / or combinations thereof supported by the technical field.
[0028] In order to make the purpose, technical solution and advantages of the present application clearer, the implementation methods of the present application will be further described in detail below in conjunction with the accompanying drawings. It should be noted that the following implementation methods can refer to, learn from or combine with each other, and the same terms, similar features and similar implementation steps in different implementation methods will not be described repeatedly.
[0029] In view of the shortcomings of the existing methods, the present application proposes a continuous water gushing treatment device and treatment system to solve the technical problems of low efficiency, high cost, difficult maintenance and potential safety hazards in the existing technology.
[0030] In a first aspect, the present application provides a device for treating continuous water inflow, such as Figure 1 As shown, Figure 1 It is a structural schematic diagram of a device for treating continuous water inflow in an embodiment of the present application.
[0031] A device for treating continuous water inflow, used for treating a vertical shaft 1, comprises a dosing unit, a drainage unit, a water quality detection unit and a gas collection system 10:
[0032] The dosing unit comprises a plurality of dosing devices and dosing pipes, wherein the dosing devices are filled with limestone 3 and an organic layer 2, one end of the dosing pipe is connected to the dosing device, and the other end extends into the vertical shaft 1;
[0033] A drainage unit, comprising a water collection enclosure 7 and a drainage pipe 8, wherein the water collection enclosure 7 surrounds and covers the opening of the shaft 1, and the drainage pipe 8 is connected to the water collection enclosure 7;
[0034] A water quality detection unit connected to the drainage pipe 8;
[0035] The gas collection system 10 is connected to the water collection enclosure 7 .
[0036] The embodiment of the present application relies on the vertical shaft 1 to install a treatment device for continuous water gushing, and directly treats the gushing water on-site through the vertical shaft 1, avoiding the cumbersome construction of reaction facilities and drainage processes in traditional methods, improving the treatment efficiency, reducing the treatment cost, and being highly efficient and economical; through the dosing unit treatment measures, the organic layer 2 is used to reduce the sulfate in the wastewater, and the limestone 3 is used to adsorb suspended matter, which can effectively reduce the pollution of the surrounding environment by abandoned mines; the treatment device can continuously treat the gushing water problem, effectively control the scale and harm of the gushing water in the abandoned mine, and provide a good foundation for subsequent mine restoration work, which is environmentally friendly and sustainable.
[0037] In this embodiment, the gushing water can be treated on-site inside the abandoned mine shaft 1, and the corresponding amount of treatment reagent (organic layer 2 + limestone 3) is added into the shaft 1 through the dosing device according to the gushing water flow rate. After the pH of the gushing water after the treatment is detected to meet the first-level discharge standard of the "Comprehensive Sewage Discharge Standard" (GB 8978-1996), it is pumped out and discharged into the surrounding streams, thereby reducing the pollution to the surrounding environment and ensuring the stability and sustainability of the gushing water treatment. In addition, the method can also adapt to different gushing water scales and water quality characteristics, and has high adaptability and flexibility.
[0038] In some embodiments of the present application, the plurality of dosing devices include a first dosing device 5 and a second dosing device 6 connected in sequence, the first dosing device 5 is connected to the second dosing device 6 through the dosing pipe, and the second dosing device 6 extends into the vertical shaft 1 through the dosing pipe.
[0039] In some embodiments of the present application, the medication unit further includes a first medication dosing valve and a second medication dosing valve, the first medication dosing valve is connected to the medication dosing pipeline between the first medication dosing device 5 and the second medication dosing device 6, and the second medication dosing valve is connected to the medication dosing pipeline between the second medication dosing device 6 and the vertical shaft 1.
[0040] In some embodiments of the present application, the dosing unit further comprises an air-permeable package, wherein the air-permeable package wraps the limestone 3 and the organic layer 2, and the limestone 3 and the organic layer 2 are mixed in layers.
[0041] In this embodiment, the dosing treatment includes: using the shaft 1 as a reaction tank, and dosing on-site to treat the polluted water. By referring to the Slurry Acid Phytostabilization System (SAPS) process, the organic layer 2 and the limestone 3 filler are modularized and put into use, and the passive treatment technology SAPS technology is used to treat the acid mine drainage (AMD) to obtain a good treatment effect.
[0042] SAPS is an innovative ecological engineering technology that combines physical, chemical and biological processes to treat acid mine drainage. This technology combines an organic matter layer2 with a limestone3 filler to create a modular treatment system for neutralizing and stabilizing acidic materials in AMD.
[0043] In this embodiment, the organic layer 2 and the limestone 3 filler are mixed in layers and packaged in permeable ton bags so that the reagents can be replaced regularly. In this process, the sulfate-reducing bacteria (SRB) in the organic layer 2 use low molecular weight organic matter as electron donors to reduce sulfate, generate alkaline substances from the wastewater, and form metal sulfide precipitation. In addition, the limestone 3 filler layer also plays a role in adsorbing part of the suspended matter, increasing the alkalinity of the wastewater again, and forming metal hydroxide precipitation. After such treatment, the pH value of the wastewater increases, and the concentrations of iron ions, copper ions and sulfate ions are greatly reduced, thereby achieving the goal of water purification.
[0044] In some embodiments of the present application, the drainage unit further includes a flow monitoring device 4, and a detection end of the flow monitoring device 4 extends into the vertical shaft.
[0045] In some embodiments of the present application, the drainage unit further includes a drainage stop valve 9 , and the drainage stop valve 9 is connected to the drainage pipe 8 .
[0046] In this embodiment, the drainage of the shaft 1 includes: using reinforced concrete to enclose and collect water around the shaft 1, opening holes in the water collection facilities to set up pipes, and draining the gushing water by gravity flow. According to the amount of gushing water and the drainage distance, a suitable drainage pipe 8 is designed and laid. The material of the pipe can be selected from materials with good corrosion resistance, such as high-density polyethylene (HDPE) pipes or steel pipes. At the same time, it is necessary to install water gushing monitoring equipment to monitor the amount of gushing water and water quality in real time. Regularly inspect and maintain the drainage equipment to ensure its normal operation, and deal with equipment failures or damage in a timely manner.
[0047] Water quality testing includes: testing the discharged spring water to ensure that the pH of the treated spring water meets the first-level discharge standard of the "Comprehensive Sewage Discharge Standard" (GB 8978-1996) before it is pumped out and discharged into the surrounding streams, and regular water quality monitoring of the discharged spring water to ensure the stability and sustainability of the water quality treatment effect. Establish a water quality monitoring and management system to promptly detect abnormal water quality and take measures to adjust and improve it.
[0048] In some embodiments of the present application, the gas collection system 10 includes a gas collection device and a gas collection pipe, the gas collection pipe includes an air inlet pipe and an air outlet pipe, the two ends of the gas collection device are connected to the vertical shaft 1 through the air inlet pipe and the air outlet pipe, respectively, and the pipe mouth height of the air inlet pipe is greater than the pipe mouth height of the air outlet pipe.
[0049] In some embodiments of the present application, the gas collection system further includes a gas control valve, which is connected to the air intake pipe.
[0050] In this embodiment, the gas collection system 10 includes: when the shaft 1 reacts and produces hydrogen sulfide gas, the gas is guided to the gas collection device through a pipeline. The collected hydrogen sulfide gas is then reintroduced into the reaction pool of the shaft 1 to ensure that the gas participates in the reduction reaction. At the same time, by controlling the opening and closing of the valve, precise control of the gas collection and introduction process can be achieved. Such a gas collection system 10 can effectively collect and reuse hydrogen sulfide gas, improve reaction efficiency and reduce resource waste.
[0051] In some embodiments of the present application, a grouting and sealing unit is further included, wherein the grouting and sealing unit includes a grouting machine filled with slurry, and the grouting machine is directed toward the water seepage point on the side wall of the shaft 1.
[0052] In this embodiment, if there is water leakage on the side wall of the shaft 1, grouting and sealing treatment is required: the shaft 1 is sealed by grouting technology to prevent water from penetrating from the surrounding of the shaft 1. During grouting, it is necessary to ensure that there is no debris in the slurry. The slurry entering the grouting machine must be filtered through a screen, and full-hole one-time grouting is adopted. This measure can block the seepage and dripping points, reduce the drainage points of groundwater in the cave, and concentrate the drainage as much as possible on the current main water gushing points.
[0053] Optionally, the organic layer 2 agent and the limestone 3 agent are modularly processed using permeable bulk bags to facilitate later replacement.
[0054] Optionally, ensure that the reinforced concrete water accumulation facility is in close contact with the shaft 1 on all sides to prevent water seepage.
[0055] Optionally, the air duct and drainage duct are made of HDPE material, which is economical, not easily corroded by acidic wastewater, and more environmentally friendly.
[0056] Optionally, the diameter of the drainage conduit is selected according to the amount of water gushing out, and the drainage treated in the reaction tank of shaft 1 can be directly discharged if it meets the inspection standards.
[0057] In the second aspect, an embodiment of the present application further provides a system for processing a continuous water gushing, comprising a vertical shaft 1 and a device for processing a continuous water gushing as described in any one of the embodiments in the first aspect, wherein the device for processing a continuous water gushing is installed on the vertical shaft 1.
[0058] Compared with the prior art, the application of the embodiments of the present application can at least achieve the following beneficial effects: the embodiments of the present application rely on the vertical shaft 1 to install a treatment device for continuous water gushing, and directly treat the gushing water on-site through the vertical shaft 1, avoiding the cumbersome construction of reaction facilities and drainage processes in traditional methods, improving the treatment efficiency, reducing the treatment cost, and being highly efficient and economical; through the dosing unit treatment measures, the organic matter layer 2 is used to reduce the sulfate in the wastewater, and the limestone 3 is used to adsorb suspended matter, which can effectively reduce the pollution of the surrounding environment by abandoned mines; the treatment device can continuously treat the gushing problem, effectively control the scale and harm of the gushing water in the abandoned mine, and provide a good foundation for subsequent mine restoration work, which is environmentally friendly and sustainable.
[0059] In the description of the present application, the directions or positional relationships indicated by the words "up", "down", "left", "right", "vertical", "horizontal", etc. are based on the exemplary directions shown in the drawings, and do not indicate or imply that the device or component referred to must have a specific orientation. The terms "first" and "second" are used for descriptive purposes only, and the features specified as "first" and "second" may explicitly or implicitly include one or more of such features. In the description of the present application, unless otherwise specified, "multiple" means two or more. It should be noted that the terms "installed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be a connection between the two elements. In addition, the "connection" used here may include a wireless connection.
[0060] In the description of this specification, specific features, structures, materials or characteristics may be combined in an appropriate manner in any one or more embodiments or examples.
[0061] Those skilled in the art will appreciate that the various operations, methods, steps, measures, and schemes in the processes discussed in this application may be alternated, modified, rearranged, decomposed, combined, or deleted.
[0062] The above is only a partial implementation method of the present application. It should be pointed out that for ordinary technicians in this technical field, without departing from the technical concept of the scheme of the present application, other similar implementation methods based on the technical ideas of the present application are also within the protection scope of the embodiments of the present application.
Claims
1. A device for treating continuous water inflow, used for treating a vertical shaft, characterized in that: include: A dosing unit, comprising a plurality of dosing devices and dosing pipelines, wherein the dosing devices are filled with limestone and an organic layer, and one end of the dosing pipeline is connected to the dosing device, and the other end extends into the vertical shaft; A drainage unit, comprising a water collection enclosure and a drainage pipe, wherein the water collection enclosure surrounds and covers the shaft opening, and the drainage pipe is connected to the water collection enclosure; A water quality detection unit connected to the drainage pipe; A gas collection system is connected to the water collection enclosure.
2. The device for treating continuous water inrush according to claim 1, characterized in that: The plurality of dosing devices include a first dosing device and a second dosing device connected in sequence, the first dosing device is connected to the second dosing device through the dosing pipe, and the second dosing device extends into the vertical shaft through the dosing pipe.
3. The device for treating continuous water inrush according to claim 2, characterized in that: The medication unit further includes a first medication valve and a second medication valve, wherein the first medication valve is connected to the medication pipeline between the first medication device and the second medication device, and the second medication valve is connected to the medication pipeline between the second medication device and the vertical shaft.
4. The device for treating continuous water inrush according to claim 1, characterized in that: The dosing unit further comprises an air-permeable package, wherein the air-permeable package wraps the limestone and the organic layer, and the limestone and the organic layer are mixed in layers.
5. The device for treating continuous water inrush according to claim 1, characterized in that: The drainage unit further comprises a flow monitoring device, wherein a detection end of the flow monitoring device extends into the shaft.
6. The device for treating continuous water inrush according to claim 1, characterized in that: The drainage unit further comprises a drainage stop valve, and the drainage stop valve is connected to the drainage pipe.
7. The device for treating continuous water inrush according to claim 1, characterized in that: The gas collection system includes a gas collection device and a gas collection pipeline. The gas collection pipeline includes an air inlet pipeline and an air outlet pipeline. The two ends of the gas collection device are connected to the vertical shaft through the air inlet pipeline and the air outlet pipeline respectively. The pipe mouth height of the air inlet pipeline is greater than the pipe mouth height of the air outlet pipeline.
8. The device for treating continuous water inrush according to claim 7, characterized in that: The gas collection system further comprises a gas control valve, and the gas control valve is connected to the air intake pipeline.
9. The device for treating continuous water inrush according to claim 1, characterized in that: It also includes a grouting and sealing unit, which includes a grouting machine filled with slurry and facing the water seepage point on the side wall of the shaft.
10. A system for treating continuous water inflow, characterized in that: It comprises a vertical shaft and a device for treating continuous water gushing as claimed in any one of claims 1 to 9, wherein the device for treating continuous water gushing is installed on the vertical shaft.