Air conditioner air pipe mounting structure of clean air conditioning system

By adopting a combined structure of components such as roof plate, hanging frame, pipe frame and other components in the air conditioner air duct installation structure, the problems of cumbersome installation operations and poor adaptability in the prior art are solved, and fast and flexible air duct installation is achieved.

CN222761111UActive Publication Date: 2025-04-15BEIJING HUAMENG XINGYE EQUIP INSTALLATION ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421559263.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-03
Publication Date
2025-04-15
Estimated Expiration
2034-07-03

AI Technical Summary

Technical Problem

The installation structure of the existing air conditioner air duct is cumbersome, the installation speed is slow, and a single hanger can only be adapted to a single-size air duct, so the use flexibility is not good.

Method used

The combined structure includes a roof plate, a hanger, a pipe frame, a groove, a stop rod, an end head, a spring, a paddle, an end rod, a press rod, a press pad, and a plug block is adopted. The top plate is installed through chemical bolts, and the cooperation of the spring and a press rod is used to quickly form an X-shaped stable upper positioning structure of the pipeline.

Benefits of technology

It greatly improves the installation speed of air ducts, simplifies the installation process, adapts to air ducts of various sizes, has good use flexibility, and can quickly build pipe frames.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222761111U_ABST
    Figure CN222761111U_ABST
Patent Text Reader

Abstract

The utility model provides an air conditioner air pipe installation structure of a clean air conditioning system, which comprises a top plate, installation holes, a hanging bracket and a pipe frame, the top plate is provided with a plurality of installation holes, and the bottom of the top plate is fixedly connected with the hanging bracket. The space air pipe mounting rack has the advantages that after the space air pipe mounting rack is mounted on a roof through chemical bolts, the stop lever is lifted upwards at the groove, the spring is compressed, the end rod is clamped into the groove and locked in the groove, the top face of the end rod abuts against the top face of the inner side of the groove, then the stop lever is reset, and the pressing pad on the bottom face of the pressing rod abuts against the top face of a pipeline. The end portion of each pressing rod is provided with an inserting block which is inserted into the corresponding pressing rod of the other set, an X-shaped stable upper positioning structure of a pipeline can be rapidly formed in a transverse inserting mode, a complex installation mode is not needed, rapid building of a pipeline frame can be completed, rubber pads on the inner side of the pipeline frame and pressing pads on the bottom faces of the pressing rods can be replaced, and the rubber pads and the pressing pads can be replaced by pressing pads with other thicknesses. Therefore, air pipes with different pipe diameters can be installed and positioned.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of air-conditioning ducts, in particular to an air-conditioning duct installation structure of a clean air-conditioning system. Background Art

[0002] When installing the circular air conditioning duct installation structure, first install the large hanger on the roof through expansion bolts, then pass the pipe, and install the pipe fixing structure on the large hanger through bolts, nuts and other connecting structures to achieve the positioning of the pipe.

[0003] Such air conditioning duct hoisting construction requires many processes and cumbersome operations. At the same time, a single hanger can only adapt to air conditioning ducts of a single size, and its flexibility is poor. Therefore, a new air conditioning duct installation structure for a clean air conditioning system is proposed, in which the fixed structure of the pipeline adopts a quick installation and quick disassembly form, which greatly improves the duct installation speed. At the same time, this installation structure can adapt to the installation of ducts of various sizes and has good flexibility. Utility Model Content

[0004] The purpose of the present invention is to solve at least one of the above technical deficiencies.

[0005] Therefore, one purpose of the present invention is to provide an air conditioning duct installation structure for a clean air conditioning system to solve the problems mentioned in the background technology and overcome the deficiencies in the prior art.

[0006] In order to achieve the above-mentioned purpose, an embodiment of one aspect of the utility model provides an air conditioning duct installation structure of a clean air conditioning system, comprising a top plate, a mounting hole, a hanger, and a pipe rack, wherein a plurality of mounting holes are opened on the top plate, a hanger is fixedly connected to the bottom of the top plate, and a pipe rack is fixedly connected to the bottom end of the hanger, and the pipe rack is semi-annular;

[0007] The inner side of the pipe rack is detachably connected with a rubber pad, and the top plates of different groups are connected by a crossbeam;

[0008] A groove is provided in the middle of the hanger, a stopper is movably connected inside the hanger, a terminal is fixedly connected to the bottom end of the stopper, and a spring is fixedly connected between the top of the terminal and the top surface inside the groove;

[0009] A plectrum is fixedly connected to one side of the end head, and the bottom surface of the end head abuts against the bottom surface of the inner side of the groove;

[0010] An end rod is clamped between the groove and the blocking rod, the end rod is bent, a pressure rod is fixedly connected to the end of the end rod, a pressure pad is detachably connected to the bottom of the pressure rod, and the top surface of the end rod abuts against the top surface of the inner side of the groove;

[0011] The front side of the pressure rod is fixedly connected with an inserting block and is inserted into the front side of the corresponding pressure rod of another group.

[0012] Preferably, any of the above schemes is that the top plate is welded to the hanger, and the pipe rack is bonded to the rubber pad.

[0013] The above technical solution is adopted: a single air-conditioning installation device is composed of two installation frames connected by a crossbeam, and the structure of a single installation frame includes: two top plates, two hangers, a single pipe rack, a single rubber pad, two grooves, two baffles, two end heads, two springs, two paddles, two end rods, a single pressure rod, a single pressure pad and a single plug-in block. The top plate is connected to the chemical bolts on the roof through the installation hole and tightened with nuts.

[0014] The pipe is placed in the rubber pad of the pipe rack, the end is lifted up by the paddle, the stop rod is retracted, the spring is compressed, the end rod is stuck in the groove, and then the stop rod is reset. The front side of one pressure rod is fixedly connected with an insert block and inserted into the front side of the corresponding pressure rod of another group. The bottom side of the pressure rod is detachably connected with a pressure pad, which presses the pipe just placed, thereby supporting the pipe from below and positioning it from above.

[0015] Preferably, any of the above schemes is that the top plate is welded to the cross beam, and the groove is closed by a stop rod and an end head.

[0016] The above technical solution is adopted: the core structure of this device is: top plate, hanger, pipe rack, groove, baffle, end, spring, paddle, end rod, pressure rod, pressure pad, plug block. The core advantage of this device is: to improve the hanger structure of the mounting frame, after the space duct mounting frame is installed on the roof by chemical bolts, lift the baffle upwards at the groove, the spring is compressed, the end rod is stuck into the groove, the end rod is locked in the groove, the top surface of the end rod abuts the top surface of the inner side of the groove, and then the baffle is reset, the pressure pad on the bottom of the pressure rod abuts the top surface of the pipe, the end of the pressure rod has a plug block and is plugged with another corresponding pressure rod, and can be inserted horizontally to quickly form an X-shaped stable upper positioning structure of the pipe, without the need for complicated installation methods, the pipe rack can be quickly built;

[0017] The rubber pads on the inside of the pipe rack and the pressure pads on the bottom of the pressure rod are both replaceable and can be replaced with other thicknesses to adapt to the installation and positioning of air ducts with different diameters.

[0018] Preferably, any of the above solutions is that the barrier rod is arranged vertically, and the end is welded to the paddle.

[0019] Preferably, any of the above schemes is that the end rod and the pressure rod are welded as one body, the bending angle of the end rod is ninety degrees, and one side of the end rod abuts against the inner side of the hanger.

[0020] Preferably, in any of the above schemes, the cross-section of the pressure rod is V-shaped, the pressure pad is made of rubber, and the pressure pad is bonded to the bottom surface of the pressure rod.

[0021] Preferably, any of the above solutions is that the pressure pad presses against the top surface of the corresponding air conditioning duct.

[0022] Compared with the prior art, the advantages and beneficial effects of the utility model are:

[0023] The air duct installation structure of the clean air conditioning system improves the hanger structure of the installation frame through the coordinated arrangement of the top plate, the hanger, the pipe rack, the groove, the baffle rod, the end head, the spring, the paddle, the end rod, the pressure rod, the pressure pad, and the plug block. After the space air duct installation frame is installed on the roof through chemical bolts, the baffle rod is lifted up at the groove, the spring is compressed, the end rod is stuck in the groove, the end rod is locked in the groove, the top surface of the end rod abuts the top surface of the inner side of the groove, and then the baffle rod is reset, the pressure pad on the bottom surface of the pressure rod abuts the top surface of the pipeline, the end of the pressure rod has a plug block and is plugged with another corresponding pressure rod, and the X-shaped stable upper positioning structure of the pipeline can be quickly formed in a horizontal plugging manner, without the need for complex installation forms, and the rapid construction of the pipeline rack can be completed;

[0024] The rubber pads on the inside of the pipe rack and the pressure pads on the bottom of the pressure rod are both replaceable and can be replaced with other thicknesses to adapt to the installation and positioning of air ducts with different diameters.

[0025] Additional aspects and advantages of the present invention will be given in part in the following description and in part will become apparent from the following description or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0027] Figure 1 It is a structural schematic diagram of the utility model from the first perspective;

[0028] Figure 2 It is a structural schematic diagram of the utility model from a second viewing angle;

[0029] Figure 3 This is a schematic diagram of the structure of a single mounting frame of the utility model;

[0030] Figure 4 For this utility model Figure 1 Schematic diagram of the enlarged structure at point A in the middle.

[0031] In the figure: 1-top plate, 2-mounting hole, 3-hanger, 4-pipe rack, 5-rubber pad, 6-cross beam, 7-groove, 8-stop rod, 9-end, 10-spring, 11-paddle, 12-end rod, 13-pressure rod, 14-pressure pad, 15-insert block. DETAILED DESCRIPTION

[0032] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0033] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0034] like Figure 1-4 As shown, the air conditioning duct installation structure of the clean air conditioning system includes a top plate 1, a mounting hole 2, a hanger 3, and a pipe rack 4. A plurality of mounting holes 2 are opened on the top plate 1, the bottom of the top plate 1 is fixedly connected with the hanger 3, and the bottom end of the hanger 3 is fixedly connected with the pipe rack 4, and the pipe rack 4 is semi-annular;

[0035] The inner side of the pipe rack 4 is detachably connected with a rubber pad 5, and the top plates 1 of different groups are connected by a crossbeam 6;

[0036] A groove 7 is provided in the middle of the hanger 3, a stopper 8 is movably connected inside the hanger 3, a terminal 9 is fixedly connected to the bottom end of the stopper 8, and a spring 10 is fixedly connected between the top of the terminal 9 and the top surface of the inner side of the groove 7;

[0037] A paddle 11 is fixedly connected to one side of the end head 9, and the bottom surface of the end head 9 abuts against the bottom surface of the inner side of the groove 7;

[0038] An end rod 12 is clamped between the groove 7 and the stop rod 8. The end rod 12 is bent, and a pressure rod 13 is fixedly connected to the end of the end rod 12. A pressure pad 14 is detachably connected to the bottom of the pressure rod 13. The top surface of the end rod 12 abuts against the top surface of the inner side of the groove 7.

[0039] The front side of the pressure rod 13 is fixedly connected with an insert block 15 and is inserted into the front side of the corresponding pressure rod 13 of another group.

[0040] Embodiment 1: The top plate 1 is welded to the hanger 3, and the pipe rack 4 is bonded to the rubber pad 5. A single air conditioner installation device is formed by connecting two installation racks through a crossbeam 6. The structure of a single installation rack includes two top plates 1, two hangers 3, a single pipe rack 4, a single rubber pad 5, two grooves 7, two stop rods 8, two end heads 9, two springs 10, two paddles 11, two end rods 12, a single pressure rod 13, a single pressure pad 14 and a single plug block 15. The top plate 1 is connected to the chemical bolts of the roof through the installation holes 2 and tightened with nuts. The pipe is placed in the rubber pad 5 of the pipe rack 4, the end head 9 is lifted upwards by the paddle 11, the stop rod 8 is retracted upwards, the spring 10 is compressed, the end rod 12 is stuck in the groove 7, and then the stop rod 8 is reset. The front side of a pressure rod 13 is fixedly connected with an insert block 15 and is inserted into the front side of another corresponding pressure rod 13. The bottom surface of the pressure rod 13 is detachably connected with a pressure pad 14, which presses the pipe just placed, thereby supporting the pipe from below and positioning it from above.

[0041] Embodiment 2: The top plate 1 is welded to the cross beam 6, and the groove 7 is closed by the stop rod 8 and the end 9. The rubber pad 5 on the inner side of the pipe rack 4 and the pressure pad 14 on the bottom of the pressure rod 13 are both replaceable and can be replaced with other thicknesses to adapt to the installation and positioning of air ducts with different pipe diameters. The stop rod 8 is arranged vertically, and the end 9 is welded to the paddle 11. The end rod 12 and the pressure rod 13 are welded as one body, and the bending angle of the end rod 12 is ninety degrees. One side of the end rod 12 abuts against the inner side of the hanger 3. The cross-sectional shape of the pressure rod 13 is V-shaped, and the material of the pressure pad 14 is rubber, and the pressure pad 14 is bonded to the bottom surface of the pressure rod 13. The pressure pad 14 is pressed against the corresponding top surface of the air duct of the air conditioner.

[0042] The working principle of the utility model is as follows:

[0043] A single air conditioning installation device is composed of two installation frames connected by a crossbeam 6. The structure of a single installation frame includes: two top plates 1, two hangers 3, a single pipe rack 4, a single rubber pad 5, two grooves 7, two baffles 8, two end heads 9, two springs 10, two paddles 11, two end rods 12, a single pressure rod 13, a single pressure pad 14 and a single plug block 15. The top plate 1 is connected to the chemical bolts on the roof through the installation hole 2 and tightened with nuts.

[0044] The pipe is placed in the rubber pad 5 of the pipe rack 4, the end head 9 is lifted upwards by the paddle 11, the stop rod 8 is retracted upwards, the spring 10 is compressed, the end rod 12 is stuck in the groove 7, and then the stop rod 8 is reset. The front side of a pressure rod 13 is fixedly connected with an insert block 15 and is inserted into the front side of another corresponding pressure rod 13. The bottom surface of the pressure rod 13 is detachably connected with a pressure pad 14, which presses the pipe just placed, thereby supporting the pipe from below and positioning it from above.

[0045] Compared with the prior art, the present invention has the following beneficial effects:

[0046] The air conditioning duct installation structure of the clean air conditioning system improves the structure of the hanger 3 of the installation frame through the coordinated arrangement of the top plate 1, the hanger 3, the pipe rack 4, the groove 7, the baffle rod 8, the end 9, the spring 10, the paddle 11, the end rod 12, the pressure rod 13, the pressure pad 14, and the plug block 15. After the space air duct installation frame is installed on the roof through the chemical bolts, the baffle rod 8 is lifted up at the groove 7, the spring 10 is compressed, the end rod 12 is stuck in the groove 7, the end rod 12 is locked in the groove 7, the top surface of the end rod 12 abuts against the top surface of the inner side of the groove 7, and then the baffle rod 8 is reset, the pressure pad 14 on the bottom surface of the pressure rod 13 abuts against the top surface of the pipeline, the end of the pressure rod 13 has a plug block 15 and is inserted with the corresponding pressure rod 13 of another group, and the X-shaped stable upper positioning structure of the pipeline can be quickly formed in a horizontal insertion manner, without the need for a complicated installation form, and the rapid construction of the pipeline rack can be completed;

[0047] The rubber pad 5 on the inner side of the pipe rack 4 and the pressure pad 14 on the bottom surface of the pressure rod 13 are both replaceable and can be replaced with other thicknesses to adapt to the installation and positioning of air ducts with different pipe diameters.

Claims

1. An air conditioning duct installation structure for a clean air conditioning system, characterized in that: It comprises a top plate (1), mounting holes (2), a hanger (3), and a pipe rack (4); the top plate (1) is provided with a plurality of mounting holes (2); the bottom of the top plate (1) is fixedly connected to the hanger (3); the bottom end of the hanger (3) is fixedly connected to the pipe rack (4); and the pipe rack (4) is semi-annular; The inner side of the pipe rack (4) is detachably connected with a rubber pad (5), and the top plates (1) of different groups are connected via a crossbeam (6); A groove (7) is provided in the middle of the hanger (3); a stopper (8) is movably connected inside the hanger (3); a terminal (9) is fixedly connected to the bottom end of the stopper (8); and a spring (10) is fixedly connected between the top of the terminal (9) and the top surface of the inner side of the groove (7); A plectrum (11) is fixedly connected to one side of the end head (9), and the bottom surface of the end head (9) abuts against the bottom surface of the inner side of the groove (7); An end rod (12) is clamped between the groove (7) and the blocking rod (8); the end rod (12) is bent; the end of the end rod (12) is fixedly connected to a pressure rod (13); the bottom of the pressure rod (13) is detachably connected to a pressure pad (14); the top surface of the end rod (12) abuts against the top surface of the inner side of the groove (7); The front side of the pressure rod (13) is fixedly connected with an insert block (15) and is inserted into the front side of another corresponding pressure rod (13).

2. The air conditioning duct installation structure of the clean air conditioning system according to claim 1, characterized in that: The top plate (1) is welded to the hanger (3), and the pipe rack (4) is bonded to the rubber pad (5).

3. The air conditioning duct installation structure of the clean air conditioning system according to claim 2, characterized in that: The top plate (1) and the cross beam (6) are welded, and the groove (7) is closed by a stop rod (8) and an end head (9).

4. The air conditioning duct installation structure of the clean air conditioning system according to claim 3, characterized in that: The blocking rod (8) is arranged vertically, and the end head (9) is welded to the paddle (11).

5. The air conditioning duct installation structure of the clean air conditioning system according to claim 4, characterized in that: The end rod (12) and the pressure rod (13) are welded as one body, the bending angle of the end rod (12) is ninety degrees, and one side of the end rod (12) abuts against the inner side of the hanger (3).

6. The air conditioning duct installation structure of the clean air conditioning system according to claim 5, characterized in that: The cross-sectional shape of the pressure rod (13) is V-shaped, the material of the pressure pad (14) is rubber, and the pressure pad (14) is bonded to the bottom surface of the pressure rod (13).

7. The air conditioning duct installation structure of the clean air conditioning system according to claim 6, characterized in that: The pressure pad (14) is pressed against the top surface of the corresponding air conditioning duct.